CN206588596U - High pressure thick-walled pipe welding production line - Google Patents
High pressure thick-walled pipe welding production line Download PDFInfo
- Publication number
- CN206588596U CN206588596U CN201720304895.7U CN201720304895U CN206588596U CN 206588596 U CN206588596 U CN 206588596U CN 201720304895 U CN201720304895 U CN 201720304895U CN 206588596 U CN206588596 U CN 206588596U
- Authority
- CN
- China
- Prior art keywords
- long rails
- pipeline
- longitudinal direction
- track
- conveyer belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The utility model is related to high pressure thick-walled pipe welding production line, pipe cutting, retaining wall on slope, welding etc. are concentrated in a same factory building, and steel pipe is transmitted by orbital fashion, save working area or space, on the one hand pipeline welding efficiency and welding quality can be effectively improved, the equipment of raising company pipeline engineering construction, technical capability, on the other hand can significantly reduce pipeline construction operating personnel's labor intensity, reduce the demand to skilled welder.
Description
Technical field
The utility model is related to a kind of production line, and in particular to high pressure thick-walled pipe welding production line.
Background technology
Thick-walled pipe is also referred to as thick walled steel tube, the steel pipe that the ratio between outer diameter of steel pipes and wall thickness are less than 20 is called thick walled steel tube, mainly
It is used as petroleum geology drill pipe, the cracking tube of petrochemical industry, boiler tube, bushed bearing and automobile, tractor, aviation with high-precision
Spend structural tube etc..
With the continuous progress and the fast development of economic construction of society, the scale of China's oil chemical industry is increasingly
Greatly, the design pressure of petrochemical equipment pipeline engineering, caliber, wall thickness are continuously increased, so that the welding job amount of pipeline engineering construction
Increasing, quality requirement more and more higher, therefore the welding efficiency and welding quality of posted sides pipeline are improved also just as pipeliner
Very the key link in journey work progress.
Utility model content
The utility model is its object is to disclose a kind of high pressure thick-walled pipe welding production line, by pipe cutting, groove
Processing, welding etc. are concentrated in a same factory building, and transmit steel pipe by orbital fashion, save working area or sky
Between, pipeline welding efficiency and welding quality on the one hand can be effectively improved, equipment, the technology energy of company's pipeline engineering construction is improved
Power, on the other hand can significantly reduce pipeline construction operating personnel's labor intensity, reduce the demand to skilled welder.
Realizing the technical scheme of high pressure thick-walled pipe welding production line described in the utility model is:
High pressure thick-walled pipe welding production line, including feeding area, the feeding area are connected by first longitudinal direction track and produced
Product output area, first longitudinal direction track front end is connected in the first conveyer belt, first conveyer belt by two the first cross tracks
Between provided with pipeline numerical control cut band sawing machine, it is described first transmission end of tape is sequentially connected the second biography by two the second cross tracks
Band, the 3rd conveyer belt and first longitudinal direction track are sent, described second conveyer belt one end is provided with the first pipeline numerical control end surface beveller, institute
The 3rd conveyer belt other end is stated provided with second pipe numerical control end surface beveller, the first longitudinal direction track end right side passes through two
3rd cross track and two article of the 4th cross track are sequentially connected second longitudinal direction track and the 3rd long rails, the second longitudinal direction
Track two ends are equipped with Quick coupling device for pipeline prefabrication, and described 3rd long rails one end is provided with cantilevered automatic pipeline welder,
The 3rd long rails other end is provided with split type automatic pipeline welder, and the first longitudinal direction track end passes on left two
3rd cross track and two article of the 4th cross track are sequentially connected the 4th long rails and the 5th long rails, the 4th longitudinal direction
Track two ends are provided with pipe prefabrication Quick butt connector, and the 5th long rails two ends are provided with split type automatic pipeline welder.
Further, small rail car logistics delivery system, the small rail car thing are provided with the right side of the 3rd long rails
Flowing delivery system includes the 6th long rails, and the 6th long rails are provided with material transportation dolly, the described 6th longitudinal rail
It is parallel that cantilevered automatic pipeline welder one end is placed in road one end with the 3rd long rails.
Further, the first longitudinal direction track, second longitudinal direction track, the 3rd long rails, the 4th long rails, the 5th
Pass through two pipelines on long rails, the first cross track, the second cross track, the 3rd cross track and the 4th cross track
Travelling bogie is transported.
Brief description of the drawings
Fig. 1 is the top view of high pressure thick-walled pipe welding production line described in the utility model.
