CN206590771U - A kind of operation wellhead hanging apparatus - Google Patents
A kind of operation wellhead hanging apparatus Download PDFInfo
- Publication number
- CN206590771U CN206590771U CN201720165518.XU CN201720165518U CN206590771U CN 206590771 U CN206590771 U CN 206590771U CN 201720165518 U CN201720165518 U CN 201720165518U CN 206590771 U CN206590771 U CN 206590771U
- Authority
- CN
- China
- Prior art keywords
- hydraulic
- guide rail
- wireline winch
- hanging apparatus
- rig floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of operation wellhead hanging apparatus, can facilitate the dismounting and installation of well head corollary apparatus, improves operating efficiency, reduces the labor intensity of workman.This hanging apparatus includes hydraulic wireline winch, and guide rail is fixed on the lower surface of rig floor by guide rail suspension rod, and operational hydraulic cylinder is fixed on the side of rig floor by fluid cylinder support, and piston rod and the hydraulic wireline winch of operational hydraulic cylinder weld, hydraulic wireline winch are arranged in guide rail;Hydraulic oil port of two oil-outs of hydraulicdirectional control valve by hydraulic line respectively with hydraulic wireline winch and operational hydraulic cylinder is connected, and the oil inlet of hydraulicdirectional control valve is connected by hydraulic line with hydraulic power source.The problem of handling that current wellhead equipment and well workover facility be present are difficult is solved, eliminate shaft mouth operation personal height installation operation, it is ensured that production safety, it is to avoid damage of the production equipment in cargo handling process, with good using effect and application value.
Description
Technical field
The utility model is related to the workover rig of petroleum industry, particularly a kind of operation wellhead hanging apparatus, can facilitate well
The dismounting and installation of mouth corollary apparatus, improve operating efficiency, reduce the labor intensity of workman.
Background technology
Current petroleum industry workover operation construction scene, when being dismantled below drilling platform of workover rig, assembling wellhead installation, due to
Driller can't see the pithead position below drilling platform of workover rig, the handling of well head and the handling of auxiliary facility when operating, such as shunt in a well
It is all highly difficult during the equipment handling such as device, self-styled, there are many potential safety hazards.Current handling mode is usually:Lifting is above-mentioned to be set
When standby, passed through with small winch wire rope out of rig floor middle body turret apertures, around rig floor bottom outer, blocking needs assembling
Equipment after lift.Need manually to have been hauled with rope because the equipment of lifting is on the tapered plane of rig floor bottom outer, during lifting
Hang, easily cause extension, the card of rope, or even break steel wire rope and cause the accidents such as lifting object landing.Not only easily cause operating personnel
Personal injury, while to equipment cause damage.
The content of the invention
The utility model is filled for the operation present situation of workover treatment rig floor handling facilities there is provided a kind of lifting of operation wellhead
Put, during workover treatment, used when the well head such as handling blowout preventer, production tree and well workover facility, reach the mesh of safety in production
, operating efficiency is improved, the labor intensity of operating personnel is reduced, production facility is protected.
What the utility model was realized in:A kind of operation wellhead hanging apparatus includes hydraulic wireline winch, and guide rail passes through guide rail
Suspension rod is fixed on the lower surface of rig floor, and operational hydraulic cylinder is fixed on the side of rig floor, the piston rod of operational hydraulic cylinder by fluid cylinder support
Welded with hydraulic wireline winch, hydraulic wireline winch is arranged in guide rail;Two oil-outs of hydraulicdirectional control valve are distinguished by hydraulic line
It is connected with the hydraulic oil port of hydraulic wireline winch and operational hydraulic cylinder, the oil inlet of hydraulicdirectional control valve is connected by hydraulic line and hydraulic power source
Connect.
The beneficial effects of the utility model are:The utility model be it is a kind of sling from rig floor bottom moved in parallel after equipment to
The device of well head top position, it is convenient to load and unload the wellhead components such as blowout preventer, production tree and well workover facility, it is to avoid artificial use
Rope hauls the defect of lifting, the personal safety of staff has been effectively ensured, production equipment is protected, it is to avoid safe thing
Therefore.The problem of solving the handling difficulty that current wellhead equipment and well workover facility are present, eliminates shaft mouth operation personal height peace
Dress operation, it is ensured that production safety, it is to avoid damage of the production equipment in cargo handling process, with good using effect and should
With value.
Brief description of the drawings
Fig. 1 is operation principle schematic diagram of the present utility model.
Embodiment
The present invention is described in detail below in conjunction with accompanying drawing, not limited the scope of the invention, all designs using the present invention are thought
The improvement that rood goes out belongs to the protection category of the present invention.
Referring to Fig. 1, a kind of operation wellhead hanging apparatus includes hydraulic wireline winch 6, and guide rail 7 is fixed on brill by guide rail suspension rod 8
The lower surface of platform 1, operational hydraulic cylinder 3 is fixed on the side of rig floor 1 by fluid cylinder support 2, and piston rod and the hydraulic pressure of operational hydraulic cylinder 3 are twisted
Car 6 is welded, and hydraulic wireline winch 6 is arranged in guide rail 7;Two oil-outs of hydraulicdirectional control valve 5 by hydraulic line 4 respectively with liquid
The hydraulic oil port connection of winch 6 and operational hydraulic cylinder 3 is pressed, the oil inlet of hydraulicdirectional control valve 5 is connected by hydraulic line 4 and hydraulic power source
Connect.The lower section of rig floor 1 is provided with rig floor pillar 9.
The base lower end of the hydraulic wireline winch 6 is equipped with roller, and the wheel face of the roller coordinates with the guide groove of guide rail 7, in liquid
Press the base lower end of winch 6 that roller is installed, make its slip smooth.
The front end of the piston rod of operational hydraulic cylinder 3 is more than with the tube chamber welds with base of hydraulic wireline winch 6, the collapsing length of piston rod
2m, such as 2.5m, 3m, are determined according to the size of rig floor 1.
The guide rail 7 is more than the radius of rig floor 1 provided with two, its length, and the front end of guide rail 7 is fixed by guide rail suspension rod 8
Lower section in the outer rim lower end of rig floor 1, the rear end fixed position of guide rail 7 is corresponding with the outer peripheral outside of well head.
The length of the guide rail suspension rod 8 is more than the height of hydraulic wireline winch 6, makes the roller and its rope above of hydraulic wireline winch 6
Rope retractable is operated freely.
The hydraulic power source includes workover rig hydraulic fluid tank and the hydraulic fluid tank of dedicated hydraulic equipment.
By the oil inlet of hydraulicdirectional control valve 5 of the present utility model and workover rig hydraulic fluid tank or dedicated hydraulic equipment hydraulic fluid tank
Power taking mouthful, i.e. oil-out are connected, and when operation wellhead needs to install the equipment such as blowout preventer, fracture well head, press hydraulicdirectional control valve 5,
Operation element fluid cylinder 3, moves to hydraulic wireline winch 6 marginal position of rig floor 1.Then hydraulicdirectional control valve 5 is pressed, hydraulic wireline winch is operated
6, rope and suspension hook are transferred, the equipment of lifting, then presses hydraulicdirectional control valve 5, operation element fluid cylinder 3 makes it required for slinging
The top that piston rod promotes the hydraulic wireline winch 6 in guide rail 7 slowly to reach well head carries out equipment installation.Dismantle the mistake of wellhead installation
Hydraulic wireline winch 6 as described above, is pushed into pithead position by journey first, and after the wellhead installation disassembled is lifted, hydraulic pressure is twisted
Car 6 is moved to the marginal position of rig floor 1, unloads wellhead installation.
The embodiment described above is only exemplary embodiments, but the present invention is not limited only to these embodiments, this area
Technical staff can make modification under without departing from the spirit of the present invention and enlightenment.Aspect disclosed herein there may be a lot
Change, combination and modification, and be within, therefore, protection domain is not limited only to explanation above.
Claims (6)
1. a kind of operation wellhead hanging apparatus, including hydraulic wireline winch, it is characterized in that, guide rail is fixed on rig floor by guide rail suspension rod
Lower surface, operational hydraulic cylinder is fixed on the side of rig floor by fluid cylinder support, and piston rod and the hydraulic wireline winch of operational hydraulic cylinder are welded, will
Hydraulic wireline winch is arranged in guide rail;Two oil-outs of hydraulicdirectional control valve by hydraulic line respectively with hydraulic wireline winch and working solution
The hydraulic oil port connection of cylinder, the oil inlet of hydraulicdirectional control valve is connected by hydraulic line with hydraulic power source.
2. a kind of operation wellhead hanging apparatus as claimed in claim 1, it is characterized in that, the base lower end dress of the hydraulic wireline winch
There is roller, the wheel face of the roller and the guide groove of guide rail coordinate.
3. a kind of operation wellhead hanging apparatus as claimed in claim 2, it is characterized in that, the front end of the operational hydraulic cylinder piston rod
The collapsing length of tube chamber welds with base, piston rod with hydraulic wireline winch is more than 2m.
4. a kind of operation wellhead hanging apparatus as claimed in claim 2, it is characterized in that, the guide rail is provided with two, its length
More than the radius of rig floor, the front end of guide rail is fixed on the outer rim lower end of rig floor, guide rail rear end fixed position by guide rail suspension rod
Lower section is corresponding with the outer peripheral outside of well head.
5. a kind of operation wellhead hanging apparatus as described in claim 1 or 4, it is characterized in that, the length of the guide rail suspension rod is big
In the height of hydraulic wireline winch.
6. a kind of operation wellhead hanging apparatus as claimed in claim 1, it is characterized in that, the hydraulic power source includes workover rig hydraulic pressure
The hydraulic fluid tank of case and dedicated hydraulic equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720165518.XU CN206590771U (en) | 2017-02-23 | 2017-02-23 | A kind of operation wellhead hanging apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720165518.XU CN206590771U (en) | 2017-02-23 | 2017-02-23 | A kind of operation wellhead hanging apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206590771U true CN206590771U (en) | 2017-10-27 |
Family
ID=60125374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720165518.XU Expired - Fee Related CN206590771U (en) | 2017-02-23 | 2017-02-23 | A kind of operation wellhead hanging apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206590771U (en) |
-
2017
- 2017-02-23 CN CN201720165518.XU patent/CN206590771U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202064839U (en) | Four-drill column double headframe for land drilling machine | |
US20140224499A1 (en) | Modular well intervention assembly | |
CN103863938B (en) | For carrying the safty hoisting device of wind tunnel experiment car | |
CN103512744B (en) | Safety valve checkout platform security protection and hanging apparatus | |
CN206590771U (en) | A kind of operation wellhead hanging apparatus | |
CN202832296U (en) | Drill rod lifting device on drilling equipment | |
CN203499592U (en) | Wellhead operating device for workover treatment | |
CN203833519U (en) | Miniature crane capable of limiting hoisting according to inclination of car body | |
CN204457501U (en) | A kind of oil pipe conveying device of improvement | |
CN203961840U (en) | Oil pipe bed hydraulic lifting oil pipe hydraulic pressure conveying device | |
CN206842924U (en) | A kind of new logging truck | |
CN217176526U (en) | Light-duty well head unmanned workover device | |
CN103437798B (en) | Device for installing and removing fully mechanized mining supporter | |
CN205773170U (en) | Underground mine use Mobile lifting inspection platform | |
CN209959289U (en) | Mining hydraulic hoisting-free loading platform | |
CN206705632U (en) | A kind of portable Work tool lift transport device | |
CN207092949U (en) | The convenient rig of elevator formula free of demolition | |
CN207363621U (en) | A kind of overhead cat road of drilling well | |
CN206538098U (en) | A kind of dedicated lifting hook of replaceable overhead traveling crane auxiliary hook | |
CN206942692U (en) | A kind of well repairing device combined by hydraulic tongs with wellhead slip | |
CN206521230U (en) | A kind of novel self-lock mechanism | |
CN106368626B (en) | A kind of safety platform automatic tube-arranging device | |
CN205778602U (en) | A kind of well head automated job device | |
CN205294680U (en) | Lifting device | |
CN205225104U (en) | Oil pipe sliding device is down played to borehole operation high efficiency in oil field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171027 Termination date: 20180223 |