CN206490383U - A kind of cable testing bridge for being easy to separated time - Google Patents

A kind of cable testing bridge for being easy to separated time Download PDF

Info

Publication number
CN206490383U
CN206490383U CN201720086122.6U CN201720086122U CN206490383U CN 206490383 U CN206490383 U CN 206490383U CN 201720086122 U CN201720086122 U CN 201720086122U CN 206490383 U CN206490383 U CN 206490383U
Authority
CN
China
Prior art keywords
crane span
span structure
hole
screw
crossbearer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720086122.6U
Other languages
Chinese (zh)
Inventor
马汉生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Union Industrial Co Ltd
Original Assignee
Guangdong Union Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Union Industrial Co Ltd filed Critical Guangdong Union Industrial Co Ltd
Priority to CN201720086122.6U priority Critical patent/CN206490383U/en
Application granted granted Critical
Publication of CN206490383U publication Critical patent/CN206490383U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of cable testing bridge for being easy to separated time, including crane span structure body and branch means, the two ends of crane span structure base have been fixedly connected with crane span structure side, first through hole are evenly distributed with crane span structure base;Crane span structure side is provided with the second through hole and heat emission hole, crane span structure top cover and is evenly distributed with third through-hole;The top of top plate is provided with the 3rd screw, and crossbearer and vertical frame are vertically connected, and the bottom of vertical frame, which is fixedly connected with bottom plate, bottom plate, is evenly distributed with the first screw.Originally it is easy to the cable testing bridge of separated time, crane span structure top cover can be slided in groove, so as to position the position of the 3rd screw, because crossbearer and vertical frame are vertically connected so that crane span structure body interior separates multiple passages, different cables can be placed on different passages, it is knotted together so that cable will not be tangled, in order, cable wiring is convenient, improves installation effectiveness for the arrangement of cable.

Description

A kind of cable testing bridge for being easy to separated time
Technical field
The utility model is related to controller switching equipment technical field, specially a kind of cable testing bridge for being easy to separated time.
Background technology
In recent years, China put into a huge sum of money and carries out upgrading urban and rural power grids, but the distribution line construction time limit in old urban area is more early, Construction criteria is relatively low compared with modern needs, and ageing equipment is serious, and a large amount of electric wires are hung in the air, no as cobweb Only hinder city outlook to look forward or upwards, also bury many potential safety hazards, seriously endanger the personal safety of the public.Under such circumstances, Strengthen the strategic height of urban distribution network reliability and line transmission ability, and thoroughly do away with visual pollution, beautifying urban environment, just into The trend of INVENTIONModern cable facility development, cable testing bridge turns into the main thoroughfare of urban electricity supply.But existing cable testing bridge knot Structure design is unreasonable, and not scientific and reasonable enough, in comprehensive wiring, complicated cable is easy to tangle and is knotted together, So it is unfavorable for the orderly wiring winding displacement of cable run, causes to be inconvenient during installation wiring, installation effectiveness is influenceed, while unfavorable In the radiating of circuit, cause after installing, cable operationally easily produces high temperature, cause aging circuit to accelerate, use Reduced lifespan, influences the quality of cable.
Utility model content
The purpose of this utility model is to provide a kind of, possess that installation and removal are convenient, cable arrangement in order, cable Line wiring is convenient and improves the advantage of installation effectiveness, solves the problems of the prior art.
To achieve the above object, the utility model provides following technical scheme:A kind of cable testing bridge for being easy to separated time, including Crane span structure body and branch means, the crane span structure body include crane span structure base, crane span structure side and crane span structure top cover;The crane span structure base Two ends have been fixedly connected with crane span structure side, and first through hole is evenly distributed with the crane span structure base;Set on the crane span structure side There are the second through hole and heat emission hole, top one end of crane span structure side, which is provided with groove, the top end face of crane span structure side, to be fixedly connected with Flange;The two ends of the crane span structure top cover are movably connected on groove, and third through-hole is evenly distributed with crane span structure top cover;Described One through hole and the second through hole are each provided on same vertical plane, and the second through hole is located at the side of heat emission hole;The branch means include Top plate, dividing wire frame and bottom plate;The top of the top plate is provided with the 3rd screw, and the 3rd screw is corresponding with third through-hole, described Dividing wire frame is fixedly connected with the bottom end face of top plate;The dividing wire frame includes crossbearer and vertical frame;The crossbearer and vertical frame are vertical Connection, the bottom of vertical frame is fixedly connected with bottom plate, the second screw, the second screw is equipped with the center of the crossbearer two sides It is corresponding with the second through hole;The first screw is evenly distributed with the bottom plate, the first screw is corresponding with first through hole.
It is preferred that, the quantity of the crane span structure side is two, and two crane span structure sides are vertical with crane span structure base.
It is preferred that, the cross section of the groove is L-type, and the thickness of groove is more than the thickness of crane span structure top cover.
It is preferred that, the top plate, crossbearer are identical with the length of bottom plate, and the length of top plate, crossbearer and bottom plate is less than crane span structure bottom The length of seat.
It is preferred that, the vertical frame is identical with the width of crossbearer, vertical frame and crossbearer integrally connected.
Compared with prior art, the beneficial effects of the utility model are as follows:
Originally it is easy to the cable testing bridge of separated time, crane span structure top cover can be slided in groove, so as to position the position of the 3rd screw, dissipates Hot hole is to entering row line radiating so that the heat that cable is operationally produced easily is distributed so that cable aging speed subtracts Slowly, service life increases;Because crossbearer and vertical frame are vertically connected so that crane span structure body interior separates multiple passages, different electricity Cable be can be placed on different passages so that cable will not be tangled and is knotted together, and the arrangement of cable is orderly, cable Wiring is convenient, improves installation effectiveness, and branch means are arranged in crane span structure body by bolt and nut, are easily installed and dismantle.
Brief description of the drawings
Fig. 1 is crane span structure bulk junction composition of the present utility model;
Fig. 2 is branch means structure chart of the present utility model;
Fig. 3 is overall structure figure of the present utility model;
Fig. 4 is A-A enlarged drawings of the present utility model.
In figure:1 crane span structure body, 11 crane span structure bases, 111 first through hole, 12 crane span structure sides, 121 second through holes, 123 Heat emission hole, 124 flange, 125 grooves, 13 crane span structure top covers, 2 branch means, 21 top plates, 211 the 3rd screws, 22 separated times Frame, 221 crossbearers, 2,211 second screws, 222 vertical frames, 23 bottom plates, 231 first screws.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer to Fig. 1-4, a kind of cable testing bridge for being easy to separated time, including crane span structure body 1 and branch means 2, crane span structure body 1 Including crane span structure base 11, crane span structure side 12 and crane span structure top cover 13, crane span structure base 11, crane span structure side 12 and crane span structure top cover 13 are used Cold-rolled steel sheet is made, and has cold galvanizing, galvanizing, electrostatic spraying, fireproof coating, baking vanish in the surface treatment processing of cold-rolled steel sheet Deng;The two ends of crane span structure base 11 have been fixedly connected with crane span structure side 12, and the quantity of crane span structure side 12 is two, two crane span structure sides 12 is vertical with crane span structure base 11, crane span structure side 12 with the integrally connected of crane span structure base 11, two crane span structure sides 12 and crane span structure bottom The composition of seat 11 is U-shaped, first through hole 111 is evenly distributed with crane span structure base 11, the quantity of first through hole 111 has three;Crane span structure The second through hole 121 and heat emission hole 122 that side 12 is provided with the second through hole 121 and heat emission hole 122, each crane span structure side 12 are counted Amount is one, and top one end of crane span structure side 12 is provided with groove 125, and groove 125 is located at the company of crane span structure side 12 and flange 124 Connect and flange 124 is fixedly connected with place, the top end face of crane span structure side 12, flange 124 plays a part of limiting crane span structure top cover 13; The two ends of crane span structure top cover 13 are movably connected on groove 125, and the cross section of groove 125 is L-type, and the thickness of groove 123 is more than The thickness of crane span structure top cover 13, crane span structure top cover 13 can be slided in groove 125, so that the position of the 3rd screw 211 is positioned, crane span structure top Third through-hole 131 is evenly distributed with lid 13;The through hole 121 of first through hole 111 and second is each provided on same vertical plane, and second leads to Hole 121 is located at the side of heat emission hole 122, and 122 pairs of heat emission hole enters row line radiating so that the heat that cable is operationally produced Easily distribute so that cable aging speed slows down, service life increases;Branch means 2 include top plate 21, dividing wire frame 22 and bottom Plate 23, top plate 21, crossbearer 221 are identical with the length of bottom plate 23, and the length of top plate 21, crossbearer 221 and bottom plate 23 is less than crane span structure bottom The length of seat 11, branch means 2 are arranged on inside crane span structure body 1;The top of top plate 21 is provided with the 3rd screw 211, the 3rd screw 211 and third through-hole 131 it is corresponding, caused by mobile crane span structure top cover 13 after the 3rd screw 211 and the correspondence of third through-hole 131, Crane span structure top cover 13 is fixed on top plate 21 by the bolt of matching, dividing wire frame is fixedly connected with the bottom end face of top plate 21 22, dividing wire frame 22 can separate cable;Dividing wire frame 22 includes crossbearer 221 and vertical frame 222;Crossbearer 221 and vertical frame 222 vertically connect Connect, vertical frame 222 is identical with the width of crossbearer 221, vertical frame 222 and the integrally connected of crossbearer 221, because crossbearer 221 and vertical frame 222 are vertical Direct-connected to connect so that multiple passages are separated inside crane span structure body 1, different cables can be placed on different passages so that electricity Cable will not be tangled and is knotted together, and in order, cable wiring is convenient, improves installation effectiveness, vertical frame 222 for the arrangement of cable Bottom be fixedly connected with bottom plate 23, in crossbearer 221 when two sides center is equipped with the second screw 2211, the second screw 2211 It is corresponding with the second through hole 121, the bolt matched is installed on the second screw 2211 and the second through hole 121 so that crossbearer 221 It is fixed on crane span structure side 12;The first screw 231 is evenly distributed with bottom plate 23, the first screw 231 and first through hole 111 are relative Should, the bolt matched is installed in the first screw 231 and first through hole 111 so that bottom plate 23 is fixed on crane span structure base 11, pacified Assembly and disassembly are convenient.
In summary:Originally it is easy to the cable testing bridge of separated time, crane span structure top cover 13 can be slided in groove 125, so as to position the The position of three screws 211,122 pairs of heat emission hole enters row line radiating so that the heat that cable is operationally produced easily is distributed, So that cable aging speed slows down, service life increases;Because crossbearer 221 and vertical frame 222 are vertically connected so that crane span structure body Multiple passages are separated inside 1, different cables can be placed on different passages so that cable will not tangle knotting one Rise, in order, cable wiring is convenient, improves installation effectiveness, branch means 2 are arranged on by bolt and nut for the arrangement of cable In crane span structure body 1, it is easily installed and dismantles.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of cable testing bridge for being easy to separated time, including crane span structure body (1) and branch means (2), it is characterised in that;The crane span structure Body (1) includes crane span structure base (11), crane span structure side (12) and crane span structure top cover (13);The two ends of the crane span structure base (11) are solid Surely crane span structure side (12) is connected with, first through hole (111) is evenly distributed with the crane span structure base (11);The crane span structure side (12) the second through hole (121) and heat emission hole (122) are provided with, the top one end of crane span structure side (12) is provided with groove (125), crane span structure Flange (124) is fixedly connected with the top end face of side (12);The two ends of the crane span structure top cover (13) are movably connected in recessed On groove (125), third through-hole (131) is evenly distributed with crane span structure top cover (13);The first through hole (111) and the second through hole (121) it is each provided on same vertical plane, the second through hole (121) is located at the side of heat emission hole (122);Branch means (2) bag Include top plate (21), dividing wire frame (22) and bottom plate (23);The top of the top plate (21) is provided with the 3rd screw (211), the 3rd screw (211) dividing wire frame (22) and third through-hole (131) is corresponding, is fixedly connected with the bottom end face of the top plate (21);Institute Stating dividing wire frame (22) includes crossbearer (221) and vertical frame (222);The crossbearer (221) and vertical frame (222) are vertically connected, vertical frame (222) bottom is fixedly connected with bottom plate (23), and the second screw is equipped with the center of the crossbearer (221) two sides (2211), the second screw (2211) and the second through hole (121) are corresponding;The first screw is evenly distributed with the bottom plate (23) (231), the first screw (231) and first through hole (111) are corresponding.
2. a kind of cable testing bridge for being easy to separated time according to claim 1, it is characterised in that:The crane span structure side (12) Quantity is two, and two crane span structure sides (12) are vertical with crane span structure base (11).
3. a kind of cable testing bridge for being easy to separated time according to claim 1, it is characterised in that:The horizontal stroke of the groove (125) Section is L-type, and the thickness of groove (125) is more than the thickness of crane span structure top cover (13).
4. a kind of cable testing bridge for being easy to separated time according to claim 1, it is characterised in that:The top plate (21), crossbearer (221) identical with the length of bottom plate (23), the length of top plate (21), crossbearer (221) and bottom plate (23) is respectively less than crane span structure base (11) length.
5. a kind of cable testing bridge for being easy to separated time according to claim 1, it is characterised in that:The vertical frame (222) and horizontal stroke The width of frame (221) is identical, vertical frame (222) and crossbearer (221) integrally connected.
CN201720086122.6U 2017-01-20 2017-01-20 A kind of cable testing bridge for being easy to separated time Expired - Fee Related CN206490383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720086122.6U CN206490383U (en) 2017-01-20 2017-01-20 A kind of cable testing bridge for being easy to separated time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720086122.6U CN206490383U (en) 2017-01-20 2017-01-20 A kind of cable testing bridge for being easy to separated time

Publications (1)

Publication Number Publication Date
CN206490383U true CN206490383U (en) 2017-09-12

Family

ID=59766866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720086122.6U Expired - Fee Related CN206490383U (en) 2017-01-20 2017-01-20 A kind of cable testing bridge for being easy to separated time

Country Status (1)

Country Link
CN (1) CN206490383U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109699135A (en) * 2019-01-22 2019-04-30 珠海格力电器股份有限公司 Electrical box assembly and air conditioner
CN110290664A (en) * 2019-07-11 2019-09-27 徐州逸腾机电科技有限公司 A kind of sealing structure of battery truck brushless motor controller shell
CN112490970A (en) * 2020-11-27 2021-03-12 闵信忠 Cable bridge with adjustable clamping force

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109699135A (en) * 2019-01-22 2019-04-30 珠海格力电器股份有限公司 Electrical box assembly and air conditioner
CN110290664A (en) * 2019-07-11 2019-09-27 徐州逸腾机电科技有限公司 A kind of sealing structure of battery truck brushless motor controller shell
CN112490970A (en) * 2020-11-27 2021-03-12 闵信忠 Cable bridge with adjustable clamping force

Similar Documents

Publication Publication Date Title
CN206490383U (en) A kind of cable testing bridge for being easy to separated time
CN207183836U (en) A kind of outdoor cabinet
CN206401832U (en) It is a kind of new to lift the monoblock type cable testing bridge easily extended
CN208922774U (en) One kind being easily installed electric wire
CN104314352B (en) Composite compact transmission line shaft tower
CN215681494U (en) Heavy-duty switching device is with multilayer formula pull type cubical switchboard
CN205104865U (en) Aluminum alloy multilayer chute solidus ware
CN213402025U (en) Electrical cabinet convenient for cable installation
CN208257315U (en) Movable splicing bridge
CN207166086U (en) Add anti-guncotton refractory busbar in a kind of
CN206135347U (en) Horizontal cross elbow of cross
CN205195105U (en) Cubical switchboard with high -efficient heat dissipation function
CN201556854U (en) Cable distribution box of low-pressure cabinet
CN205724463U (en) A kind of electric power is with the intelligent power distribution cabinet of circuit display screen
CN210957329U (en) Suspension fixed high-low voltage power distribution cabinet
CN204068109U (en) The closed wire frame of a kind of rack overhead
CN214958461U (en) Anti-static cable bridge connecting structure
CN204167691U (en) Cable stable type floatless switch case
CN205231539U (en) Cubical switchboard convenient to electric elements is categorised
CN205489212U (en) Convenient box -type substation who removes
CN204174992U (en) Composite material compact transmission line shaft tower
CN205039483U (en) Hot -galvanize crane span structure
CN203445457U (en) Cabinet with secondary wire ducts for hoisting
CN218386230U (en) Positioning and fixing device for installing low-voltage complete switch equipment bus
CN219576336U (en) Outdoor floor type three-phase 4 watchband CT metering box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170912

Termination date: 20190120