CN206495214U - A kind of underwater concrete perfusion conduit - Google Patents

A kind of underwater concrete perfusion conduit Download PDF

Info

Publication number
CN206495214U
CN206495214U CN201720148076.8U CN201720148076U CN206495214U CN 206495214 U CN206495214 U CN 206495214U CN 201720148076 U CN201720148076 U CN 201720148076U CN 206495214 U CN206495214 U CN 206495214U
Authority
CN
China
Prior art keywords
catheter body
mounting hole
kickboard
wall
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720148076.8U
Other languages
Chinese (zh)
Inventor
陈军
王华林
李庆
张爱国
岳贤会
贾振威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing East Earth Rock Engineering Co Ltd
Original Assignee
Beijing East Earth Rock Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing East Earth Rock Engineering Co Ltd filed Critical Beijing East Earth Rock Engineering Co Ltd
Priority to CN201720148076.8U priority Critical patent/CN206495214U/en
Application granted granted Critical
Publication of CN206495214U publication Critical patent/CN206495214U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Media Introduction/Drainage Providing Device (AREA)

Abstract

The utility model discloses a kind of underwater concrete perfusion conduit, including catheter body, on the outer wall of the catheter body lightweight kickboard is fixed with perpendicular to its length direction, the kickboard is fixed on the position of the determining deviation of lower end one away from the conduit, multiple first mounting holes are provided with the catheter body outer wall along its length, the kickboard includes plate body and the installation chimb being arranged on the plate body, the second mounting hole is provided with the installation chimb, the kickboard is fixed on the catheter body outer wall by the first bolt through second mounting hole and first mounting hole;Have the advantages that pouring quality is good, in filling process catheter body center of gravity relatively stablize, the length of embedment of catheter body it is accurate adjustable, easy to use.

