CN206541498U - The river environment monitoring experiment teaching system in laboratory is come into river - Google Patents

The river environment monitoring experiment teaching system in laboratory is come into river Download PDF

Info

Publication number
CN206541498U
CN206541498U CN201621454997.9U CN201621454997U CN206541498U CN 206541498 U CN206541498 U CN 206541498U CN 201621454997 U CN201621454997 U CN 201621454997U CN 206541498 U CN206541498 U CN 206541498U
Authority
CN
China
Prior art keywords
river
water
test block
circulating water
bed material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621454997.9U
Other languages
Chinese (zh)
Inventor
黑鹏飞
武海波
金军
王英
陈坦
杨静
尚毅梓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Minzu University of China
Original Assignee
Minzu University of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Minzu University of China filed Critical Minzu University of China
Priority to CN201621454997.9U priority Critical patent/CN206541498U/en
Application granted granted Critical
Publication of CN206541498U publication Critical patent/CN206541498U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Or Analyzing Non-Biological Materials By The Use Of Chemical Means (AREA)

Abstract

The river environment for coming into laboratory the utility model discloses a kind of river monitors experiment teaching system, including circulating water chennel, and circulating water chennel is provided with natural river test block, branch afflux, river work building area, bed material test block and functional areas mark;Natural river test block uses various shapes entity plug-in unit, simulates a variety of fluvial morphologies, including flexure type river, divaricating river;Branch afflux is drawn water using suction pump from branch water distribution manifold cylinder;River work building area uses various shapes entity plug-in unit, simulation river work building, including port and pier, groynes;Bed material test block is provided with the natural bed material of addition in multiple sand pits, sand pit;Functional areas mark includes potable water source district intake, provincial boundaries mark.It can be encountered problems according to course teaching, adjustment river topography, pollution sources and functional areas distribution in time, Scientific Establishment river course excites student's curiosity than chi and river topography, guiding student thinking, exploration, and then the innovative thinking and the ability of solving practical problems of training student.

Description

The river environment monitoring experiment teaching system in laboratory is come into river
Technical field
The utility model is related to a kind of river environment monitoring experiment teaching system, more particularly to laboratory is come into a kind of river River environment monitoring experiment teaching system.
Background technology
Environmental monitoring is an application subject, and the content of courses includes natural river data collection, solution formulation, sampled point Optimization, sample transport and preservation, sample analysis, data processing, environmental evaluation.Wherein sampling point optimization is important step.River Stream pollution is big with spatial dimension, the complicated feature of change, and it is multiple that natural river flows into remittance, bend and river work building area fluidised form in branch Miscellaneous, corresponding concentration distribution of pollutants is changed greatly, and is the key factor of the selection of environmental monitoring section and middle consideration of layouting.River ring The setting of border monitoring section needs to meet principle of whole, representativeness principle, economy principle, feasibility and convenience original simultaneously Then.Section, which is chosen, to be needed to consider the information such as function of water body area, hydrology gaging section, branch inflow remittance, discharge of pollutant sources, simultaneously Cross section place should avoid slough, backwater zone, at sewage draining exit, and straight chanel, stabilization of river bed, water flow stationary, the water surface are selected as far as possible It is broad, without torrent, without shoal at.Natural river difference section river course form, analysis and functional areas distribution are different. Therefore, such as how minimum monitoring section data, the overall water quality information in river is reflected to greatest extent, is the weight of river environment monitoring Point difficult point, is also the core content of Environmental Monitoring Experiment teaching.
In existing teaching method, the teaching of water quality of river monitoring test is main, and using sampling on the spot, water sample is adopted back behind laboratory, Carry out chemical analysis and data processing.
The shortcoming of existing teaching method:
Sample and limited by following factor on the spot:
1) department geographical position is limited, and suitable natural river is not present in school area, there are teaching feasibility problems;
2) basis《Surface water and sewage monitoring technical specification》, the river that width is more than 50m needs, in korneforos sampling, to be related to Experimental teaching safety problem;
3) river yardstick is larger, and sampling cost is high, and most colleges and universities' funds can not be supported, and there is the not enough problem of teaching fund;
4) importantly, single river section hydrology, river topography and functional areas are stablized relatively, it is impossible to provide abundant teaching Case, and then it is unable to the ability that training student lays sampled point scientific and flexiblely.
Utility model content
The purpose of this utility model is to provide the river environment monitoring experiment teaching system that laboratory is come into a kind of river.
The purpose of this utility model is achieved through the following technical solutions:
The river environment monitoring experiment teaching system in laboratory, including circulating water chennel, institute are come into river of the present utility model Circulating water chennel is stated provided with natural river test block, branch afflux, river work building area, bed material test block and functional areas mark;
The natural river test block uses various shapes entity plug-in unit, simulates a variety of fluvial morphologies, including flexure type river Stream, divaricating river;
The branch afflux is drawn water using suction pump from branch water distribution manifold cylinder;
The river work building area uses various shapes entity plug-in unit, simulation river work building, including port and pier, groynes;
The bed material test block is provided with the natural bed material of addition in multiple sand pits, sand pit;
The functional areas mark includes potable water source district intake, provincial boundaries mark.
The river that the utility model embodiment is provided it can be seen from the technical scheme that above-mentioned the utility model is provided is come into The river environment monitoring experiment teaching system in laboratory, can simulate different upstream flowrates, the level of tail water, the pollution of stream gradient Mixing Coefficient in Rectangular Channels under the conditions of thing transport process, different river course forms (such as meander stream, branch type river course, middle bar) is transported Pollutant Transportation process etc., flexibly identifies water body service function under the conditions of process, different analysis and pollutant discharge amount Area, increase different shape plug-in unit simulation river work building, culture consider river work Influence on Architecture, Optimizing.Based on above work( Can, it can be encountered problems according to course teaching, river topography, pollution sources and functional areas distribution, Scientific Establishment river are adjusted in time Road excites student's curiosity than chi and river topography, and the innovative thinking of guiding student thinking, exploration, and then training student is conciliate The certainly ability of practical problem.
Brief description of the drawings
Fig. 1 is the structural representation of the side of circulating water chennel in the utility model embodiment.
Fig. 2 is the structural representation of the plane of circulating water chennel in the utility model embodiment.
Fig. 3 is the arrangement schematic diagram of different identification plug-in unit in the utility model embodiment.
Embodiment
With reference to the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out clear Chu, it is fully described by, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole realities Apply example.Based on embodiment of the present utility model, those of ordinary skill in the art are obtained under the premise of creative work is not made The every other embodiment obtained, belongs to protection domain of the present utility model.
The river environment monitoring experiment teaching system in laboratory is come into river of the present utility model, and it is preferably embodied Mode is:
Including circulating water chennel, the circulating water chennel is provided with natural river test block, branch afflux, river work building area, bed material Test block and functional areas mark;
The natural river test block uses various shapes entity plug-in unit, simulates a variety of fluvial morphologies, including flexure type river Stream, divaricating river;
The branch afflux is drawn water using suction pump from branch water distribution manifold cylinder;
The river work building area uses various shapes entity plug-in unit, simulation river work building, including port and pier, groynes;
The bed material test block is provided with the natural bed material of addition in multiple sand pits, sand pit;
The functional areas mark includes potable water source district intake, provincial boundaries mark.
The circulating water chennel is connected with pump pond, upper storage reservoir, regulating reservoir and two water supply cylinders, and the pump pond is connected with regulating reservoir, Main pump is provided between the pump pond and the water inlet of circulating water chennel stem, moisturizing is provided between described two water supply cylinders and regulating reservoir Pump, the delivery port of the circulating water chennel afterbody is connected with two water supply cylinders;
The main pump and small pump are respectively equipped with flowmeter, and the water inlet position of the circulating water chennel is provided with ball current stabilization Device, the delivery port of the circulating water chennel afterbody is provided with water-level regulator.
The river environment monitoring experiment teaching system that laboratory is come into river of the present utility model has following functions:
1) can simulate different upstream flowrates, the level of tail water, the Pollutant Transportation process of stream gradient, training student according to Different hydrological conditions, the correct ability for choosing experiment section;
2) Mixing Coefficient in Rectangular Channels under the conditions of different river course forms (such as meander stream, branch type river course, middle bar) is simulated Transport process, training student considers influence of the different river course forms for current, the ability of correct selection monitoring section;
3) Pollutant Transportation process under the conditions of different analysis and pollutant discharge amount is simulated, training student is correctly set Put the ability of control section and control section;
4) flexible mark water body service function area, such as waterworks, heavy industrial district, training student is according to function distinguishing Cloth, the correct ability for laying sampled point;
5) increase different shape plug-in unit simulation river work building, produces backflow or spiral flow area etc., and culture considers river work Influence on Architecture, Optimizing.Based on function above, encountered problems according to course teaching, river topography, pollution sources are adjusted in time With functional areas distribution, Scientific Establishment river course excites student's curiosity than chi and river topography, and guiding student is thought deeply, explored, and then The innovative thinking of training student and the ability of solving practical problems.
Specific embodiment:
1. water trough design:
As shown in Figure 1 and Figure 2, " laboratory is come into river " system design science, the design considerations River function of experimental trough Similarity principle is learned, setting experimental trough compares chi.Recirculated water flute length L=12.00m, wide B=0.30m, supertronic scope 0~ 1.5%.Maximum water depth 0.15m (breadth depth ratio 2), Peak Flow Rate 1.00m/s.Flow velocity is 0.40m/s during maximum water depth;Peak Flow Rate Shi Shuishen 0.06m.Convection current and diffusion transport process of the pollutant in river can be reflected comprehensively.River course experiment plug-in unit also according to River course meets hydrodynamic similarity principle, can science simulate different river course forms and river work building for hydrodynamic force and pollution The influence of thing Transport And Transformation.
Experimental teaching for convenience, River function dynamical system uses the control system of science.Supplied water using double pond double pumps System, it is ensured that the stably and controllable property of the discharge of river, alternately supplies water from small pump from two water supply cylinders to regulating reservoir, keeps regulation water Invariant position, main pump supplies water from pump pond to tank;Flowmeter is provided between double pump, passes through testing pump uninterrupted;Tank afterbody goes out The mouth of a river is provided with water-level regulator, can adjust water level;Using spiral adjuster, convenient control stream gradient;Tank import position Put and set up ball flow straightener, it is ensured that the stabilization of tank fluidised form.
Concentration is controllable and supply subsurface water simultaneously, bed material monitoring section.Experiment proposes twin-tub alternative water-supply system, effectively control Pollutant concentration.If the cycle that water supply cylinder changes water is T, a water supply cylinder delivery period, another cylinder regulation concentration is standby;Bed material experimental section Using the native cup of 9 groups (every group of 12 lattice) parallel lateral spacing, close-packed arrays are flushed in bed material experimental section at the top of each native cup with upstream riverbed, Different soil cups, which have, contains husky function, and native cup is filled with into sand before experiment.The bed material method of sampling is similar to natural column device, using tubulose Using device, vertical sampling is carried out, by determining different height silt pollution amount, it may be determined that the vertical characteristics of bed material pollutant.
2. functional areas plug-in unit and mark:
1) natural river test block:Using different shape entity (stainless steel) plug-in unit, it is placed in inside tank, simulates different rivers Manifold state, such as flexure type river, divaricating river Pollutant Transportation (Fig. 3).
2) branch afflux:Drawn water using suction pump from branch water distribution manifold cylinder, water supply cylinder concentration is adjustable, research different flow, dense Degree is for main flow influence (Fig. 3).
3) river work building area:Using different shape entity plug-in unit, simulation river work building, such as port and pier, groynes river work Build (Fig. 3)
4) bed material test block:Groove body sets 2.8 × 0.30 × 0.45=0.731m3 sand pits (Fig. 1, Fig. 2), real as bed material Test area.Add natural bed material in experimentation sand pit.Chosen for sampled point and bed material sampling and the concentration mensuration experiment of dye thing test block.
5) difference in functionality area is identified, such as potable water source district intake, provincial boundaries mark etc..
The beneficial effect that technical solutions of the utility model are brought
1st, practicality.Experimental system is not influenceed by the hydrography condition of school region, realizes that " experiment is come into river Room " so that all processes of environmental monitoring can be completed in laboratory, the experimental teaching of the institution of higher learning of different zones is applicable. And experimental system is easy to operation, performance stable, uses safety.Relative to field sampling experiment, " laboratory is come into river " teaching System greatly reduces experiment fees, cheap, is easy to promote, with good practicality;
3rd, it is enlightening.Experimental trough system reduces space scale and the time scale that Mixing Coefficient in Rectangular Channels is transported, can be directly perceived The defeated shifting rule of display pollutant, and after student's sample analysis is finished, by contrasting actual concentration, can easily verify and adopt The reasonability that sample section and sampled point are set, guiding student is actively engaged in, deeply thinks deeply hydrodynamic force, river course form and building pair The influence set in sampling section;It is distributed by flexible modulation river course form, discharge of pollutant sources and functional areas, abundant teaching case Example can excite student's curiosity, and training student is under different river course forms, the hydrology, blowdown, functional areas combination condition, and observation is dirty Thing transportion and transformation is contaminated, science lays pollutant section and sampled point, with good enlightenment.
It is described above, only the utility model preferably embodiment, but protection domain of the present utility model is not This is confined to, any one skilled in the art can readily occur in the technical scope that the utility model is disclosed Change or replacement, should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should It is defined by the protection domain of claims.

Claims (2)

1. the river environment monitoring experiment teaching system in laboratory is come into a kind of river, it is characterised in that including circulating water chennel, institute Circulating water chennel is stated provided with natural river test block, branch afflux, river work building area, bed material test block and functional areas mark;
The natural river test block uses various shapes entity plug-in unit, simulates a variety of fluvial morphologies, including flexure type river, point Fork property river;
The branch afflux is drawn water using suction pump from branch water distribution manifold cylinder;
The river work building area uses various shapes entity plug-in unit, simulation river work building, including port and pier, groynes;
The bed material test block is provided with the natural bed material of addition in multiple sand pits, sand pit;
The functional areas mark includes potable water source district intake, provincial boundaries mark.
2. the river environment monitoring experiment teaching system in laboratory is come into river according to claim 1, it is characterised in that The circulating water chennel is connected with pump pond, upper storage reservoir, regulating reservoir and two water supply cylinders, and the pump pond is connected with regulating reservoir, the pump pond Main pump is provided between the water inlet of circulating water chennel stem, small pump is provided between described two water supply cylinders and regulating reservoir, it is described The delivery port of circulating water chennel afterbody is connected with two water supply cylinders;
The main pump and small pump are respectively equipped with flowmeter, and the water inlet position of the circulating water chennel is provided with ball flow straightener, institute The delivery port for stating circulating water chennel afterbody is provided with water-level regulator.
CN201621454997.9U 2016-12-28 2016-12-28 The river environment monitoring experiment teaching system in laboratory is come into river Expired - Fee Related CN206541498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621454997.9U CN206541498U (en) 2016-12-28 2016-12-28 The river environment monitoring experiment teaching system in laboratory is come into river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621454997.9U CN206541498U (en) 2016-12-28 2016-12-28 The river environment monitoring experiment teaching system in laboratory is come into river

Publications (1)

Publication Number Publication Date
CN206541498U true CN206541498U (en) 2017-10-03

Family

ID=59937980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621454997.9U Expired - Fee Related CN206541498U (en) 2016-12-28 2016-12-28 The river environment monitoring experiment teaching system in laboratory is come into river

Country Status (1)

Country Link
CN (1) CN206541498U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106781882A (en) * 2016-12-28 2017-05-31 中央民族大学 The river environment monitoring experiment teaching system in laboratory is come into river
CN108597316A (en) * 2018-03-14 2018-09-28 李�杰 Hydrological experiment device
CN111127992A (en) * 2019-12-17 2020-05-08 燕山大学 River evolution simulation device and experiment method for automatically generating terrain

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106781882A (en) * 2016-12-28 2017-05-31 中央民族大学 The river environment monitoring experiment teaching system in laboratory is come into river
CN106781882B (en) * 2016-12-28 2023-11-10 中央民族大学 River environment monitoring experiment teaching system for river running into laboratory
CN108597316A (en) * 2018-03-14 2018-09-28 李�杰 Hydrological experiment device
CN111127992A (en) * 2019-12-17 2020-05-08 燕山大学 River evolution simulation device and experiment method for automatically generating terrain

Similar Documents

Publication Publication Date Title
Li et al. Improved Yangtze River diversions: are they helping to solve algal bloom problems in Lake Taihu, China?
Signell et al. Modeling tidal exchange and dispersion in Boston Harbor
CN109657418A (en) A kind of Water Environment In Lakes capacity calculation methods based on MIKE21
Jingqiao et al. Three-dimensional eutrophication model and application to Taihu Lake, China
CN206541498U (en) The river environment monitoring experiment teaching system in laboratory is come into river
CN104264622B (en) The device and method that the migration of tide simulation reversing current pollution of river thing and salt solution trace back
CN110197017A (en) A kind of urban river rubber dam group's Ecology regulation method
CN109101781A (en) The calculation method of pollution sources contribution proportion in a kind of Complex River
CN103243676A (en) System for confirming vegetation bed bottom resistance and confirming method
CN109271672A (en) A kind of river-lake-pumping plant influences each other the river water surface curve calculation method under acting on
CN106781882A (en) The river environment monitoring experiment teaching system in laboratory is come into river
CN109598376A (en) A method of optimization ecology filling water
Niayifar et al. Modeling macroroughness contribution to fish habitat suitability curves
CN204199236U (en) The device that the migration of tide simulation reversing current pollution of river thing and salt solution trace back
Li et al. Water flow and nitrate transport through a lakeshore with different revetment materials
CN109948220A (en) Gate dam multiple target aerial drainage evaluation method and system
CN107024456B (en) It is a kind of for predicting the clear water method of replacing in situ of river water body transparency
Sauvage et al. A numerical tool to integrate biophysical diversity of a large regulated river: hydrobiogeochemical bases. The case of the Garonne River (France)
CN115293037A (en) Hydrodynamic modeling method of river and lake composite system based on machine learning
Feng et al. Water quality modeling for a tidal river network: A case study of the Suzhou River
CN205449231U (en) Sheet flow roll wave measuring device based on electromagnetic sensor
D'Alpaos et al. Mathematical Modeling of Tidal Flow Over Saltmarshes and Tidal Flats With Applications to the Venice Lagoon
CN105466527A (en) Thin sheet flow roll wave measurement system and method based on electromagnetic sensors
Shen et al. Distribution and interaction characteristics of water quality at the stratified confluence reservoirs
Kneis A water quality model for shallow river-lake systems and its application in river basin management

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171003

Termination date: 20201228

CF01 Termination of patent right due to non-payment of annual fee