CN206581593U - Template scaffold system - Google Patents

Template scaffold system Download PDF

Info

Publication number
CN206581593U
CN206581593U CN201720140055.1U CN201720140055U CN206581593U CN 206581593 U CN206581593 U CN 206581593U CN 201720140055 U CN201720140055 U CN 201720140055U CN 206581593 U CN206581593 U CN 206581593U
Authority
CN
China
Prior art keywords
modularization
scaffold
safety protection
bearing frame
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720140055.1U
Other languages
Chinese (zh)
Inventor
韩军松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720140055.1U priority Critical patent/CN206581593U/en
Application granted granted Critical
Publication of CN206581593U publication Critical patent/CN206581593U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a kind of template scaffold system, including inside wall formwork, modularization scaffold and bearing frame, and modularization scaffold is made up of modularization steel form, safety protection frame, modularization close-network and travelling platform;Sleeve pipe is welded with modularization steel form, and safety protection frame is enclosed in sleeve pipe, is locked with two-way bolt, travelling platform is completed, finally modularization close-network is set on the inside of safety protection frame;The modularization steel form is connected with inside wall formwork;The modularization scaffold is seated on bearing frame, and is connected by bolt with interior wall.Match somebody with somebody by physical dimension on the overall all-steel mold plate of mould, scaffold welding large steel moulding plate, be seated on exterior wall bearing frame, interior drawing safety pole, periphery is all closed with modularization expanded metal lath, safe and reliable, both artistic and practical, one-time process completes to construct twice.While installation form, while completing the installation of support body, construction cost is significantly saved, and ensures construction quality, is the inexorable trend of future architecture industry development.

Description

Template scaffold system
Technical field
The utility model is related to building implement technical field, especially a kind of template scaffold system.
Background technology
Scaffold is the various supports set up at the construction field (site) for operative and high-rise working, mainly in construction site It is upper to be used in exterior wall, inside fitting or the higher place that directly construct of floor height.Scaffold making material generally has bamboo and wood, steel Pipe or synthetic material etc.;Also scaffold is used as template in the engineering of part at present, it is in advertising, municipal administration, friendship in addition It is also widely used in the fields such as path bridge, mine.And return in building field, current construction techniques:Traditional construction Mode, is that after scaffold is risen, assembling reinforcement, installation form is constructed in two times, and security is poor, and construction cost is high.Used Scaffold mainly set up using steel pipe, connection card and miscellaneous part according to predetermined specification, it is impossible to what is set up During it is interim on existing support body set up required fixed structure, and need to use different rule for the different parts of support body The steel pipe of lattice, causes scaffolding species more, and frame structure is complicated, is both needed to expend during assembling and dismounting Many is artificial, and labor intensity is big for single workmen;The uniformity of support body different parts attachment structure when assembling simultaneously It is low, and then the uncertainty produced in an assembling process by human factor is consequently increased, and is easily caused support body and there is many peaces Full hidden danger;Therefore based on foregoing problems, it is necessary to which the structure for existing building scaffold further is improved.
Utility model content:
The utility model provides a kind of template scaffold system, including inside wall formwork, modularization scaffold and bearing frame, mould Block scaffold is made up of modularization steel form, safety protection frame, modularization close-network and travelling platform;On modularization steel form Sleeve pipe is welded with, and safety protection frame is enclosed in sleeve pipe, is locked with two-way bolt, travelling platform is completed, finally seals modularization Net is closed to be set on the inside of safety protection frame;
The modularization steel form is connected with inside wall formwork;
The modularization scaffold is seated on bearing frame, and is connected by bolt with interior wall.
The modularization steel form is connected with inside wall formwork by split bolt;Pitch of bolts 300mm.
The inside wall formwork is connected with safe steel wire and safe draw-in bar.
The bearing frame number is 3-5.
Described sleeve pipe specification is 50 × 70mm square tube.
The advantage of utility model
The template scaffold system of the application is to introduce advanced country's skill in the case where current country advocates millions of people innovation overall situation Art, a kind of new type formwork scaffold system of research and development.Its advantage is, it is ensured that safety, improves construction quality, and reduction is constructed into This.Match somebody with somebody by physical dimension on the overall all-steel mold plate of mould, scaffold welding large steel moulding plate, be seated on exterior wall bearing frame, it is interior to draw Safety pole, periphery is all closed with modularization expanded metal lath, safe and reliable, both artistic and practical, and one-time process completes to construct twice.Install While template, while completing the installation of support body, construction cost is significantly saved, and ensures construction quality, is future architecture industry The inexorable trend of development.
Utility model only needs one-time process, completes secondary construction.Safety, civilization, energy-saving and environmental protection.The utility model is used Such scheme:From being connected to after building structure drawing, according to physical dimension, in factory, modularized production, size is accurate, installation side Just, improving quality reduces cost, in Construction practices, and the construction quality up to country's construction standards is overproof.
Brief description of the drawings:
The scaffolding structure schematic diagram that Fig. 1 provides for the utility model;
Wherein:Modularization steel form 1, safety protection frame 2, modularization close-network 3, travelling platform 4, bearing frame 5, interior wall mould Plate 6, safe steel wire 7 and safe draw-in bar 8.
Embodiment:
Embodiment 1:
The utility model is a kind of construction shear wall structure, modular construction system.
The realization of template scaffold system utility model technical scheme:
Bearing frame 5 (bolt containing load-bearing), after testing each bearing frame of data can 10 tons of load-bearing, and design modular template Scaffold system, design weight is no more than 3 tons, meets construction requirement.
Modular template scaffold system, is by inside wall formwork 6, modularization steel form 1, safety protection frame 2, modularization envelope Close net 3 and combined type running platform 4, hoisting ring are combined into one, it is safe and reliable.
All inside wall formworks 6 are all connected with corresponding outer wall mould, connected mode, are connected with split bolt formula pulling-on piece, Spacing 300mm, inside wall formwork 6 is connected with safe steel wire 7 and safe draw-in bar 8.
Sleeve pipe is welded with modularization steel form 1, and safety protection frame 2 is enclosed in sleeve pipe, sleeve pipe specification is 50 × 70mm Square tube, locked with two-way bolt, complete travelling platform 4, modularization close-network 3 is finally set in the inner side of safety protection frame 2;Rise To safety protection function, one is formed.
Installation operation:First on next layer of wall, load-bearing rack position is reserved, the accurate ± 2mm of size is usedBolt Pass and be connected with bearing frame 5 from interior wall, then two ends are locked, and it is the key of the system, and each bearing frame after testing can load-bearing 10 tons/, every piece of template scaffold system sets 3-5 bearing frame, and modular template scaffold then is seated into bearing frame 5 On, load-bearing, 5 is installed, bolt is then locked simultaneously, sissy bar in good is drawn, adjusts bearing frame, make modularization steel form 1 Vertical smooth ± 2mm, you can install inside wall formwork 6.

Claims (5)

1. a kind of template scaffold system, including inside wall formwork (6), modularization scaffold and bearing frame (5), it is characterised in that: Modularization scaffold is made up of modularization steel form (1), safety protection frame (2), modularization close-network (3) and travelling platform (4); Sleeve pipe is welded with modularization steel form (1), and safety protection frame (2) is enclosed in sleeve pipe, is locked with two-way bolt, completes walking Modularization close-network (3), is finally set on the inside of safety protection frame (2) by platform (4);
The modularization steel form (1) is connected with inside wall formwork (6);
The modularization scaffold is seated on bearing frame (5), and is connected by bolt with interior wall.
2. template scaffold system according to claim 1, it is characterised in that:The modularization steel form (1) and interior wall Template (6) is connected by split bolt;Pitch of bolts 300mm.
3. template scaffold system according to claim 1, it is characterised in that:The inside wall formwork (6) and safe steel wire (7) it is connected with safe draw-in bar (8).
4. template scaffold system according to claim 1, it is characterised in that:Bearing frame (5) number is 3-5.
5. template scaffold system according to claim 1, it is characterised in that:Described sleeve pipe specification is 50 × 70mm side Pipe.
CN201720140055.1U 2017-02-16 2017-02-16 Template scaffold system Expired - Fee Related CN206581593U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720140055.1U CN206581593U (en) 2017-02-16 2017-02-16 Template scaffold system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720140055.1U CN206581593U (en) 2017-02-16 2017-02-16 Template scaffold system

Publications (1)

Publication Number Publication Date
CN206581593U true CN206581593U (en) 2017-10-24

Family

ID=60091074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720140055.1U Expired - Fee Related CN206581593U (en) 2017-02-16 2017-02-16 Template scaffold system

Country Status (1)

Country Link
CN (1) CN206581593U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331854A (en) * 2019-07-04 2019-10-15 山东松宝模板工程有限公司 Combined steel formwork
CN110735530A (en) * 2019-11-06 2020-01-31 江西志特新材料股份有限公司 external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof
CN113858302A (en) * 2021-08-26 2021-12-31 天津中贺科技发展有限公司 Formwork scaffold production system and operation method
CN114658209A (en) * 2022-05-05 2022-06-24 山西四建集团有限公司 Concrete structure outer wall arc shaping template and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331854A (en) * 2019-07-04 2019-10-15 山东松宝模板工程有限公司 Combined steel formwork
CN110735530A (en) * 2019-11-06 2020-01-31 江西志特新材料股份有限公司 external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof
CN113858302A (en) * 2021-08-26 2021-12-31 天津中贺科技发展有限公司 Formwork scaffold production system and operation method
CN113858302B (en) * 2021-08-26 2022-12-13 天津中贺科技发展有限公司 Formwork scaffold production system and operation method
CN114658209A (en) * 2022-05-05 2022-06-24 山西四建集团有限公司 Concrete structure outer wall arc shaping template and construction method thereof

Similar Documents

Publication Publication Date Title
CN206581593U (en) Template scaffold system
CN101435276B (en) Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof
CN105201195A (en) Liftable supporting leg type elevator shaft construction platform and method
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN206722368U (en) One kind is used to protect frame system outside the working regularization of assembled architecture
CN204475850U (en) Clear-water concrete balcony template
CN203759976U (en) Detachable teaching model for overhead formwork construction
CN201546323U (en) Steel angle concrete column steel box combined beam frame
CN206158204U (en) Construction equipment of chimney shaft
CN205954842U (en) Deformed steel tubular column reinforced concrete ring beam
CN204940608U (en) The prefabrication and lifting body of wall of fabricated structure
CN107267165A (en) A kind of dry coke quenching body of heater is circular layout pre-embedded bolt fixed structure and installation method
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN107675876A (en) A kind of slding form operation method
CN207362885U (en) A kind of prefabricated piping lane system being freely combined
CN102720357B (en) High form-tie assembly
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN206000192U (en) A kind of large-scale horizontal opening protective device
CN204662739U (en) A kind of steel bar truss floor support plate and light-steel light-concrete combining structure
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN208137272U (en) A kind of self-supporting masonry partition wall support rigid frame
CN204282816U (en) A kind of girder template
CN204983640U (en) Construction sort module formula climbing form
CN204212385U (en) Scaffold strengthened by truss
CN209539398U (en) A kind of evacuation platform of Fast Installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

Termination date: 20200216

CF01 Termination of patent right due to non-payment of annual fee