CN206591862U - A kind of subway overhead station construction protecting platform car - Google Patents

A kind of subway overhead station construction protecting platform car Download PDF

Info

Publication number
CN206591862U
CN206591862U CN201720203527.3U CN201720203527U CN206591862U CN 206591862 U CN206591862 U CN 206591862U CN 201720203527 U CN201720203527 U CN 201720203527U CN 206591862 U CN206591862 U CN 206591862U
Authority
CN
China
Prior art keywords
platform
car
protecting
track
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720203527.3U
Other languages
Chinese (zh)
Inventor
杨思谋
颜小锋
吴华
艾万民
李建平
颜益红
郑朗
钟明
刘会颖
梁华锋
刘建
王洪华
兰胜林
陈臣
秦泳生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co Ltd Of Heavy Industry Architecture Design Institute Of Guangdong Province
Original Assignee
Co Ltd Of Heavy Industry Architecture Design Institute Of Guangdong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Of Heavy Industry Architecture Design Institute Of Guangdong Province filed Critical Co Ltd Of Heavy Industry Architecture Design Institute Of Guangdong Province
Priority to CN201720203527.3U priority Critical patent/CN206591862U/en
Application granted granted Critical
Publication of CN206591862U publication Critical patent/CN206591862U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model is a kind of subway overhead station construction protecting platform car.Include platform car crossbeam, two platform stays, platform truck diagonal brace, platform pulley sheave, platform truck track girder, platform slab track built-in fittings, underground railway track both sides are equipped with platform slab track built-in fitting or are equiped with two temporary support columns, two platform truck upright supports are on platform slab built-in fitting or temporary support column, platform car crossbeam is connected with the platform stay of both sides, and platform truck diagonal brace is provided between platform car crossbeam and platform stay and is supported reinforcing.The utility model is simple in construction, workable, and reliability is high, and efficiency of construction is higher, and structure stress clearly, and can realize that train operation and station construction are carried out simultaneously, between be independent of each other, abundant guarantee train operation safety and station construction efficiency.

