CN206663469U - A kind of special concrete slab of Construction of Civil Engineering pours device - Google Patents

A kind of special concrete slab of Construction of Civil Engineering pours device Download PDF

Info

Publication number
CN206663469U
CN206663469U CN201720389283.2U CN201720389283U CN206663469U CN 206663469 U CN206663469 U CN 206663469U CN 201720389283 U CN201720389283 U CN 201720389283U CN 206663469 U CN206663469 U CN 206663469U
Authority
CN
China
Prior art keywords
civil engineering
construction
concrete slab
concrete
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720389283.2U
Other languages
Chinese (zh)
Inventor
宣鹏
庞成山
李凌杰
邓海博
袁海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720389283.2U priority Critical patent/CN206663469U/en
Application granted granted Critical
Publication of CN206663469U publication Critical patent/CN206663469U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

It the utility model is related to technical field of civil engineering, more particularly to a kind of special concrete slab of Construction of Civil Engineering pours device, including bottom plate, the upper center of the bottom plate is provided with tank, the side of the tank is provided with delivery port, is provided with several support bases in the tank, concrete-pouring template is connected with the support base, the both sides of the bottom plate are equipped with chute, and workbench is connected with by sliding block on the chute.The utility model proposes a kind of special concrete slab of Construction of Civil Engineering pour device and be provided with the tank of moistening can be always maintained to concrete-pouring template, avoid the phenomenon that surface after concrete slab is molded produces pitted skin, and automation is carried out to concrete there is provided machine and vibrated, there is provided the elastic doctor blade that wiper can be carried out to post surface of vibrating simultaneously, in order to avoid concrete influences effect of vibrating in its surface solidification, vibrate more uniformly, it is more efficient.

Description

A kind of special concrete slab of Construction of Civil Engineering pours device
Technical field
It the utility model is related to technical field of civil engineering, more particularly to the concrete slab that a kind of Construction of Civil Engineering is special Pour device.
Background technology
Concrete slab, formed moulding in concrete slurry casting to template, be building construction and various engineering knots Basic structure or component in structure, are commonly used for roof system, superstructure, platform, wall, retaining wall, basis, terrace, road surface, pond etc., should Extremely wide with scope, concrete slab is divided into square plate, plectane and sketch plate by flat shape, and the thickness of plate should meet strength and stiffness It is required that existing concrete slab pours device, most of using manually being vibrated to concrete, efficiency is low, and effect is not Ideal, due to uneven to vibrating for concrete, and concrete vibrating mechanism surface can be pasted with a small amount of concrete unavoidably when vibrating, when long Between go down this part concrete in its surface solidification, influence quality of vibrating, if while the wooden template that uses do not moisten processing, It or plank is excessively dried during pouring, can cause the concrete slab of manufacture uneven, and easily produce pitted skin, shadow Ring construction effect, and product quality.
Utility model content
The purpose of this utility model is to solve the problems, such as that a kind of civil engineering for carrying and proposing in background technology is applied The concrete slab of working platform pours device.
To achieve these goals, the utility model employs following technical scheme:
Design a kind of special concrete slab of Construction of Civil Engineering and pour device, including bottom plate, in the top of the bottom plate Portion is provided with tank, and the side of the tank is provided with delivery port, is provided with several support bases in the tank, connects on the support base It is connected to concrete-pouring template, the both sides of the bottom plate are equipped with chute, and workbench is connected with by sliding block on the chute, Each workbench is provided with hydraulic cylinder, and two hydraulic cylinders are connected to stripe board, the bar shaped by hydraulic stem The bottom surface of plate is respectively positioned on the surface of concrete-pouring template, the bar provided with several posts that vibrate, each post that vibrates The lower section of shape plate is provided with fixed plate, and the both ends of the fixed plate are fixed on two workbenches by support bar, the fixation Plate be provided with the one-to-one through hole of the post that vibrates, be equipped with elastic doctor blade, the workbench connection in each through hole There is delivery device.
Preferably, the delivery device includes cylinder, push rod, and the cylinder is connected with push rod, and the push rod is flat with work Platform connects, and the cylinder is on bottom plate.
Preferably, the post that vibrates is the smooth metallic rod in surface, and diameter is between 30 millimeters to 50 millimeters.
Preferably, the post that vibrates is threadedly coupled with stripe board.
The utility model proposes a kind of special concrete slab of Construction of Civil Engineering pour device, beneficial effect is: The special concrete slab of the Construction of Civil Engineering pours device and is provided with the water that moistening can be always maintained to concrete-pouring template Groove, surface produces the phenomenon of pitted skin after avoiding concrete slab shaping, and carries out automation to concrete there is provided machine and vibrate, Simultaneously there is provided the elastic doctor blade that wiper can be carried out to post surface of vibrating, in case concrete influences effect of vibrating in its surface solidification Fruit, vibrate more uniformly, it is more efficient.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of special concrete slab of Construction of Civil Engineering pour the front view of device;
Fig. 2 be the utility model proposes a kind of special concrete slab of Construction of Civil Engineering pour device pushing mechanism Side view;
Fig. 3 be the utility model proposes a kind of special concrete slab of Construction of Civil Engineering pour the knot of device fixed plate Structure schematic diagram.
In figure:Sliding block 1, workbench 2, hydraulic cylinder 3, hydraulic stem 4, stripe board 5, cylinder 6, push rod 7, vibrate post 8, water outlet Mouth 9, support base 11, chute 12, tank 13, concrete-pouring template 14, fixed plate 15, through hole 16, elastic doctor blade 17, support bar 18。
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.
Reference picture 1-3, a kind of special concrete slab of Construction of Civil Engineering pour device, including bottom plate 10, bottom plate 10 Upper center is provided with tank 13, and the side of tank 13 is provided with delivery port 9, several support bases 11, support base are provided with tank 13 It is connected with concrete-pouring template 14 on 11, the both sides of bottom plate 10 are equipped with chute 12, and work is connected with by sliding block 1 on chute 12 Make platform 2, each workbench 2 is provided with hydraulic cylinder 3, and two hydraulic cylinders 3 are connected to stripe board 5, bar shaped by hydraulic stem 4 Provided with several posts 8 that vibrate, the post 8 that each vibrates is respectively positioned on the surface of concrete-pouring template 14, stripe board for the bottom surface of plate 5 5 lower section is provided with fixed plate 15, and the both ends of fixed plate 15 are fixed on two workbenches 2 by support bar 18, fixed plate 15 Be provided with the one-to-one through hole 16 of the post 8 that vibrates, be equipped with elastic doctor blade 17 in each through hole 16, workbench 2 is connected with Delivery device, delivery device include cylinder 6, push rod 7, and push rod 7 is connected with workbench 2, and cylinder 6 vibrates on bottom plate 10 Post 8 is the smooth metallic rod in surface, and between 30 millimeters to 50 millimeters, the post 8 that vibrates is threadedly coupled diameter with stripe board 5.
The utility model when in use, because concrete-pouring template 14 is in tank, remains liquid level in tank Higher than the floor height of concrete-pouring template 14, the moistening of wooden template is so remained in casting process, pours effect Fruit is more preferable, and the post 8 that vibrates set drives stripe board to pump in hydraulic cylinder, while cylinder 6 drives workbench 2 The motion of horizontal direction is done in chute 12, is so vibrated more uniformly, saves manpower, it is more efficient.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model Within enclosing.

Claims (4)

1. a kind of special concrete slab of Construction of Civil Engineering pours device, including bottom plate(10), it is characterised in that the bottom plate (10)Upper center be provided with tank(13), the tank(13)Side be provided with delivery port(9), the tank(13)Inside it is provided with Several support bases(11), the support base(11)On be connected with concrete-pouring template(14), the bottom plate(10)Both sides It is equipped with chute(12), the chute(12)On pass through sliding block(1)It is connected with workbench(2), each workbench(2) It is provided with hydraulic cylinder(3), two hydraulic cylinders(3)Pass through hydraulic stem(4)It is connected to stripe board(5), the stripe board(5) Bottom surface provided with several posts that vibrate(8), each post that vibrates(8)It is respectively positioned on concrete-pouring template(14)Just on Side, the stripe board(5)Lower section be provided with fixed plate(15), the fixed plate(15)Both ends pass through support bar(18)It is fixed on Two workbenches(2)On, the fixed plate(15)It is provided with and the post that vibrates(8)One-to-one through hole(16), it is each described Through hole(16)Inside it is equipped with elastic doctor blade(17), the workbench(2)It is connected with delivery device.
2. a kind of special concrete slab of Construction of Civil Engineering according to claim 1 pours device, it is characterised in that:Institute Stating delivery device includes cylinder(6), push rod(7), the cylinder(6)With push rod(7)Connection, the push rod(7)With workbench (2)Connection, the cylinder(6)Located at bottom plate(10)On.
3. a kind of special concrete slab of Construction of Civil Engineering according to claim 1 pours device, it is characterised in that:Institute State the post that vibrates(8)For the metallic rod that surface is smooth, diameter is between 30 millimeters to 50 millimeters.
4. a kind of special concrete slab of Construction of Civil Engineering according to claim 1 pours device, it is characterised in that:Institute State the post that vibrates(8)With stripe board(5)Threaded connection.
CN201720389283.2U 2017-04-14 2017-04-14 A kind of special concrete slab of Construction of Civil Engineering pours device Expired - Fee Related CN206663469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720389283.2U CN206663469U (en) 2017-04-14 2017-04-14 A kind of special concrete slab of Construction of Civil Engineering pours device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720389283.2U CN206663469U (en) 2017-04-14 2017-04-14 A kind of special concrete slab of Construction of Civil Engineering pours device

Publications (1)

Publication Number Publication Date
CN206663469U true CN206663469U (en) 2017-11-24

Family

ID=60381278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720389283.2U Expired - Fee Related CN206663469U (en) 2017-04-14 2017-04-14 A kind of special concrete slab of Construction of Civil Engineering pours device

Country Status (1)

Country Link
CN (1) CN206663469U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108098980A (en) * 2017-12-28 2018-06-01 四川建筑职业技术学院 A kind of assembled architecture component production mould
CN109914418A (en) * 2019-04-18 2019-06-21 中铁十七局集团第三工程有限公司 Concrete casting device
CN112157795A (en) * 2020-09-22 2021-01-01 湖南汇渠建筑科技有限公司 Assembly type building concrete pouring device based on BIM

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108098980A (en) * 2017-12-28 2018-06-01 四川建筑职业技术学院 A kind of assembled architecture component production mould
CN109914418A (en) * 2019-04-18 2019-06-21 中铁十七局集团第三工程有限公司 Concrete casting device
CN112157795A (en) * 2020-09-22 2021-01-01 湖南汇渠建筑科技有限公司 Assembly type building concrete pouring device based on BIM

Similar Documents

Publication Publication Date Title
CN206663469U (en) A kind of special concrete slab of Construction of Civil Engineering pours device
CN204435234U (en) A kind of highway bridge maintenance spray equipment
CN210791388U (en) Cement product forming machine
CN210767805U (en) Structure is pour in construction of building
CN206438778U (en) The civil engineering even device of vibration
CN108019037A (en) Closed template
CN207224204U (en) A kind of porous shale brick molding machine
CN211499818U (en) Automatic watering device of construction concrete
CN208965373U (en) Concrete road pouring vibration platform with adjustable length and gradient
CN106182362B (en) A kind of die assembly and its application for being used to make concrete slit floor
CN205969480U (en) Can dismantle reinforcement fetal membrane frame
CN209211873U (en) A kind of new concrete construction formwork
CN108044771A (en) One kind makes brick equipment
CN201168996Y (en) Gridding cloth press-in device for gypsum decorative line
CN209277004U (en) The hyperbola abnormal shape pier steel form of speed of application can be improved
CN207240452U (en) A kind of mould for foam concrete partition plate verticle mould shaping
CN208309391U (en) A kind of moveable concrete distributing device
CN207863189U (en) A kind of secondary structure metope leak-proof device
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN208934292U (en) A kind of precast stair
CN209397511U (en) A kind of device of evenly dispersed casting concrete
CN209704015U (en) A kind of stair aluminum alloy mould plate closed cover with the mouth that vibrates
CN207582939U (en) A kind of Shimizu concrete template aluminium frame
CN207296427U (en) A kind of knockdown concrete vibrating device
CN206016201U (en) A kind of filling type wall, ground fast spreading system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171124

Termination date: 20210414