CN206581596U - Toilet chamfering section bar - Google Patents

Toilet chamfering section bar Download PDF

Info

Publication number
CN206581596U
CN206581596U CN201720189391.5U CN201720189391U CN206581596U CN 206581596 U CN206581596 U CN 206581596U CN 201720189391 U CN201720189391 U CN 201720189391U CN 206581596 U CN206581596 U CN 206581596U
Authority
CN
China
Prior art keywords
plate
section bar
toilet
chamfering
chamfering section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720189391.5U
Other languages
Chinese (zh)
Inventor
沈伟
吴铁利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan xuntou Engineering Technology Co., Ltd
FOSHAN ZHONGXUN TUOXIN MATERIAL TECHNOLOGY Co.,Ltd.
Original Assignee
In City Of Foshan Xuntuo Aluminum Mold Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by In City Of Foshan Xuntuo Aluminum Mold Technology Co Ltd filed Critical In City Of Foshan Xuntuo Aluminum Mold Technology Co Ltd
Priority to CN201720189391.5U priority Critical patent/CN206581596U/en
Application granted granted Critical
Publication of CN206581596U publication Critical patent/CN206581596U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses toilet chamfering section bar, it includes the first plate, second plate and threeth plate vertical with the first plate, one end of second plate is directly connected to the 3rd plate, the other end of second plate is connected by connecting swash plate with the first plate, first plate and the 3rd plate are respectively positioned on the same side of the second plate, pass through the first plate, second plate, 3rd plate and connection swash plate and other template splicings are into after casting system, the outside for connecting swash plate forms lavatory caisson chamfering casting space, so, the concrete chamfering one-shot forming of caisson of toilet position can be made, the process for reducing the secondary chamfering of this position construction, be conducive to the waterproof of toilet.The utility model is suitable for the pouring of lavatory caisson.

