CN206668323U - Mining filling water draw-off - Google Patents

Mining filling water draw-off Download PDF

Info

Publication number
CN206668323U
CN206668323U CN201720498023.9U CN201720498023U CN206668323U CN 206668323 U CN206668323 U CN 206668323U CN 201720498023 U CN201720498023 U CN 201720498023U CN 206668323 U CN206668323 U CN 206668323U
Authority
CN
China
Prior art keywords
filling
water
collecting container
mining
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720498023.9U
Other languages
Chinese (zh)
Inventor
尹国光
王照亚
张忠辉
郭建民
李纪玉
李腾
王攀志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine
Original Assignee
Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine filed Critical Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine
Priority to CN201720498023.9U priority Critical patent/CN206668323U/en
Application granted granted Critical
Publication of CN206668323U publication Critical patent/CN206668323U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

Dug up mine the utility model discloses one kind and fill water draw-off, including some hollow collecting containers(1), the collecting container(1)Surface offers spilled water hole(1‑1), described collecting container(1)Between pass through aqueduct(2)It is connected to form the collection water assembly for being used for being arranged in mining excavation;Also include being used to close mining excavation to form the filling board wall of filling space(4), and one end is connected with collection water assembly, the other end passes through filling board wall(4)So that the water collected in water assembly to be directed to the outlet pipe outside mining excavation(3).The utility model not only increases sluicing efficiency and pack effectiveness, and can effectively avoid water draw-off from influenceing Tight filling, improves filling quality.

Description

Mining filling water draw-off
Technical field
It the utility model is related to a kind of water draw-off for filling area of digging up mine.
Background technology
At present, the sluicing mode of known slush mining codes obturation is to set up return pipe to sluice, and is had a disadvantage in that: (1)Runoff area is small, cause in filling space sluice the time it is longer, pack effectiveness is low;(2)Because return pipe is erected at filling face Top, influences Tight filling effect, and filling quality is poor.
Utility model content
Dug up mine the utility model proposes one kind and fill water draw-off, the purpose is to:(1)Improve sluicing efficiency and filling is imitated Rate;(2)Improve Tight filling effect, improve filling quality.
Technical solutions of the utility model are as follows:
One kind mining filling water draw-off, including some hollow collecting containers, the collecting container surface offer Spilled water hole, it is connected by aqueduct between described collecting container to form the group of catchmenting for being used for being arranged in mining excavation Part;
Also include being used to close mining excavation to form the filling board wall of filling space, and one end is connected with collection water assembly The logical, other end passes through filling board wall so that the water collected in water assembly to be directed to the outlet pipe outside mining excavation.
Further improvement as the present apparatus:The collecting container is spherical.
Further improvement as the present apparatus:The collecting container is coated with drainage geotextile layer.
Further improvement as the present apparatus:The collecting container is provided with support frame.
Further improvement as the present apparatus:The hanging for also including being used to collecting container being arranged in mining excavation fills Put.
Further improvement as the present apparatus:The erecting by overhang is iron wire.
Relative to prior art, the utility model has the positive effect that:(1)It is evenly arranged in more in filling space Individual collecting container catchments simultaneously, and runoff area is big, improves sluicing efficiency and pack effectiveness;(2)It instead of by collecting container The tapping pipe being arranged at the top of filling area, avoiding water draw-off influences Tight filling, improves filling quality;(3)By iron The erectings by overhang such as silk, set collecting container by the way of being evenly arranged, and can not only increase collection water spot and runoff area, also simultaneously Avoid and continuous, the non-fill area of large area formed in filling space, it is ensured that the intensity of filling space, reduce by Cause the possibility of slump in reserved sluicing space;(4)Collecting container has big surface area, uniform force and interior to be spherical The runny advantage of portion's water;(5)Collecting container is spherical, and using suspending way installation, material impact collection when avoiding filling Water receptacle is allowed to assemble, and causes the non-filling space of continuous large-area to occur, then causes slump;(6)On collecting container High intensity macromolecule support frame is additionally provided with, the water capacity of receiving of collecting container has been effectively ensured;(7)Collecting container is coated with filter Water geotextile layer, attal can be avoided to block spilled water hole;(6)Aqueduct and outlet pipe use hard tubing, can not only Enough ensure that water guide is smooth, and can also play a part of positioning collecting container, further avoid collecting container from assembling.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of specific embodiment.
Fig. 2 is the structural representation of the cross-wise direction of specific embodiment.
Fig. 3 is the structural representation of collecting container.
Embodiment
Describe the technical solution of the utility model in detail below in conjunction with the accompanying drawings:
Such as Fig. 1 and 2, one kind mining filling water draw-off, including some hollow collecting containers 1, such as Fig. 3, the collection Water receptacle 1 is spherical rubber buoy, and the surface of collecting container 1 offers spilled water hole 1-1, the outer cladding of collecting container 1 There is drainage geotextile layer 1-2, prevent attal from blocking spilled water hole 1-1;High intensity macromolecule is additionally provided with the collecting container 1 Support frame.
Such as Fig. 1, it is connected between described collecting container 1 by aqueduct 2 and is used to be arranged in mining excavation to form Collection water assembly;
The mining filling water draw-off also includes being used to close mining excavation to form the filling board wall 4 of filling space, And one end is connected with collection water assembly, the other end passes through filling board wall 4 so that the water collected in water assembly is directed at outside mining excavation Outlet pipe 3.
Such as Fig. 2, described mining filling water draw-off also includes being used to collecting container 1 being arranged on hanging in mining excavation Hang device, preferably hung using iron wire 5, avoid collecting container 1 during filling from assembling.
The aqueduct 2 and outlet pipe 3 are plastic tube, and it can not only water guide, moreover it is possible to aid in erecting by overhang to fix each The position of collecting container 1.
Such as Fig. 1 to 3, the method and step to be sluiced using above-mentioned mining filling water draw-off is:
(A)After mining excavation is formed, collecting container 1, the part of collecting container 1 are evenly arranged in space to be filled Ground is arranged in, a part is hung in space to be filled by iron wire 5;
(B)Each collecting container 1 is connected using aqueduct 2, forms collection water assembly;
(C)The one end of outlet pipe 3 is connected with a collecting container 1;
(D)Arrangement filling board wall 4, and make the other end of outlet pipe 3 through filling board wall 4;
(E)Filled, the water in filling space enters collecting container 1 by spilled water hole 1-1, then by aqueduct 2, The collecting container 1 and outlet pipe 3 being connected are directed at outside filling space.

