CN206562792U - Overlapping for existing structure strengthening reconstruction changes antitorque structure - Google Patents

Overlapping for existing structure strengthening reconstruction changes antitorque structure Download PDF

Info

Publication number
CN206562792U
CN206562792U CN201621184028.6U CN201621184028U CN206562792U CN 206562792 U CN206562792 U CN 206562792U CN 201621184028 U CN201621184028 U CN 201621184028U CN 206562792 U CN206562792 U CN 206562792U
Authority
CN
China
Prior art keywords
newly
increased
existing structure
outrigger
conversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621184028.6U
Other languages
Chinese (zh)
Inventor
胡狄
吴映栋
徐兵
吴雪峰
姚开明
彭智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiedi Design Group Co ltd
Original Assignee
Zhejiang Jiedi Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jiedi Architectural Design Co Ltd filed Critical Zhejiang Jiedi Architectural Design Co Ltd
Application granted granted Critical
Publication of CN206562792U publication Critical patent/CN206562792U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model belongs to building engineering field, in particular it relates to a kind of overlapping for existing structure strengthening reconstruction changes antitorque structure, including:Existing structure beam and existing structure plate, existing structure plate are supported on existing structure beam;Newly-increased conversion outrigger, newly-increased overlapping concealed beam and newly-increased concrete bracket are set on existing structure beam and existing structure plate, increases newly and newly-increased vertical member is set on conversion outrigger, and newly-increased conversion outrigger extension is set;Newly-increased conversion outrigger extension bottom sets styrofoam to replace template.The utility model ensure that effective connection, the continuous safety transmission of structural internal force of newly-increased vertical member and existing structure;And eliminating foundation construction caused by newly-increased vertical member, it is to avoid the existing structure of large area cuts work, reduces construction cost, improves efficiency of construction.

Description

Overlapping for existing structure strengthening reconstruction changes antitorque structure
Technical field
The utility model belongs to building engineering field, in particular it relates to a kind of overlapping for existing structure strengthening reconstruction Change antitorque structure.
Background technology
Strengthening reconstruction is the hot fields of building trade in recent years, particularly real estate plate, and developer is in order to comply with city Market, the function to construction building thing changes and house type is worked with great care so that strengthening reconstruction existing structure into For new normality in the industry.
In existing structure transformation, building use requirement can not be met by frequently encountering existing vertical member, and need to be increased newly vertical Component, is located at the situation outside existing structure main building scope, according to traditional especially for the newly-increased vertical member in part Technical finesse then needs to re-start foundation construction, and can cause to cut destruction, difficulty of construction to the certain area of existing structure Greatly, cost is higher, and can not ensure newly-increased vertical member and effective connection of existing structure and collective effect.
Utility model content
To overcome the defect that prior art is present, the utility model provides a kind of overlapping conversion of existing structure strengthening reconstruction Antitorque structure and construction method, can not only meet safe and applicable durable requirement, be provided simultaneously with stronger shock resistance, also have Have the advantages that construction cost is relatively low and efficiency of construction is higher.
To achieve the above object, the utility model uses following technical proposals:
Overlapping for existing structure strengthening reconstruction changes antitorque structure, including:Existing structure beam and existing structure plate, both There is structural slab to be supported on existing structure beam;Wherein:Newly-increased conversion outrigger is set on existing structure beam and existing structure plate, increased newly Concealed beam and newly-increased concrete bracket are overlapped, increases newly and newly-increased vertical member is set on conversion outrigger, and sets newly-increased conversion outrigger to prolong Stretch section;Newly-increased conversion outrigger extension bottom sets styrofoam to replace template, increases conversion outrigger top muscle, newly-increased conversion outrigger bottom newly Muscle, newly-increased conversion outrigger stirrup, newly-increased conversion outrigger extension top muscle, newly-increased conversion outrigger extension bottom muscle are chosen with newly-increased conversion Beam extension stirrup, should according to using need carry out calculating determination.
Preferably, existing structure beam, existing structure plate and newly-increased conversion outrigger, newly-increased overlapping concealed beam, newly-increased coagulation clay ox Leg passes through superposed surfaces horizontal shear reinforcing bar, the vertical shear reinforcement of superposed surfaces, newly-increased coagulation clay ox at New-old concrete interface The horizontal tension reinforcement of leg and the vertical tension reinforcement of newly-increased concrete bracket are reliably connected;It is superposed surfaces horizontal shear reinforcing bar, folded The vertical shear reinforcement in conjunction face, the newly-increased horizontal tension reinforcement of concrete bracket, the newly-increased vertical tension reinforcement of concrete bracket and newly-increased Concrete bracket distributing reinforcement, should according to using need carry out calculating determination.
Preferably, should be according to using needing to take respective handling method when New-old concrete interface is handled, and meet and set Count the processing quality requirement proposed.
Preferably, the newly-increased vertical member on the newly-increased conversion outrigger is arranged according to top-out using needs.
The construction method of the above-mentioned antitorque structure of overlapping conversion for existing structure strengthening reconstruction, step is as follows:
(1), in existing structure beam, existing structure plate and newly-increased conversion outrigger, newly-increased overlapping concealed beam, newly-increased concrete bracket Between carry out the processing of New-old concrete interface, remove original loose concrete, breakage and surface carbonation layer, form bumps poor Mat surface not less than 6mm;
(2) it is dark in existing structure beam, existing structure plate and newly-increased conversion outrigger, newly-increased overlapping, according to force analysis is calculated Between beam, newly-increased concrete bracket, superposed surfaces horizontal shear reinforcing bar, the vertical shear reinforcement of superposed surfaces, newly-increased coagulation are set respectively The horizontal tension reinforcement of clay ox leg and the vertical tension reinforcement of newly-increased concrete bracket are reliably connected, and are ensureing that New-old concrete is common While with work, the anti-twisting property, the level of significance power transmission capacity of iterative structure and overall bending resistance of existing structure beam are improved Bearing capacity;
(3), according to force analysis is calculated, newly-increased conversion outrigger top muscle, newly-increased conversion is set to choose in newly-increased conversion outrigger Beam bottom muscle, newly-increased conversion outrigger stirrup;Newly-increased conversion outrigger extension top muscle is set in newly-increased conversion outrigger extension, it is newly-increased Change outrigger extension bottom muscle and newly-increased conversion outrigger extension stirrup;
(4), the moment of flexure caused by the newly-increased vertical member of balance conversion, sets newly-increased conversion outrigger extension, increases conversion newly Outrigger extension bottom sets styrofoam to replace template, to ensure the independent stressed and construction party of newly-increased conversion outrigger extension Just;
(5), after the completion of work to be tested of knocking off, model sheetinstallat work is carried out, formwork elevation measuring, position, size should closely conform to set Meter requires that support and template fix reliable, and formwork edge joint is tight;
(6), casting concrete, vibrates, maintenance.
Preferably, the processing of New-old concrete interface is carried out using artificial chiseling method or high pressure water jet method.
Compared with prior art, the utility model has the advantages that:
1st, by setting newly-increased conversion outrigger, to change newly-increased vertical member outside main building, resist in superposed surfaces implantation level Shear-steel muscle, come the superposed surfaces horizontal shear resisted existing structure torsion beam suspension and produced;
2nd, horizontal tension reinforcement, vertical tension reinforcement are implanted into by setting up concrete bracket on the inside of existing structure beam, and, To resist the part pulling force of existing structure torsion beam suspension drive;
3rd, by being implanted into vertical shear reinforcement on the outside of existing structure beam, erected to resist caused by the newly-increased vertical member of conversion To shearing;
4th, by setting newly-increased conversion outrigger extension, to balance moment of flexure caused by the newly-increased vertical member of conversion.
It thus ensure that effective connection, the continuous safety transmission of structural internal force of newly-increased vertical member and existing structure;And Eliminate foundation construction caused by newly-increased vertical member, it is to avoid the existing structure of large area cuts work, reduces and is constructed into This, improves efficiency of construction.
Brief description of the drawings
Fig. 1 is the floor map of the antitorque structure of overlapping conversion for existing structure strengthening reconstruction;
Fig. 2 is the diagrammatic cross-section of the antitorque structure of overlapping conversion for existing structure strengthening reconstruction;
In figure:1st, existing structure beam, 2, existing structure plate, 3, newly-increased conversion outrigger, 4, newly-increased overlapping concealed beam, 5, newly-increased perpendicular To component, 6, newly-increased concrete bracket, 7, newly-increased conversion outrigger extension, 8, styrofoam, 9, newly-increased conversion outrigger top muscle, 10, Newly-increased conversion outrigger bottom muscle, 11, newly-increased conversion outrigger stirrup, 12, superposed surfaces horizontal shear reinforcing bar, 13, the vertical shearing resistance of superposed surfaces Reinforcing bar, 14, the newly-increased horizontal tension reinforcement of concrete bracket, 15, the vertical tension reinforcement of newly-increased concrete bracket, 16, newly-increased coagulation Clay ox leg distributing reinforcement, 17, newly-increased conversion outrigger extension top muscle, 18, newly-increased conversion outrigger extension bottom muscle, 19, newly-increased conversion Outrigger extension stirrup, 20, New-old concrete interface.
Embodiment
As shown in Figure 1, 2, the overlapping for existing structure strengthening reconstruction changes antitorque structure, including:The He of existing structure beam 1 Existing structure plate 2, existing structure plate 2 is supported on existing structure beam 1;With reference to the arrangement of newly-increased vertical member and newly-increased vertical The force request of member bottom section, to ensure to set on the validity of structure stress transmission, existing structure beam 1 and existing structure plate 2 Newly-increased conversion outrigger 3, newly-increased overlapping concealed beam 4 and newly-increased concrete bracket 6, increase newly and newly-increased vertical member are set on conversion outrigger 3 5, the moment of flexure caused by the newly-increased vertical member 5 of balance conversion sets newly-increased conversion outrigger extension 7;Newly-increased conversion outrigger extension 7 bottoms of section set styrofoam 8 to replace template, to ensure independent stressed and the easy construction of newly-increased conversion outrigger extension 7;Newly Increase conversion outrigger top muscle 9, newly-increased conversion outrigger bottom muscle 10, newly-increased conversion outrigger stirrup 11, newly-increased conversion outrigger extension top muscle 17th, conversion outrigger extension bottom muscle 18 and newly-increased conversion outrigger extension stirrup 19 are increased newly, should be according to using needing to be calculated It is determined that.
Existing structure beam 1, existing structure plate 2 and newly-increased conversion outrigger 3, newly-increased overlapping concealed beam 4, newly-increased concrete bracket 6 Pass through superposed surfaces horizontal shear reinforcing bar 12, the vertical shear reinforcement 13 of superposed surfaces, newly-increased coagulation at New-old concrete interface 20 The horizontal tension reinforcement 14 of clay ox leg and the vertical tension reinforcement 15 of newly-increased concrete bracket are reliably connected;Superposed surfaces horizontal shear The vertical shear reinforcement 13 of reinforcing bar 12, superposed surfaces, the horizontal tension reinforcement 14 of newly-increased concrete bracket, newly-increased concrete bracket vertically resist Reinforcing bar 15 and newly-increased concrete bracket distributing reinforcement 16 are drawn, should be according to using needing to carry out calculating determination.
, should be according to using needing to take respective handling method during the processing of New-old concrete interface 20, and meet design and carry The processing quality requirement gone out.
Newly-increased vertical member 5 on the newly-increased conversion outrigger 3, can have according to top-out using needing to be arranged There is larger freedom.
The construction method of the above-mentioned antitorque structure of overlapping conversion for existing structure strengthening reconstruction, step is as follows:
1st, in existing structure beam 1, existing structure plate 2 and newly-increased conversion outrigger 3, newly-increased overlapping concealed beam 4, newly-increased coagulation clay ox The processing of New-old concrete interface 20 is carried out between leg 6, artificial chiseling method or high pressure water jet method is such as used, original coagulation is removed Soil loosening, breakage and surface carbonation layer, form the mat surface that concavo-convex difference is not less than 6mm;
2nd, according to force analysis is calculated, in existing structure beam 1, existing structure plate 2 and newly-increased conversion outrigger 3, newly-increased overlapping Between concealed beam 4, newly-increased concrete bracket 6, set respectively superposed surfaces horizontal shear reinforcing bar 12, the vertical shear reinforcement 13 of superposed surfaces, The newly-increased horizontal tension reinforcement 14 of concrete bracket and the vertical tension reinforcement 15 of newly-increased concrete bracket are reliably connected, and are being ensured While New-old concrete cooperation, anti-twisting property, the level of significance power transmission energy of iterative structure of existing structure beam are improved Power and overall bending bearing capacity;
3rd, according to force analysis is calculated, newly-increased conversion outrigger top muscle 9, newly-increased conversion is set to choose in newly-increased conversion outrigger 3 Beam bottom muscle 10, newly-increased conversion outrigger stirrup 11;Newly-increased conversion outrigger extension top muscle is set in newly-increased conversion outrigger extension 7 17th, conversion outrigger extension bottom muscle 18 and newly-increased conversion outrigger extension stirrup 19 are increased newly;
4th, the moment of flexure caused by the newly-increased vertical member 5 of balance conversion, sets newly-increased conversion outrigger extension 7, increases conversion newly The bottom of outrigger extension 7 sets styrofoam 8 to replace template, to ensure the independent stressed of newly-increased conversion outrigger extension 7 and apply Work is convenient;
5th, after the completion of work to be tested of knocking off, model sheetinstallat work is carried out, formwork elevation measuring, position, size should closely conform to design It is required that, support and template fix reliable, and formwork edge joint is tight;
6th, casting concrete, answers continuous placing one-shot forming, such as must interval, the intermittent time tries one's best shortening, and in lower floor Upper strata concreting is finished before concrete initial set;When vibrating, vibrating head collision slab should be avoided, such as template, support occur Stop pouring immediately during deformation displacement, and it is intact to rest and reorganize before the concrete coagulation poured.Concreting, which is finished, treats final set When should start watering maintenance, determination can be specifically integrated according to situations such as slump, temperature.
The utility model can set newly-increased vertical member according to needs are used on the outside of existing structure main building, without Carry out the foundation construction in conventional method, it is to avoid the existing structure of large area cuts work, reduces construction cost, improves Efficiency of construction, after enhancing transformation while structural-load-carrying capacity, moreover it is possible to meet later stage useful life longevity requirement and anti-earthquake ductility It is required that, it is a kind of low energy consumption and the antitorque structure of efficient overlapping conversion.

Claims (2)

1. a kind of overlapping for existing structure strengthening reconstruction changes antitorque structure, including:Existing structure beam and existing structure plate, Existing structure plate is supported on existing structure beam;It is characterized in that:Newly-increased conversion is set on existing structure beam and existing structure plate Outrigger, newly-increased overlapping concealed beam and newly-increased concrete bracket, increase newly and newly-increased vertical member are set on conversion outrigger, and set newly-increased turn Change outrigger extension;Newly-increased conversion outrigger extension bottom sets styrofoam to replace template.
2. the overlapping according to claim 1 for existing structure strengthening reconstruction changes antitorque structure, it is characterised in that:Both There are structural beams, existing structure plate to have a common boundary with newly-increased conversion outrigger, newly-increased overlapping concealed beam, newly-increased concrete bracket in New-old concrete Pass through superposed surfaces horizontal shear reinforcing bar, the vertical shear reinforcement of superposed surfaces, the newly-increased horizontal tension reinforcement of concrete bracket and new at face Increase the vertical tension reinforcement of concrete bracket to be reliably connected.
CN201621184028.6U 2016-10-13 2016-10-30 Overlapping for existing structure strengthening reconstruction changes antitorque structure Active CN206562792U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2016211205917 2016-10-13
CN201621120591 2016-10-13

Publications (1)

Publication Number Publication Date
CN206562792U true CN206562792U (en) 2017-10-17

Family

ID=57894596

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610951253.6A Active CN106368443B (en) 2016-10-13 2016-10-30 Overlapping for existing structure strengthening reconstruction converts torsional structure and construction method
CN201621184028.6U Active CN206562792U (en) 2016-10-13 2016-10-30 Overlapping for existing structure strengthening reconstruction changes antitorque structure

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610951253.6A Active CN106368443B (en) 2016-10-13 2016-10-30 Overlapping for existing structure strengthening reconstruction converts torsional structure and construction method

Country Status (1)

Country Link
CN (2) CN106368443B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678417A (en) * 2018-07-31 2018-10-19 天津市建筑设计院 A kind of floor of steel structure transformation node
CN116770887A (en) * 2023-08-10 2023-09-19 中国铁路设计集团有限公司 New and old subway station structure connecting node and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110878641B (en) * 2019-12-10 2023-11-07 四川大学锦江学院 Reinforcing structure adopting superimposed hollow floor slab grid system and new construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2174580C2 (en) * 1998-11-12 2001-10-10 ЗАО "БЭСКИТ" (Безопасная эксплуатация строительных конструкций и техники) Device for strengthening reinforced concrete beams
CN2583229Y (en) * 2002-11-22 2003-10-29 上海市第二建筑有限公司 Steel holding hoop fastening structure of added storey new and old point pitch of high rise building
JP4163539B2 (en) * 2003-03-20 2008-10-08 株式会社ミラクルスリーコーポレーション Seismic reinforcement extension method of building and earthquake resistance reinforcement extension building
CN101078299B (en) * 2007-06-25 2010-05-19 李林 Method for reconstructing frontage multilayer brick-concrete structure building to frame structure building
CN201377186Y (en) * 2009-01-05 2010-01-06 上海维固工程实业有限公司 Reversible reinforcing structure of building
CN103924793B (en) * 2014-05-06 2016-05-04 北京筑福建筑事务有限责任公司 Old house reinforcement structure and reinforcement means thereof
CN204001813U (en) * 2014-08-29 2014-12-10 安徽天筑建设(集团)有限公司 A kind of existing reinforced concrete floor or roof panel ruggedized construction
CN104314321B (en) * 2014-11-10 2016-10-05 上海建工二建集团有限公司 Structural beams transformation reinforcement means

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678417A (en) * 2018-07-31 2018-10-19 天津市建筑设计院 A kind of floor of steel structure transformation node
CN108678417B (en) * 2018-07-31 2023-07-21 天津市建筑设计院 Steel construction floor reforms transform node
CN116770887A (en) * 2023-08-10 2023-09-19 中国铁路设计集团有限公司 New and old subway station structure connecting node and construction method thereof

Also Published As

Publication number Publication date
CN106368443A (en) 2017-02-01
CN106368443B (en) 2019-03-08

Similar Documents

Publication Publication Date Title
CN106401207B (en) The overlapping connection structure and its construction method on pillar basis are added for existing building
CN107542196A (en) Prestressed concrete bidirectional laminated slab and preparation method
CN103510639B (en) A kind of can the overlaid plate type shear wall of restore funcitons and implementation method thereof
CN101768916A (en) Lower flange improved corrugated steel web plate composite box girder and construction method thereof
CN206562792U (en) Overlapping for existing structure strengthening reconstruction changes antitorque structure
CN101487332A (en) Prefabricated hollow superposed beam, and cast-in-situ construction method for beam and precast slab
CN103498533A (en) Prestressed H-shaped steel reinforced concrete superposed beam
CN104831639B (en) A kind of ultra-wide nonprismatic continuous beam 0# block consolidation and releasing construction method
CN203487664U (en) Suspension type flexible connection for precast concrete infilled wall
CN105604183B (en) The construction method of node is welded after a kind of truss
CN108590035A (en) High-strength recycled concrete superposed column and preparation method thereof
CN110130233A (en) A kind of remodeling method suitable for double curvature arched bridge spandrel construction
CN203547019U (en) Prestressed H-shaped steel reinforced concrete superposed beam
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN208792625U (en) High-strength recycled concrete superposed column
CN208105474U (en) A kind of assembly node of upper and lower interior wall and floor
CN208152311U (en) A kind of two-sided folded type steel shear wall
CN208668274U (en) A kind of steel reinforced concrete composite beam bridge
CN105984015B (en) One collects together sets of brackets on top of the columns prefabricated concrete element preparation method in building in the style of the ancients
CN206158221U (en) Existing coincide reinforced structure of striding structural newly -increased post net greatly
CN206158220U (en) A coincide connection structure that is used for existing building to add post basis
CN101570998A (en) Rib beam hoop reinforcement and application method thereof
CN110067198A (en) A kind of steel reinforced concrete composite beam bridge and its construction method
CN108775086A (en) The additional assembled integral beam-column node structure and construction method for being closed connection reinforcing bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230426

Address after: 409-419, Floor 4, Martial Arts Hall Building, 168 Yugu Road, Xihu District, Hangzhou City, Zhejiang Province, 310013 (singular)

Patentee after: Jiedi Design Group Co.,Ltd.

Address before: No. 168, Xihu District Yu Gu Road, Xihu District, Hangzhou, Zhejiang

Patentee before: ZHEJIANG JIEDI ARCHITECTURAL DESIGN Co.,Ltd.

TR01 Transfer of patent right