CN206599704U - A kind of subway rail guidance tape basement construction equipment - Google Patents

A kind of subway rail guidance tape basement construction equipment Download PDF

Info

Publication number
CN206599704U
CN206599704U CN201621101946.8U CN201621101946U CN206599704U CN 206599704 U CN206599704 U CN 206599704U CN 201621101946 U CN201621101946 U CN 201621101946U CN 206599704 U CN206599704 U CN 206599704U
Authority
CN
China
Prior art keywords
cutter machine
thick vibrator
accurate
thick
vibrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621101946.8U
Other languages
Chinese (zh)
Inventor
汤如意
张宏波
尹志超
李和平
薛明胜
龚楠富
吴志伟
***
尹忠文
罗新南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Sixth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Sixth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Sixth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201621101946.8U priority Critical patent/CN206599704U/en
Application granted granted Critical
Publication of CN206599704U publication Critical patent/CN206599704U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of subway rail guidance tape basement construction equipment, it includes total powerstation dolly(1), accurate bump-cutter machine(2)With thick vibrator(3), this three part forms a whole;Total powerstation dolly(1)With accurate bump-cutter machine(2), thick vibrator(3)Using dedicated radio link, total powerstation(1‑1)With accurate bump-cutter machine control computer(2‑5), thick vibrator control computer(3‑4)Using dedicated radio link, accurate bump-cutter machine control computer(2‑5), thick vibrator control computer(3‑4)Respectively with accurate bump-cutter machine hydraulic oil pump(2‑7), thick vibrator hydraulic oil pump(3‑10)With accurate bump-cutter machine digital oil cylinder(2‑2), thick vibrator digital oil cylinder(3‑2)And accurate bump-cutter machine servomotor(2‑3), thick vibrator servomotor(3‑3)Connected using control circuit.