Claims (6)

1. mining filling water draw-off, it is characterised in that:Including some hollow collecting containers(1), the collecting container(1) Surface offers spilled water hole(1-1), described collecting container(1)Between pass through aqueduct(2)It is connected and is used to set to form Collection water assembly in mining excavation;
Also include being used to close mining excavation to form the filling board wall of filling space(4), and one end with collection water assembly be connected The logical, other end passes through filling board wall(4)So that the water collected in water assembly to be directed to the outlet pipe outside mining excavation(3).
2. mining filling water draw-off as claimed in claim 1, it is characterised in that:The collecting container(1)To be spherical.
3. mining filling water draw-off as claimed in claim 1, it is characterised in that:The collecting container(1)It is coated with filter Water geotextile layer(1-2).
4. mining filling water draw-off as claimed in claim 1, it is characterised in that:The collecting container(1)It is provided with support Skeleton.
5. the mining filling water draw-off as described in Claims 1-4 is any, it is characterised in that:Also include being used to that the water capacity will to be collected Device(1)Erecting by overhang in mining excavation.
6. mining filling water draw-off as claimed in claim 5, it is characterised in that:The erecting by overhang is iron wire(5).
CN201720498023.9U 2017-05-08 2017-05-08 Mining filling water draw-off Active CN206668323U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720498023.9U CN206668323U (en) 2017-05-08 2017-05-08 Mining filling water draw-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720498023.9U CN206668323U (en) 2017-05-08 2017-05-08 Mining filling water draw-off

Publications (1)

Publication Number Publication Date
CN206668323U true CN206668323U (en) 2017-11-24

Family

ID=60370622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720498023.9U Active CN206668323U (en) 2017-05-08 2017-05-08 Mining filling water draw-off

Country Status (1)

Country Link
CN (1) CN206668323U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044297A (en) * 2017-05-08 2017-08-15 山东黄金矿业(莱州)有限公司焦家金矿 Mining filling water draw-off and sluicing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044297A (en) * 2017-05-08 2017-08-15 山东黄金矿业(莱州)有限公司焦家金矿 Mining filling water draw-off and sluicing method

Similar Documents

Publication Publication Date Title
CN107297358A (en) A kind of exploitation of mineral resources mineral surface cleaning equipment
CN208605228U (en) A kind of mine laneway top plate seepage drainage device
CN106702182B (en) A kind of recovery system of re dip solution
CN206668323U (en) Mining filling water draw-off
CN105672250B (en) A kind of diaphram wall and underwater concrete tongue and groove bindiny mechanism and construction method
CN107044297A (en) Mining filling water draw-off and sluicing method
CN209100088U (en) A kind of used fault belt drainage arrangement of constructing tunnel
CN201173134Y (en) Cemented filling device
CN206522154U (en) A kind of subway tunnel drainage equipment
CN106640082B (en) A kind of system improving rare earth yield and the Rare-earth Mine liquor collecting system using it
CN205012325U (en) Prefabricated precipitation tubular pile in building foundation
CN207228279U (en) A kind of sinking greenery patches structure
CN208040449U (en) Automatic structure that drains in colliery gas drainage system negative pressure side
CN108643968B (en) A kind of waterpower filling auxiliary support apparatus of the mining on sluicing water collector
CN211007353U (en) PE pipe capable of automatically draining water through siphon effect
CN209557038U (en) Back water drenching drainage device
CN209457113U (en) A kind of rainwater collection utilization unit in sponge city
CN203530963U (en) Counter weight method cage floating prevention device
CN202822986U (en) Solid-liquid separation and settlement device
CN106869283A (en) A kind of speed oozes formula rainwater treatment method
CN108316971A (en) Automatic water discharging structure and method for negative pressure side of coal mine gas extraction system
CN105716330B (en) The water-collecting return unification well construction that a kind of screen pipe moves down
CN207512742U (en) A kind of pipe-line system for the downward pumping concrete of deep basal pit
CN205718073U (en) The water-collecting return unification well construction that a kind of screen pipe moves down
CN105201431B (en) A kind of coal and water separate system and its separation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant