CN206554264U - Modularized house assembling structure - Google Patents

Modularized house assembling structure Download PDF

Info

Publication number
CN206554264U
CN206554264U CN201720229967.6U CN201720229967U CN206554264U CN 206554264 U CN206554264 U CN 206554264U CN 201720229967 U CN201720229967 U CN 201720229967U CN 206554264 U CN206554264 U CN 206554264U
Authority
CN
China
Prior art keywords
wallboard
tubing
floor plates
hole
assembling structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720229967.6U
Other languages
Chinese (zh)
Inventor
陈阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720229967.6U priority Critical patent/CN206554264U/en
Application granted granted Critical
Publication of CN206554264U publication Critical patent/CN206554264U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is related to house building technology field, and in particular to a kind of modularized house assembling structure, including:Prefabricated profiled wallboard, floor plates and beam, the tubing of connection function has been embedded with three, tubing is connected with same prefabricated connector, connected in socket mode and realize located lateral, fixed entirely with bolt again, coordinate positioning with the tongue-and-groove and tenon bar opened up between layer adjacent wall board by wallboard sidepiece, realize live Fast Installation.Using above-mentioned technical proposal, the modularized house assembling structure that the utility model is provided, can modularization batch it is prefabricated, constructing operation is simple, and work on the spot amount is few, and can reuse, and assembled in situ is simple and direct quickly.

Description

Modularized house assembling structure
Technical field
The utility model is related to house building technology field, and in particular to a kind of modularized house assembling structure.
Background technology
With the development of modern industrial technology, building house can in batch completely be manufactured as machine production, as long as Prefabricated house component, transport to assemble in site and get up.This assembled architecture begins to cause people in early 20th century Interest, realized finally to the sixties, the state such as English, method, Soviet Union made first attempt and succeed, and based on its construction The advantage that speed is fast, production cost is relatively low, is able to worldwide be promoted rapidly.
Existing assembled architecture, has reached and set is directly assembled into building site with prefabricated component to a certain extent Effect, but limited by terms of node interconnection technique, otherwise need live second pouring, larger same of site operation amount When, it is difficult to dismount and reused;Too emphasize being dismounted for multiple times and cause node structure relative complex, operation inconvenience etc. Problem, fails to give full play to the advantage that assembled architecture is simple, quick, save.
Utility model content
In view of the above-mentioned problems, the utility model aim to provide one kind can modularization batch it is prefabricated, constructing operation is simple, scene Workload is few, and the assembled arthitecutral structure that can be reused, and reaches the purpose of simple and direct quick assembling at the scene.
To reach the effect above, the technical scheme that the utility model is used for:
A kind of modularized house assembling structure, including:Several prefabricated profiled vertical vertically arranged wallboards and horizontal stroke To horizontally disposed floor plates and beam, many tubing being vertically arranged are embedded with the wallboard, floor plates and beam, pass through institute The endoporus for stating tubing forms spliced eye on the upper and lower end face of wallboard, floor plates and beam;The tubing is respectively along wallboard and beam The length direction of upper and lower end face, and floor plates both ends be evenly arranged into it is parallel multiple rows of;The close upper and lower end face of wallboard Metope on each horizontally disposed bolt hole for having an at least wallboard described in row's insertion, being horizontally disposed with the side of beam has an at least row The bolt hole of beam described in insertion, and each bolt hole is passed perpendicularly through corresponding tubing;The wallboard, floor plates and Connection between beam, is connected by being socketed a connection piece in corresponding each tubing on adjacent connection surfaces respectively;It is described Connector be on strip, and correspondence tubing the position of the bolt hole be radially arranged connecting hole, if bolt stem also cross Bolt hole and the connecting hole on wallboard and/or beam, the fixed wallboard, floor plates and beam.
The tubing of connection function is embedded with wallboard, floor plates and beam, leading to too small amount of mould just can be prefabricated in batches Shaping, realizes produced modularization in batches;Pre-buried tubing and same prefabricated company are connected through between wallboard, floor plates and beam Fitting, which coordinates, to be realized, is connected with to be socketed mode and is realized located lateral, then is completely fixed with bolt, and integral construction operation is simple Single, work on the spot amount is few, and can reuse, and assembled in situ is simple and direct quick.
Further, two sides of above-mentioned wallboard are equipped with the tongue-and-groove of up/down perforation, and two with layer adjacent wall board A tenon bar played the role of positioning is set in the tongue-and-groove.With coordinating between layer adjacent wall board by tongue-and-groove and tenon bar, strengthen positioning Meanwhile, it can also eliminate the gap between wallboard.
Further, above-mentioned modularized house assembling structure also includes:Beam connection and wall connector, the beam connection Including yi word pattern beam connection and L-type beam connection, the connection for being respectively used to two beam straight line docking and the docking that intersects vertically adds Gu, the both sides of beam connection are respectively by fixed to two beams of the bolt hole on bolt and beam;Install simple, and can carry The intensity of high building structure.
Further, above-mentioned modularized house assembling structure also includes:For filling up difference in height between beam and floor plates Obturator, the thickness of the obturator is identical with floor plates, and the width of obturator is identical with the thickness of wallboard;In the obturator Be embedded with the tubing of many vertical insertion its upper and lower surface, and the position distribution of the tubing with the tubing on the beam one by one Correspondence;The difference in height being likely to occur between beam and floor plates is filled up with obturator, is easy to the specification of unified preformed parts, reduces The quantity of prefabricated mould, further improves the efficiency of produced modularization in batches.
Further, above-mentioned modularized house assembling structure also includes:Waterproof cover piece, the lower surface of the waterproof cover piece is convex Sealing-plug provided with the endoporus interference fit of tubing in two rows and floor plates, sealing-plug described in two rows is inserted respectively into two on top layer In the tubing of adjacent floor plates, while blocking inner hole of pipe, the connecting sewing between floor plates is covered, the effect of roof waterproof is played Really.
Further, the spool hole for supplying pipe inserting is preset with above-mentioned wallboard and floor plates, so as to facilities such as water, electricity Install.
Further, embedded bar in above-mentioned wallboard, floor plates and beam, it is ensured that enough intensity.
Further, the two ends of above-mentioned bolt hole are provided with counter sink, and wallboard, floor plates and beam in each hole Hole gadget has been filled, has made the surface in house more smooth, plays a part of beautification.
Further, tubing pre-buried at least partly above-mentioned beam is replaced with to the bar coordinated with the inner hole of pipe gap The section bar of shape, and the section bar one end stretch out insertion floor plates and/or wallboard on tubing in, and section bar and building Laminate and/or the corresponding position of wallboard upper bolt hole set the connecting hole of radial direction, bolt passing through bolt hole and the connection Hole, realizes the fixation between beam and floor plates and/or wallboard.The beam of this structure, can continue to use general mould and carry out preset shaping, Extra die cost will not be increased, and be more suitable for the installation requirement of bottom and top layer assembly environment, efficiency of assembling is improved.
Further, tubing pre-buried at least partly above-mentioned beam is replaced with to the bar coordinated with the inner hole of pipe gap In the section bar of shape, and the tubing that stretches out respectively on insertion floor plates and/or wallboard of two ends of the section bar, and in section bar The position corresponding with floor plates and/or wallboard upper bolt hole sets the connecting hole of radial direction, bolt passing through bolt hole and described Connecting hole, realizes the fixation between beam and floor plates and/or wallboard.The beam of this structure, can equally continue to use general mould Carry out preset shaping, be more suitable for the installation requirement of intermediate layer assembly environment, further improve efficiency of assembling.
In summary, the modularized house assembling structure that the utility model is provided, can prefabricated, the constructing operation of modularization batch Simply, work on the spot amount is few, and can reuse, and assembled in situ is simple and direct quick.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model is completed state;
Fig. 2 is assembling schematic diagram of the present utility model;
Fig. 3 is the cross section structure diagram of the utility model confined state;
Fig. 4 is the structure enlarged diagram at I positions in Fig. 3;
Fig. 5 is the structural representation that the wall plate of the utility model two is assembled;
Fig. 6 is the cross-sectional structural representation of the utility model wallboard upper bolt hole position;
Fig. 7 is the structural representation of the utility model floor plates;
Fig. 8 is the vertical profile structural representation of tubing position in the utility model floor plates;
Fig. 9 is the structural representation of the utility model connector;
Figure 10 is the structural representation of the utility model beam;
Figure 11 is the cross section structure diagram of the utility model beam A-A sections;
Figure 12 is the positive structure diagram of the utility model girder construction one;
Figure 13 is the cross section structure diagram of the B-B sections of the utility model girder construction one;
Figure 14 is the positive structure diagram of the utility model girder construction two;
Figure 15 is the cross section structure diagram of the C-C sections of the utility model girder construction two;
Figure 16 is the positive structure diagram of the utility model girder construction three;
Figure 17 is the cross section structure diagram of the D-D sections of the utility model girder construction three.
Reference:
1- wallboards;11- tongue-and-grooves;12- tenon bars;2- floor plates;3- beams;31- section bars;32- beam connections;321- yi word pattern beams Connector;322-L type beam connections;4- tubing;5- connectors;51- connecting holes;6- bolts hole;61- counter sinks;62- bolts; 7- obturators;8- waterproof cover pieces;81- sealing-plugs;9- reinforcing bars
Embodiment
The embodiment of technical solutions of the utility model is described in detail below in conjunction with accompanying drawing.
As shown in Fig. 1 to Figure 17, the modularized house assembling structure that the present embodiment is provided, including:Several are pre-formed Wallboard 1, floor plates 2 and beam 3, the material selection of wallboard 1, floor plates 2 and beam 3 need to ensure that it has enough intensity and used Security, can select the conventional construction material such as concrete, can be macromolecule chemical material, composite can also be used, Certainly the material of use requirement can be met by also including other;Reinforcing bar 9 is embedded with wallboard 1, floor plates 2 and beam 3, to ensure foot Enough intensity.Wallboard 1 is vertically arranged vertically, floor plates 2 and the transverse horizontal of beam 3 arrangement, and three, which is connected with each other to be assembled into, is available for people Class inhabitation or the house for making other purposes;And the spool hole for pipe inserting is preset with wallboard 1 and floor plates 2, so as to water, electricity Deng the installation of facility.
Referring to Fig. 2 and Fig. 3, many tubing being vertically arranged 4 are embedded with wallboard 1, floor plates 2 and beam 3, the tubing 4 For the prefabricated shaped-section of the materials such as aluminium, steel or composite, it can be pipe, square tube or polygonal tube, respectively there is advantage and disadvantage;Tubing 4 form spliced eye by its endoporus on the upper and lower end face of wallboard 1, floor plates 2 and beam 3, in this, as being covered on tie point The socket end connect, it can respectively symmetrically be arranged in the upper and lower side of wallboard 1, floor plates 2 and beam 3 in the form of two shorter tube bodies On face, while socket effect is ensured, the consumption of tubing 4 can be reduced as far as possible;Or with an elongated pipe insertion wallboard 1, The upper and lower end face of floor plates 2 and beam 3, can simplify prefabricated profiled technique.
Referring to Fig. 5, Fig. 6, Figure 10 and Figure 11, tubing 4 is along wallboard 1 and the length direction of the upper and lower end face of beam 3, symmetrically cloth It is set to two parallel rows;Referring to Fig. 7 and Fig. 8, both ends of the tubing 4 on the length direction of floor plates 2 respectively set a row, two combs Material 4 is equally symmetrically arranged, and ensures that the tubing 4 during assembling on above-below direction in each wallboard 1, floor plates 2 and beam 3 can be one by one Alignment, to facilitate the insertion of connector 5 to dock.Referring to Fig. 9, the connector 5 is the length that a section is adapted with the endoporus of tubing 4 Beam is inserted with the tubing 4 in floor plates and/or wallboard, reality is connected to be socketed mode in strip section, the two ends of connector 5 respectively The existing located lateral between each wallboard 1, floor plates 2 and beam 3.Meanwhile, on the metope of the close upper and lower end face of wallboard 1, each water The flat bolt hole 6 for being provided with least row's insertion wallboard 1, is horizontally disposed with the bolt hole 6 for having at least row's through beam 3 on beam 3, Each bolt hole 6 is set to pass perpendicularly through each bolt on corresponding two tubing 4 in two comb materials 4, and the correspondence tubing 4 of connector 5 The position in hole 6, is respectively provided with the connecting hole 51 of a radial direction, bolt 62 is also cross the bolt hole 6 on wallboard 1 and/or beam 3 and is somebody's turn to do Connecting hole 51, and fixed with nut, the longitudinally fixed of wallboard 1, floor plates 2 and beam 3 is realized, finally in socket and bolt connection Cooperation under realize being completely fixed between each part.
Furthermore, the tongue-and-groove 11 of up/down perforation is equipped with two sides of wallboard 1, when two same layer adjacent wall board 1 are spliced, one Tenon bar 12 is inserted in the tongue-and-groove 11 of both sides simultaneously, is carried out reinforcement positioning to wallboard 1, can also be eliminated the gap between wallboard 1;Meanwhile, Also by some wall connectors come reinforcement by connection between wallboard 1, the chamber connector is provided with yi word pattern wall connector and L-type wall connects The forms such as fitting, are respectively used to two straight line of wallboard 1 docking and the reinforcement by connection intersected vertically when docking;The two ends of wall connector Two row's bolts hole 6 that portion offers in multiple through holes for being available for the bar portion of bolt 62 to pass through, the present embodiment on unilateral correspondence wallboard 1 are set Two of Cheng Yilie above and below being set to;The both sides of wall connector are fixed by the bolt hole 6 on bolt 62 and wallboard 1 respectively during installation Snap on two wallboards 1, install simple.
In the present embodiment, multiple through holes are uniformly arranged in floor plates 2 along its length, to mitigate the weight of floor plates 2 Amount;Connector 5 is same to be made using tubulose section bar, saves material and energy is while loss of weight;Tubing 4 and connector 5 is supporting is arranged to Regular hexagon, facilitates bolt hole 6 and the centering of connecting hole 51 to align, or is arranged to circle, facilitates process mating;And the He of wallboard 1 Bolt hole 6 on beam 3 is disposed as two rows, simplifies assembled in situ workload as far as possible under conditions of bonding strength is ensured, improves Efficiency of assembling.The two ends of bolt hole 6 are provided with counter sink 61, and on the counter sink 61 and wallboard 1, floor plates 2 and beam 3 In other each exposed holes, a hole gadget is respectively filled with filling cavity, makes the surface in house more smooth, plays beautification Effect.
Referring to Fig. 1 and Fig. 2, when modularized house is assembled, on beam 3 and floor plates 2 between the side of not pre-buried tubing 4, meeting There is breach because of the difference in height of the two, thus be provided with some prefabricated profiled obturators 7 to make up the difference in height;The filling The thickness of body 7 is identical with the thickness of floor plates 2, and width is identical with the thickness of wallboard 1, and the tubing 4 also corresponded in it on beam 3 is pre- The many tubing 4 for passing through its upper and lower surface vertically are embedded with, facilitate connector 5 to extend there through to be connected thereto the wallboard 1 on lower position With beam 3;The appearance of obturator 7, has preferably unified the specification of preformed parts, reduces the quantity of prefabricated mould, further carries The high efficiency of produced modularization in batches.
As shown in Figure 1 to Figure 3, the modularized house that the utility model is provided is when assembling at the scene, the installation of the bottom from One layer of beam 3 is assembled on the ground as ground collar tie beam to start, and reinforcement by connection is carried out again by some beam connections 32 between beam 3.Should Beam connection 32 includes:The form such as yi word pattern beam connection 321 and L-type beam connection 322, is respectively used to two straight lines pair of beam 3 The reinforcement by connection for connecing and intersecting vertically when docking;The both ends of beam connection 32, which are offered, multiple is available for what the bar portion of bolt 62 was passed through Two row's bolts hole 6 in through hole, the present embodiment on unilateral correspondence beam 3 be arranged to above and below two of Cheng Yilie;Beam is connected during installation The both sides of part 32 are respectively by fixed to two beams 3 of the bolt hole 6 on bolt 62 and beam 3, installing simple.Afterwards the bottom of at The top of the beam 3 paving first floor laminate 2 of layer, if occurring difference in height between beam 3 and floor plates 2, aligns filling with obturator 7, makes It can keep smooth per floor laminate 2.Wallboard 1 is equipped with floor plates 2 and obturator 7 afterwards, each contraposition of connector 5 is inserted Enter in the tubing 4 on same plumb line, be sequentially connected in series beam 3, floor plates 2 or obturator 7 and wallboard 1, carried out afterwards with bolt 6 It is completely fixed.
Choose the positions such as higher bottom or entrance hall in floor, can by the way of two wallboards are docked about 1 come Increase floor and choose height, directly by the two ends of connector 5, respectively in the tubing 4 on the contraposition insertion same plumb line of two wallboard 1, it It is completely fixed afterwards with bolt 6, the wallboard 1 of orientation two is directly connected to above and below realization.
Lower floor does not set the special circumstances of wallboard 1 when being installed based on bottom, can be by the beam 3 of part said structure one (referring to figure 12 and Figure 13) in pre-buried tubing 4 replace with the section bar 31 of the strip coordinated with interporal lacuna in the tubing 4, form another knot It is more suitable for the beam 3 of the structure two of bottom matching requirements on structure;Referring to Figure 14 and Figure 15, structure and the class of connector 4 of the section bar 31 Seemingly, can substitute equivalents, its one end is embedded into the position of original pre-buried tubing 4 on beam 3, and the other end extends outwardly through floor plates 2 Or the tubing 4 on obturator 7, it is inserted into afterwards in the tubing 4 on wallboard 1;Section bar 31 is again provided with spiral shell on each tubing 4 of correspondence The connecting hole 51 of keyhole 6, is connected again by bolt 62, substitute former connector 5 realize beam 3 and floor plates 2 or obturator 7 and Fixation between wallboard 1, work on the spot amount is smaller, and efficiency of assembling is higher.Meanwhile, the beam 3 of this structure can still continue to use structure one The mould of central sill 3 (referring to Figure 12 and Figure 13) carrys out preset shaping, will not increase extra die cost.
When assembling intermediate floor, the space arrangement of connecting portion is followed successively by wallboard 1, beam 3, floor plates 2 or filled out from top to bottom Fill body 7, on set wallboard 1 again, connected again by connector 5 and bolt 62, it is same between beam 3 that beam connection 32, tool are set Body connection method is referring to the mounting means of above-mentioned bottom, and here is omitted.When intermediate floor is assembled, beam 3 can equally be used Another beam 3 of structure three shown in structure, i.e. Figure 16 and Figure 17;By in the structure two (referring to Figure 14 and Figure 15) of said structure Pre-buried section bar 31 in beam 3, the structure stretched out from only one end is changed to two ends while stretching out:Upper end is extended up through Tubing 4 in floor plates 2 or obturator 7, is inserted into the tubing 4 on the wallboard 1 on upper strata, its lower end is inserted into lower floor afterwards In tubing 4 on wallboard 1;Afterwards using bolt 62 by the connecting hole 51 and bolt hole 6 on section bar 31 complete each prefabricated component it Between be completely fixed, be more suitable for the assembly environment of intermediate floor, play reduction work on the spot amount, improve efficiency of assembling effect Really.The beam 3 of this structure, the mould that can still continue to use the central sill 3 (referring to Figure 12 and Figure 13) of structure one carrys out preset shaping, will not increase Extra die cost.
Meanwhile, when the structural strength of wallboard 1 supports whole house enough, beam 3 can be cancelled in the link position of floor, To reduce build-up member and process, the difference in height being likely to occur between beam 3 and floor plates 2 can be also eliminated, and then cancel obturator 7 Further simplify structure;Now, the space arrangement of connecting portion is followed successively by wallboard 1, floor plates and wallboard 1 from top to bottom, equally The wallboard 1 on wallboard 1, floor plates 2 and the upper strata of lower floor is sequentially passed through by connector 5, is connected afterwards with bolt 62, concrete operations Here is omitted.
The assembling of house top layer, directly installs floor plates 2 at the top of wallboard 1 of the superiors and binds, beam 3 and floor plates Filling then is aligned with obturator 7 when occurring difference in height between 2, keeps roof smooth, is connected afterwards by bolt 62.Due to In top layer, floor plates 2 must do water-proofing treatment, and Gu Te sets the laminal waterproof cover piece 8 of strip, the waterproof cover piece on top layer On 8 lower surface, two rows and the sealing-plug 81 of the endoporus interference fit of tubing 4 in floor plates 2, two 81 points of row's sealing-plugs are convexly equipped with It is not inserted on top layer in the tubing 4 of the two adjacent docking locations of floor plates 2, while blocking 4 endoporus of tubing, covers floor plates Connecting sewing between 2, plays the effect of roof waterproof.The water-proofing treatment of other seams, can use means general in Building technology, Such as lay waterproof cloth, bitumen layer.
In the modularized house assembling structure provided using above scheme, the utility model, wallboard 1, floor plates 2 and beam 3 The tubing 4 of connection function is embedded with, leading to too small amount of mould just can be pre-formed in batches, realizes produced modularization in batches; The pre-buried tubing 4 that connects through between wallboard 1, floor plates 2 and beam 3 coordinates realization with same prefabricated connector 5, to be socketed Mode, which is connected, realizes located lateral, then is completely fixed with bolt, with passing through tongue-and-groove 11 and tenon bar 12 between layer adjacent wall board 1 Coordinate positioning, integral construction is simple to operate, and work on the spot amount is few, and can reuse, assembled in situ is simple and direct quick.
In summary, the modularized house assembling structure that the utility model is provided, can prefabricated, the constructing operation of modularization batch Simply, work on the spot amount is few, and can reuse, and assembled in situ is simple and direct quick.
It should be noted that preferred embodiment above is only limited to illustrate the technical solution of the utility model, rather than to it System;Although the utility model is described in detail with reference to the foregoing embodiments, one of ordinary skill in the art should manage Solution:It can still modify to the technical scheme described in previous embodiment, or to which part or whole technologies Feature carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from the utility model reality The scope of a technical scheme is applied, it all should cover among claim of the present utility model and the scope of specification.

Claims (10)

1. a kind of modularized house assembling structure, including:Several prefabricated profiled vertical vertically arranged wallboards and transverse direction Horizontally disposed floor plates and beam, it is characterised in that
The many tubing being vertically arranged are embedded with the wallboard, floor plates and beam, by the endoporus of the tubing wallboard, Spliced eye is formed on the upper and lower end face of floor plates and beam;The tubing respectively along wallboard and the length direction of the upper and lower end face of beam, And the both ends of floor plates be evenly arranged into it is parallel multiple rows of;There is each be horizontally disposed with the metope of the close upper and lower end face of wallboard The bolt hole for having at least beam described in row's insertion is horizontally disposed with least described in row's insertion on the bolt hole of wallboard, the side of beam, And each bolt hole is passed perpendicularly through corresponding tubing;
Connection between the wallboard, floor plates and beam, passes through in corresponding each tubing on adjacent connection surfaces points Tao Jie not a connection piece connection;The connector is in that the position of the bolt hole on strip, and correspondence tubing has been radially arranged Connecting hole, if bolt stem is also cross the bolt hole on wallboard and/or beam and the connecting hole, the fixed wallboard, floor Plate and beam.
2. modularized house assembling structure according to claim 1, it is characterised in that two sides of the wallboard are all provided with There is the tongue-and-groove of up/down perforation, and a tenon bar played the role of positioning is set in two tongue-and-grooves with layer adjacent wall board.
3. modularized house assembling structure according to claim 1, it is characterised in that also include:Beam connection, the beam Connector includes yi word pattern beam connection and L-type beam connection, is respectively used to two beam straight line docking and the docking that intersects vertically Reinforcement by connection, the both sides of beam connection are respectively by fixed to two beams of the bolt hole on bolt and beam.
4. modularized house assembling structure according to claim 1, it is characterised in that also include:For filling up Liang Yulou The obturator of difference in height between laminate, the thickness of the obturator is identical with floor plates, the width of obturator and the thickness of wallboard It is identical;Be embedded with the tubing of many vertical insertion its upper and lower surface in the obturator, and the position distribution of the tubing with Tubing on the beam is corresponded.
5. modularized house assembling structure according to claim 3, it is characterised in that also include:Waterproof cover piece, it is described anti- The lower surface of water cover part is convexly equipped with the sealing-plug with the endoporus interference fit of tubing in floor plates, and the sealing-plug is inserted respectively into On top layer in the tubing of two adjacent floor plates, while blocking inner hole of pipe, the connecting sewing between floor plates is covered.
6. modularized house assembling structure according to claim 1, it is characterised in that
The spool hole for pipe inserting is preset with the wallboard and floor plates.
7. modularized house assembling structure according to claim 1, it is characterised in that
Embedded bar in the wallboard, floor plates and beam.
8. modularized house assembling structure according to claim 1, it is characterised in that
The two ends of the bolt hole are provided with counter sink, and the wallboard, floor plates and beam and have filled hole in each hole Gadget.
9. the modularized house assembling structure according to claim any one of 1-8, it is characterised in that
Tubing pre-buried at least partly described beam is replaced with to the section bar of the strip coordinated with the inner hole of pipe gap, and institute State in the tubing that one end of section bar stretches out on insertion floor plates and/or wallboard, and in section bar and floor plates and/or wallboard The corresponding position of upper bolt hole sets the connecting hole of radial direction, bolt passing through bolt hole and the connecting hole, realizes Liang Yulou Fixation between laminate and/or wallboard.
10. the modularized house assembling structure according to claim any one of 1-8, it is characterised in that
Tubing pre-buried at least partly described beam is replaced with to the section bar of the strip coordinated with the inner hole of pipe gap, and institute State in the tubing that the two ends of section bar stretch out on insertion floor plates and/or wallboard respectively, and in section bar and floor plates and/or The corresponding position of wallboard upper bolt hole sets the connecting hole of radial direction, bolt passing through bolt hole and the connecting hole, realizes beam Fixation between floor plates and/or wallboard.
CN201720229967.6U 2017-03-09 2017-03-09 Modularized house assembling structure Withdrawn - After Issue CN206554264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720229967.6U CN206554264U (en) 2017-03-09 2017-03-09 Modularized house assembling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720229967.6U CN206554264U (en) 2017-03-09 2017-03-09 Modularized house assembling structure

Publications (1)

Publication Number Publication Date
CN206554264U true CN206554264U (en) 2017-10-13

Family

ID=60362349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720229967.6U Withdrawn - After Issue CN206554264U (en) 2017-03-09 2017-03-09 Modularized house assembling structure

Country Status (1)

Country Link
CN (1) CN206554264U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836502A (en) * 2017-03-09 2017-06-13 陈阳 Modularized house assembling structure
CN108894331A (en) * 2018-08-02 2018-11-27 江苏华大装配式房屋有限公司 A kind of light steel house of spliced light steel wallboard and its composition
CN109403505A (en) * 2018-12-11 2019-03-01 哈尔滨理工大学 Stalk-steel body system assembled wall and its joint connecting method
CN110512722A (en) * 2019-08-08 2019-11-29 武汉迈特绿色建筑科技股份有限公司 The light steel house connection frame of modular assembly formula

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836502A (en) * 2017-03-09 2017-06-13 陈阳 Modularized house assembling structure
CN108894331A (en) * 2018-08-02 2018-11-27 江苏华大装配式房屋有限公司 A kind of light steel house of spliced light steel wallboard and its composition
CN109403505A (en) * 2018-12-11 2019-03-01 哈尔滨理工大学 Stalk-steel body system assembled wall and its joint connecting method
CN110512722A (en) * 2019-08-08 2019-11-29 武汉迈特绿色建筑科技股份有限公司 The light steel house connection frame of modular assembly formula

Similar Documents

Publication Publication Date Title
CN106836502A (en) Modularized house assembling structure
CN206554264U (en) Modularized house assembling structure
CN103790265B (en) A kind of prefabricated assembled steel tube concrete core pillar is put more energy into the making assembly method of shear wall
CN1078291C (en) Housing system with structural cored hollow components
CN205685511U (en) A kind of prefabricated components assembling die
CN100529312C (en) Modular system for the construction of overhead wire support and/or supporting pile foundations
CN107419801B (en) A kind of assembled single layer ALC wood connecting building and its construction method and ALC board manufacturing method
CN103321421A (en) Construction method for one-time formation of concrete pool wall
CN202706198U (en) Building structure
CN105178432A (en) Precast concrete shear wall structure and construction method thereof
CN113914605B (en) Assembling method of special-shaped double-curved-surface bare concrete wall
CN204001701U (en) Be applicable to the construction formwork system of multilayer rammed earth wall
CN107687211A (en) A kind of full prefabricated buildings system
CN104532983A (en) Steel pipe concrete composite system of building and masonry construction method thereof
CN107687210A (en) A kind of method of construction of full prefabricated buildings
CN106193402B (en) Girder truss integrated form flooring module and its installation method
KR101765334B1 (en) Construction methods of precast concrete slab having its connection part being concealed by coupled ribs and, precast concrete slab used therefor
CN104775546A (en) Concrete composite shear wall with embedded steel plates and production method thereof
CN212535440U (en) Integrally prefabricated external window, connected node of wafing
CN104153579B (en) A kind of formwork for placing structure of non-standard layers structure and construction method
CN104060853A (en) Lightweight steel structure modularized residential building
CN204163191U (en) Steel concrete integrated building
CN101417460A (en) Post welding mounting construction method of pseudo-classic architecture element
CN204266400U (en) A kind of concrete filled steel tube combined system of building
CN204001306U (en) Argil board curtain beam column decorative structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20171013

Effective date of abandoning: 20230630

AV01 Patent right actively abandoned

Granted publication date: 20171013

Effective date of abandoning: 20230630