- Publication number
- CN206581593U CN206581593U CN201720140055.1U CN201720140055U CN206581593U CN 206581593 U CN206581593 U CN 206581593U CN 201720140055 U CN201720140055 U CN 201720140055U CN 206581593 U CN206581593 U CN 206581593U
- Authority
- CN
- China
- Prior art keywords
- modularization
- scaffold
- safety protection
- bearing frame
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides a kind of template scaffold system, including inside wall formwork, modularization scaffold and bearing frame, and modularization scaffold is made up of modularization steel form, safety protection frame, modularization close-network and travelling platform;Sleeve pipe is welded with modularization steel form, and safety protection frame is enclosed in sleeve pipe, is locked with two-way bolt, travelling platform is completed, finally modularization close-network is set on the inside of safety protection frame;The modularization steel form is connected with inside wall formwork;The modularization scaffold is seated on bearing frame, and is connected by bolt with interior wall.Match somebody with somebody by physical dimension on the overall all-steel mold plate of mould, scaffold welding large steel moulding plate, be seated on exterior wall bearing frame, interior drawing safety pole, periphery is all closed with modularization expanded metal lath, safe and reliable, both artistic and practical, one-time process completes to construct twice.While installation form, while completing the installation of support body, construction cost is significantly saved, and ensures construction quality, is the inexorable trend of future architecture industry development.
Description
Technical field
The utility model is related to building implement technical field, especially a kind of template scaffold system.
Background technology
Scaffold is the various supports set up at the construction field (site) for operative and high-rise working, mainly in construction site
It is upper to be used in exterior wall, inside fitting or the higher place that directly construct of floor height.Scaffold making material generally has bamboo and wood, steel
Pipe or synthetic material etc.;Also scaffold is used as template in the engineering of part at present, it is in advertising, municipal administration, friendship in addition
It is also widely used in the fields such as path bridge, mine.And return in building field, current construction techniques:Traditional construction
Mode, is that after scaffold is risen, assembling reinforcement, installation form is constructed in two times, and security is poor, and construction cost is high.Used
Scaffold mainly set up using steel pipe, connection card and miscellaneous part according to predetermined specification, it is impossible to what is set up
During it is interim on existing support body set up required fixed structure, and need to use different rule for the different parts of support body
The steel pipe of lattice, causes scaffolding species more, and frame structure is complicated, is both needed to expend during assembling and dismounting
Many is artificial, and labor intensity is big for single workmen;The uniformity of support body different parts attachment structure when assembling simultaneously
It is low, and then the uncertainty produced in an assembling process by human factor is consequently increased, and is easily caused support body and there is many peaces
Full hidden danger;Therefore based on foregoing problems, it is necessary to which the structure for existing building scaffold further is improved.
Utility model content:
The utility model provides a kind of template scaffold system, including inside wall formwork, modularization scaffold and bearing frame, mould
Block scaffold is made up of modularization steel form, safety protection frame, modularization close-network and travelling platform;On modularization steel form
Sleeve pipe is welded with, and safety protection frame is enclosed in sleeve pipe, is locked with two-way bolt, travelling platform is completed, finally seals modularization
Net is closed to be set on the inside of safety protection frame;
The modularization steel form is connected with inside wall formwork;
The modularization scaffold is seated on bearing frame, and is connected by bolt with interior wall.
The modularization steel form is connected with inside wall formwork by split bolt;Pitch of bolts 300mm.
The inside wall formwork is connected with safe steel wire and safe draw-in bar.
The bearing frame number is 3-5.
Described sleeve pipe specification is 50 × 70mm square tube.
The advantage of utility model
The template scaffold system of the application is to introduce advanced country's skill in the case where current country advocates millions of people innovation overall situation
Art, a kind of new type formwork scaffold system of research and development.Its advantage is, it is ensured that safety, improves construction quality, and reduction is constructed into
This.Match somebody with somebody by physical dimension on the overall all-steel mold plate of mould, scaffold welding large steel moulding plate, be seated on exterior wall bearing frame, it is interior to draw
Safety pole, periphery is all closed with modularization expanded metal lath, safe and reliable, both artistic and practical, and one-time process completes to construct twice.Install
While template, while completing the installation of support body, construction cost is significantly saved, and ensures construction quality, is future architecture industry
The inexorable trend of development.
Utility model only needs one-time process, completes secondary construction.Safety, civilization, energy-saving and environmental protection.The utility model is used
Such scheme:From being connected to after building structure drawing, according to physical dimension, in factory, modularized production, size is accurate, installation side
Just, improving quality reduces cost, in Construction practices, and the construction quality up to country's construction standards is overproof.
Brief description of the drawings:
The scaffolding structure schematic diagram that Fig. 1 provides for the utility model;
Wherein:Modularization steel form 1, safety protection frame 2, modularization close-network 3, travelling platform 4, bearing frame 5, interior wall mould
Plate 6, safe steel wire 7 and safe draw-in bar 8.
Embodiment:
Embodiment 1:
The utility model is a kind of construction shear wall structure, modular construction system.
The realization of template scaffold system utility model technical scheme:
Bearing frame 5 (bolt containing load-bearing), after testing each bearing frame of data can 10 tons of load-bearing, and design modular template
Scaffold system, design weight is no more than 3 tons, meets construction requirement.
Modular template scaffold system, is by inside wall formwork 6, modularization steel form 1, safety protection frame 2, modularization envelope
Close net 3 and combined type running platform 4, hoisting ring are combined into one, it is safe and reliable.
All inside wall formworks 6 are all connected with corresponding outer wall mould, connected mode, are connected with split bolt formula pulling-on piece,
Spacing 300mm, inside wall formwork 6 is connected with safe steel wire 7 and safe draw-in bar 8.
