CN206624443U - A kind of steel pipe loading apparatus and steel pipe transmission car - Google Patents

A kind of steel pipe loading apparatus and steel pipe transmission car Download PDF

Info

Publication number
CN206624443U
CN206624443U CN201720300569.9U CN201720300569U CN206624443U CN 206624443 U CN206624443 U CN 206624443U CN 201720300569 U CN201720300569 U CN 201720300569U CN 206624443 U CN206624443 U CN 206624443U
Authority
CN
China
Prior art keywords
steel pipe
coaster
loading apparatus
frame
pipe loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720300569.9U
Other languages
Chinese (zh)
Inventor
周朋
张�浩
杨春鹤
韩培
王欢
钟会军
孟大志
周波
童宗圣
杨志超
李鹏
王文远
赵尔峰
殷俊
周素博
赵彬
马永刚
孙乘育
黄树
顾成富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ordos Zhongbei Coal Chemical Industry Co Ltd
Original Assignee
Ordos Zhongbei Coal Chemical Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ordos Zhongbei Coal Chemical Industry Co Ltd filed Critical Ordos Zhongbei Coal Chemical Industry Co Ltd
Priority to CN201720300569.9U priority Critical patent/CN206624443U/en
Application granted granted Critical
Publication of CN206624443U publication Critical patent/CN206624443U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

A kind of steel pipe loading apparatus and steel pipe transmission car provided by the utility model, including frame, coaster and gear unit;The frame includes lifting orbital segment and upset orbital segment;The lifting orbital segment is connected with the upset orbital segment and forms the conveying track for being mutually slidably connected with the coaster;The gear unit includes reel and fixed pulley;Being arranged in the frame for the fixed pulley fixed-axis rotation, power line is wound with the fixed pulley;One end of the power line connects the coaster, and the other end of the power line connects the reel, drives the coaster to be slided along the conveying track by the rotation of the reel.The steel pipe loading apparatus of said structure can substantially reduce the labor intensity of staff, improve operating efficiency.

Description

A kind of steel pipe loading apparatus and steel pipe transmission car
Technical field
Pit mining equipment technical field is the utility model is related to, more particularly, to a kind of steel pipe loading apparatus and steel pipe Transport vehicle.
Background technology
Various pipelines can be disposed with the lane of working face in the pit two of mine, with the back production of working face, the various pipes of underground Road will be reclaimed, and existing mode is typically all that can use trackless rubber-tyred flat car to reclaim transport these pipelines, when entering When row recovery, these pipelines are removed first, then these pipelines are attached on trackless rubber-tyred flat car, pass through trackless glue Wheel flat car is transported to ground.
Existing trackless rubber-tyred flat car typically has 1.2 meters of height, due to by underworkings space and it is special it is explosion-proof will The factor such as ask to restrict, the loading machine equipment of complexity can not be employed to aid in entrucking, so, carrying out the entrucking of pipeline is all Mainly manually single-handedly for lift dress come what is carried out, the pipe weight of underground is larger, and the mode labor intensity of artificial single-handedly lift dress is very big, Make whole entrucking work all relatively difficult, generally, 6 staff need 3 hours just to install a car, and also Easily damage trick etc., unsafe factor be present, during entrucking working expenditure, laborious, whole work efficiency is very low.
Utility model content
The purpose of this utility model is to provide a kind of steel pipe loading apparatus and steel pipe transmission car, to solve prior art Present in mine working face pipeline entrucking working expenditure when, laborious, the low technical problem of whole work efficiency.
A kind of steel pipe loading apparatus provided by the utility model, including frame, coaster and gear unit;
The frame includes lifting orbital segment and upset orbital segment;
The lifting orbital segment is connected with the upset orbital segment and forms the fortune for being mutually slidably connected with the coaster Defeated track;
The gear unit includes reel and fixed pulley;
The fixed pulley fixed-axis rotation is arranged in the frame, meanwhile, it is wound with power line on the fixed pulley;
One end of the power line connects the coaster, and the other end of the power line connects the reel, by described The rotation of reel drives the coaster to be slided along the conveying track.
Further, in embodiment of the present utility model, the steel pipe loading apparatus also includes power unit;
The power unit includes motor, and the output end of the motor is connected with the reel, for driving the reel Rotate.
Further, in embodiment of the present utility model, the power unit also includes being used to control the motor to turn The decelerator of speed;
The decelerator is arranged between the motor and the reel;
Wherein, the output end of the motor is connected with the decelerator, the output end of the decelerator and the reel It is connected.
Further, in embodiment of the present utility model, the motor includes air motor;
The stop valve for controlling wind regime is provided with the air motor.
Further, in embodiment of the present utility model, the steel pipe loading apparatus also includes vibration absorption unit;
The vibration absorption unit includes being arranged on the spring of the conveying track end.
Further, in embodiment of the present utility model, distance of the coaster from top side to bottom side and the frame Become larger.
Further, in embodiment of the present utility model, distance of the coaster from top side to bottom side and the frame Become larger including:
The top side of the coaster is provided with the top side supporting leg for being connected with the housing slide, and the bottom side of the coaster is set It is equipped with the bottom side supporting leg for being connected with the housing slide;
Wherein, the top side leg length is less than the length of the bottom side supporting leg.
Further, in embodiment of the present utility model, the frame also includes being used to support the upset orbital segment Vertical section, the vertical section with it is described upset orbital segment be fixedly connected.
Further, in embodiment of the present utility model, the steel pipe loading apparatus also includes mobile unit;
The mobile unit includes supporting leg and road wheel, and the road wheel includes the first road wheel and the second road wheel;
Described supporting leg one end is fixed on the frame, setting first walking of the other end fixed-axis rotation of the supporting leg Wheel;
The second road wheel fixed-axis rotation is arranged on the frame.
Present invention also provides a kind of steel pipe transmission car, including the steel pipe loading apparatus.
In the above-mentioned technical solutions, there is provided a kind of loading apparatus that can facilitate the recovery pipe in underworkings, this Kind steel pipe loading apparatus is mainly what is be made up of frame and coaster, is included in frame by lifting orbital segment and upset orbital segment group Into conveying track, coaster is exactly to carry out sliding motion along by lifting orbital segment and the conveying track that forms of upset orbital segment 's.During use, pipeline can be placed on coaster by staff, then allow coaster successively along the lifting orbital segment Slided with the upset orbital segment, wherein, when coaster slides in the lifting orbital segment, being can be overall by coaster Lifting, the pipeline in coaster is raised, and then coaster slides along the upset orbital segment again, the action overturn is done, by coaster Pipeline be poured on transport vehicle, this completes the loading work of a pipeline.In the process that coaster slides along conveying track In, its power is provided by the reel, and reel is connected to power by being fixed between the fixed pulley in frame and coaster Line, can be to drive power line during such spool turns, and then hauls coaster and slided along the conveying track, realizes pipeline Load.
This steel pipe loading apparatus can substantially reduce the labor intensity of staff, improve operating efficiency.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, describe below In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the dimensional structure diagram for the steel pipe loading apparatus that the utility model one embodiment provides;
Fig. 2 is the left view for the steel pipe loading apparatus that the utility model one embodiment provides;
Fig. 3 is the right view for the steel pipe loading apparatus that the utility model one embodiment provides;
Fig. 4 is the dimensional structure diagram for the coaster that the utility model one embodiment provides;
Fig. 5 is the left view for the coaster that the utility model one embodiment provides;
Fig. 6 is the dimensional structure diagram for the steel pipe transmission car that the utility model one embodiment provides;
Fig. 7 is the partial enlargement structural representation for the steel pipe transmission car that the utility model one embodiment provides.
Reference:
1- frames;2- coasters;8- flat cars;
11- lifts orbital segment;12- overturns orbital segment;13- vertical sections;
31- reels;32- fixed pulleys;33- power lines;
41- motors;42- decelerators;51- springs;
61- top sides supporting leg;62- bottom sides supporting leg;71- supporting legs;
The road wheels of 72- first;The road wheels of 73- second.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described Embodiment is the utility model part of the embodiment, rather than whole embodiments.Based on the embodiment in the utility model, sheet The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality Novel protected scope.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation of the instruction such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only Described for the ease of description the utility model and simplifying, rather than instruction or imply signified device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or hint relative importance.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in the utility model.
Fig. 1 is the dimensional structure diagram for the steel pipe loading apparatus that the utility model one embodiment provides;
Fig. 2 is the left view for the steel pipe loading apparatus that the utility model one embodiment provides;
Fig. 3 is the right view for the steel pipe loading apparatus that the utility model one embodiment provides.
First, as shown in Figure 1, Figure 2 and Figure 3, a kind of steel pipe loading apparatus that the present embodiment provides, including frame 1, coaster 2 and gear unit;
The frame 1 includes lifting orbital segment 11 and upset orbital segment 12;
The lifting orbital segment 11 is connected and formed for being slidably connected with the phase of coaster 2 with the upset orbital segment 12 Conveying track;
The gear unit includes reel 31 and fixed pulley 32;
The fixed-axis rotation of fixed pulley 32 is arranged in the frame 1, meanwhile, it is wound with power line on the fixed pulley 32 33;
One end of the power line 33 connects the coaster 2, and the other end of the power line 33 connects the reel 31, led to The rotation of the reel 31 is crossed to drive the coaster 2 to be slided along the conveying track.
In the particular embodiment, this of the application offer can facilitate the recovery pipe in underworkings, this steel Pipe loading apparatus is mainly what is be made up of frame 1 and coaster 2, is included in frame 1 by lifting orbital segment 11 and upset orbital segment The conveying track of 12 compositions, coaster 2 are exactly to be carried out along the conveying track being made up of lifting orbital segment 11 and upset orbital segment 12 Sliding motion.
During use, pipeline can be placed on coaster 2 by staff, then allow coaster 2 successively along described Lifting orbital segment 11 and the upset orbital segment 12 slide, wherein, when coaster 2 slides in the lifting orbital segment 11 Wait, be that the overall lifting of coaster 2 can be raised the pipeline in coaster 2, then coaster 2 is slided along the upset orbital segment 12 again It is dynamic, the action overturn is done, the pipeline in coaster 2 is poured on transport vehicle, this completes the loading work of a pipeline.
During coaster 2 slides along conveying track, its power is provided by the reel 31, and reel 31 passes through solid Power line 33 is connected between the fixed pulley 32 and coaster 2 that are scheduled in frame 1, can be dynamic to drive when such reel 31 rotates The line of force 33, and then haul coaster 2 and slided along the conveying track, realize the loading of pipeline.
Wherein, the driving of the reel 31 can use the modes such as manual drive or electric power operation, in this application only Limited embodiment is provide only, so, it is any to be based on technical scheme, on the premise of without creative work, The new technical scheme obtained, is all contained within the protection domain of technical scheme.
With continued reference to Fig. 1, Fig. 2 and Fig. 3, the steel pipe loading apparatus also includes power unit;
The power unit includes motor 41, and the output end of the motor 41 is connected with the reel 31, for driving Reel 31 is stated to rotate.
During the reel 31 is driven, by the way of the driving of motor 41, coaster 2 can be further improved in institute The speed slided on lifting orbital segment 11 and the upset orbital segment 12 is stated, staff has been also convenient for and has been operated, it is only necessary to Adjust rotating forward, reversion and the start and stop of motor 41.
Further, the power unit also includes being used for the decelerator 42 for controlling the rotating speed of motor 41;
The decelerator 42 is arranged between the motor 41 and the reel 31;
Wherein, the output end of the motor 41 is connected with the decelerator 42, the output end of the decelerator 42 and institute Reel 31 is stated to be connected.
In one embodiment, the junction of the motor 41 and the decelerator 42 can be fixed using key.
By there is provided decelerator 42, can further improve the rotation sensitivity of motor 41 in the course of the work, make Staff can control the rotating speed of motor 41 according to actual conditions, smoothly to load pipeline.
Wherein, when motor 41 are selected, the species of motor 41 for being adapted to underground to use in the prior art, example can be used Such as electro-motor, air motor.
In one embodiment, the motor 41 includes air motor;It is provided with the air motor for controlling wind The stop valve in source.
By the way that air motor is connected on the air line of underground in the form of pipeline, it is possible to carry out described in power drive Reel 31, and wind regime is controlled by the stop valve, relatively it is adapted to the entrucking work of underground.
Fig. 7 is the partial enlargement structural representation for the steel pipe transmission car that the utility model one embodiment provides.
As shown in fig. 7, further, the steel pipe loading apparatus also includes vibration absorption unit;The vibration absorption unit includes setting Put the spring 51 in the conveying track end.
After spring 51, frame 1 is caused to damage when can slide into upset 12 end of orbital segment to prevent on-slip car 2 Evil.
Wherein, this damper element is not limited to use spring 51, other can also be used to have the cushioning element of buffering effect Part, to realize the effect of damping.
Fig. 4 is the dimensional structure diagram for the coaster that the utility model one embodiment provides;
Fig. 5 is the left view for the coaster that the utility model one embodiment provides.
As shown in Figure 4 and Figure 5, further, the coaster 2 gradually becomes from top side to bottom side and the distance of the frame 1 Greatly.
The amplitude that the increase coaster 2 slided beneficial to coaster 2 on the upset orbital segment 12 is integrally overturn so is designed with, The pipeline for alloing to carry on coaster 2 is smoothly rolled down.
In one embodiment, the coaster 2 from the distance of top side to bottom side and the frame 1 become larger including:
The top side of the coaster 2 is provided with the top side supporting leg 61 for being slidably connected with the frame 1, the coaster 2 Bottom side is provided with the bottom side supporting leg 62 for being slidably connected with the frame 1;
Wherein, the length of top side supporting leg 61 is less than the length of the bottom side supporting leg 62.
It is shorter than the design of the bottom side supporting leg 62 by using top side supporting leg 61, can be smoothly to make coaster 2 incline Tiltedly, the radian that increase is overturn when upset, is easy to unload the pipeline on lower block 2.
Further, the frame 1 also includes being used for the vertical section 13 for supporting the upset orbital segment 12, the vertical section 13 are fixedly connected with the upset orbital segment 12.
Further, the steel pipe loading apparatus also includes mobile unit;
The mobile unit includes supporting leg 71 and road wheel, and the road wheel includes the first road wheel 72 and the second road wheel 73;
Described one end of supporting leg 71 is fixed on the frame 1, the setting described of the other end fixed-axis rotation of the supporting leg 71 One road wheel 72;
The fixed-axis rotation of second road wheel 73 is arranged on the frame 1.
When steel pipe loading apparatus is installed on flat car 8, the first road wheel 72 and the second road wheel 73 all leave ground, After the steel pipe loading apparatus is removed from flat car 8, the first road wheel 72 and the second road wheel 73, steel pipe dress can be push Car device is walked.
Wherein, the first road wheel 72 and the second road wheel 73 can use directional wheel or universal wheel, can be according to suitable feelings Condition is set to arrange in pairs or groups.
Fig. 6 is the dimensional structure diagram for the steel pipe transmission car that the utility model one embodiment provides.
As shown in fig. 6, present invention also provides a kind of steel pipe transmission car, including the steel pipe loading apparatus.
Because concrete structure, the principle of work and power and the technique effect of the steel pipe loading apparatus are in detailed hereinbefore, This is just repeated no more.
So any technology contents for being related to the steel pipe loading apparatus, refer to record above.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should Understand:It can still modify to the technical scheme described in foregoing embodiments, either to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly The scope of each embodiment technical scheme of type.

Claims (10)

1. a kind of steel pipe loading apparatus, it is characterised in that including frame (1), coaster (2) and gear unit;
The frame (1) includes lifting orbital segment (11) and upset orbital segment (12);
The lifting orbital segment (11), which is connected and formed with the upset orbital segment (12), to be used for and the coaster (2) the mutually company of slip The conveying track connect;
The gear unit includes reel (31) and fixed pulley (32);
Fixed pulley (32) fixed-axis rotation is arranged in the frame (1), meanwhile, around dynamic on the fixed pulley (32) Line (33);
One end of the power line (33) connects the coaster (2), and the other end of the power line (33) connects the reel (31), the coaster (2) is driven to be slided along the conveying track by the rotation of the reel (31).
2. steel pipe loading apparatus according to claim 1, it is characterised in that the steel pipe loading apparatus also includes power list Member;
The power unit includes motor (41), and the output end of the motor (41) is connected with the reel (31), for driving The reel (31) rotates.
3. steel pipe loading apparatus according to claim 2, it is characterised in that the power unit also includes being used to control institute State the decelerator (42) of motor (41) rotating speed;
The decelerator (42) is arranged between the motor (41) and the reel (31);
Wherein, the output end of the motor (41) is connected with the decelerator (42), the output end of the decelerator (42) with The reel (31) is connected.
4. steel pipe loading apparatus according to claim 2, it is characterised in that the motor (41) includes air motor;
The stop valve for controlling wind regime is provided with the air motor.
5. the steel pipe loading apparatus according to any one of claim 1-4, it is characterised in that the steel pipe loading apparatus is also Including vibration absorption unit;
The vibration absorption unit includes being arranged on the spring (51) of the conveying track end.
6. steel pipe loading apparatus according to claim 5, it is characterised in that the coaster (2) is from top side to bottom side and institute The distance for stating frame (1) becomes larger.
7. steel pipe loading apparatus according to claim 6, it is characterised in that the coaster (2) is from top side to bottom side and institute State frame (1) distance become larger including:
The top side of the coaster (2) is provided with the top side supporting leg (61) for being slidably connected with the frame (1), the coaster (2) bottom side is provided with the bottom side supporting leg (62) for being slidably connected with the frame (1);
Wherein, top side supporting leg (61) length is less than the length of the bottom side supporting leg (62).
8. steel pipe loading apparatus according to claim 5, it is characterised in that the frame (1) also includes being used to support institute The vertical section (13) of upset orbital segment (12) is stated, the vertical section (13) is fixedly connected with the upset orbital segment (12).
9. steel pipe loading apparatus according to claim 5, it is characterised in that the steel pipe loading apparatus also includes mobile single Member;
The mobile unit includes supporting leg (71) and road wheel, and the road wheel includes the first road wheel (72) and the second road wheel (73);
Described supporting leg (71) one end is fixed on the frame (1), described in the setting of the other end fixed-axis rotation of the supporting leg (71) First road wheel (72);
Second road wheel (73) fixed-axis rotation is arranged on the frame (1).
10. a kind of steel pipe transmission car, it is characterised in that including steel pipe loading apparatus as claimed in any one of claims 1-9 wherein.
CN201720300569.9U 2017-03-24 2017-03-24 A kind of steel pipe loading apparatus and steel pipe transmission car Expired - Fee Related CN206624443U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720300569.9U CN206624443U (en) 2017-03-24 2017-03-24 A kind of steel pipe loading apparatus and steel pipe transmission car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720300569.9U CN206624443U (en) 2017-03-24 2017-03-24 A kind of steel pipe loading apparatus and steel pipe transmission car

Publications (1)

Publication Number Publication Date
CN206624443U true CN206624443U (en) 2017-11-10

Family

ID=60208285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720300569.9U Expired - Fee Related CN206624443U (en) 2017-03-24 2017-03-24 A kind of steel pipe loading apparatus and steel pipe transmission car

Country Status (1)

Country Link
CN (1) CN206624443U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106743798A (en) * 2017-03-24 2017-05-31 鄂尔多斯市中北煤化工有限公司 A kind of steel pipe loading apparatus and steel pipe transmission car

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106743798A (en) * 2017-03-24 2017-05-31 鄂尔多斯市中北煤化工有限公司 A kind of steel pipe loading apparatus and steel pipe transmission car

Similar Documents

Publication Publication Date Title
CN106743798A (en) A kind of steel pipe loading apparatus and steel pipe transmission car
CN202829353U (en) Gantry crane used for pipeline construction in tunnel
CN105339230A (en) Transportation system and displacement device therefor
CN202899040U (en) Crossing tunnel box girder transporting and mounting all-in-one machine
CN203855325U (en) Bridge magnet crane for heavy rail
CN106115199B (en) Intelligent robot is carried in a kind of construction based on hybrid connected structure
CN104097982A (en) Crawler type cable conveyor
CN203065087U (en) Novel mobile hoisting device
CN206624443U (en) A kind of steel pipe loading apparatus and steel pipe transmission car
CN205257317U (en) Reel materials handling device with intelligence turns to
CN207209809U (en) A kind of extraordinary Dramatic Air Lifts
CN203394545U (en) Tube sheet transporting device for shield tunnel
CN206358762U (en) Automatic telescopic belt conveyer
CN203439748U (en) Device for even distribution of loose materials
CN210087337U (en) Intelligent economical segment construction tool
CN209158317U (en) Automatic turning rolling frame vehicle
CN204819899U (en) Trailer wagon driven transportation hopper
CN203373044U (en) Telegraph pole loading and unloading device for flat car
CN207240296U (en) Waterproof roll cutter device
CN206307546U (en) Highway and the dual-purpose mobile container of railway
CN112897364B (en) Tool trolley for hoisting GIL through pipe
CN203754297U (en) Vehicle-mounted brick transporting machine
CN204982676U (en) Conveyer is assembled on steel purlin girder segment section ground
CN103587604B (en) A kind of magnetic force climbing car
CN206827956U (en) The crane device that side installation exhaust blower uses

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171110

Termination date: 20190324