The title that each part is marked in figure is as follows:
11st, first longitudinal direction track;12nd, second longitudinal direction track;13rd, the 3rd long rails;14th, the 4th long rails;15th,
Five long rails;16th, the 6th long rails;21st, the first cross track;22nd, the second cross track;23rd, the 3rd cross track;
24th, the 4th cross track;31st, the first conveyer belt;32nd, the second conveyer belt;33rd, the 3rd conveyer belt;4th, pipeline numerical control cutting belt is sawed
Bed;51st, the first pipeline numerical control end surface beveller;52nd, second pipe numerical control end surface beveller;6th, Quick coupling device for pipeline prefabrication;
7th, cantilevered automatic pipeline welder;8th, split type automatic pipeline welder;9th, material transportation dolly;10th, pipeline transportation dolly;100、
Feeding area;200th, output of products area.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment, based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Embodiment:High pressure thick-walled pipe welding production line, including feeding area 100, the feeding area 100 are vertical by first
To the connection output of products of track 11 area 200, the front end of first longitudinal direction track 11 connects first by two the first cross tracks 21 and passed
Send and cut band sawing machine 4 provided with pipeline numerical control in the middle of band 31, first conveyer belt 31, the end of the first conveyer belt 31 passes through two
Article the second cross track 22 is sequentially connected the second conveyer belt 32, the 3rd conveyer belt 33 and first longitudinal direction track 11, and described second passes
The one end of band 32 is sent to be provided with the first pipeline numerical control end surface beveller 51, the other end of the 3rd conveyer belt 33 is provided with second pipe numerical control
Pass through two article of the 3rd cross track 23 and two article of the 4th transverse rails on the right side of end surface beveller 52, the end of first longitudinal direction track 11
Road 24 is sequentially connected the long rails 13 of second longitudinal direction track 12 and the 3rd, and it is pre- that the two ends of second longitudinal direction track 12 are equipped with pipeline
Quick group is made to device 6, described one end of 3rd long rails 13 is provided with cantilevered automatic pipeline welder 7, the 3rd long rails
13 other ends are provided with split type automatic pipeline welder 8, and the end of first longitudinal direction track 11 passes on left two article of the 3rd transverse rails
Road 23 and two article of the 4th cross track 24 are sequentially connected the 4th long rails 14 and the 5th long rails 15, the described 4th longitudinal rail
The two ends of road 14 are provided with pipe prefabrication Quick butt connector 6, and the two ends of the 5th long rails 15 are provided with split type automatic pipeline welder
8。
The right side of 3rd long rails 13 is provided with small rail car logistics delivery system, and system is transported in the small rail car logistics
System includes the 6th long rails 16, and the 6th long rails 16 are provided with material transportation dolly 9, the 6th long rails 16
It is parallel that 7 one end of cantilevered automatic pipeline welder are placed in one end with the 3rd long rails 13.
The first longitudinal direction track 11, second longitudinal direction track 12, the 3rd long rails 13, the 4th long rails the 14, the 5th
Lead on long rails 15, the first cross track 21, the second cross track 22, the 3rd cross track 23 and the 4th cross track 24
Two pipeline transportation dollies 10 are crossed to be transported.
The operation principle of the present embodiment:Pipeline is put into two pipeline transportation dollies on first longitudinal direction track 11 from feeding area
On 10, pipeline is transported on the first conveyer belt 31 by two pipeline transportation dollies 10, the first conveyer belt 31 is by pipeline transportation
Cut on to pipeline numerical control cutting band sawing machine 4, complete to transport to the first pipeline by the second cross track 22 after cutting
Numerical control end surface beveller 51 carries out both ends of the surface retaining wall on slope with second pipe numerical control end surface beveller 52, is transported back after completing processing
To first longitudinal direction track 11, first longitudinal direction track 11 is provided with pipeline again by pipeline transportation to welding area in welding area
Prefabricated quick group, to device 6,8 three kinds of machines of cantilevered automatic pipeline welder 7 and split type automatic pipeline welder, passes through transverse rails
Welding pipeline transportation can be grouped into corresponding machine with the effect of pipeline transportation dolly 10 in road, long rails, welding
After the completion of duct products are transported on first longitudinal direction track 11 by cross track again, by first longitudinal direction track 11 by pipeline
Product is transferred to output of products area 200.
The beneficial effects of the utility model are:By the way that pipe cutting, retaining wall on slope, welding etc. are concentrated on into a factory
In room, (+4 welding work of i.e. 1 cutting stock work station of configuration " 1+4 " high pressure thick-walled pipe welding production line
Stand), then it is transmitted by conveyer belt, track and travelling bogie, completes pipe prefabrication production, be effectively reduced welder
Time to wait, the high advantage of its production efficiency can be more fully played, to strive for the maximization of benefit.
Claims (3)
1. high pressure thick-walled pipe welding production line, including feeding area, it is characterised in that the feeding area passes through first longitudinal direction rail
Road connection output of products area, first longitudinal direction track front end connects the first conveyer belt, described first by two the first cross tracks
Band sawing machine is cut provided with pipeline numerical control in the middle of conveyer belt, the first transmission end of tape is connected successively by two the second cross tracks
The second conveyer belt, the 3rd conveyer belt and first longitudinal direction track are connect, described second conveyer belt one end is provided with the first pipeline numerical control end surface
Beveling machine, the 3rd conveyer belt other end is provided with second pipe numerical control end surface beveller, and the first longitudinal direction track end is right
Side is sequentially connected second longitudinal direction track and the 3rd long rails by two article of the 3rd cross track and two article of the 4th cross track, institute
State second longitudinal direction track two ends and be equipped with Quick coupling device for pipeline prefabrication, described 3rd long rails one end is provided with cantilevered pipeline
Automatic welder, the 3rd long rails other end is provided with split type automatic pipeline welder, and the first longitudinal direction track end is left
Side is sequentially connected the 4th long rails and the 5th long rails by two article of the 3rd cross track and two article of the 4th cross track, institute
The 4th long rails two ends are stated provided with pipe prefabrication Quick butt connector, the 5th long rails two ends are provided with split type pipeline certainly
Dynamic welding machine.
2. high pressure thick-walled pipe welding production line according to claim 1, it is characterised in that the 3rd long rails are right
Side is provided with small rail car logistics delivery system, and the small rail car logistics delivery system includes the 6th long rails, the described 6th
Long rails are provided with material transportation dolly, and cantilevered pipeline is placed certainly in described 6th long rails one end with the 3rd long rails
Dynamic welding machine one end is parallel.
3. high pressure thick-walled pipe welding production line according to claim 1, it is characterised in that the first longitudinal direction track,
Second longitudinal direction track, the 3rd long rails, the 4th long rails, the 5th long rails, the first cross track, the second transverse rails
Transported on road, the 3rd cross track and the 4th cross track by two pipeline transportation dollies.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720304895.7U CN206588596U (en) | 2017-03-27 | 2017-03-27 | High pressure thick-walled pipe welding production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720304895.7U CN206588596U (en) | 2017-03-27 | 2017-03-27 | High pressure thick-walled pipe welding production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206588596U true CN206588596U (en) | 2017-10-27 |
Family
ID=60122984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720304895.7U Active CN206588596U (en) | 2017-03-27 | 2017-03-27 | High pressure thick-walled pipe welding production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206588596U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109290808A (en) * | 2018-09-26 | 2019-02-01 | 昆山华恒焊接股份有限公司 | Pipeline modularization prefabricated production line and pipeline module method for prefabricating |
CN112571079A (en) * | 2020-11-30 | 2021-03-30 | 王振凯 | Pipe gallery and pipeline integrated construction device and construction method |
-
2017
- 2017-03-27 CN CN201720304895.7U patent/CN206588596U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109290808A (en) * | 2018-09-26 | 2019-02-01 | 昆山华恒焊接股份有限公司 | Pipeline modularization prefabricated production line and pipeline module method for prefabricating |
CN109290808B (en) * | 2018-09-26 | 2024-06-07 | 昆山华恒焊接股份有限公司 | Pipeline modularization prefabrication production line and pipeline module prefabrication method |
CN112571079A (en) * | 2020-11-30 | 2021-03-30 | 王振凯 | Pipe gallery and pipeline integrated construction device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102513787B (en) | Process for production line of an ocean engineering structural steel pipes | |
CN206588596U (en) | High pressure thick-walled pipe welding production line | |
CN202015947U (en) | Multifunctional modular container-type pipeline prefabricating work station | |
CN202411761U (en) | Thick-wall pipeline aligning and welding seam adjusting device | |
CN201720659U (en) | Novel pipeline aligning device | |
CN201982799U (en) | Cross traveling trolley for pipe laying ship | |
CN104175119A (en) | Novel pipeline elbow automatic production line | |
CN206969493U (en) | A kind of tubing transmits lifting mechanism | |
CN210162750U (en) | Automatic pipe feeding device | |
CN103624872A (en) | Automatic streamlined operating platform for anti-corrosion prestressed concrete tubular piles | |
CN103552822B (en) | Multistation steel plate conveying carrier | |
CN203495496U (en) | Seamless steel pipe rotating cutting auxiliary tool | |
CN203579193U (en) | Automatic prefabricating production line for large-scale LNG pipeline | |
CN203601935U (en) | Multistation steel plate conveying trolley | |
CN203997772U (en) | A kind of motor car wheel is carried and marshalling ordering system underground long distance | |
CN212928987U (en) | Construction equipment for quickly installing pipeline in pipe gallery | |
CN211442941U (en) | Automatic stacking mechanism system of waiting material area for steel pipe casing equipment | |
CN219028175U (en) | Prefabricated insulating pipe production line capable of running continuously | |
CN202201452U (en) | Combined conveying equipment for steel door leaves | |
CN203282172U (en) | Novel automatic production line of pipeline elbows | |
CN207061321U (en) | Geldart-D particle plug-back device | |
CN202897430U (en) | Hot-rolled stock waste material conveying system of hot continuous rolling production line | |
CN218577786U (en) | Universal transfer trolley for pipes | |
CN212687428U (en) | Large-size pipeline transportation device suitable for narrow space | |
CN201208687Y (en) | Pairing fixture for producing pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |