CN206590771U - A kind of operation wellhead hanging apparatus - Google Patents

A kind of operation wellhead hanging apparatus Download PDF

Info

Publication number
CN206590771U
CN206590771U CN201720165518.XU CN201720165518U CN206590771U CN 206590771 U CN206590771 U CN 206590771U CN 201720165518 U CN201720165518 U CN 201720165518U CN 206590771 U CN206590771 U CN 206590771U
Authority
CN
China
Prior art keywords
hydraulic
guide rail
wireline winch
hanging apparatus
rig floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720165518.XU
Other languages
Chinese (zh)
Inventor
李东春
卢继峰
范玉斌
董佳佳
陶陶
王文辉
李雪梅
王培鹏
张宝伟
张玲玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Sinopec Shengli Petroleum Engineering Corp
Downhole Operation Co Sinopec of Shengli Petroleum Engineering Corp
Original Assignee
Sinopec Oilfield Service Corp
Sinopec Shengli Petroleum Engineering Corp
Downhole Operation Co Sinopec of Shengli Petroleum Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Service Corp, Sinopec Shengli Petroleum Engineering Corp, Downhole Operation Co Sinopec of Shengli Petroleum Engineering Corp filed Critical Sinopec Oilfield Service Corp
Priority to CN201720165518.XU priority Critical patent/CN206590771U/en
Application granted granted Critical
Publication of CN206590771U publication Critical patent/CN206590771U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of operation wellhead hanging apparatus, can facilitate the dismounting and installation of well head corollary apparatus, improves operating efficiency, reduces the labor intensity of workman.This hanging apparatus includes hydraulic wireline winch, and guide rail is fixed on the lower surface of rig floor by guide rail suspension rod, and operational hydraulic cylinder is fixed on the side of rig floor by fluid cylinder support, and piston rod and the hydraulic wireline winch of operational hydraulic cylinder weld, hydraulic wireline winch are arranged in guide rail;Hydraulic oil port of two oil-outs of hydraulicdirectional control valve by hydraulic line respectively with hydraulic wireline winch and operational hydraulic cylinder is connected, and the oil inlet of hydraulicdirectional control valve is connected by hydraulic line with hydraulic power source.The problem of handling that current wellhead equipment and well workover facility be present are difficult is solved, eliminate shaft mouth operation personal height installation operation, it is ensured that production safety, it is to avoid damage of the production equipment in cargo handling process, with good using effect and application value.

Description

A kind of operation wellhead hanging apparatus
Technical field
The utility model is related to the workover rig of petroleum industry, particularly a kind of operation wellhead hanging apparatus, can facilitate well The dismounting and installation of mouth corollary apparatus, improve operating efficiency, reduce the labor intensity of workman.
Background technology
Current petroleum industry workover operation construction scene, when being dismantled below drilling platform of workover rig, assembling wellhead installation, due to Driller can't see the pithead position below drilling platform of workover rig, the handling of well head and the handling of auxiliary facility when operating, such as shunt in a well It is all highly difficult during the equipment handling such as device, self-styled, there are many potential safety hazards.Current handling mode is usually:Lifting is above-mentioned to be set When standby, passed through with small winch wire rope out of rig floor middle body turret apertures, around rig floor bottom outer, blocking needs assembling Equipment after lift.Need manually to have been hauled with rope because the equipment of lifting is on the tapered plane of rig floor bottom outer, during lifting Hang, easily cause extension, the card of rope, or even break steel wire rope and cause the accidents such as lifting object landing.Not only easily cause operating personnel Personal injury, while to equipment cause damage.
The content of the invention
The utility model is filled for the operation present situation of workover treatment rig floor handling facilities there is provided a kind of lifting of operation wellhead Put, during workover treatment, used when the well head such as handling blowout preventer, production tree and well workover facility, reach the mesh of safety in production , operating efficiency is improved, the labor intensity of operating personnel is reduced, production facility is protected.
What the utility model was realized in:A kind of operation wellhead hanging apparatus includes hydraulic wireline winch, and guide rail passes through guide rail Suspension rod is fixed on the lower surface of rig floor, and operational hydraulic cylinder is fixed on the side of rig floor, the piston rod of operational hydraulic cylinder by fluid cylinder support Welded with hydraulic wireline winch, hydraulic wireline winch is arranged in guide rail;Two oil-outs of hydraulicdirectional control valve are distinguished by hydraulic line It is connected with the hydraulic oil port of hydraulic wireline winch and operational hydraulic cylinder, the oil inlet of hydraulicdirectional control valve is connected by hydraulic line and hydraulic power source Connect.
The beneficial effects of the utility model are:The utility model be it is a kind of sling from rig floor bottom moved in parallel after equipment to The device of well head top position, it is convenient to load and unload the wellhead components such as blowout preventer, production tree and well workover facility, it is to avoid artificial use Rope hauls the defect of lifting, the personal safety of staff has been effectively ensured, production equipment is protected, it is to avoid safe thing Therefore.The problem of solving the handling difficulty that current wellhead equipment and well workover facility are present, eliminates shaft mouth operation personal height peace Dress operation, it is ensured that production safety, it is to avoid damage of the production equipment in cargo handling process, with good using effect and should With value.
Brief description of the drawings
Fig. 1 is operation principle schematic diagram of the present utility model.
Embodiment
The present invention is described in detail below in conjunction with accompanying drawing, not limited the scope of the invention, all designs using the present invention are thought The improvement that rood goes out belongs to the protection category of the present invention.
Referring to Fig. 1, a kind of operation wellhead hanging apparatus includes hydraulic wireline winch 6, and guide rail 7 is fixed on brill by guide rail suspension rod 8 The lower surface of platform 1, operational hydraulic cylinder 3 is fixed on the side of rig floor 1 by fluid cylinder support 2, and piston rod and the hydraulic pressure of operational hydraulic cylinder 3 are twisted Car 6 is welded, and hydraulic wireline winch 6 is arranged in guide rail 7;Two oil-outs of hydraulicdirectional control valve 5 by hydraulic line 4 respectively with liquid The hydraulic oil port connection of winch 6 and operational hydraulic cylinder 3 is pressed, the oil inlet of hydraulicdirectional control valve 5 is connected by hydraulic line 4 and hydraulic power source Connect.The lower section of rig floor 1 is provided with rig floor pillar 9.
The base lower end of the hydraulic wireline winch 6 is equipped with roller, and the wheel face of the roller coordinates with the guide groove of guide rail 7, in liquid Press the base lower end of winch 6 that roller is installed, make its slip smooth.
The front end of the piston rod of operational hydraulic cylinder 3 is more than with the tube chamber welds with base of hydraulic wireline winch 6, the collapsing length of piston rod 2m, such as 2.5m, 3m, are determined according to the size of rig floor 1.
The guide rail 7 is more than the radius of rig floor 1 provided with two, its length, and the front end of guide rail 7 is fixed by guide rail suspension rod 8 Lower section in the outer rim lower end of rig floor 1, the rear end fixed position of guide rail 7 is corresponding with the outer peripheral outside of well head.
The length of the guide rail suspension rod 8 is more than the height of hydraulic wireline winch 6, makes the roller and its rope above of hydraulic wireline winch 6 Rope retractable is operated freely.
The hydraulic power source includes workover rig hydraulic fluid tank and the hydraulic fluid tank of dedicated hydraulic equipment.
By the oil inlet of hydraulicdirectional control valve 5 of the present utility model and workover rig hydraulic fluid tank or dedicated hydraulic equipment hydraulic fluid tank Power taking mouthful, i.e. oil-out are connected, and when operation wellhead needs to install the equipment such as blowout preventer, fracture well head, press hydraulicdirectional control valve 5, Operation element fluid cylinder 3, moves to hydraulic wireline winch 6 marginal position of rig floor 1.Then hydraulicdirectional control valve 5 is pressed, hydraulic wireline winch is operated 6, rope and suspension hook are transferred, the equipment of lifting, then presses hydraulicdirectional control valve 5, operation element fluid cylinder 3 makes it required for slinging The top that piston rod promotes the hydraulic wireline winch 6 in guide rail 7 slowly to reach well head carries out equipment installation.Dismantle the mistake of wellhead installation Hydraulic wireline winch 6 as described above, is pushed into pithead position by journey first, and after the wellhead installation disassembled is lifted, hydraulic pressure is twisted Car 6 is moved to the marginal position of rig floor 1, unloads wellhead installation.
The embodiment described above is only exemplary embodiments, but the present invention is not limited only to these embodiments, this area Technical staff can make modification under without departing from the spirit of the present invention and enlightenment.Aspect disclosed herein there may be a lot Change, combination and modification, and be within, therefore, protection domain is not limited only to explanation above.

Claims (6)

1. a kind of operation wellhead hanging apparatus, including hydraulic wireline winch, it is characterized in that, guide rail is fixed on rig floor by guide rail suspension rod Lower surface, operational hydraulic cylinder is fixed on the side of rig floor by fluid cylinder support, and piston rod and the hydraulic wireline winch of operational hydraulic cylinder are welded, will Hydraulic wireline winch is arranged in guide rail;Two oil-outs of hydraulicdirectional control valve by hydraulic line respectively with hydraulic wireline winch and working solution The hydraulic oil port connection of cylinder, the oil inlet of hydraulicdirectional control valve is connected by hydraulic line with hydraulic power source.
2. a kind of operation wellhead hanging apparatus as claimed in claim 1, it is characterized in that, the base lower end dress of the hydraulic wireline winch There is roller, the wheel face of the roller and the guide groove of guide rail coordinate.
3. a kind of operation wellhead hanging apparatus as claimed in claim 2, it is characterized in that, the front end of the operational hydraulic cylinder piston rod The collapsing length of tube chamber welds with base, piston rod with hydraulic wireline winch is more than 2m.
4. a kind of operation wellhead hanging apparatus as claimed in claim 2, it is characterized in that, the guide rail is provided with two, its length More than the radius of rig floor, the front end of guide rail is fixed on the outer rim lower end of rig floor, guide rail rear end fixed position by guide rail suspension rod Lower section is corresponding with the outer peripheral outside of well head.
5. a kind of operation wellhead hanging apparatus as described in claim 1 or 4, it is characterized in that, the length of the guide rail suspension rod is big In the height of hydraulic wireline winch.
6. a kind of operation wellhead hanging apparatus as claimed in claim 1, it is characterized in that, the hydraulic power source includes workover rig hydraulic pressure The hydraulic fluid tank of case and dedicated hydraulic equipment.
CN201720165518.XU 2017-02-23 2017-02-23 A kind of operation wellhead hanging apparatus Expired - Fee Related CN206590771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720165518.XU CN206590771U (en) 2017-02-23 2017-02-23 A kind of operation wellhead hanging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720165518.XU CN206590771U (en) 2017-02-23 2017-02-23 A kind of operation wellhead hanging apparatus

Publications (1)

Publication Number Publication Date
CN206590771U true CN206590771U (en) 2017-10-27

Family

ID=60125374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720165518.XU Expired - Fee Related CN206590771U (en) 2017-02-23 2017-02-23 A kind of operation wellhead hanging apparatus

Country Status (1)

Country Link
CN (1) CN206590771U (en)

Similar Documents

Publication Publication Date Title
CN202064839U (en) Four-drill column double headframe for land drilling machine
US20140224499A1 (en) Modular well intervention assembly
CN103863938B (en) For carrying the safty hoisting device of wind tunnel experiment car
CN103512744B (en) Safety valve checkout platform security protection and hanging apparatus
CN206590771U (en) A kind of operation wellhead hanging apparatus
CN202832296U (en) Drill rod lifting device on drilling equipment
CN203499592U (en) Wellhead operating device for workover treatment
CN203833519U (en) Miniature crane capable of limiting hoisting according to inclination of car body
CN204457501U (en) A kind of oil pipe conveying device of improvement
CN203961840U (en) Oil pipe bed hydraulic lifting oil pipe hydraulic pressure conveying device
CN206842924U (en) A kind of new logging truck
CN217176526U (en) Light-duty well head unmanned workover device
CN103437798B (en) Device for installing and removing fully mechanized mining supporter
CN205773170U (en) Underground mine use Mobile lifting inspection platform
CN209959289U (en) Mining hydraulic hoisting-free loading platform
CN206705632U (en) A kind of portable Work tool lift transport device
CN207092949U (en) The convenient rig of elevator formula free of demolition
CN207363621U (en) A kind of overhead cat road of drilling well
CN206538098U (en) A kind of dedicated lifting hook of replaceable overhead traveling crane auxiliary hook
CN206942692U (en) A kind of well repairing device combined by hydraulic tongs with wellhead slip
CN206521230U (en) A kind of novel self-lock mechanism
CN106368626B (en) A kind of safety platform automatic tube-arranging device
CN205778602U (en) A kind of well head automated job device
CN205294680U (en) Lifting device
CN205225104U (en) Oil pipe sliding device is down played to borehole operation high efficiency in oil field

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171027

Termination date: 20180223