Description

A kind of subway rail guidance tape basement construction equipment
Technical field
The utility model is related to a kind of subway rail guidance tape pedestal concreting outfit, belongs to Subway track engineering construction skill Art field.
Background technology
As subway construction progressively develops in each city, subway work technique also changes therewith, present underground railway track work Journey Monolithic Track Bed Construction is cast-in-place concrete technique.With the development of technology, it is desirable to raising, Subway track engineering solid concrete roabed Start to develop toward the direction of prefabricated board, i.e., factory is produced solid concrete roabed by technical requirements, then be transported to job site Row is installed, the continuous discrepancy in elevation≤3mm of this technological requirement track plates base plane.Existing concrete speading car currently on the market The broad place construction in the places such as factory building, airport is generally used for, volume is larger, and walking manner is rubber-tyred, by manually controlling Direction.And the subway work overwhelming majority is construction in tunnel, construction surface is long and narrow, and existing paver vehicle volume is excessive to be entered Tunnel, and tunnel is largely circular tunnel, existing paver vehicle can not walk in tunnel, also there is slope in work progress in addition Road, curve, existing paver vehicle can not reach required precision.
Utility model content
The technical problems to be solved in the utility model is:A kind of subway rail guidance tape basement construction equipment is provided, it is existing to overcome It can not enter tunnel because volume is excessive with the presence of technology, the deficiencies such as required precision can not be reached.
The utility model is adopted the technical scheme that:It includes total powerstation dolly, accurate bump-cutter machine and thick vibrator, and this three Part forms a whole;Total powerstation dolly uses wireless connection with accurate bump-cutter machine, thick vibrator, and total powerstation is flattened with accurate Machine control computer, thick vibrator control computer use dedicated radio link, accurate bump-cutter machine control computer, thick vibrator control Computer processed respectively with accurate bump-cutter machine hydraulic oil pump, thick vibrator hydraulic oil pump and accurate bump-cutter machine digital oil cylinder, slightly vibrate Machine digital oil cylinder and accurate bump-cutter machine servomotor, thick vibrator servomotor are connected using control circuit.
Accurate bump-cutter machine by accurate bump-cutter machine prism, accurate bump-cutter machine digital hydraulic jack, accurate bump-cutter machine servomotor, Accurate bump-cutter machine hydraulic top stretches system, accurate bump-cutter machine control computer, accurate bump-cutter machine skeleton, accurate bump-cutter machine hydraulic oil Pump, accurate bump-cutter machine travelling wheel and accurate bump-cutter machine vibro-rammer composition.
Thick vibrator is by thick vibrator prism, thick vibrator digital hydraulic jack, thick vibrator servomotor, thick vibrator Control computer, thick vibrator skeleton, thick vibrator concrete spades, thick vibrator concrete spades support system, concrete Vibrating head, thick vibrator hydraulic top stretch system, thick vibrator hydraulic oil pump, thick vibrator travelling wheel and thick vibrator vibro-rammer group Into.
Accurate bump-cutter machine vibro-rammer, thick vibrator vibro-rammer are made up of cloth screw rod and the panel that vibrates respectively.
Concrete vibration bar uses plug-in type vibrating rod.
Walking manner uses tool track structure.
The utility model is that tool track is set up in the circular tunnel scope of operation, and subway rail guidance tape basement construction is equipped in instrument It can be walked back and forth on rail, this equipment is made up of three parts, Part I is total powerstation dolly, Part II flattens to be accurate Machine, Part III is thick vibrator.Total powerstation band ATR on total powerstation dolly sights system and super search system automatically, with Just continuous dynamic tracking and measurement are supported, total powerstation passes through with the measurement on thick vibrator and accurate bump-cutter machine and control computer Wireless to carry out data communication, data add Handshake Protocol and verification, 1 point of CP of demarcation, by the cross-post point of operation section circuit, it is straight it is slow, Slow circle, circle are slow, delay the data such as straight, curved medium dots and route curve radius deposit control system, total powerstation dolly and slightly vibrate The signal installed on the oil cylinder of machine receives the good original position of prism static demarcating, then indulges the bid section that total station survey is obtained The road surface such as slope, horizontal slope parameter input controller, is walked back and forth once in scope of operation zero load by thick vibrator, surveyed out because of tool track Road surface parameter error that is out of shape and producing is gone up, then measurement error input controller, thick vibrator begins to work, thick vibrator On the displacement transducer that is carried by digital hydraulic jack of cylinder action displacement feed back to controller and form closed-loop control, according to Device, the angle of inclination of vibro-rammer and cloth screw hydraulic motor direction of rotation are evened in the change control of circuit superelevation out, are then slightly shaken Stamper is walked toward construction direction, and aggregate is evened out, while operating concrete vibration bar to decline, inserts concrete vibration bar Enter in aggregate and fully vibrate, enable aggregate uniform pack into the bar-mat reinforcement of tunnel road base, this operation After the completion of concrete surface reserve positive error, highly higher 3 millimeters than design seat surface, thick vibrator, which runs to next station, to be stopped etc. Next cycle operation is treated, then accurate bump-cutter machine is travelled to operation original position, and control principle is the same with thick vibrator, utilized The real time measured position of prism is compared with theoretical position on digital oil cylinder, extracts correspondence position parameter in gross data storehouse and enters Row compares, and controls height and the inclination angle of the eccentric vibro-rammer of hydraulic jack adjustment, concrete to be carried out accurate leveling, by servo electricity The digital disk that machine is carried measures Operation Van's Displacement Feedback out of shape to controller, and controller control leveling oil cylinder is carried out individually or simultaneously Action, to control the longitudinal and transverse gradient on base road surface and the uniformity of total station survey data, leveling precision reaches that every 3m length is high Difference is less than or equal to 2mm, is travelled after the completion of operation to next station and stops waiting next cycle operation.Described above is this technology One cycle operation of scheme, in circular tunnel interior circulation above-mentioned technical proposal, subway rail guidance tape pedestal just can be completed on request Construction operation.
Equipment of the present utility model solves the technical problem walked on request in subway tunnel well, and can be straight Line, curve, track plates pedestal concrete is uniformly vibrated on ramp, accurate leveling, make track plates base plane continuously high Difference≤3mm, substantially increases construction precision.
Brief description of the drawings
Fig. 1 is overall schematic of the present utility model;
Fig. 2 is total powerstation dolly schematic diagram of the present utility model;
Fig. 3 is the schematic perspective view of accurate bump-cutter machine of the present utility model;
Fig. 4 is another view stereo schematic diagram of accurate bump-cutter machine of the present utility model;
Fig. 5 is the schematic perspective view of thick vibrator of the present utility model;
Fig. 6 is another view stereo schematic diagram of thick vibrator of the present utility model;
Fig. 7 is the schematic perspective view of vibro-rammer bottom views of the present utility model.
In the figures above:1st, total powerstation dolly;2nd, accurate bump-cutter machine;3rd, thick vibrator;4th, tool track;1-1, total powerstation TS50;1-2, total powerstation dolly travelling wheel;1-3 total powerstation dolly skeletons;2-1, accurate bump-cutter machine prism;2-2 accurate bump-cutter machines Digital oil cylinder;2-3, accurate bump-cutter machine servomotor;2-4, accurate bump-cutter machine hydraulic top stretch system;2-5, accurate bump-cutter machine control Computer;2-6, accurate bump-cutter machine skeleton;2-7, accurate bump-cutter machine hydraulic oil pump;2-8, accurate bump-cutter machine travelling wheel;2-9, essence Close evener vibro-rammer;3-1, thick vibrator prism;3-2, thick vibrator digital oil cylinder;3-3, thick vibrator servomotor;3- 4th, thick vibrator control computer;3-5, thick vibrator skeleton;3-6, thick vibrator concrete spades;3-7, concrete spades branch Support system;3-8, concrete vibration bar;3-9, thick vibrator hydraulic top stretch system;3-10, thick vibrator hydraulic oil pump;3-11、 Thick vibrator travelling wheel;3-12, thick vibrator vibro-rammer;5-1, vibro-rammer panel;5-2, cloth screw rod.
Embodiment
Below in conjunction with the accompanying drawings and embodiment is further described to the utility model:
First, accompanying drawing 1-7 is compareed, it is as follows to each part of the present utility model and function declaration:
Total powerstation 1-1 models TS15 or 1 point of TS50, CP belong to the track foundations of CP III control net, and this network is to utilize tunnel The precision traverse point that owner provides in road, the baseline network set up on tunnel inner tubal wall;Start before operation, by total powerstation Dolly 1 is fixed on operation original position, is remained stationary as in whole cycle operation.
Accurate bump-cutter machine 2 stretches system 2-4, control by prism 2-1, digital hydraulic jack 2-2, servomotor 2-3, hydraulic top Computer 2-5, skeleton 2-6, hydraulic motor 2-7, travelling wheel 2-8, vibro-rammer 2-9 compositions.Hydraulic top, which stretches system 2-4, is used for precision After the construction of evener 2 is finished, when pedestal or structural base are discharged to from tool track 4, the top of accurate bump-cutter machine 2 is first reached into travelling wheel 2-8 is higher by 10mm positions than tool track 4, and accurate bump-cutter machine 2 is rotated by 90 °, then retract cylinder, falls on ground by accurate bump-cutter machine 2 Face, you can lifting is mobile, conversely, accurate bump-cutter machine 2 can also be placed on tool track 4;Travelling wheel 2-8 carries roller Device, the error caused when can reduce out of shape, servomotor 2-3 is used for controlling travelling wheel to walk, while and control computer Displacement data is transmitted in 2-5 connections;Fixed prism 2-1 is installed at the top of digital hydraulic jack 2-2, measured in real time for total powerstation 1-1 Digital oil cylinder 2-2 coordinates, digital oil cylinder 2-2 bottoms connection vibro-rammer 2-9, hydraulic motor 2-7 are connected control with control computer 2-5 Digital oil cylinder 2-2 strokes processed, total powerstation 1-1 sends measured data to control computer 2-5, by control computer 2-5 ratios Compared with the difference of actual coordinate and theoretical coordinate, to adjust digital oil cylinder 2-2 stroke, so as to control vibro-rammer 2-9 front and rear, a left side Right height, to reach precision controlling.
Thick vibrator 3 by prism 3-1, digital hydraulic jack 3-2, servomotor 3-3, control computer 3-4, skeleton 3-5, Concrete spades 3-6, concrete spades support system 3-7, concrete vibration bar 3-8, hydraulic top stretch system 3-9, hydraulic motor 3-10, travelling wheel 3-11, vibro-rammer 3-12 compositions.Hydraulic top stretches system 3-9, vibro-rammer 3-12, digital hydraulic jack 3-2, rib Mirror 3-1, travelling wheel 3-11, hydraulic motor 3-10, servomotor 3-3 operation principle, effect are identical with accurate bump-cutter machine 2;It is mixed Solidifying unmanufactured iron shovel 3-6 is located at the front end in thick vibrator 3 direction out of shape, for aggregate stand to be scattered, concrete vibration bar 3-8 Positioned at spades rear, using plug-in type vibrating rod, make it abundant vibrated concrete, so as to vibro-rammer energy normal work.
Vibro-rammer 2-9,3-12 are made up of cloth screw rod 5-2 and the panel 5-1 that vibrates, concrete distributing screw rod 5-2 bottoms Face requires to keep certain synchronous with vibro-rammer panel 5-1, to drive unnecessary concrete out of before precision leveling;Vibro-rammer 2-9, 3-12 is connected with digital hydraulic jack 2-2,3-2, above and below hydraulic jack 2-2,3-2, can control vibro-rammer 2-9,3-12 Angle of inclination around.
Secondly, it is described as follows with reference to work progress:
Four travelling wheel 1-2 are installed on skeleton 1-3 two sides in the total powerstation dolly 1, make total powerstation dolly 1 can With the traveling on tool track 4, the center position placing total station 1-1 of the skeleton 1-3, total powerstation 1-1 is by being installed on number The real time position of prism 2-1,3-1 measurement accurate bump-cutter machine 2 and thick vibrator 3 on word hydraulic jack 2-2,3-2 obtains data, Data are real-time transmitted to control computer 2-5,3-4 on the left of skeleton 2-6,3-5 again, by control computer 2-5,3-4 Actual measurement and theoretical error are calculated, and sends control instruction to installed in two travelling wheels 2-8,3- on rear side of skeleton 2-6,3-5 Servomotor 2-3,3-3 on 11 and hydraulic oil pump 2-7,3-10 on the right side of skeleton 2-6,3-5, so as to control accurate whole The traveling speed of flat machine 2 and thick vibrator 3 and digital hydraulic jack 2-2,3-2 action positioned at skeleton 2-6,3-5 rears, pass through Digital hydraulic jack 2-2,3-2 action come control below skeleton 2-6,3-5 with vibrating that digital hydraulic jack 2-2,3-2 are connected Plate 2-9,3-12 are flattened to track plates pedestal concrete surface, and the skeleton 3-5 forefronts are provided with concrete spades 3- 6, for the concrete of accumulation in the middle of track plates pedestal push away it is scattered, shakeout, the concrete spades 3-6 passes through support system 3-7 is connected with skeleton 3-5, and concrete vibration bar 3-8 is provided with below the skeleton 3-5, for being carried out to the concrete shakeout Vibrate, cloth screw rod 5-2 bottoms should be synchronous with vibro-rammer panel 5-1 holdings in described vibro-rammer 2-9,3-12, to flatten Before drive any excess concrete out of, described skeleton 2-6,3-5 middle are provided with hydraulic top and stretch system 2-4,3-9, are easy to accurate whole The handling and handling of flat machine 2 and thick vibrator 3.
It is described above to comprise the following steps that, construction procedure one:As shown in Figure 1 successively by total powerstation dolly 1, accurate bump-cutter machine 2nd, thick vibrator 3 is placed on tool track 4, and the road surface parameter of design and control point are inputted into accurate bump-cutter machine 2 and thick vibrator 3 Control computer 2-5,3-4, then travel to scope of operation end, wait aggregate to pour into tunnel bottom surface, 6 square stocks, Equipment is travelled to original position successively afterwards, total powerstation dolly 1 is fixed, by thick vibrator 3 and each zero load of accurate bump-cutter machine 2 Walk back and forth once, total powerstation 1-1 surveys out what is produced because being walked on tool track 4 by prism 3-1,2-1 above equipment Error, is then forwarded to control computer 3-4,2-5, and when formal construction, control computer 2-5,3-4 is automatic according to error Adjusting parameter, makes construction precision more accurate;Construction procedure two:Thick vibrator 3 is walked toward construction direction, utilizes concrete spades 3- The concrete accumulated in the middle of pedestal is pushed away scattered by 6 toward both sides, while operate concrete vibration bar 3-8 that concrete fully vibrates, it is past While preceding traveling, cloth screw rod 5-2 releases unnecessary material, and thick vibrator vibro-rammer 3-12 is whole by pedestal concrete surface It is flat, vibro-rammer 3-12 is controlled by control computer 3-4, the concrete surface of leveling is retained positive error, it is higher than design height Thick vibrator 3 leaves for subsequent region wait subsequent cycle after the completion of 3mm, this step;Construction procedure three:Accurate bump-cutter machine 2 is past to be applied Work direction is walked, and total powerstation 1-1 is by accurate bump-cutter machine prism 2-1 real-time measuring datas and feeds back to accurate bump-cutter machine control meter Calculation machine 2-5, control computer 2-5 give accurate bump-cutter machine hydraulic oil pump 2-7 by calculating real-time Transmission control instruction, so as to control Above and below accurate bump-cutter machine digital oil cylinder 2-2, accurate bump-cutter machine digital oil cylinder 2-2 are connected with accurate bump-cutter machine vibro-rammer 2-9, this Sample can just adjust vibro-rammer 2-9 angle of inclination in real time, and pedestal concrete surface is flattened, and reach design requirement, this Accurate bump-cutter machine 2 leaves for subsequent region wait subsequent cycle after the completion of step;Step 2 and step 3 are repeated, until this work Industry task is completed.
It is described above, embodiment only of the present utility model, but protection domain of the present utility model do not limit to In this, any one skilled in the art can readily occur in change in the technical scope that the utility model is disclosed Or replace, it should all cover within protection domain of the present utility model, therefore, protection domain of the present utility model should be with the power The protection domain that profit is required is defined.

Claims (5)

1. a kind of subway rail guidance tape basement construction equipment, it is characterised in that:It includes total powerstation dolly(1), accurate bump-cutter machine(2) With thick vibrator(3), this three part forms a whole;Total powerstation dolly(1)With accurate bump-cutter machine(2), thick vibrator(3)Adopt With dedicated radio link, total powerstation(1-1)With accurate bump-cutter machine control computer(2-5), thick vibrator control computer(3-4)Adopt With dedicated radio link, accurate bump-cutter machine control computer(2-5), thick vibrator control computer(3-4)Respectively with precision leveling Machine hydraulic oil pump(2-7), thick vibrator hydraulic oil pump(3-10)With accurate bump-cutter machine digital oil cylinder(2-2), thick vibrator numeral Oil cylinder(3-2)And accurate bump-cutter machine servomotor(2-3), thick vibrator servomotor(3-3)Connected using control circuit.
2. subway rail guidance tape basement construction equipment according to claim 1, it is characterised in that:Accurate bump-cutter machine(2)By essence Close evener prism(2-1), accurate bump-cutter machine digital hydraulic jack(2-2), it is accurate bump-cutter machine servomotor (2-3), accurate whole Flat machine hydraulic top stretches system (2-4), accurate bump-cutter machine control computer (2-5), accurate bump-cutter machine skeleton (2-6), accurate leveling Machine hydraulic oil pump (2-7), accurate bump-cutter machine travelling wheel (2-8) and accurate bump-cutter machine vibro-rammer (2-9) composition.
3. subway rail guidance tape basement construction equipment according to claim 1, it is characterised in that:Thick vibrator(3)By slightly shaking Stamper prism(3-1), thick vibrator digital hydraulic jack(3-2), thick vibrator servomotor(3-3), thick vibrator control meter Calculation machine(3-4), thick vibrator skeleton(3-5), thick vibrator concrete spades(3-6), thick vibrator concrete spades support system System(3-7), concrete vibration bar(3-8), thick vibrator hydraulic top stretch system(3-9), thick vibrator hydraulic oil pump(3-10), it is thick Vibrator travelling wheel(3-11)With thick vibrator vibro-rammer(3-12)Composition.
4. subway rail guidance tape basement construction equipment according to claim 3, it is characterised in that:Concrete vibration bar(3-8) Using plug-in type vibrating rod.
5. subway rail guidance tape basement construction equipment according to claim 1, it is characterised in that:Whole station on total powerstation dolly Instrument band ATR sights system and super search system automatically.
CN201621101946.8U 2016-10-08 2016-10-08 A kind of subway rail guidance tape basement construction equipment Expired - Fee Related CN206599704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621101946.8U CN206599704U (en) 2016-10-08 2016-10-08 A kind of subway rail guidance tape basement construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621101946.8U CN206599704U (en) 2016-10-08 2016-10-08 A kind of subway rail guidance tape basement construction equipment

