CN206495201U - A kind of positioner of filling concrete pile cages - Google Patents

A kind of positioner of filling concrete pile cages Download PDF

Info

Publication number
CN206495201U
CN206495201U CN201720180096.3U CN201720180096U CN206495201U CN 206495201 U CN206495201 U CN 206495201U CN 201720180096 U CN201720180096 U CN 201720180096U CN 206495201 U CN206495201 U CN 206495201U
Authority
CN
China
Prior art keywords
guide cylinder
hook body
positioner
hook
abutment sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720180096.3U
Other languages
Chinese (zh)
Inventor
孙晓林
季进亮
吴村田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Dongjie Construction Engineering Co Ltd
Original Assignee
Qingdao Dongjie Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Dongjie Construction Engineering Co Ltd filed Critical Qingdao Dongjie Construction Engineering Co Ltd
Priority to CN201720180096.3U priority Critical patent/CN206495201U/en
Application granted granted Critical
Publication of CN206495201U publication Critical patent/CN206495201U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of positioner of filling concrete pile cages, positioner includes the abutment sleeve being arranged at the top of bored concrete pile, being prefabricated with abutment sleeve can make to fix the pre-manufactured hole that drag hook passes through abutment sleeve, fixed drag hook includes coupler body and hook body, hook body surface is provided with external screw thread, it is provided with the outside of abutment sleeve and the guide cylinder that adjustable hook body uses length is engaged with hook body, guide cylinder is hollow female thread structure, it is connected with the external screw thread spiral on hook body surface, the handle for driving guide cylinder rotation forward or rotating to later adjustable hook body using length is provided with guide cylinder, pre-manufactured hole symmetrically adds two groups, quantity is set to four altogether, fixed drag hook and the quantity of guide cylinder are adapted with the quantity of pre-manufactured hole.The positioner of filling concrete pile cages of the present utility model, the positioner ensures steel reinforcement cage after hanging and finishing, and in concreting process, steel reinforcement cage does not shift, so as to improve pile quality.

Description

A kind of positioner of filling concrete pile cages
Technical field
The utility model is related to technical field of building construction, more particularly to a kind of positioning of filling concrete pile cages Device.
Background technology
When concrete structure is column or strip component, the center portion thereof point does not need arrangement of reinforcement, only in concrete structure Configuration reinforcement under the face of part ingress of air.If this component is independent, the steel bar preassembling that first this component periphery is set First make, be formed steel reinforcement cage.Generally the bar constructions of the pre-productions such as cast-in-situ bored pile, caisson, column steel Muscle cage.In bridges and culverts or high-building construction, basis being may require as requested and is driven piles, method is to use to rush using machine Hole and water mill drilling, and hole depth reaches design requirement, then transfers steel reinforcement cage to stake holes, is inserted into conduit progress concrete and pours Note.Pile foundation is used current Tall Building Foundation more, and it is at most cast-in-place concrete pile to use;Concrete Grouting Pale mistake Journey is first by drill hole of drilling machine, rear borehole cleaning;Steel reinforcement cage is hung, rear cast;Steel reinforcement cage is hung finish after, in concrete placement, steel Muscle cage location easily shifts, and causes bored pile piling quality to be unsatisfactory for design requirement.
Utility model content
For defect present in prior art or deficiency, the utility model innovatively proposes a kind of filling concrete The positioner of pile cages, the positioner ensures steel reinforcement cage after hanging and finishing, and in concreting process, steel reinforcement cage is not Shift, so as to improve pile quality.
What the technical solution of the utility model was realized in:
A kind of positioner of filling concrete pile cages, the positioner, which includes, to be arranged at the top of bored concrete pile Being prefabricated with abutment sleeve, the abutment sleeve can make to fix the pre-manufactured hole that drag hook passes through abutment sleeve, the fixed drag hook bag Include coupler body and with the detachable hook body being fixedly connected of coupler body, the hook body surface is provided with external screw thread, the abutment sleeve Outside is provided with and the guide cylinder that adjustable hook body uses length is engaged with hook body, and the guide cylinder is hollow female thread structure, with Being provided with the external screw thread spiral connection on hook body surface, the guide cylinder can drive guide cylinder rotation forward or rotate to later tune Save the handle that hook body uses length, the pre-manufactured hole is symmetrically equipped with two groups, quantity is set to four altogether, the fixed drag hook and The quantity of guide cylinder is adapted with the quantity of pre-manufactured hole.
It is preferred that, the hook body is provided with the circular baffle plate that can prevent that guide cylinder from coming off, the circle close to one end of handle Shape baffle plate
Diameter be more than the diameter of guide cylinder, the quantity of the circular baffle plate is adapted with the quantity of guide cylinder.
It is preferred that, the external screw thread of described coupler body one end is connected with the internal thread spiral of hook body one end.
It is preferred that, the handle outer surface be provided with can increasing friction force garment bag.
Compared with prior art, the beneficial effects of the utility model are:
The utility model discloses a kind of positioner of filling concrete pile cages, the device is used in perfusion stake top Portion, which is provided with abutment sleeve, abutment sleeve, symmetrically adds two groups of fixation drag hooks, and coupler body hook is placed on steel reinforcement cage, and steel reinforcement cage is hung On earth, and while crane hook lifting, steel reinforcement cage is accurately positioned in stake position center by rotating handles with fixed drag hook Afterwards, concrete is poured into a mould;When concrete is poured into abutment sleeve height, after stake lower concrete fixes steel reinforcement cage, unclamp Fixed drag hook.The positioner ensures steel reinforcement cage after hanging and finishing, and in concreting process, steel reinforcement cage does not shift, So as to improve pile quality.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Reference:1st, abutment sleeve;2nd, coupler body;3rd, hook body;4th, guide cylinder;5th, handle;6th, circular baffle plate.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
As shown in Figure 1, the utility model provides a kind of positioner of filling concrete pile cages, the positioning Device includes to be prefabricated with the abutment sleeve 1 being arranged at the top of bored concrete pile, the abutment sleeve 1 and can make to fix drag hook and pass through to determine Position sleeve 1 pre-manufactured hole, the fixed drag hook include coupler body 2 and with the detachable hook body 3 being fixedly connected of coupler body 2, it is described One end of coupler body 2 is provided with external screw thread, is threadedly coupled with the internal thread hole of the one end of hook body 3;The surface of hook body 3 is provided with outer spiral shell Line, the outside of abutment sleeve 1 is provided with the guide cylinder 4 that adjustable hook body 3 is engaged with hook body 3 using length, the guide cylinder 4 For hollow female thread structure, it is connected with the external screw thread spiral on the surface of hook body 3, guide cylinder 4 can be driven by being provided with the guide cylinder 4 The handle 5 using length to later adjustable hook body 3 is rotated forward or rotates, the outer surface of handle 5, which is provided with, can increase friction The garment bag of power, the pre-manufactured hole is symmetrically equipped with two groups, and quantity is set to four altogether, the fixed drag hook and guide cylinder 4 Quantity is adapted with the quantity of pre-manufactured hole, and the hook body 3 is provided with the circle that can prevent that guide cylinder 4 from coming off close to one end of handle 5 Shape baffle plate 6, the diameter of the circular baffle plate 6 is more than the diameter of guide cylinder 4, the quantity of the circular baffle plate 6 and the number of guide cylinder 4 Amount is adapted.
The positioner of the filling concrete pile cages uses and abutment sleeve 1, positioning sleeve is provided with the top of bored concrete pile Two groups of fixation drag hooks symmetrically are added on cylinder 1, the hook of coupler body 2 is placed on steel reinforcement cage, steel reinforcement cage hangs onto bottom, and crane hook is lifted by crane While, steel reinforcement cage is accurately positioned in behind the center of stake position, pours into a mould concrete by rotating handles 5 with fixed drag hook;Treat concrete When being poured into the height of abutment sleeve 1, after stake lower concrete fixes steel reinforcement cage, fixed drag hook is unclamped.The positioner Steel reinforcement cage is ensured after hanging and finishing, and in concreting process, steel reinforcement cage does not shift, so as to improve pile quality.
The preferred embodiment of utility model is the foregoing is only, it is all in this reality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in of the present utility model Within protection domain.

Claims (4)

1. a kind of positioner of filling concrete pile cages, it is characterised in that:The positioner, which includes, is arranged on filling Noting to be prefabricated with the abutment sleeve in stake top portion, the abutment sleeve can make to fix the pre-manufactured hole that drag hook passes through abutment sleeve, described Fixed drag hook include coupler body and with the detachable hook body being fixedly connected of coupler body, the hook body surface is provided with external screw thread, institute State to be provided with the outside of abutment sleeve and the guide cylinder that adjustable hook body uses length is engaged with hook body, the guide cylinder is hollow interior spiral shell Line structure, is connected with the external screw thread spiral on hook body surface, and being provided with the guide cylinder can drive guide cylinder rotation forward or rotation The handle that later adjustable hook body uses length is turned to, the pre-manufactured hole is symmetrically equipped with two groups, quantity is set to four altogether, described Fixed drag hook and the quantity of guide cylinder are adapted with the quantity of pre-manufactured hole.
2. the positioner of filling concrete pile cages according to claim 1, it is characterised in that:The hook body is close One end of handle is provided with the circular baffle plate that can prevent that guide cylinder from coming off, and the diameter of the circular baffle plate is more than the straight of guide cylinder Footpath, the quantity of the circular baffle plate is adapted with the quantity of guide cylinder.
3. the positioner of filling concrete pile cages according to claim 2, it is characterised in that:Described coupler body one end External screw thread be connected with the internal thread spiral of hook body one end.
4. the positioner of filling concrete pile cages according to claim 3, it is characterised in that:The handle appearance Face be provided with can increasing friction force garment bag.
CN201720180096.3U 2017-02-27 2017-02-27 A kind of positioner of filling concrete pile cages Expired - Fee Related CN206495201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720180096.3U CN206495201U (en) 2017-02-27 2017-02-27 A kind of positioner of filling concrete pile cages

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720180096.3U CN206495201U (en) 2017-02-27 2017-02-27 A kind of positioner of filling concrete pile cages

Publications (1)

Publication Number Publication Date
CN206495201U true CN206495201U (en) 2017-09-15

Family

ID=59806011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720180096.3U Expired - Fee Related CN206495201U (en) 2017-02-27 2017-02-27 A kind of positioner of filling concrete pile cages

Country Status (1)

Country Link
CN (1) CN206495201U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107964944A (en) * 2017-12-29 2018-04-27 上海三凯建设管理咨询有限公司 A kind of filling pile cage of reinforcement component and its construction method
CN109680687A (en) * 2019-01-17 2019-04-26 江西联保工程咨询有限公司 A kind of integrally formed construction technology of platform
CN110939129A (en) * 2019-12-24 2020-03-31 中铁三局集团有限公司 Anti-deviation device for bored pile reinforcement cage and using method thereof
CN113404041A (en) * 2021-07-19 2021-09-17 牛海超 Highway bridge cast-in-situ bored pile construction device and wall protection method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107964944A (en) * 2017-12-29 2018-04-27 上海三凯建设管理咨询有限公司 A kind of filling pile cage of reinforcement component and its construction method
CN107964944B (en) * 2017-12-29 2023-06-02 上海三凯工程咨询有限公司 Bored concrete pile reinforcement cage assembly and construction method thereof
CN109680687A (en) * 2019-01-17 2019-04-26 江西联保工程咨询有限公司 A kind of integrally formed construction technology of platform
CN109680687B (en) * 2019-01-17 2021-02-05 江西联保工程咨询有限公司 Pile platform integrated forming construction process
CN110939129A (en) * 2019-12-24 2020-03-31 中铁三局集团有限公司 Anti-deviation device for bored pile reinforcement cage and using method thereof
CN113404041A (en) * 2021-07-19 2021-09-17 牛海超 Highway bridge cast-in-situ bored pile construction device and wall protection method
CN113404041B (en) * 2021-07-19 2022-10-14 牛海超 Highway bridge cast-in-situ bored pile construction device and wall protection method

Similar Documents

Publication Publication Date Title
CN206495201U (en) A kind of positioner of filling concrete pile cages
CN101864769B (en) Cast-in-place X-shaped large-diameter hollow concrete pile and construction method thereof
CN102628269B (en) Technical device for reducing negative frictional resistance on driven cast-in-place pile, and application method thereof
CN211898338U (en) Device for preventing bored concrete pile steel reinforcement cage come-up
CN108978644A (en) Energy saving and environment friendly bored pile construction method
CN109083591B (en) Drilling bored concrete pile body and pile cap integrated drilling pore-forming method
CN108755729A (en) A kind of CFG pile foundations pile cover and pile body integrative construction device and method
CN108867625A (en) Long auger guncreting pile grouting behind shaft or drift lining handles construction method and its postposition grouting device
CN201802310U (en) Excavation drilling machine
CN101942830A (en) Combined concrete soil pile with core pile and construction method as well as construction device thereof
CN208472717U (en) A kind of depth back filled region bored concrete pile steel pile casting retaining wall
CN106930274B (en) A kind of a full set of cylinder rotatory boring castinplace pile construction method that reinforcing bar cage location is fixed
CN205742166U (en) A kind of steel reinforcement cage positioner for construction
CN208717933U (en) A kind of CFG pile foundation pile cover and pile body integrative construction device
CN206646492U (en) Positioner for filling concrete pile cages
CN207633342U (en) A kind of bridge pile foundation pile crown abolishes device
CN203113332U (en) Anchor rod construction structure device after construction
CN205954640U (en) Stake siding wall
CN108316288A (en) Half casing guncreting pile construction equipment and construction method
CN205894063U (en) A complete set of pipe long spiral drilling filling pile presses cage ware
CN105544510A (en) Pile forming method of cast-in-situ bored pile
CN204780943U (en) H type precast concrete pile and excavation supporting device
CN208251078U (en) A kind of bottom-expanding sinking-pipe pilework
CN209384226U (en) A kind of Manual hole pile digging device in shifting sand layers
CN208088287U (en) Half casing guncreting pile construction equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170915

Termination date: 20180227