CN206625575U - A kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut - Google Patents

A kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut Download PDF

Info

Publication number
CN206625575U
CN206625575U CN201720338749.6U CN201720338749U CN206625575U CN 206625575 U CN206625575 U CN 206625575U CN 201720338749 U CN201720338749 U CN 201720338749U CN 206625575 U CN206625575 U CN 206625575U
Authority
CN
China
Prior art keywords
elephant trunk
main
gamut
cloth
aggregate bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720338749.6U
Other languages
Chinese (zh)
Inventor
赵忠杨
于科
陈前钟
乔元亮
张爱军
赵海峰
董森
李应心
冯善中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201720338749.6U priority Critical patent/CN206625575U/en
Application granted granted Critical
Publication of CN206625575U publication Critical patent/CN206625575U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Reciprocating Pumps (AREA)

Abstract

It the utility model is related to a kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut.This exempts from the elephant trunk system for pumping the quick cloth concrete of gamut, including a drain hopper, the one main elephant trunk being obliquely installed and several rotary distributing devices being connected with main elephant trunk being connected with drain hopper, main elephant trunk includes some sections of steel pipes, a distributor gear is provided between two sections of adjacent steel pipes, the distributor gear includes an aggregate bin, the end for forming adjacent two sections of steel pipes of main elephant trunk is stretched into aggregate bin from the both sides of aggregate bin respectively, the two sections of main elephant trunk steel pipes stretched into each aggregate bin are connected by a dismountable connecting pipe, the bottom of the aggregate bin is connected by a distribution supervisor with rotary distributing device.This exempts from the elephant trunk system for pumping the quick cloth concrete of gamut, it is rational in infrastructure, realize cloth successively from top to bottom, convenient use, use range are wide, pour low cost, flexible rotation, easy to operate, and efficiency of construction is high and can realize gamut cloth.

Description

A kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut
Technical field
It the utility model is related to a kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut.
Background technology
It is big under complex environment with the construction of current domestic city center landmark building and the design of big thickness raft plate Volume concrete fast pouring problem particularly highlights.At present, conventional casting of concrete in mass method has pumping, chute and slipped Pipe construction method, pumping need larger place, can not solve the restricted engineering raft board concrete in place and pour, and can produce Raw larger noise;Although chute can solve the problems, such as that place is limited, cost of manufacture is higher, and cloth is not convenient, often needs Benefit side is pumped, it is necessary to set up full hall support scaffolding in raft plate, the processing of subsequent construction process is complicated, and needs larger water Flat angle, can not solve low-angle concrete in the case of narrow field pours problem;Existing elephant trunk generally require with move back with Tear pipe open, the time length of moving cloth point and can not realize the quick cloth of gamut at complex operation, generally require reserved 50cm thickness Degree is poured by the way of pumping.
In actual construction, the situation of job site is often more complicated, and the job site passage of many projects is past Toward can the narrow or passage gradient it is too big, a large amount of concrete placement vehicles while current relatively difficult are caused, so as to be inconvenient to install Pump truck, pumping method are limited.Moreover, the narrow job site of passage will also tend to the problem of angle of arrival is small, along with chute Construction method often also needs to pump benefit side, and cloth and subsequent construction are all comparatively laborious, so, in the construction of many projects Scene is unsuitable for the construction method using pumping and chute.It is intensive that traditional elephant trunk casting method is generally utilized in main chute surrounding Set up several elephant trunks, concrete flows to branch elephant trunk from main elephant trunk and carries out cloth, and each cloth shots, which are required for setting up several, slips Groove, process complexity is set up, can not solve the problems, such as gamut cloth and influence speed of perfusion.In addition, traditional chute casting method can not Gamut cloth is realized, so as to realize that concrete exempts to pump, needs repeatedly to move in cloth, it is impossible to realize that gamut is fast Fast cloth, low construction efficiency.Therefore, needing a kind of convenient use, flexible rotation, easy to operate badly, efficiency of construction is high and can be real The elephant trunk system for exempting to pump the quick cloth concrete of gamut of existing gamut cloth.
The content of the invention
The utility model is in order to make up the deficiencies in the prior art, there is provided a kind of rational in infrastructure, convenient use, rotation spirit Living, easy to operate, efficiency of construction is high and can realize the elephant trunk for exempting to pump the quick cloth concrete of gamut of gamut cloth System, solve problems of the prior art.
The utility model is achieved by the following technical solution:
A kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut, including a drain hopper, one be connected with drain hopper The main elephant trunk being obliquely installed and several rotary distributing devices being connected with main elephant trunk, be provided with several in main elephant trunk bottom Support frame, the rotary distributing device are erected on support frame as described above, and the main elephant trunk includes some sections of steel pipes, adjacent two A distributor gear is equipped between Duan Gangguan, the distributor gear includes an aggregate bin, forms adjacent two sections of steel pipes of main elephant trunk End stretch into aggregate bin set from the both sides of aggregate bin respectively, the main elephant trunk steel pipe of two stretched into each aggregate bin section passes through One dismountable connecting pipe is connected, and the bottom of the aggregate bin is connected by a distribution supervisor with rotary distributing device.
The bottom of the drain hopper is connected by a buffer unit with the front end of main elephant trunk.
The buffer unit is connected including a top with drain hopper, the vertical tube of bottom lock setting, before the main elephant trunk End is welded in vertical tube side, and the junction of main elephant trunk and vertical tube is higher than vertical tube bottom.
A support platform is respectively equipped with the both sides of support frame bottom, the rotary distributing device, which includes being arranged on supporting, puts down Two material collecting barrels on platform, the top of the material collecting barrel are connected by a dispensing branch with distribution supervisor respectively, material collecting barrel Bottom is installed in support platform by an electric turntable respectively, and it is folding to be connected to one in the bottom of each material collecting barrel Distributor chute.
The folding distributor chute includes two sections of distributor chute bodies set diagonally downward along feed direction, two Both sides are respectively welded a fixation steel plate at the top of the adjacent both ends of distributor chute body, are equipped with least on each fixation steel plate Two fixation steel plate bolts hole, each fixation steel plate bolt hole of two folding chute both sides are fastenedly connected by a bolt respectively.
The both ends of the connecting pipe pass through ring flange and main elephant trunk fastener for connection respectively.
The beneficial effects of the utility model:This exempts from the elephant trunk system for pumping the quick cloth concrete of gamut, rational in infrastructure, Dismountable connecting pipe that connection is turned on main elephant trunk is provided with aggregate bin, whether needs cloth according to cloth shots successively from upper end To dismount connecting pipe and closure or open lower section elephant trunk, cloth successively from top to bottom is realized, convenient use, uses model Enclose it is wide, pour low cost, be flexible rotation, easy to operate, efficiency of construction is high and can realize gamut cloth.This exempts to pump full model Enclose the elephant trunk system of quick cloth concrete, noise is small, saves the energy, rationally utilizes place, influenceed by construction site it is small, each Cloth shots only need one distribution supervisor of design, set up conveniently, realize that complete concrete exempts to pump, solve and deposit in the prior art Many construction sites be unsatisfactory for construction problem using pumping, chute and traditional elephant trunk system.In addition, the elephant trunk system Buffer unit is provided between drain hopper and main elephant trunk, is realized at turning and does friction resistant material using concrete, avoids steel pipe curved Head is worn through, moreover, the making material of the elephant trunk system can be used in turn, good in economic efficiency, cost is low.Moreover, support frame For standard section of tower crane, it is few that peace tears fast speed, consumption manpower and machine resource open.
This exempts from the elephant trunk system for pumping the quick cloth concrete of gamut, and rotary distributing device can realize 360 ° of rotations, real Existing gamut non-blind area cloth, without pumping teeming, flexible material distribution can be achieved, a people can complete whole cloth work, Chute need not stop concreting when rotating, and can be achieved to work continuously, and accelerate concreting speed;Moreover, when a cloth After the completion of shots cloth, distributor chute and support platform are allocated and transported to next cloth point together and is installed, connected and cloth, is turned It is convenient to move.After distributor chute can be folded when running into barrier in use by, can be achieved more distances, mostly The cloth in footpath, reach the effect for exempting from pumping, adapt to the chute cloth under various complex working conditions, accelerate concrete flowing velocity.
Brief description of the drawings
The utility model is further described below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the mplifying structure schematic diagram of distributor gear in Fig. 1;
Fig. 3 is Fig. 2 top view;
Fig. 4 is the mplifying structure schematic diagram of distributor gear when connecting pipe is dismantled in Fig. 1;
Fig. 5 is Fig. 4 top view;
Fig. 6 is the mplifying structure schematic diagram in A portions in Fig. 1;
Fig. 7 is the mplifying structure schematic diagram of distributor chute in Fig. 1;
Fig. 8 is Fig. 7 top view;
Structural representation when Fig. 9 is Fig. 7 folded states.
In figure, 1, drain hopper, 2, main elephant trunk, 3, aggregate bin, 4, connecting pipe, 5, distribution supervisor, 6, ring flange, 7, vertical tube, 8th, support frame, 9, support platform, 10, material collecting barrel, 11, dispensing branch, 12, electric turntable, 13, distributor chute body, 14, fixed Steel plate, 15, fixation steel plate bolt hole, 16, bolt.
Embodiment
For the technical characterstic for illustrating this programme can be understood, below by embodiment, and with reference to accompanying drawing to this practicality It is new to be described in detail.
As shown in figures 1 to 9, the embodiment is exempted to pump the elephant trunk system of the quick cloth concrete of gamut, including a blowing The main elephant trunk 2 being obliquely installed and several rotary distributing devices being connected with main elephant trunk 2 that bucket 1, one is connected with drain hopper 1, Several support frames 8 are provided with the main bottom of elephant trunk 2, the rotary distributing device is erected on support frame as described above 8, the main elephant trunk 2 include some sections of steel pipes, and a distributor gear is equipped between two sections of adjacent steel pipes, and the distributor gear includes an aggregate bin 3, setting in aggregate bin 3 is stretched into the end for forming adjacent two sections of steel pipes of main elephant trunk 2 from the both sides of aggregate bin 3 respectively, stretches into every Two sections of main elephant trunk steel pipes in individual aggregate bin 3 are connected by a dismountable connecting pipe 4, and the bottom of the aggregate bin 3 passes through one Distribution supervisor 5 is connected with rotary distributing device;Dismountable connecting pipe 4 with the conducting connection of main elephant trunk 2 is provided with distributor gear, Connecting pipe 4 and closure or the main elephant trunk steel pipe of open lower section are dismounted according to whether cloth shots need cloth successively from upper end, is realized Cloth successively from top to bottom, two sections steel pipes, concrete are connected when this cloth shots do not need cloth with connecting pipe 4 Aggregate bin 3 is not passed through, when this cloth shots need cloth, saves main elephant trunk steel pipe after connecting pipe 4 is removed and under blocking so that mixed Solidifying soil is flow in aggregate bin 3, and will not save main elephant trunk steel pipe trickling downwards.The bottom of the drain hopper 1 is filled by a buffering Put and be connected with the front end of main elephant trunk 2.
The buffer unit includes a vertical tube 7 that top is connected with drain hopper 1, bottom lock is set, the main elephant trunk 2 Front end is welded in the side of vertical tube 7, and the junction of main elephant trunk 2 and vertical tube 7 is higher than the bottom of vertical tube 7;The He of drain hopper 1 of the elephant trunk system Buffer unit is provided between main elephant trunk 2, is realized at turning and does friction resistant material using concrete, avoids steel elbow from being ground Wear, improve the service life of the elephant trunk system.
A support platform 9 is respectively equipped with the both sides of the bottom of support frame 8, the rotary distributing device includes being arranged on support Two material collecting barrels 10 on platform 9, the top of the material collecting barrel 10 are connected by a dispensing branch 11 with distribution supervisor 5 respectively Logical, the bottom of material collecting barrel 10 is installed in support platform 9 by an electric turntable 12 respectively, in the lower part of each material collecting barrel 10 A folding distributor chute is not connected with;Each cloth shots are equipped with 2 material collecting barrels 10, and each material collecting barrel 10 can realize 180 ° of rotations Turn cloth, whole distribution device can realize 360 ° of rotations, and then accomplish gamut non-blind area cloth, can be real without pumping teeming Existing flexible material distribution, a people can complete whole cloth work, need not stop concreting when chute rotates, the company of can be achieved Continuous operation, accelerates concreting speed.
The folding distributor chute includes two sections of distributor chute bodies 13 set diagonally downward along feed direction, Both sides are respectively welded a fixation steel plate 14 at the top of the adjacent both ends of two distributor chute bodies 13, on each fixation steel plate 14 Provided with least two fixation steel plate bolts hole 15, each fixation steel plate bolt hole 15 of two folding chute both sides passes through a spiral shell respectively Bolt 16 is fastenedly connected;After the completion of a cloth shots cloth, distributor chute and support platform 9 are allocated and transported to next cloth shots together Installed, connected and cloth, the cloth of whole cloth shots can be achieved in convenient transfer, and making material is that building and machinery are normal It is relatively low with material, cost.When running into barrier in use, the distributor chute body 13 of lower end is revolved after bolt is unclamped Turn lifting, when the folding angles of distributor chute body 13, which reach, to be flowed out without prejudice to the concrete in chute, by bolt 16 again Tighten, put down the distributor chute body 13 of lower end after cut-through thing, fastening is re-started using bolt 16, you can continue into Row concrete distributing, reach the effect for exempting from pumping, adapt to the chute cloth under various complex working conditions, accelerate concrete flowing speed Degree.Folding distributor chute is engaged with rotary distributing device, and more distances, the cloth of more radiuses can be achieved, reach and exempt to pump Effect.
The both ends of the connecting pipe 4 pass through ring flange 6 and the main fastener for connection of elephant trunk 2 respectively.
In use, the elephant trunk system for exempting to pump the quick cloth concrete of gamut, tool are installed using following mounting process Body step is:
(1) support frame 8 is installed:According to the concrete condition of job site, processing and fabricating support frame 8, main stand machines Afterwards, in the upper weld safeguard structure of support frame 8, the progress after the completion of aggregate bin 3 is fixed, adjusts absolute altitude temporarily of support frame 8 is live Welding, the height of support frame 8 determine according to the height of distributor gear;
(2) processing installation support platform 9:After the completion of the processing and fabricating of support platform 9, it is fixed using bolt and is arranged on branch The both sides of the bottom of support 8;
(3) processing installation drain hopper 1:By the way of assembled spot welding, assembly carries out weld seam after the completion of checking expires drain hopper 1 Weldering, drain hopper 1 is installed according to the position of line setting;
(4) processing installation buffer unit:Buffer unit is that have two sections of steel pipe socket welds to form, and first carries out socket joint setting-out, Enter line number material after the completion of setting-out, finally welded;Buffer unit is connected with drain hopper using ring flange during installation, using common Bolt is symmetrically fastened;
(5) processing installation distributor gear:Distributor gear is made up of aggregate bin 3 and connecting pipe 4, and aggregate bin 3 is by welded steel plate Form, first carry out steel plate number material typesetting, then steel plate is cut, and subsequent assembled spot welding, weld seam full weld is finally carried out, in aggregate bin 3 Distribution supervisor 5, the termination of connecting pipe 4 weldering ring flange 6 are connected with bottom opening, distributor gear is arranged on the top of support frame 8;
(6) the main elephant trunk 2 between distributor gear is installed:After distributor gear installation, according between elephant trunk interface it is actual away from From determining elephant trunk length and to carry out elephant trunk installation, install from bottom to up, the both ends of elephant trunk steel pipe and connecting pipe 4 use method during installation Blue disk 6 is connected, and rubber pad is installed additional between ring flange 6;
(7) rotary distributing device is installed:Rotary distributing device is by the way of tower crane lifting, using pin and support frame 8 Installed;One electric turntable 12 is set respectively in support platform 9, and a fixed material collecting barrel 10, gathers materials on electric turntable 12 The top of bucket 10 is connected by a dispensing branch 11 with distribution supervisor 5 respectively;
(8) folding distributor chute is installed:Both sides are respectively welded at the top of the adjacent both ends of two distributor chute bodies 13 One fixation steel plate 14, two fixation steel plates 14 are fastenedly connected by multiple bolts 16, and folding distributor chute is arranged on material collecting barrel 10 bottom, is connected using flange;
Installation begins to use the elephant trunk system to carry out cloth after terminating, specifically used technological process is:
(1) profit pipe:With ring flange by the main plug at end part of elephant trunk 2, hopper is used to connect profit pipe mortar at distributor chute, puts Mortar carries out profit pipe, when mortar no longer falls in the whereabouts oral fluid face of drain hopper 1, stops blowing, checks whether pipeline has spillage Phenomenon, if then marking good position, repair welding and repairing are carried out after profit pipe mortar is released, after checking out elephant trunk system, by end Portion's ring flange is removed, and the rotated distribution device of mortar is flowed into the hopper placed in advance;
(2) blowing:Concrete carries out blowing after stirring, elder generation's slow play during blowing, then according to coagulation in distribution device Native mobility status adjusts dispensing speed, needs two cars or more cars to replace discharging during blowing, it is ensured that concrete is uninterrupted, reduces plugging Probability;
(3) cloth:When certain cloth shots needs cloth, the connecting pipe 4 in the distributor gear of front end is all connected, it is ensured that mixed Solidifying soil is not lost in front end flow velocity, and the main elephant trunk steel pipe in lower end in the distributor gear of required cloth is blocked up with flange disk seal, is kept away Exempt from concrete and flow to next cloth shots along main elephant trunk steel pipe;There is interval in each corresponding two distributor chutes of distributor gear, cloth When, it must then moisten pipe again more than 45 minutes when the intermittent time;
(4) pipe is washed:The main end of elephant trunk 2 is blocked using ring flange 6, discharged water, when water in the whereabouts oral fluid face of drain hopper 1 no longer During whereabouts, stop discharging water, end flange disk 6 is removed, the rotated distribution device of water is flowed into the hopper placed in advance.
This exempts from the elephant trunk system for pumping the quick cloth concrete of gamut, rational in infrastructure, convenient use, use range be wide, Low cost, flexible rotation, easy to operate is poured, efficiency of construction is high and can realize gamut cloth.And made an uproar in work progress Sound is small, saves the energy, rationally utilizes place, is influenceed by construction site small, solves and is unsatisfactory for using pump in existing construction technology Send, the construction site problem of chute and traditional elephant trunk system.Moreover, the making material of the elephant trunk system can have enough to meet the need:Drain hopper 1 Concrete or mortar can be used as to hang hopper and use after the completion of concreting;Main elephant trunk 2, distribution supervisor 5 are in concreting After the completion of can be used as basic point wall bushing processing or garbage shaft use;Support frame 8 can be direct after concreting completion Recovery;Rotary distributing device can be used for the moving cloth of later stage concreting, and good in economic efficiency, cost is low.Moreover, support frame 8 be standard section of tower crane, and it is few that peace tears fast speed, consumption manpower and machine resource open.
Part is not described in detail for the utility model, is the known technology of those skilled in the art of the present technique.Finally illustrate, with Upper embodiment is only to illustrate the technical solution of the utility model and unrestricted, although with reference to preferred embodiment to the utility model It is described in detail, it will be understood by those within the art that, the technical solution of the utility model can be repaiied Change or equivalent substitution, without departing from the objective and scope of technical solutions of the utility model, it all should cover in the utility model Right among.

Claims (6)

1. a kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut, it is characterized in that:Including a drain hopper, one and blowing The bucket connected main elephant trunk being obliquely installed and several rotary distributing devices being connected with main elephant trunk, are provided with main elephant trunk bottom Several support frames, the rotary distributing device are erected on support frame as described above, and the main elephant trunk includes some sections of steel pipes, in phase A distributor gear is equipped between two sections of adjacent steel pipes, the distributor gear includes an aggregate bin, forms adjacent the two of main elephant trunk Duan Gangguan end is stretched into aggregate bin from the both sides of aggregate bin set respectively, the main elephant trunk steel of two stretched into each aggregate bin section Pipe is connected by a dismountable connecting pipe, and the bottom of the aggregate bin is connected by a distribution supervisor with rotary distributing device.
2. a kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut according to claim 1, it is characterized in that:Institute The bottom for stating drain hopper is connected by a buffer unit with the front end of main elephant trunk.
3. a kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut according to claim 2, it is characterized in that:Institute State buffer unit include a top be connected with drain hopper, the vertical tube of bottom lock setting, the front end of the main elephant trunk is welded in perpendicular Pipe side, the junction of main elephant trunk and vertical tube are higher than vertical tube bottom.
4. a kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut according to claim 1, it is characterized in that: The both sides of support frame bottom are respectively equipped with a support platform, and the rotary distributing device includes two be arranged in support platform Material collecting barrel, the top of the material collecting barrel are connected by a dispensing branch with distribution supervisor respectively, and the bottom of material collecting barrel leads to respectively Cross an electric turntable to be installed in support platform, a folding distributor chute is connected in the bottom of each material collecting barrel.
5. a kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut according to claim 4, it is characterized in that:Institute Stating folding distributor chute includes two sections of distributor chute bodies set diagonally downward along feed direction, in two distributor chute sheets Both sides are respectively welded a fixation steel plate at the top of the adjacent both ends of body phase, and at least two fixation steel are equipped with each fixation steel plate Crab bolt hole, each fixation steel plate bolt hole of two folding chute both sides are fastenedly connected by a bolt respectively.
6. a kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut according to claim 1, it is characterized in that:Institute The both ends of connecting pipe are stated respectively by ring flange and main elephant trunk fastener for connection.
CN201720338749.6U 2017-03-31 2017-03-31 A kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut Expired - Fee Related CN206625575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720338749.6U CN206625575U (en) 2017-03-31 2017-03-31 A kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720338749.6U CN206625575U (en) 2017-03-31 2017-03-31 A kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut

Publications (1)

Publication Number Publication Date
CN206625575U true CN206625575U (en) 2017-11-10

Family

ID=60207688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720338749.6U Expired - Fee Related CN206625575U (en) 2017-03-31 2017-03-31 A kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut

Country Status (1)

Country Link
CN (1) CN206625575U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301416A (en) * 2018-04-20 2018-07-20 北京城建集团有限责任公司 Large volume, deep basal pit bottom rotary type appts. for transferring ready-mixed concrete and its application process
CN109230428A (en) * 2018-09-30 2019-01-18 中国水利水电第七工程局有限公司 A kind of packaged type concrete rotation material-distributing system
CN110834861A (en) * 2019-09-29 2020-02-25 中国一冶集团有限公司 Chute slope alignment method
CN112376567A (en) * 2020-11-05 2021-02-19 中国建筑土木建设有限公司 Large-volume concrete chute pouring system and construction method thereof
CN114029288A (en) * 2021-11-02 2022-02-11 中国建筑第八工程局有限公司 Chute method anti-blocking dredging system and construction method thereof
CN114059542A (en) * 2021-11-16 2022-02-18 中国建筑第七工程局有限公司 Unit assembled elephant trunk system
CN114808986A (en) * 2022-03-18 2022-07-29 中国建筑第八工程局有限公司 Double-shaft rotary chute equipment

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301416A (en) * 2018-04-20 2018-07-20 北京城建集团有限责任公司 Large volume, deep basal pit bottom rotary type appts. for transferring ready-mixed concrete and its application process
CN109230428A (en) * 2018-09-30 2019-01-18 中国水利水电第七工程局有限公司 A kind of packaged type concrete rotation material-distributing system
CN109230428B (en) * 2018-09-30 2023-12-29 中国水利水电第七工程局有限公司 Movable concrete rotary material distributing system
CN110834861A (en) * 2019-09-29 2020-02-25 中国一冶集团有限公司 Chute slope alignment method
CN110834861B (en) * 2019-09-29 2021-10-01 中国一冶集团有限公司 Chute slope alignment method
CN112376567A (en) * 2020-11-05 2021-02-19 中国建筑土木建设有限公司 Large-volume concrete chute pouring system and construction method thereof
CN114029288A (en) * 2021-11-02 2022-02-11 中国建筑第八工程局有限公司 Chute method anti-blocking dredging system and construction method thereof
CN114059542A (en) * 2021-11-16 2022-02-18 中国建筑第七工程局有限公司 Unit assembled elephant trunk system
CN114059542B (en) * 2021-11-16 2023-05-26 中国建筑第七工程局有限公司 Unit assembled chute system
CN114808986A (en) * 2022-03-18 2022-07-29 中国建筑第八工程局有限公司 Double-shaft rotary chute equipment

Similar Documents

Publication Publication Date Title
CN206625575U (en) A kind of elephant trunk system for exempting to pump the quick cloth concrete of gamut
CN109555539A (en) A kind of Tunnel Second Lining concrete trolley automatic pouring system
CN206233590U (en) A kind of rotatable quick distribution device for elephant trunk method concreting
CN211621596U (en) Rotary chute device for circular well breast wall concrete pouring
CN204212157U (en) Supper-fast buffering dichotomous concreting string pipe
CN209469875U (en) A kind of concrete pump pipe bending place support device
CN203403420U (en) Concrete vertical conveying pouring system
CN212866902U (en) Inclined three-way pipe for pouring concrete in funnel tank
CN206647110U (en) Tunnel pre-buried channel flow mounting structure
CN202628120U (en) Tunnel two-lining concrete construction trolley based material distributing device
CN207750651U (en) A kind of concrete pump pipe temporary blocking device
CN104344086B (en) Pipeline buttress device and using method
CN207210965U (en) A kind of continuous beam pin-connected panel end head formwork
CN217175793U (en) Movable assembly type box column grouting device
CN107130603B (en) It is a kind of to refute the construction method that assembling boom pours concrete waterborne using idle side
CN208201872U (en) A kind of improved simple self-made concrete elephant trunk
CN205999801U (en) A kind of Bridge Rotation Construction Technique overturn-preventing system
CN208040405U (en) A kind of tunnel double-lining trolley vault assembled secondary grouting system
CN104372796B (en) Supper-fast buffering dichotomous concreting string pipe and construction method thereof
CN210622331U (en) Pump pipe non-return device for preventing backflow of poured concrete
CN209440479U (en) Material distribution system
CN207862787U (en) A kind of pin-connected panel slideway
CN207660296U (en) A kind of precast concrete hanging apparatus
CN207110447U (en) A kind of Ribbed Bar shuttering supporting fastener
CN207130780U (en) A kind of inspection shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171110