Description

Toilet chamfering section bar
Technical field
The utility model is related to a kind of section bar in building aluminum alloy pattern plate research field, particularly a kind of toilet chamfering type Material.
Background technology
There is no special toilet section bar in existing building aluminum alloy pattern plate.It is connected into by common aluminum alloy mould plate piece After casting system, toward after the interior injection concrete mud of building system, in caisson of toilet position, side wall and the angle of bottom surface are 90 °, junction in subsequent construction, it is necessary between side wall and bottom surface on cement chamfering, because cement chamfering is secondary Construction, causes its sealing between side wall or/and ground not enough, the infiltration toward cement chamfering inside easily occurs, causes water The situation that mud chamfering is peeled off.In order to solve the above problems, it is necessary to which one kind can realize that cement chamfering, side and bottom surface are integrally formed Template.
Utility model content
The purpose of this utility model, is to provide a kind of toilet chamfering section bar.
The solution that the utility model solves its technical problem is:Toilet chamfering section bar, it includes the first plate, with the One plate vertical the second plate and the 3rd plate, one end and the 3rd plate of second plate are directly connected to, and the other end of the second plate leads to Cross connection swash plate to be connected with the first plate, first plate and the 3rd plate are respectively positioned on the same side of the second plate.
As the further improvement of above-mentioned technical proposal, first plate and connection swash plate are connected by the first arc, Second plate and connection swash plate are connected by the second arc.
As the further improvement of above-mentioned technical proposal, the medial surface of second plate and the 3rd plate junction is disposed with One transition arc.
As the further improvement of above-mentioned technical proposal, the 3rd plate and the first plate are parallel.
As the further improvement of above-mentioned technical proposal, the angle of first plate and connection swash plate is 45 °.
As the further improvement of above-mentioned technical proposal, the lateral surface of the 3rd plate is disposed with the first locating slot and second Locating slot.
As the further improvement of above-mentioned technical proposal, connection is disposed between first locating slot and the second locating slot Screw recess.
As the further improvement of above-mentioned technical proposal, first plate, connection swash plate, the second plate and the 3rd plate it is interior Side forms the first cell body, and the two ends of first cell body are blocked by end plate, and several connecting holes are disposed with the end plate.
The beneficial effects of the utility model are:The utility model passes through the first plate, the second plate, the 3rd plate and connection swash plate With other template splicings into after casting system, the outside of connection swash plate forms lavatory caisson chamfering casting space, so, can make to defend Concrete chamfering one-shot forming in caisson position between life, the process for reducing the secondary chamfering of this position construction, is conducive to toilet Waterproof.The utility model is suitable for the pouring of lavatory caisson.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the utility model embodiment The accompanying drawing to be used is briefly described.Obviously, described accompanying drawing is a part of embodiment of the present utility model, rather than entirely Portion's embodiment, those skilled in the art on the premise of not paying creative work, can also obtain it according to these accompanying drawings His design and accompanying drawing.
Fig. 1 is schematic cross-section of the present utility model;
Structural representation when Fig. 2 is utility model works.
Embodiment
The technique effect of design of the present utility model, concrete structure and generation is carried out below with reference to embodiment and accompanying drawing Clearly and completely describe, to be completely understood by the purpose of this utility model, feature and effect.Obviously, described embodiment It is a part of embodiment of the present utility model, rather than whole embodiments, based on embodiment of the present utility model, the skill of this area The other embodiment that art personnel are obtained on the premise of not paying creative work, belongs to the model of the utility model protection Enclose.In addition, all connection/annexations being previously mentioned in text, not singly refer to component and directly connect, and refer to can be according to specific reality Situation is applied, by adding or reducing couple auxiliary, to constitute more excellent draw bail.
1~Fig. 2 of reference picture, toilet chamfering section bar, it includes the first plate 1, second plate 2 vertical with the first plate 1 and 3rd plate 3, one end and the 3rd plate 3 of second plate 2 are directly connected to, and the other end of the second plate 2 is by connecting swash plate 4 and first Plate 1 is connected, and the plate 3 of the first plate 1 and the 3rd is respectively positioned on the same side of the second plate 2.
By the first plate 1, the second plate 2, the 3rd plate 3 and connection swash plate 4 and other template splicings into after casting system, even The outside for connecing swash plate 4 forms lavatory caisson chamfering casting space, the lateral surface of the first plate 1 and the second plate 2 also for casting space this Sample, can make the concrete chamfering one-shot forming of caisson of toilet position, the process for reducing the secondary chamfering of this position construction, be conducive to The waterproof of toilet.
It is further used as preferred embodiment, first plate 1 and connection swash plate 4 are connected by the first arc 5, institute State the second plate 2 and connection swash plate 4 is connected by the second arc 6, after the first arc 5 and the connection of the second arc 6, just In the demoulding of this section bar.
It is further used as preferred embodiment, the medial surface of second plate 2 and the junction of the 3rd plate 3 is disposed with first The lateral surface of transition arc 7, the second plate 2 and the junction of the 3rd plate 3 is right angle portion, after the 3rd plate 3 and other templates are connected, The position that second plate 2 and other templates are docked is right angle portion, improves the sealing between two section bars.
It is further used as preferred embodiment, the 3rd plate 3 is parallel with the first plate 1, is easy to the utility model and its He connects template.The length for being shorter in length than the second plate 2 of first plate 1.
It is further used as preferred embodiment, the angle of first plate 1 and connection swash plate 4 is 45 °, so, is poured Out, hygienic angle chamfering is 45 °.
It is further used as preferred embodiment, the lateral surface of the 3rd plate 3, which is disposed with the first locating slot 8 and second, to be determined Position groove 9, the first locating slot 8 and the second locating slot 9 mainly play the role of positioning.
It is further used as preferred embodiment, connection spiral shell is disposed between the locating slot 9 of the first locating slot 8 and second Recess 10 is followed closely, by the first locating slot 8 and the second locating slot 9 with after other template Primary Locations, other moulds are passed through by screw It is fixed after plate and attachment screw recess 10.
Be further used as preferred embodiment, first plate 1, connection swash plate 4, the second plate 2 and the 3rd plate 3 it is interior Side forms the first cell body 13, and the first cell body 13 can reduce weight of the present utility model, and the two ends of first cell body 13 lead to Cross end plate 11 to block, several connecting holes 12 are disposed with the end plate 11, the one side of end plate 11 can increase the utility model Intensity, be on the other hand easy to the utility model to be connected with other templates.Specific connected mode is that screw or pin are worn Cross and being connected for the utility model and other sheet materials is realized after other templates and connecting hole 12.
Above is better embodiment of the present utility model is illustrated, but the invention is not limited to institute Embodiment is stated, those skilled in the art can also make a variety of be equal on the premise of without prejudice to the utility model spirit Modification or replacement, these equivalent modifications or replacement are all contained in the application claim limited range.