Description

A kind of underwater concrete perfusion conduit
Technical field
The utility model is related to the realm of building construction, more specifically, it relates to a kind of underwater concrete perfusion conduit.
Background technology
If bored concrete pile owner first passes through the means such as machine drilling, steel pipe soil compaction or manpower excavation and stake is formed in foundation soil Hole, then place in stake holes steel reinforcement cage, finally by conduit into steel reinforcement cage concrete perfusion and form stake.Wherein in concrete Needed in filling process in conduit Transducers Embedded in Concrete.Otherwise the pile body after the completion of perfusion easily occur a certain section entirely without Continuity, there is honeycomb, local folder mud, the local part such as do not solidify without continuity phenomenon.But if conduit embedment is too deep again Conduit can be caused not pull out not come out.
So in the prior art, conduit is embedded in filling process in the concrete of constant depth scope, and with The continuous increase of underwater gliders amount need to constantly lift conduit, and the height of conduit lifting is by manual control every time, it is impossible to Conduit is set to be maintained at the length of embedment of a more exact extension in filling process.Often occur broken pile, plugging, folder mud, honeybee The quality problems such as nest, few filling.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is that providing a kind of underwater gliders leads Catheter body, is embedded in the more stable depth bounds of concrete by pipe by kickboard.
To achieve the above object, the utility model provides following technical scheme:
Perpendicular to its length on a kind of underwater concrete perfusion conduit, including catheter body, the outer wall of the catheter body Direction is fixed with lightweight kickboard, and the kickboard is fixed on the position of the determining deviation of lower end one away from the conduit.
By using above-mentioned technical proposal, by mutually being fixed with the kickboard for swimming in concrete upper surface, make conduit all the time Small range floating up and down is maintained in fixed length of embedment, so that filling concrete maintains good pouring quality, significantly The quality problems such as broken pile, honeycomb, folder mud are reduced to occur.
Further, multiple first mounting holes, the kickboard bag are provided with the catheter body outer wall along its length The second mounting hole is provided with rubbing board body and the installation chimb being arranged on the plate body, the installation chimb, the kickboard passes through First bolt is fixed on the catheter body outer wall through second mounting hole and first mounting hole.
By using above-mentioned technical proposal, the first mounting hole of the second mounting hole and different height can mutually be fixed and made Kickboard is fixed on the outer wall of the different height of catheter body, and catheter body is adjusted according to the demand of practice of construction condition The whole length of embedment for needing to keep.
Further, the plate body is in hollow discoid and is socketed in outside the catheter body.
By using above-mentioned technical proposal, make buoyancy suffered by plate body more symmetrical, so that conduit is during perfusion Center of gravity is more stablized, and is not susceptible to tilt, improves quality of concreting.
Further, the cycle surface of the plate body is provided with the rib that a circle upper surface is higher than the plate body upper surface.
By using above-mentioned technical proposal, when plate body is floated on concrete, due to the stop of rib, make in plate body small Concrete is difficult to flow to plate body upper surface when scope fluctuates, so that plate body remains a preferable floating effect, Simultaneously as merely add a circle rib, less is increased to overall weight, the lifting to catheter body is reduced and bears.
Further, the first mounting hole of bottom and the mounting hole of the top are located at respectively on the catheter body outer wall At catheter body the lower surface 2m and 6m.
By using above-mentioned technical proposal, by the way that kickboard to be fixed on to apart from catheter body lower surface 2m to 6m scopes Catheter body can be adjusted to different and convenient lengths of embedment on one mounting hole;Catheter body is maintained at into 2m simultaneously to arrive The length of embedment of 6m scopes, can make farthest to improve overall filling quality, both reduce quality of concreting and asked Topic, can allow catheter body to be relatively drawn out easily again.
Further, the first mounting hole of the first bolt is not worn on the catheter body outer wall by wearing the second spiral shell Bolt and blocked.
By using above-mentioned technical proposal, the sealing of catheter body is on the one hand improved;On the other hand the second peace is prevented Fill hole to be blocked, convenient adjustment next time to kickboard with respect to the upper-lower position of catheter body.
Compared with prior art, the utility model has the advantages that:
(1)Catheter body is fixed with kickboard and rib, has reached that being issued to larger row in less weight premise mixes Solidifying soil body product, reduces lifting burden, and catheter body is maintained at more accurately length of embedment, improves the perfusion of concrete Quality;
(2)By the way that the first mounting hole of the second mounting hole and different height is mutually fixed, allow catheter body according to reality The demand adjustment of border execution conditions needs the length of embedment kept, to ensure optimal pouring quality;
(3)Plate body makes conduit center of gravity during perfusion more stablize, is not susceptible to tilt, carries in hollow discoid High quality of concreting.
Brief description of the drawings
Fig. 1 is the structural representation of the underwater concrete perfusion conduit of the present embodiment;
Fig. 2 is the upward view of the underwater concrete perfusion conduit of the present embodiment;
Fig. 3 is the sectional view of the line A-A along along Fig. 2;
Fig. 4 is the enlarged drawing in B portions in Fig. 3.
Reference:1st, catheter body;2nd, kickboard;21st, plate body;The 22nd, chimb is installed;3rd, the first mounting hole;4th, the second peace Fill hole;5th, the first bolt;6th, rib;7th, the second bolt.
Embodiment
With reference to the accompanying drawings and examples, the utility model is described in detail.
As depicted in figs. 1 and 2, on a kind of underwater concrete perfusion conduit, including catheter body 1, the outer wall of catheter body 1 The lightweight kickboard 2 that density is less than the concrete density used in construction is fixed with perpendicular to its length direction.Kickboard 2 in actual use The plastics or plank of high intensity can be used.One layer of sheet iron can be fixed on the surface of kickboard 2 again in addition as protection.
Shown as shown in Figure 1, Figure 3 and Figure 4, the outer wall both sides of catheter body 1 are provided with multiple first mounting holes 3 along its length.It is floating Plate 2 includes plate body 21 and the installation chimb 22 being connected on plate body 21.Plate body 21 is in hollow discoid and be socketed in catheter body 1 Outside.Install and be provided with the second mounting hole 4 on chimb 22.Kickboard 2 by the first bolt 5 and the second mounting hole 4 and one of them first The threaded connection of mounting hole 3 is fixed on the outer wall of catheter body 1.Kickboard 2 makes mutually solid with it under the buoyancy that concrete is given Fixed catheter body 1 is maintained at more accurately length of embedment, improves the pouring quality of concrete.And catheter body 1 can be with The length of embedment for needing to keep is adjusted according to the demand of practice of construction condition, to ensure optimal pouring quality.By in hollow Discoid plate body 21, makes conduit center of gravity during perfusion more stablize, is not susceptible to tilt, improves filling concrete matter Amount.
As shown in figures 1 and 3, the cycle surface of plate body 21 is provided with the rib that a circle upper surface is higher than the upper surface of plate body 21 6.Make rib 6 and plate body 21 be integrally formed one it is barrel-shaped, reached and larger row's coagulation be issued in less weight premise Soil body product reduces the lifting burden of the upper end of catheter body 1 there is provided bigger buoyancy.
As depicted in figs. 1 and 2, the first mounting hole 3 of bottom and the mounting hole of the top difference on the outer wall of catheter body 1 Positioned at catheter body 1 lower surface 2m and 6m.It can make farthest to improve overall filling quality, both reduce mixed Solidifying soil pouring quality problem, can allow catheter body 1 relatively be drawn out easily again.
As shown in Figures 2 and 3, remaining the first mounting hole 3 for not wearing the first bolt 5 passes through on the outer wall of catheter body 1 Wear the second bolt 7 and blocked.On the one hand the sealing of catheter body 1 is improved;On the other hand the second mounting hole 4 is prevented Blocked by concrete, convenient adjustment next time to kickboard 2 with respect to the upper-lower position of catheter body 1.
Described above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (6)

1. a kind of underwater concrete perfusion conduit, including catheter body (1), it is characterised in that the outer wall of the catheter body (1) On be fixed with lightweight kickboard (2) perpendicular to its length direction, the kickboard (2) be fixed on the lower end away from the conduit it is certain between Away from position.
2. a kind of underwater concrete perfusion conduit according to claim 1, it is characterised in that the catheter body (1) is outside Multiple first mounting holes (3) are provided with wall along its length, the kickboard (2) includes plate body (21) and is arranged on the plate body (21) the second mounting hole (4) is provided with the installation chimb (22) on, the installation chimb (22), the kickboard (2) passes through first Bolt (5) is fixed in the catheter body (1) through second mounting hole (4) and first mounting hole (3) On outer wall.
3. a kind of underwater concrete perfusion conduit according to claim 2, it is characterised in that the plate body (21) is in hollow It is discoid and be socketed in the catheter body (1) outside.
4. a kind of underwater concrete perfusion conduit according to claim 3, it is characterised in that the outer ring of the plate body (21) End face is provided with the rib (6) that a circle upper surface is higher than the plate body (21) upper surface.
5. a kind of underwater concrete perfusion conduit according to claim 2, it is characterised in that the catheter body (1) is outside The first mounting hole (3) of bottom and the mounting hole of the top are located at apart from the catheter body (1) lower surface 2m respectively on wall At 6m.
6. a kind of underwater concrete perfusion conduit according to claim 2, it is characterised in that the catheter body (1) is outside The first mounting hole (3) that the first bolt (5) is not worn on wall is blocked by wearing the second bolt (7).
CN201720148076.8U 2017-02-18 2017-02-18 A kind of underwater concrete perfusion conduit Active CN206495214U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720148076.8U CN206495214U (en) 2017-02-18 2017-02-18 A kind of underwater concrete perfusion conduit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720148076.8U CN206495214U (en) 2017-02-18 2017-02-18 A kind of underwater concrete perfusion conduit

Publications (1)

Publication Number Publication Date
CN206495214U true CN206495214U (en) 2017-09-15

Family

ID=59805337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720148076.8U Active CN206495214U (en) 2017-02-18 2017-02-18 A kind of underwater concrete perfusion conduit

Country Status (1)

Country Link
CN (1) CN206495214U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897966A (en) * 2021-10-28 2022-01-07 北京建工一建工程建设有限公司 Deep foundation pit large-volume concrete pouring device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897966A (en) * 2021-10-28 2022-01-07 北京建工一建工程建设有限公司 Deep foundation pit large-volume concrete pouring device
CN113897966B (en) * 2021-10-28 2022-09-20 北京建工一建工程建设有限公司 Deep foundation pit large-volume concrete pouring device

Similar Documents

Publication Publication Date Title
CN106351242B (en) A kind of exposed high intensity sea area the Dou Yan steel trestle of the big flow velocity of deep water and its construction method
CN203034467U (en) Combined steel pile cofferdam with water-proof fore shafts
CN103410156B (en) Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe
CN106121090A (en) 3D prints the method for anchor connection reinforcing bar in filled wall
CN102121251A (en) Construction method for pouring main tower pier foundation of bridge on deep-water oblique river bed
CN107338804B (en) A kind of hollow independent composite pile foundation of super-large diameter and its method of construction
CN108560544A (en) A kind of sleeve connection assembled pile foundation and its construction method
CN208486404U (en) A kind of concrete shear force wall of steel bar template integrative installation technology
CN105113539B (en) Combined multi-functional diaphram wall Core Walls Structure and its construction method in a kind of contrary sequence method
CN209308050U (en) A kind of double-wall cofferdam and pier construction device
CN206495214U (en) A kind of underwater concrete perfusion conduit
CN103410158A (en) Recoverable vertical type portal self-stabilizing enveloping structure and application method thereof
CN205116202U (en) Stake of prestressing force side and integrated stand of steel lattice column
CN114517473A (en) Prefabricated pipe pile suitable for soft soil stratum and capable of effectively enhancing bearing capacity and construction method of prefabricated pipe pile
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN206928323U (en) A kind of ring muscle fastens assembled pipe gallery
CN210263026U (en) Anti structure that floats of hole-forming bored concrete pile steel sleeve is protected to mud dado of going out terrace
CN206529712U (en) Assembled steel reinforced concrete aliform type culvert opening
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN207092093U (en) A kind of fabricated structure for ensureing steel column perpendicularity
CN214219929U (en) Unilateral formwork reinforced structure of basement outer wall
CN211421161U (en) Rock anchoring foundation with horizontal resistance for power transmission tower
CN212772510U (en) Steel-pipe pile foundation reinforced structure
CN205688443U (en) It is applicable to the core stake guider of cement slotting built pile
CN107587476A (en) A kind of wave wall and its design and construction method provided with prefabricated anti-arc eagle mouth structure