Description

A kind of subway overhead station construction protecting platform car
Technical field
The utility model technology is related to urban rail transit elevated station construction technical field, is particularly suitable for use in and is runing The situation of overhead station is built on railroad section.The protecting platform car that the utility model technology is used is that one kind can effectively ensure that Station construction safety, the measure for improving efficiency of construction.
Background technology
With the urbanization of modern metropolitan cities surrounding area and continuing to develop for Construction of Urban Rail Traffic, the fast of city is covered Fast traffic system gradually extends to suburbs, with the underground station by factor controllings such as downtown surface structures, road network, construction costs Compare, the advantage of elevated station is clearly:Construction cost is low, and construction speed is fast, broad view, and passenger's perception is good, comfort level is good, Fire-fighting and rescue condition is good during accident, without ventilating system, and air-conditioning and lighting energy consumption are small, run energy consumption greatlys save.Therefore, As urban transportation is improved, City Green, low-carbon, the accessory substance of the effective measures of sustainable development, urban track traffic are promoted The planning and design of elevated station are got growing concern for.
In subway line process of construction, part overhead station is present because planning reason wouldn't construct, and erect-position is reserved, and treats it Surrounding enviroment reach situation about implementing again after planning requirement.In these reserved overhead stations, with the middle of existing operating line The situation for setting up station is the most complicated.Because operation has been put into the railroad section opened in advance, the station such as set up is not taken Corresponding safeguard measure, the then waste and debris that construction period produces may fall into and run interval, so as to have influence on train Normal operation even threaten the personal safety of passenger.On the other hand, the interval safeguard measure of operating line is belonged to and faced When measure, its protectiving scheme should match with setting up the form and scale at station, on the premise of subway traffic safety is ensured, to the greatest extent Amount reduction investment, and reduce the influence to setting up station construction.Therefore, overhead station is set up on the existing operation line of subway, it is right Design and construction requirement are higher, and its construction safeguard measure and scheme need to suit measures to local conditions, with reference to on-site actual situations and surrounding enviroment Consider, on the premise of traffic safety is ensured, take into account station construction progress and quality.
In the case where not using the utility model technology, due to the no any resistance in construction working face and circuit rail row interval Gear and barrier, building materials and equipment very likely fall into Gui Hang areas in construction period, so as to cause potential risks and potential safety hazard; On the other hand, to avoid influencing each other between station construction and train operation, unit in charge of construction must treat that overnight train is stopped transport and overhaul Shi Fangke marches into the arena construction, and must catch up with and withdrawn at second day before railroad embankment, and the engineering time is short, and job placement is difficult, cost compared with It is high.
The content of the invention
The purpose of this utility model is to provide a kind of subway overhead station construction protecting platform car.The letter of the utility model structure Single, workable, reliability is high, and efficiency of construction is higher, and structure stress clearly, and can realize that train operation and station construction are same Shi Jinhang, between be independent of each other, fully ensure train operation safety and station construction efficiency.
The purpose of the utility model technology is to be achieved by the following technical programs:Subway overhead vehicle of the present utility model Stand construction protecting platform car, include platform car crossbeam, two platform stays, platform truck diagonal brace, platform pulley sheave, platform trucks Track girder, platform slab track built-in fitting, underground railway track both sides are equipped with platform slab track built-in fitting or are equiped with two interim branch Support column, two platform truck upright supports on platform slab built-in fitting or temporary support column, platform car crossbeam and both sides it is flat Chassis column is connected, and platform truck diagonal brace is provided between platform car crossbeam and platform stay and is supported reinforcing
The utility model technology has the advantages that:
(1)Protecting platform is simple in construction, workable, and reliability is high, and main member is prefabricated in factory, then transports To building site assembly, welding and lifting, efficiency of construction is higher, and speed of application can be completed up to 3 ~ 4 Pin/day within the most short time Whole protecting platform construction.
(2)Protecting platform uses steel structure system, and structure stress is clear and definite, load bang path is clear, structural bearing capacity height, Rigidity is big, and station construction efficiency and the safety of train operation can be taken into account simultaneously, facilitates on-site hoisting.
(3)Protecting platform by station construction working face and circuit rail row separate from, it is ensured that train operation and station construction are same Shi Jinhang, between be independent of each other, because day and night can construct, therefore can effectively shorten the construction period.
(4)It is advantageously implemented saving, green, the engineering concept of environmental protection.The steel structure system that protecting platform is used is AT STATION Construction can be dismantled after finishing, and can reduce the use of construction material repeatedly using simultaneously final recyclable.
In order to reduce the risk brought during the newly-built station on operating line and improve station construction efficiency.By adopting With stress clearly, load bang path clearly protecting platform structure, by station construction working face and circuit rail row separate from, with Realize that train operation and station construction are carried out simultaneously, between be independent of each other, fully ensure train operation safety and station construction effect Rate.
Brief description of the drawings
The utility model is described in further detail below in conjunction with example and accompanying drawing:
Fig. 1 is protecting platform structural representation of the utility model example AT STATION in the range of effective platform.
Fig. 2 is protecting platform structural representation of the utility model example AT STATION outside effective platform scope.
Fig. 3 is protecting platform structural representation of the utility model example AT STATION in the range of device rooms.
Embodiment
Embodiment:
A kind of structural representation of the present utility model protecting platform car as shown in figure 1, subway overhead station is constructed, includes Platform car crossbeam 1, two platform stays 2, platform truck diagonal brace 3, platform pulley sheave 4, platform truck track girder 5, platform slab tracks Built-in fitting 10, underground railway track both sides are equipped with platform slab track built-in fitting 10 or are equiped with two temporary support columns 6, and two are put down Chassis column 2 is supported on platform slab built-in fitting 10 or temporary support column 6, platform car crossbeam 1 and the platform stay 2 of both sides It is connected, platform truck diagonal brace 3 is installed between platform car crossbeam 1 and platform stay 2 and is supported reinforcing.
In the present embodiment, the above-mentioned bottom of platform stay 2 is provided with the peaceful trolley track beam 5 of platform pulley sheave 4, platform truck Pulley 4 can be slided in platform truck track girder 5, and platform truck track girder 5 is installed in platform slab track built-in fitting 10 or temporary support On column 6.
In the present embodiment, above-mentioned two temporary support columns 6 are connected with interim diagonal brace 7.
In the present embodiment, temperature pier stull 8 is connected between above-mentioned two temporary support columns 6.
In the present embodiment, the bottom of above-mentioned two temporary support columns 6 is equiped with bar shaped armored concrete independence base respectively Plinth 9.Two temporary support columns 6 are combined into interim base with bar shaped reinforced concrete independent foundation 9, for support platform Car.
In the present embodiment, the above-mentioned bottom of platform slab built-in fitting 10 can install armored concrete buttress 13 additional.
In the present embodiment, above-mentioned armored concrete buttress 13 is supported in pier bottom temporary support 14.
In the present embodiment, above-mentioned platform car crossbeam 1 can install Dense mesh screen 11 additional.
In the present embodiment, the bottom of above-mentioned platform truck track girder 5 can install Bailey bracket 12 additional.
The utility model is when making:
(1)Platform car crossbeam 1, platform stay 2, platform truck diagonal brace 3, platform pulley sheave 4 use steel construction, in work It is prefabricated in factory, then it is transported to job site assembling and lifts, Pin portal-rigid frames is assembled on ground by workman.In addition, AT STATION Construction can be dismantled after finishing, and can reduce the use of construction material repeatedly using simultaneously final recyclable.
(2), should be pre- in platform slab relevant position construction protecting platform track road before platform plate face above structure construction, finishing Embedded part 10, spacing is 1m, is then attached platform truck track girder 5 with platform slab track built-in fitting 10, it is ensured that platform track Road beam 5 has enough strength and stiffness during protecting platform car is slided, safe and reliable.
(3)After after overnight train parking maintenance, the portal-rigid frames assembled on ground are lifted to by car by loop wheel machine successively Stand one end, and slide onto behind relevant position mutual snapping along track girder and be fixed on track girder, form protecting platform car.
(4)It is attached above protecting platform car between portal-rigid frames by purlin, and in the steel plate of laying protection above.Door It is stable that formula rigid frame side sets counterbracing to ensure, and carries out linked network and enclose to cover.
(5)Under the protection of the in-orbit interim protecting platform in row area, construction steel roof truss post and temporary support lift pars intermedia steel splitting Roof system skeleton, completes steel worm-gearing overall package.
(6)Under the protection of the in-orbit interim protecting platform in row area, roof system and station layer decoration construction are completed, is finally removed The interim protecting platform in Gui Hang areas.
The utility model has following features:
1)The structure type of protecting platform
Protecting platform uses shaped steel combination portal-rigid frames+track girder+temporary supporting system.Whole protecting platform installation Afterwards, equivalent to forming a containment vessel on the outside of train, can also image be interpreted as train and runed in temporary tunnel.Protection is flat Platform is divided into following three kinds of situations according to present position difference:
1. AT STATION in the range of effective platform, shaped steel portal-rigid frames are fallen within track girder by post bottom pulley, and track girder leads to The pre-embedded steel slab connection crossed in the form and platform slab of welding;
2. AT STATION beyond effective platform scope, shaped steel portal-rigid frames are fallen within track girder by post bottom pulley, track girder It is connected by the form of welding with lower section temporary supporting system.Temporary supporting system is welded using H profile steel, and lower section sets steel Reinforced concrete isolated footing, ground is reached by upper load.
3. in the range of equipment room, shaped steel portal-rigid frames are fallen within track girder by post bottom pulley, and track girder passes through welding Form be connected with lower section Bailey bracket system, Bailey bracket is positioned on the armored concrete buttress above station equipment shingle, Finally correspondence position sets interim I-shaped bracing members below armored concrete buttress, and upper load is reached into ground.
2)The distribution of protecting platform
Every construction period is likely to result in throwing object in high sky or the scope of pendant thing is considered as setting protecting platform, to avoid this A little objects are fallen into operating line, cause security incident.For overhead station, effective platform and steel structural roof upright projection In the range of be both needed to set protecting platform, and be considered as it is appropriate extend 5 ~ 10m to two ends, to ensure being perfectly safe for construction period.
3)The mounting means of protecting platform
Protecting platform component by prefabrication it is good after be transported to job site, using section to be single after ground is completed at the scene One end is lifted member AT STATION, is slid and transported by dedicated track.Operation platform car mutually snapping and is fixed on rail after in place On road beam.
4)Linked network
Protecting platform side should carry out linked network and enclose to cover, linked network way:Nexine steel wire, the close mesh safety net in intermediate layer, outer layer Steel wire.Close mesh safety net screen frequency is not less than 800 mesh/100cm2.
5)The dismounting of protecting platform
Protecting platform is removed after project under construction and safety door installation construction beyond protecting platform, it is removed Order slides platform truck to station one end with installing just on the contrary, release intersegmental fastener, final operation platform car with Section is that unit is hung to ground one by one.
The utility model solves the problem that station is set up on the existing operation line of subway.Formed by steel structure platform car Containment vessel isolates in station Gui Hang areas with construction working face so that during layer Steel Structure roof system of constructing, both can guarantee that The uninterrupted operation of existing operating line, can guarantee that the safety of existing operating line operation again, moreover it is possible to ensure station construction not by The influence of operating line.
Although embodiment of the present utility model is described above in association with accompanying drawing, the utility model does not limit to In above-mentioned specific embodiments and applications field, above-mentioned specific embodiment be only it is schematical, guiding, without It is restricted.One of ordinary skill in the art is under the enlightenment of this specification and is not departing from the utility model claim In the case of the scope protected, the form of many kinds can also be made, these belong to the row of the utility model protection.

Claims (9)

  1. The protecting platform car 1. a kind of subway overhead station is constructed, it is characterised in that include platform car crossbeam, two platform trucks and stand Post, platform truck diagonal brace, platform pulley sheave, platform truck track girder, platform slab track built-in fitting, underground railway track both sides are equipped with platform Plate track built-in fitting is equiped with two temporary support columns, and two platform truck upright supports are in platform slab built-in fitting or interim branch Support on column, platform car crossbeam is connected with the platform stay of both sides, is provided between platform car crossbeam and platform stay Platform truck diagonal brace is supported reinforcing.
  2. The protecting platform car 2. subway overhead station according to claim 1 is constructed, it is characterised in that above-mentioned platform stay Bottom is provided with the peaceful trolley track beam of platform pulley sheave, and platform pulley sheave can be slided in platform truck track girder, platform track Road beam is installed on platform slab track built-in fitting or temporary support column.
  3. The protecting platform car 3. subway overhead station according to claim 2 is constructed, it is characterised in that above-mentioned two interim branch Support column is connected with interim diagonal brace.
  4. The protecting platform car 4. subway overhead station according to claim 3 is constructed, it is characterised in that above-mentioned two interim branch Temperature pier stull is connected between support column.
  5. The protecting platform car 5. subway overhead station according to claim 4 is constructed, it is characterised in that above-mentioned two interim branch The bottom of support column is equiped with bar shaped reinforced concrete independent foundation, two temporary support columns and bar shaped armored concrete respectively Isolated footing is combined into interim base, for support platform car.
  6. The protecting platform car 6. subway overhead station according to claim 1 is constructed, it is characterised in that above-mentioned platform slab is pre-buried Part bottom can install armored concrete buttress additional.
  7. The protecting platform car 7. subway overhead station according to claim 6 is constructed, it is characterised in that above-mentioned armored concrete Buttress is supported in the temporary support of pier bottom.
  8. 8. the subway overhead station construction protecting platform car according to any one of claim 1 to 7, it is characterised in that above-mentioned flat Chassis crossbeam can install Dense mesh screen additional.
  9. The protecting platform car 9. subway overhead station according to claim 8 is constructed, it is characterised in that above-mentioned platform truck track The bottom of beam can install Bailey bracket additional.
CN201720203527.3U 2017-03-03 2017-03-03 A kind of subway overhead station construction protecting platform car Active CN206591862U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720203527.3U CN206591862U (en) 2017-03-03 2017-03-03 A kind of subway overhead station construction protecting platform car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720203527.3U CN206591862U (en) 2017-03-03 2017-03-03 A kind of subway overhead station construction protecting platform car

Publications (1)

Publication Number Publication Date
CN206591862U true CN206591862U (en) 2017-10-27

Family

ID=60127003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720203527.3U Active CN206591862U (en) 2017-03-03 2017-03-03 A kind of subway overhead station construction protecting platform car

Country Status (1)

Country Link
CN (1) CN206591862U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110682922A (en) * 2019-11-04 2020-01-14 广东省重工建筑设计院有限公司 Implementation method for adding station in existing line section
CN112609912A (en) * 2020-12-10 2021-04-06 中铁五局集团建筑工程有限责任公司 Construction method for newly building canopy in overhead operation subway station
CN112681372A (en) * 2020-12-10 2021-04-20 中铁五局集团建筑工程有限责任公司 Truss vehicle for reconstruction and extension construction of existing overhead operation subway station
CN112727132A (en) * 2020-12-10 2021-04-30 中铁五局集团建筑工程有限责任公司 Method for dismantling existing canopy of overhead operation subway station
CN113833292A (en) * 2021-05-28 2021-12-24 中铁五局集团建筑工程有限责任公司 Reconstruction method of station canopy
CN115162784A (en) * 2022-07-27 2022-10-11 浙江精工钢结构集团有限公司 Supporting tool for cross-operation-track upper cover concrete structure and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110682922A (en) * 2019-11-04 2020-01-14 广东省重工建筑设计院有限公司 Implementation method for adding station in existing line section
CN112609912A (en) * 2020-12-10 2021-04-06 中铁五局集团建筑工程有限责任公司 Construction method for newly building canopy in overhead operation subway station
CN112681372A (en) * 2020-12-10 2021-04-20 中铁五局集团建筑工程有限责任公司 Truss vehicle for reconstruction and extension construction of existing overhead operation subway station
CN112727132A (en) * 2020-12-10 2021-04-30 中铁五局集团建筑工程有限责任公司 Method for dismantling existing canopy of overhead operation subway station
CN113833292A (en) * 2021-05-28 2021-12-24 中铁五局集团建筑工程有限责任公司 Reconstruction method of station canopy
CN115162784A (en) * 2022-07-27 2022-10-11 浙江精工钢结构集团有限公司 Supporting tool for cross-operation-track upper cover concrete structure and construction method thereof
CN115162784B (en) * 2022-07-27 2023-06-27 浙江精工钢结构集团有限公司 Supporting tool of cross-operation track upper cover concrete structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN206591862U (en) A kind of subway overhead station construction protecting platform car
CN111254796B (en) Single-side integral hoisting long-span overbridge for multiple railway business lines and construction method
CN105926669A (en) Construction method of subway station
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN112727134B (en) Construction method for rebuilding and expanding main structure of existing overhead operation subway station building
CN110578339B (en) Construction method of shaft type underground stereo garage
CN106760529A (en) Roof system steel truss slipping and assembling operation platform and installation method
CN112609912B (en) Construction method for newly building canopy in overhead operation subway station
CN112727132B (en) Method for dismantling existing canopy of overhead operation subway station
CN208122371U (en) On across the high-speed rail safe guarding shed fast dismounting device of operation line
CN112746569B (en) Old bridge ecological demolition structure and construction method
CN104763109A (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
CN214005379U (en) Prefabricated part for expanding existing elevated operation subway station platform
CN105888281A (en) Method for utilizing jacking storey-adding technique to promote integrated function of community
CN209958508U (en) Fabricated concrete structure and subway ground access structure thereof
CN108277994A (en) On across the high ferro safe guarding shed quick method for dismounting of operation line
CN205875162U (en) Unilateral formula rock -anchored beam concrete placement rebar installation platform truck
Li et al. Study on construction technology of hydraulic climbing formwork for super high-rise building under aluminum formwork system
CN106193621A (en) Fabricated construction superimposed sheet string hangs construction method
CN112610244B (en) Prefabricated part for expanding existing elevated operation subway station platform and installation method thereof
CN205976546U (en) Rail transport device for inclined working face
CN113005900A (en) Inverted protection shed and mounting and dismounting method thereof
CN107143336A (en) A kind of road constructing structure against the wind with shield synchronous construction rail
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo
CN209742334U (en) Steel construction vestibule bottom curtain construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant