- Publication number
- CN206655083U CN206655083U CN201720293327.1U CN201720293327U CN206655083U CN 206655083 U CN206655083 U CN 206655083U CN 201720293327 U CN201720293327 U CN 201720293327U CN 206655083 U CN206655083 U CN 206655083U
- Authority
- CN
- China
- Prior art keywords
- brick
- monomer
- permeable
- floor slab
- aqueduct
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a kind of permeable floor slab structure of town road, including surface layer, the upper end of the metalling is equipped with concrete layer, the upper end of the concrete layer is equipped with brick body layer, brick body layer is made up of the splicing of monomer brick, it is equidistant between monomer brick and monomer brick that three groups of aqueducts are at least installed, and the lower end of aqueduct is through concrete layer and metalling and water passage, the side of the monomer brick is provided with inserting column, and the opposite side of monomer brick offers and the one-to-one spliced eye of inserting column.The permeable floor slab structure of the town road, a part of water is introduced by sewer by aqueduct, another part water under permeable hole by oozing, aqueduct and permeable hole coordinate, substantially increase drainage efficiency, the service life on road surface is substantially increased, while improves the security of pedestrian, is adapted to large-scale promotion.
Description
Technical field
Town road technical field is the utility model is related to, specially a kind of permeable floor slab structure of town road.
Background technology
When being related to drainage system or flood control, and a part of draining or flood control works.Urban road is basic
On be among city, county, cities and towns, link up residential area, shopping centre, factory, enterprise, office, the traffic between school, pavement-height
Normally close to neighbouring ground, largely road surface and neighbour's runoff need to be excluded by system.The effect of water discharger for road, it is to arrange rapidly
Except road surface, surface runoff and various municipal wastewaters, ponding is prevented, too high level of ground water is reduced and excludes to penetrate into road surface structare layer
And the water of roadbed, to ensure subgrade stability, extend pavement life, maintain vehicle and the normal traffic and safety of pedestrian,
And make road neatly hygienic.Therefore, should be with the unified consideration of urban drainage planning to urban road drainage.Urban road drainage has
Systematicness, it is complex, separate system and combined system can be divided into(See run-off system).The design storm return period of urban road drainage
And enter the run-off of drainage system, calculated by drainage system requirement and relevant formula.The road in the original old city of China
Road draining substantially belongs to combined system, in recent years newly-built, enlarging area gradually increasing using separate system, road drainage mode,
There are Ming Dynasty style, dark formula and hybrid.
Wherein pavement is also the important component of town road, in traditional pavement, is also had using permeable paving
Build pavement structure, the top of traditional permeable floor slab structure be brick body layer, is to turn laying by monomer to form, but monomer turn and
There is no ruggedized construction between monomer brick, the stability for causing brick body layer overall is poor, and service life is low, and traditional permeable paves
Pavement structure, drainage efficiency are low, it is therefore desirable to improve.
Utility model content
The purpose of this utility model is to provide a kind of town road permeable floor slab structure, to solve above-mentioned background skill
The problem of being proposed in art.
To achieve the above object, the utility model provides following technical scheme:A kind of permeable floor slab knot of town road
Structure, including surface layer, the laid inside of the surface layer have sewer, and the surface layer top is equipped with metalling, described broken
The upper end of rock layers is equipped with concrete layer, and the upper end of the concrete layer is equipped with brick body layer, and brick body layer is spelled by monomer brick
Composition is connect, it is equidistant between monomer brick and monomer brick that three groups of aqueducts are at least installed, and the lower end of aqueduct is through coagulation
Soil layer and metalling and water passage, the side of the monomer brick are provided with inserting column, and the opposite side of monomer brick offer with
The one-to-one spliced eye of inserting column.
Preferably, the outside of the aqueduct offers permeable hole, and each monomer vertically on the matrix of monomer brick
At least offer eight permeable holes on the matrix of brick vertically, and permeable hole is evenly distributed setting.
Preferably, the upper end of the monomer brick is provided with non-slip bumps, and non-slip bumps are set for half elliptic.
Compared with prior art, the beneficial effects of the utility model are:The permeable floor slab structure of the town road, the knot
Structure uses on pavement, a part of water is introduced into sewer by aqueduct, another part water under permeable hole by oozing, aqueduct
Coordinate with permeable hole, substantially increase drainage efficiency, when rainwater under permeable hole by oozing, because the caching of metalling acts on, prevent
Only collapse, while ensureing that drainage efficiency is high, prevent road collapsion;Brick body layer spliced by multiple monomer brick head and the tail grafting and
Into having greatly reinforced the overall stability of brick body layer, substantially increased the service life on road surface.The town road is permeable to be paved
Pavement structure, a part of water is introduced by sewer by aqueduct, another part water under permeable hole by oozing, aqueduct and permeable
Hole coordinates, and substantially increases drainage efficiency, substantially increases the service life on road surface, while improves the security of pedestrian, fits
Close large-scale promotion.
Brief description of the drawings
Fig. 1 is the utility model structure main view sectional drawing;
Fig. 2 is the utility model structure top view;
Fig. 3 is the utility model structures alone brick top view.
In figure:1 surface layer, 2 sewers, 3 metallings, 4 concrete layers, 5 brick body layers, 51 monomer bricks, 511 aqueducts, 512
Inserting column, 513 spliced eyes, 514 permeable holes, 6 non-slip bumps.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of permeable floor slab structure of town road,
Including surface layer 1, the laid inside of the surface layer 1 has sewer 2, and the top of surface layer 1 is equipped with metalling 3, described
The upper end of metalling 3 is equipped with concrete layer 4, and the upper end of the concrete layer 4 is equipped with brick body layer 5, and brick body layer 5 is by list
The splicing composition of body brick 51, it is equidistant between monomer brick 51 and monomer brick 51 that three groups of aqueducts 511, and aqueduct are at least installed
511 lower end connects through concrete layer 4 and metalling 3 with sewer 2, and the side of the monomer brick 51 is provided with inserting column
512, and the opposite side of monomer brick 51 offers spliced eye 513 one-to-one with inserting column 512, the right-hand member of the monomer brick 51
Integrally formed with inserting column 512, the right-hand member of each monomer brick 51 is at least provided with two inserting columns 512, and inserting column 512 is in
Setting is uniformly distributed, the right-hand member of each monomer brick 51 is equipped with multiple inserting columns 512, and the right-hand member of inserting column 512 is equipped with tip,
Facilitate the laying of the inside, just brick body layer 5 of the right-hand member insertion spliced eye 513 of inserting column 512, brick body layer 5 is by multiple monomer bricks 51
Head and the tail grafting is spliced, and has greatly reinforced the overall stability of brick body layer 5, substantially increases the service life on road surface, and
The left side of monomer brick 51 offers spliced eye 513 one-to-one with inserting column 512.
Specifically, the outside of the aqueduct 511 offers permeable hole 514 vertically on the matrix of monomer brick 51, leads to
Cross aqueduct 511 and a part of water is introduced into sewer 2, another part water under permeable hole 514 by oozing, aqueduct 511 and permeable
Hole 514 coordinates, and substantially increases drainage efficiency.
Specifically, the upper end of the monomer brick 51 is integrally formed with non-slip bumps 6, and non-slip bumps 6 are half elliptic
Set, while preventing road from sliding causes the pedestrian to slip, do not damage the shoes of pedestrian.
The permeable floor slab structure of the town road, the structure use on pavement, by aqueduct 511 by a part of water
Sewer 2 is introduced, another part water under permeable hole 514 by oozing, and aqueduct 511 and permeable hole 514 coordinate, the row of substantially increasing
Water efficiency, when rainwater under permeable hole 514 by oozing, because the caching of metalling 3 acts on, prevent from collapsing, ensureing drainage efficiency
While high, road collapsion is prevented;Brick body layer 5 is spliced by multiple head and the tail grafting of monomer brick 51, has greatly reinforced brick body layer 5
Overall stability, substantially increase the service life on road surface;Multiple permeable holes 514 substantially increase drainage efficiency;Each
The right-hand member of monomer brick 51 is equipped with multiple inserting columns 512, and brick body layer 5 is spliced by multiple head and the tail grafting of monomer brick 51, significantly
The overall stability of brick body layer 5 is strengthened, substantially increases the service life on road surface;The right-hand member of inserting column 512 is equipped with point
Head, facilitate the right-hand member of inserting column 512 to insert the inside of spliced eye 513, facilitate the laying of brick body layer 5;The upper end of monomer brick 51 is equal
Integrally formed with non-slip bumps 6, prevent road is slided from causing pedestrian to slip;Non-slip bumps 6 are set for half elliptic, prevent road is slided from causing
While pedestrian slips, the shoes of pedestrian are not damaged.Therefore the permeable floor slab structure of the town road, passes through aqueduct 511
A part of water is introduced into sewer 2, another part water under permeable hole 514 by oozing, and aqueduct 511 and permeable hole 514 coordinate, greatly
Drainage efficiency is improved greatly, substantially increases the service life on road surface, while improves the security of pedestrian, is adapted to push away on a large scale
Extensively.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (3)
1. a kind of permeable floor slab structure of town road, including surface layer(1), the surface layer(1)Laid inside have under
Water channel(2), it is characterised in that:The surface layer(1)Top is equipped with metalling(3), the metalling(3)Upper end be equipped with
Concrete layer(4), the concrete layer(4)Upper end be equipped with brick body layer(5), brick body layer(5)By monomer brick(51)Spell
Connect composition, monomer brick(51)With monomer brick(51)Between equidistant three groups of aqueducts are at least installed(511), and aqueduct
(511)Lower end through concrete layer(4)And metalling(3)With sewer(2)Connection, the monomer brick(51)Side set
There is inserting column(512), and monomer brick(51)Opposite side offer and inserting column(512)One-to-one spliced eye(513).
A kind of 2. permeable floor slab structure of town road according to claim 1, it is characterised in that:The aqueduct
(511)Outside in monomer brick(51)Matrix on offer permeable hole vertically(514), and each monomer brick(51)Matrix
On at least offer eight permeable holes vertically(514), and permeable hole(514)Be evenly distributed setting.
A kind of 3. permeable floor slab structure of town road according to claim 1, it is characterised in that:The monomer brick
(51)Upper end be provided with non-slip bumps(6), non-slip bumps(6)Set for half elliptic.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720293327.1U CN206655083U (en) | 2017-03-24 | 2017-03-24 | A kind of permeable floor slab structure of town road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720293327.1U CN206655083U (en) | 2017-03-24 | 2017-03-24 | A kind of permeable floor slab structure of town road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206655083U true CN206655083U (en) | 2017-11-21 |
Family
ID=60315704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720293327.1U Expired - Fee Related CN206655083U (en) | 2017-03-24 | 2017-03-24 | A kind of permeable floor slab structure of town road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206655083U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111549611A (en) * | 2020-05-21 | 2020-08-18 | 中建水务环保有限公司 | Method for repairing permeable function of permeable concrete pavement |
-
2017
- 2017-03-24 CN CN201720293327.1U patent/CN206655083U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111549611A (en) * | 2020-05-21 | 2020-08-18 | 中建水务环保有限公司 | Method for repairing permeable function of permeable concrete pavement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207259888U (en) | A kind of sponge urban road sinking greenbelt | |
CN203866663U (en) | Porous pavement structure | |
CN103590476B (en) | A kind of design and construction method alleviating the Low elevation greenbelt of waterlogging caused by excessive rain | |
CN205347914U (en) | Interlocking formula ecology concrete road surface brick that permeates water with water conservancy diversion hole | |
CN105970764B (en) | A kind of laying method of drainage pavement | |
CN206655083U (en) | A kind of permeable floor slab structure of town road | |
CN106087639A (en) | A kind of highway, Irish bridge structure and Irish bridge construction method | |
CN107964881A (en) | The method for arranging that a kind of peg board formula barricade is combined with culvert | |
CN206721596U (en) | A kind of pavement structure of permeable road | |
CN207469190U (en) | A kind of infitration galleries structure of efficient draining | |
CN206052915U (en) | A kind of rainwater water-retention suitable for footpath, bicycle lane is regulated and stored system | |
CN205741824U (en) | A kind of Pavement surface drainage system | |
CN209722651U (en) | A kind of water-permeable brick and its pavement with the water-permeable brick | |
CN106996063A (en) | A kind of pavement structure of permeable road | |
CN202989722U (en) | Permeable road kerb | |
CN203411895U (en) | Drainage facility for highway bridge floor | |
CN207435841U (en) | A kind of campus asphalt paving structure | |
CN206873225U (en) | A kind of novel garden road pavior brick | |
CN205839502U (en) | A kind of permeable road structure | |
CN216107914U (en) | Drainage brick for sponge urban sidewalk | |
CN111980131A (en) | Construction method for combining wooden plank road with sunken green land | |
CN214573097U (en) | Permeable sidewalk paving structure | |
CN205893848U (en) | Highway and ford structure | |
CN206143898U (en) | Rainwater permeation enhancing system of soft soil foundation | |
CN206127818U (en) | Sponge people from city moving walkways |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171121 Termination date: 20180324 |