Claims (8)

1. toilet chamfering section bar, it is characterised in that:It includes the first plate, second plate and threeth plate vertical with the first plate, One end of second plate is directly connected to the 3rd plate, and the other end of the second plate is connected by connecting swash plate with the first plate, described First plate and the 3rd plate are respectively positioned on the same side of the second plate.
2. chamfering section bar in toilet according to claim 1, it is characterised in that:First plate and connection swash plate pass through the One arc is connected, and second plate and connection swash plate are connected by the second arc.
3. chamfering section bar in toilet according to claim 1, it is characterised in that:Second plate and the 3rd plate junction Medial surface is disposed with First Transition circular arc.
4. chamfering section bar in toilet according to claim 1, it is characterised in that:3rd plate and the first plate are parallel.
5. chamfering section bar in toilet according to claim 1, it is characterised in that:The angle of first plate and connection swash plate For 45 °.
6. chamfering section bar in toilet according to claim 1, it is characterised in that:The lateral surface of 3rd plate is disposed with One locating slot and the second locating slot.
7. chamfering section bar in toilet according to claim 6, it is characterised in that:First locating slot and the second locating slot Between be disposed with attachment screw recess.
8. the toilet chamfering section bar according to any one of claim 1 ~ 6, it is characterised in that:First plate, connection are oblique Medial surface the first cell body of formation of plate, the second plate and the 3rd plate, the two ends of first cell body are blocked by end plate, the end Several connecting holes are disposed with plate.
CN201720189391.5U 2017-02-28 2017-02-28 Toilet chamfering section bar Active CN206581596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720189391.5U CN206581596U (en) 2017-02-28 2017-02-28 Toilet chamfering section bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720189391.5U CN206581596U (en) 2017-02-28 2017-02-28 Toilet chamfering section bar

Publications (1)

Publication Number Publication Date
CN206581596U true CN206581596U (en) 2017-10-24

Family

ID=60091980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720189391.5U Active CN206581596U (en) 2017-02-28 2017-02-28 Toilet chamfering section bar

Country Status (1)

Country Link
CN (1) CN206581596U (en)

Similar Documents

Publication Publication Date Title
CN208594747U (en) Guide wall form board fixture and guide wall form board system
CN206581596U (en) Toilet chamfering section bar
CN207063511U (en) Aluminum alloy pattern plate and precast concrete right angle setting mortar leakage prevention structure
CN206123903U (en) Prefabricated assembled concrete stairway mould
CN208136933U (en) A kind of preformed bricks fetal membrane standard component
CN210086806U (en) U-shaped aluminum alloy template
CN207847399U (en) A kind of window construction of house
CN206034734U (en) Novel building hollow brick and adopt wall body that this hollow brick made
CN208235983U (en) A kind of vertical concrete structure curing means
CN204010717U (en) The hanging apparatus of canyon protective cover plate
CN208235950U (en) A kind of zigzag wears flooring angle bar pull rod
CN208034952U (en) A kind of PC production lines cement strike-off stick
CN207512999U (en) A kind of wear-resisting building corner brick of tenon joint type
CN209556080U (en) One kind can have enough to meet the need precast concrete gutter
CN209082681U (en) A kind of prefabricated assembled bay window constructing structure of residential building
CN206722132U (en) Punched-type split connecting bridge
CN212743368U (en) Constructional column moulded die plate structure
CN205688614U (en) A kind of concrete cross-drilled hole Interlocking hollow block bearing wall
CN218713020U (en) Auxiliary device for pouring waterproof protective layer
CN208899858U (en) A kind of template for constructional engineering construction
CN206287304U (en) A kind of fluid pressure type box culvert mould
CN206428973U (en) One kind building drip one-shot forming apparatus
CN110899194A (en) Belt cleaning device is used in new material production
CN210620637U (en) Pier maintenance auxiliary device
CN207934312U (en) A kind of high-strength environment-friendly brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 "change of name, title or address"

Address after: 528138 one of F1 and one of block 3, No.11 Yongye Road, Yundonghai street, Sanshui District, Foshan City, Guangdong Province (application for residence)

Patentee after: FOSHAN ZHONGXUN TUOXIN MATERIAL TECHNOLOGY Co.,Ltd.

Address before: 528138 G3-1, South District B, fan Yuan District, Sanshui science and Technology Industrial Zone, Sanshui, Guangdong, Foshan

Patentee before: FOSHAN ZHONGXUNTUO ALUMINUM MOLD TECHNOLOGY Co.,Ltd.

CP03 "change of name, title or address"
TR01 Transfer of patent right

Effective date of registration: 20201113

Address after: No.11, No.11, Yongye Road, Yundonghai street, Sanshui District, Foshan City, Guangdong Province

Patentee after: FOSHAN ZHONGXUN TUOXIN MATERIAL TECHNOLOGY Co.,Ltd.

Patentee after: Foshan xuntou Engineering Technology Co., Ltd

Address before: 528138 one of F1 and one of block 3, No.11 Yongye Road, Yundonghai street, Sanshui District, Foshan City, Guangdong Province (application for residence)

Patentee before: FOSHAN ZHONGXUN TUOXIN MATERIAL TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right