Publications (1)

Publication Number Publication Date
CN206599704U true CN206599704U (en) 2017-10-31

Family

ID=60149519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621101946.8U Expired - Fee Related CN206599704U (en) 2016-10-08 2016-10-08 A kind of subway rail guidance tape basement construction equipment

Country Status (1)

Country Link
CN (1) CN206599704U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108132050A (en) * 2017-11-15 2018-06-08 上海建工集团股份有限公司 Tunneling curtain frame system monitors system and monitoring method
CN109082955A (en) * 2018-09-30 2018-12-25 天津天轨道交通设备有限公司 Pedestal board concrete automation control flattens system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108132050A (en) * 2017-11-15 2018-06-08 上海建工集团股份有限公司 Tunneling curtain frame system monitors system and monitoring method
CN108132050B (en) * 2017-11-15 2020-07-03 上海建工集团股份有限公司 System and method for monitoring underground excavation curtain frame system
CN109082955A (en) * 2018-09-30 2018-12-25 天津天轨道交通设备有限公司 Pedestal board concrete automation control flattens system

Similar Documents

Publication Publication Date Title
CN106351077B (en) A kind of subway rail guidance tape basement construction equipment
CN201065510Y (en) Real time dynamic measuring digital control automatic leveling device for spreading machine
CN106702833B (en) One kind is vibrated and integer construction equipment and construction technology for the straight shop fixtures seat of subway
CN106638183A (en) Urban rail transit assembly board type high precision rail base cast-in-place construction method
CN206599704U (en) A kind of subway rail guidance tape basement construction equipment
CN103114509B (en) Slipform construction method for concrete side film of roadbase
CN106351086B (en) A kind of construction operation method and its system and device of tunnel railway roadbed
CN107326871A (en) Sliding formwork equipment, sliding-mode method and its construction method being molded for irrigation canals and ditches
CN110004800A (en) Asphalt concrete pavement construction equipment and construction method based on 3D numerical control system
CN113622316A (en) Steel truss girder multipoint traction type pushing construction system and construction method thereof
CN112695584A (en) Construction method for paving two sides of cement-stabilized gravel layer for one-step forming
CN108943365A (en) A kind of exquisiteness precast concrete production line
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN204662270U (en) A kind of case girder transferring system
CN107083726A (en) The plate-type fragment-free track slab self-compacting concretes four of CRTS III connect block constructing device and method
CN110714412A (en) Self-walking prepressing device suitable for cast-in-place beam support and prepressing method thereof
CN114517436B (en) 3D paving construction method for small-radius variable-amplitude bend
CN104975567A (en) Full-cross-section concrete bridge deck pavement device and method
CN114263085A (en) Intelligent paving control system of paver
CN114808619A (en) 3D paving process and 3D paving system for cement stabilization layer
CN113389353A (en) Construction method of narrow roadway high-precision super-flat terrace
CN211171515U (en) Automatic leveling structure of paver
CN209975325U (en) Asphalt concrete pavement construction equipment based on 3D digital control system
CN212026327U (en) Prefabricated plate positioning mechanism
CN211171987U (en) Movable foam concrete spreader

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171031

Termination date: 20191008

CF01 Termination of patent right due to non-payment of annual fee