CN206533110U - A kind of no-dig technique push pipe - Google Patents

A kind of no-dig technique push pipe Download PDF

Info

Publication number
CN206533110U
CN206533110U CN201720145321.XU CN201720145321U CN206533110U CN 206533110 U CN206533110 U CN 206533110U CN 201720145321 U CN201720145321 U CN 201720145321U CN 206533110 U CN206533110 U CN 206533110U
Authority
CN
China
Prior art keywords
cable protection
protection pipe
pipe
cable
dig technique
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720145321.XU
Other languages
Chinese (zh)
Inventor
曹云虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Changneng Planning And Design Co ltd
Original Assignee
Hangzhou Changneng Electric Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Changneng Electric Power Technology Co Ltd filed Critical Hangzhou Changneng Electric Power Technology Co Ltd
Priority to CN201720145321.XU priority Critical patent/CN206533110U/en
Application granted granted Critical
Publication of CN206533110U publication Critical patent/CN206533110U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a kind of no-dig technique push pipe, including the first cable protection pipe and the second cable protection pipe, first cable protection pipe and the second cable protection pipe are staggered, welded together between cable protection pipe using thermofussion welding, and dottle pin is set between adjacent two cable protection pipe outer walls, first cable protection pipe and the second cable protection tube cavity are inserted with two reinforcements parallel with cable protection pipe length direction, and two reinforcements are separately positioned on jacketed cable protection pipe both sides, first cable protection pipe and second cable protection pipe one end are arranged with tapered guide head, the utility model is simple in construction, low manufacture cost, intensity is high, outer wall endurance is big, service life is long.

Description

A kind of no-dig technique push pipe
Technical field
The utility model is related to power cable technical field, specially a kind of no-dig technique push pipe.
Background technology
With the raising and the continuous construction of infrastructure of life of urban resident level, underground engineering construction is increasingly extensive, And commonly excavate ground laying pipeline construction method and show significant limitation and weak point, the utilization of pipe-jacking technology will be solved Certainly densely populated, above ground structure is numerous, heavy traffic, the construction difficult problem of underground utilities complex ground.
Pipe-jacking technology is no-dig technique pipe-jacking technology, is the no-dig technique for being used for a municipal construction driving formula pipeline laying construction Technology, it passes through pipe jacking tool pipe or development machine by the thrust of main top oil cylinder and pipeline enclosure, relay well etc. out of active well Soil layer under road surface, is advanced in received well always, and stretchy is gone back while propulsion needs the tunnel synchronization laid to advance, and realizes Non-excavation laying underground piping.Advantage is not influence surrounding environment or influences smaller, and construction site is small, and noise is small.And Underground job can be goed deep into, this is to excavate the incomparable advantage of pipe laying.But pipe-jacking technology also has a shortcoming, the engineering time compared with It is long, construction costs height etc..
Pipe-jacking technology in the world has had evolved to very ripe stage, various push pipe methods at present Occur.But, change ten thousand times without leaving the original aim or stand, what the principle of pipe jacking construction technique was just as.Typically all work perpendicular to the ground well, Then high pressure hydraulic jack is used, cement or steel pipe underground is headed into, the difference of various technologies is that transport pipeline The soil inside excavated, the method for the bits such as stone, there is artificial, there is a water odd test, advanced to also have remote control.Existing skill In art, push pipe required resistance born when heading into bottom is very big, therefore causes push pipe to be easily damaged.
Utility model content
The purpose of this utility model is to provide a kind of no-dig technique push pipe, with asking for solving to propose in above-mentioned background technology Topic.
To achieve the above object, the utility model provides following technical scheme:A kind of no-dig technique push pipe, including the first cable Protection pipe and the second cable protection pipe, first cable protection pipe and the second cable protection pipe are staggered, cable protection pipe Between welded together using thermofussion welding, and dottle pin is set, first cable is protected between adjacent two cable protection pipe outer walls Pillar and the second cable protection tube cavity are inserted with two first reinforcements parallel with cable protection pipe length direction, and two First reinforcement is separately positioned on cable protection pipe both sides.
It is preferred that, first cable protection pipe and second cable protection pipe one end are arranged with tapered guide head, the cone The socket part of shape seeker and cable protection pipe is arranged with the second reinforcement.
It is preferred that, the internal diameter of first cable protection pipe is 150mm, and wall thickness is 12mm;Second cable protection pipe Internal diameter be 100mm, wall thickness is 8mm;First cable protection pipe and the second cable protection pipe are moulded using modified polypropene Expect cable duct tube.
It is preferred that, armor is provided between first reinforcement, and the armor is set around cable protection pipe.
Compared with prior art, the beneficial effects of the utility model are:
(1) the utility model is simple in construction, low manufacture cost, intensity are high, and outer wall endurance is big, and service life is long.
(2) the utility model uses the cable protection pipe for the different-diameter being staggered, and adjacent two cable protection pipes Dottle pin is set between outer wall, it is possible to increase the integrally-built stability of pipe.
(3) cable protection pipe of the utility model first and second cable protection pipe one end are arranged with tapered guide head, taper The socket part of seeker and cable protection pipe is arranged with the second reinforcement, using this structure, can reduce push pipe and enter bottom Needed for the resistance that bears, improve efficiency of construction.
Brief description of the drawings
Fig. 1 is the utility model front view;
Fig. 2 is sectional view of the present utility model.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of no-dig technique push pipe, including the first cable are protected The cable protection pipe 2 of pillar 1 and second, the internal diameter of the first cable protection pipe 1 is 150mm, and wall thickness is 12mm;Second cable is protected The internal diameter of pillar 2 is 100mm, and wall thickness is 8mm;The cable protection pipe 2 of first cable protection pipe 1 and second is using modified poly- Acrylic plastic cable duct tube, the modified polypropylene plastic cable duct tube of use has superior fire resistance, heat resisting Energy, resistance to low temperature, can reduce the washing shrinkage of modified polypropylene plastic, improve modified polypropylene plastic dimensional stability, carry High modified polypropylene plastic rigidity;The cable protection pipe 2 of first cable protection pipe 1 and second is staggered, cable protection pipe Between welded together using thermofussion welding, and dottle pin is set, first cable is protected between adjacent two cable protection pipe outer walls The inner chamber of 1 and second cable protection pipe of pillar 2 is inserted with two first reinforcements 3 parallel with cable protection pipe length direction, and Two the first reinforcement 3 is separately positioned on cable protection pipe both sides;Armor 6, and the armour are provided between first reinforcement 3 Layer 6 is filled to set around cable protection pipe.
In the present embodiment, the first cable protection pipe 1 and the one end of the second cable protection pipe 2 are arranged with tapered guide first 4, described The socket part of tapered guide first 4 and cable protection pipe is arranged with the second reinforcement 5, using this structure, can reduce push pipe and enter Enter the resistance born needed for bottom, improve efficiency of construction.
The utility model is simple in construction, low manufacture cost, intensity high, and outer wall endurance is big, and service life is long;This practicality is new Type uses the cable protection pipe for the different-diameter being staggered, and sets dottle pin, energy between adjacent two cable protection pipe outer walls Enough improve the integrally-built stability of pipe.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of no-dig technique push pipe, including the first cable protection pipe (1) and the second cable protection pipe (2), it is characterised in that:It is described First cable protection pipe (1) and the second cable protection pipe (2) are staggered, and one is welded on using thermofussion welding between cable protection pipe Rise, and dottle pin, first cable protection pipe (1) and the second cable protection pipe are set between adjacent two cable protection pipe outer walls (2) inner chamber is inserted with two first reinforcements (3) parallel with cable protection pipe length direction, and two the first reinforcements (3) It is separately positioned on cable protection pipe both sides.
2. a kind of no-dig technique push pipe according to claim 1, it is characterised in that:First cable protection pipe (1) and Two cable protection pipes (2) one end is arranged with tapered guide head (4), the tapered guide head (4) and the socket part of cable protection pipe It is arranged with the second reinforcement (5).
3. a kind of no-dig technique push pipe according to claim 1, it is characterised in that:First cable protection pipe (1) it is interior Footpath is 150mm, and wall thickness is 12mm;The internal diameter of second cable protection pipe (2) is 100mm, and wall thickness is 8mm;First electricity Cable protection pipe (1) and the second cable protection pipe (2) use modified polypropylene plastic cable duct tube.
4. a kind of no-dig technique push pipe according to claim 1, it is characterised in that:Set between first reinforcement (3) There is armor (6), and the armor (6) is set around cable protection pipe.
CN201720145321.XU 2017-02-17 2017-02-17 A kind of no-dig technique push pipe Expired - Fee Related CN206533110U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720145321.XU CN206533110U (en) 2017-02-17 2017-02-17 A kind of no-dig technique push pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720145321.XU CN206533110U (en) 2017-02-17 2017-02-17 A kind of no-dig technique push pipe

Publications (1)

Publication Number Publication Date
CN206533110U true CN206533110U (en) 2017-09-29

Family

ID=59919513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720145321.XU Expired - Fee Related CN206533110U (en) 2017-02-17 2017-02-17 A kind of no-dig technique push pipe

Country Status (1)

Country Link
CN (1) CN206533110U (en)

Similar Documents

Publication Publication Date Title
CN107989152B (en) Freezing structure for protecting municipal pipeline
CN105673935A (en) Method for replacing underground pipeline through cracking and inserting method
CN104695971A (en) Annular pipe-jacking construction method
CN103215946A (en) Electroosmosis electrode and electroosmosis draining system thereof
CN205936422U (en) Double -walled drilling rod
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN103290848B (en) Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof
CN110878697A (en) Shield underwater receiving method next to urban main road in high-water-rich sandy gravel stratum
CN204040062U (en) Prefabricated wedge shape flexible interface assembling piping lane
CN102889428A (en) Non-excavation correction method and apparatus of pipeline center line deviation after pipe-jacking construction
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN104110265A (en) Thixotropic slurry grouting system for large-section rectangular pipe-jacking pipeline
CN203924301U (en) A kind of propelling with volume rises cooperating type pipeline displacement prosthetic device
CN104099946B (en) Inspection-pit between a kind of Novel top pipeline section
CN104775418A (en) Underground continuous wall for energy collection and construction method thereof
CN203334295U (en) Large-diameter arc-shaped steel sheet pile foundation pit supporting structure
CN203476354U (en) Underground excavation engineering major structure
CN206533110U (en) A kind of no-dig technique push pipe
CN210106788U (en) Pipe jacking structure of circular open caisson
CN203757176U (en) Non-excavation-type pipeline replacement device
CN206626283U (en) A kind of new concrete push pipe
CN206110120U (en) A rectangle concrete pile for making up piping lane lateral wall
CN209799980U (en) Integral advance support board canopy
CN204098067U (en) Side's culvert formula underground pipe gallery
CN203950935U (en) Jacking pipe joints ground structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 310013 Room 812, 815, 817, Sanba Commercial Complex Building, 656 Gudun Road, Xihu District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang Changneng Planning and Design Co.,Ltd.

Address before: 310013 Room 812, 815, 817, Sanba Commercial Complex Building, 656 Gudun Road, Xihu District, Hangzhou City, Zhejiang Province

Patentee before: HANGZHOU CHANGNENG ELECTRIC POWER TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170929

Termination date: 20220217