Sleeve pipe is welded with modularization steel form 1, and safety protection frame 2 is enclosed in sleeve pipe, sleeve pipe specification is 50 × 70mm
Square tube, locked with two-way bolt, complete travelling platform 4, modularization close-network 3 is finally set in the inner side of safety protection frame 2;Rise
To safety protection function, one is formed.
Installation operation:First on next layer of wall, load-bearing rack position is reserved, the accurate ± 2mm of size is usedBolt
Pass and be connected with bearing frame 5 from interior wall, then two ends are locked, and it is the key of the system, and each bearing frame after testing can load-bearing
10 tons/, every piece of template scaffold system sets 3-5 bearing frame, and modular template scaffold then is seated into bearing frame 5
On, load-bearing, 5 is installed, bolt is then locked simultaneously, sissy bar in good is drawn, adjusts bearing frame, make modularization steel form 1
Vertical smooth ± 2mm, you can install inside wall formwork 6.
Claims (5)
1. a kind of template scaffold system, including inside wall formwork (6), modularization scaffold and bearing frame (5), it is characterised in that:
Modularization scaffold is made up of modularization steel form (1), safety protection frame (2), modularization close-network (3) and travelling platform (4);
Sleeve pipe is welded with modularization steel form (1), and safety protection frame (2) is enclosed in sleeve pipe, is locked with two-way bolt, completes walking
Modularization close-network (3), is finally set on the inside of safety protection frame (2) by platform (4);
The modularization steel form (1) is connected with inside wall formwork (6);
The modularization scaffold is seated on bearing frame (5), and is connected by bolt with interior wall.
2. template scaffold system according to claim 1, it is characterised in that:The modularization steel form (1) and interior wall
Template (6) is connected by split bolt;Pitch of bolts 300mm.
3. template scaffold system according to claim 1, it is characterised in that:The inside wall formwork (6) and safe steel wire
(7) it is connected with safe draw-in bar (8).
4. template scaffold system according to claim 1, it is characterised in that:Bearing frame (5) number is 3-5.
5. template scaffold system according to claim 1, it is characterised in that:Described sleeve pipe specification is 50 × 70mm side
Pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720140055.1U CN206581593U (en) | 2017-02-16 | 2017-02-16 | Template scaffold system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720140055.1U CN206581593U (en) | 2017-02-16 | 2017-02-16 | Template scaffold system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206581593U true CN206581593U (en) | 2017-10-24 |
Family
ID=60091074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720140055.1U Expired - Fee Related CN206581593U (en) | 2017-02-16 | 2017-02-16 | Template scaffold system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206581593U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331854A (en) * | 2019-07-04 | 2019-10-15 | 山东松宝模板工程有限公司 | Combined steel formwork |
CN110735530A (en) * | 2019-11-06 | 2020-01-31 | 江西志特新材料股份有限公司 | external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof |
CN113858302A (en) * | 2021-08-26 | 2021-12-31 | 天津中贺科技发展有限公司 | Formwork scaffold production system and operation method |
CN114658209A (en) * | 2022-05-05 | 2022-06-24 | 山西四建集团有限公司 | Concrete structure outer wall arc shaping template and construction method thereof |
-
2017
- 2017-02-16 CN CN201720140055.1U patent/CN206581593U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331854A (en) * | 2019-07-04 | 2019-10-15 | 山东松宝模板工程有限公司 | Combined steel formwork |
CN110735530A (en) * | 2019-11-06 | 2020-01-31 | 江西志特新材料股份有限公司 | external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof |
CN113858302A (en) * | 2021-08-26 | 2021-12-31 | 天津中贺科技发展有限公司 | Formwork scaffold production system and operation method |
CN113858302B (en) * | 2021-08-26 | 2022-12-13 | 天津中贺科技发展有限公司 | Formwork scaffold production system and operation method |
CN114658209A (en) * | 2022-05-05 | 2022-06-24 | 山西四建集团有限公司 | Concrete structure outer wall arc shaping template and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206581593U (en) | Template scaffold system | |
CN101435276B (en) | Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof | |
CN105201195A (en) | Liftable supporting leg type elevator shaft construction platform and method | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN206722368U (en) | One kind is used to protect frame system outside the working regularization of assembled architecture | |
CN204475850U (en) | Clear-water concrete balcony template | |
CN203759976U (en) | Detachable teaching model for overhead formwork construction | |
CN201546323U (en) | Steel angle concrete column steel box combined beam frame | |
CN206158204U (en) | Construction equipment of chimney shaft | |
CN205954842U (en) | Deformed steel tubular column reinforced concrete ring beam | |
CN204940608U (en) | The prefabrication and lifting body of wall of fabricated structure | |
CN107267165A (en) | A kind of dry coke quenching body of heater is circular layout pre-embedded bolt fixed structure and installation method | |
CN204715764U (en) | The structure that a kind of constructional column and agent structure are constructed simultaneously | |
CN107675876A (en) | A kind of slding form operation method | |
CN207362885U (en) | A kind of prefabricated piping lane system being freely combined | |
CN102720357B (en) | High form-tie assembly | |
CN205976447U (en) | Scaffold frame of connecting with straight screw sleeve links wall spare | |
CN206000192U (en) | A kind of large-scale horizontal opening protective device | |
CN204662739U (en) | A kind of steel bar truss floor support plate and light-steel light-concrete combining structure | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN208137272U (en) | A kind of self-supporting masonry partition wall support rigid frame | |
CN204282816U (en) | A kind of girder template | |
CN204983640U (en) | Construction sort module formula climbing form | |
CN204212385U (en) | Scaffold strengthened by truss | |
CN209539398U (en) | A kind of evacuation platform of Fast Installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171024 Termination date: 20200216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |