CN206473712U - Running training equipment - Google Patents

Running training equipment Download PDF

Info

Publication number
CN206473712U
CN206473712U CN201720149903.5U CN201720149903U CN206473712U CN 206473712 U CN206473712 U CN 206473712U CN 201720149903 U CN201720149903 U CN 201720149903U CN 206473712 U CN206473712 U CN 206473712U
Authority
CN
China
Prior art keywords
hand thread
hand
connection
bearing
thread bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720149903.5U
Other languages
Chinese (zh)
Inventor
郭艳花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luliang University
Original Assignee
Luliang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luliang University filed Critical Luliang University
Priority to CN201720149903.5U priority Critical patent/CN206473712U/en
Application granted granted Critical
Publication of CN206473712U publication Critical patent/CN206473712U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rehabilitation Tools (AREA)

Abstract

The utility model is related to the technical field of sport health servicing unit, more particularly to a kind of running training equipment, the height of its adjustable armrest, and adjusts the distance between left-hand tread plate and right-hand tread plate, improves adaptability, and reduction uses limitation;Including left pillar, right pillar, handrail, left connecting pole, left bearing, left connection leg, left-hand tread plate, right connecting pole, right bearing, right connection leg and right-hand tread plate;Also include left connection board, right connection board, the first left-hand thread pipe, the first left-hand thread bar, the first right-hand thread pipe and the first right-hand thread bar, left connection board is arranged on the top of left pillar, left connection board top is provided with the first left standing groove, the first left ball bearing is provided with first left standing groove, right connection board top is provided with the first right standing groove, the first right standing groove and is provided with the first right ball bearing;Also include the second left-hand thread pipe, the second left-hand thread bar, the second right-hand thread pipe and the second right-hand thread bar.

Description

Running training equipment
Technical field
The utility model is related to the technical field of sport health servicing unit, more particularly to a kind of running training equipment.
Background technology
It is well known that running training equipment is a kind of sport health servicing unit, it is each in school, community and Office Area etc. Plant and be widely used in region, and by the extensive favor of various crowds;Existing running training equipment includes left branch Post, right pillar, handrail, left connecting pole, left bearing, left connection leg, left-hand tread plate, right connecting pole, right bearing, right connection leg and the right side are stepped on Plate, the top of the left end and right-hand member of the handrail respectively with left pillar and right pillar is connected, and left connecting pole left end is right with left pillar End connection, left bearing is rotatably mounted on left connecting pole, and left connection leg top is connected with left bearing, left connection leg bottom and a left side Pedal is connected, and right connecting pole right-hand member is connected with right pillar left end, and right bearing is rotatably mounted on right connecting pole, right connection leg top End is connected with right bearing, and right connection leg bottom is connected with right-hand tread plate;User will be manually placed at when this running training equipment is used On handrail, it is individually positioned in by left foot and right crus of diaphragm on left-hand tread plate and right-hand tread plate, left-hand tread plate and right-hand tread plate simulation is scrunched forwards, backwards Running is acted, so as to complete motion;Found in its use, because existing running training equipment needs to coordinate different age group User, and single unit system is highly to be fixed with width, it is impossible to it is adjusted according to the high height and long arm of user, causes its to adapt to energy Power is poor, higher using limitation.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of height of adjustable armrest, and adjust left-hand tread plate The distance between with right-hand tread plate, improve adaptability, reduction using limitation running training equipment.
Running training equipment of the present utility model, including left pillar, right pillar, handrail, left connecting pole, left bearing, Zuo Lian Leg, left-hand tread plate, right connecting pole, right bearing, right connection leg and right-hand tread plate are connect, left bearing is rotatably mounted on left connecting pole, it is left Connection leg top is connected with left bearing, and left connection leg bottom is connected with left-hand tread plate, and right bearing is rotatably mounted on right connecting pole, Right connection leg top is connected with right bearing, and right connection leg bottom is connected with right-hand tread plate;Also include left connection board, right connection board, the One left-hand thread pipe, the first left-hand thread bar, the first right-hand thread pipe and the first right-hand thread bar, the left connection board are arranged on left pillar Top, left connection board top is provided with the first left standing groove, and is provided with the first left standing groove the first left ball bearing, institute State the first left-hand thread ttom of pipe end to be inserted into the first left ball bearing, simultaneously spiral shell is filled to the first left spiral shell to the insertion of the first left-hand thread bar bottom Inside line tube top end, the right connection board is arranged on the top of right pillar, and right connection board top is provided with the first right standing groove, and The first right ball bearing is provided with the first right standing groove, the first right-hand thread ttom of pipe end is inserted into the first right ball bearing Interior, simultaneously spiral shell is filled to inside the first right-hand thread tube top end the insertion of the first right-hand thread bar bottom, the first left-hand thread bar and the first right-hand thread Bar top is connected with handrail left end and right-hand member respectively;Also include the second left-hand thread pipe, the second left-hand thread bar, the second right-hand thread pipe and Second right-hand thread bar, the left pillar right-hand member is provided with the second left standing groove, and it is left to be provided with the second left standing groove second Ball bearing, the second left-hand thread pipe left end is inserted into the second left ball bearing, the insertion of the second left-hand thread bar left end and spiral shell It is filled to inside the second left-hand thread pipe right-hand member, left connecting pole is arranged on the second left-hand thread bar right-hand member, the right pillar left end is provided with Second right standing groove, and it is provided with the second right standing groove the second right ball bearing, the second right-hand thread pipe right-hand member insertion To the second right ball bearing, simultaneously spiral shell is filled to inside the second right-hand thread pipe left end the insertion of the second right-hand thread bar right-hand member, right connecting pole Installed in the second right-hand thread bar left end.
Running training equipment of the present utility model, in addition to left rack and right rack, the left rack are arranged on Left pillar left end, right rack is arranged on right pillar right-hand member, and the left rack is internally provided with left placed cavity, right rack Be internally provided with right placed cavity.
Running training equipment of the present utility model, in addition to left spring, left clamp, right spring and right clamp, the left bullet Spring and left clamp are respectively positioned in left placed cavity, and left spring bottom is connected with left placed cavity inner bottom wall, left spring top and left clamp Connection, the right spring and right clamp are respectively positioned in right placed cavity, and right spring bottom end is connected with right placed cavity inner bottom wall, right spring Top is connected with right clamp.
The beneficial effects of the utility model are compared with prior art:By above-mentioned setting, the first left-hand thread can be passed through The synchronous rotary of pipe and the first right-hand thread pipe carries out the height regulation of handrail, and passes through the second left-hand thread pipe and the second right-hand thread The rotation of pipe can carry out the regulation of the distance between left-hand tread plate and right-hand tread plate, so as to reach the effect for the user for adapting to different high height and long arm Really, it is more practical.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure:1st, left pillar;2nd, right pillar;3rd, handrail;4th, left connecting pole;5th, left bearing;6th, left connection leg;7th, a left side is stepped on Plate;8th, right connecting pole;9th, right-hand tread plate;10th, left connection board;11st, right connection board;12nd, the first left-hand thread pipe;13rd, the first left-hand thread Bar;14th, the first right-hand thread pipe;15th, the first right-hand thread bar;16th, the second left-hand thread pipe;17th, the second right-hand thread pipe;18th, second is right Threaded rod;19th, the second right ball bearing;20th, right rack;21st, left spring;22nd, left clamp;23rd, right clamp.
Embodiment
With reference to the accompanying drawings and examples, embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not limited to scope of the present utility model.
As shown in figure 1, running training equipment of the present utility model, including left pillar 1, right pillar 2, handrail 3, left connecting pole 4th, left bearing 5, left connection leg 6, left-hand tread plate 7, right connecting pole 8, right bearing, right connection leg and right-hand tread plate 9, the rotatable peace of left bearing On left connecting pole, left connection leg top is connected with left bearing, and left connection leg bottom is connected with left-hand tread plate, and right bearing is rotatable On right connecting pole, right connection leg top is connected with right bearing, and right connection leg bottom is connected with right-hand tread plate;Also include left company Fishplate bar 10, right connection board 11, the first left-hand thread pipe 12, the first left-hand thread bar 13, the first right-hand thread pipe 14 and the first right-hand thread bar, Left connection board is arranged on the top of left pillar, and left connection board top is provided with the first left standing groove, and in the first left standing groove The first left ball bearing 15 is provided with, the first left-hand thread ttom of pipe end is inserted into the first left ball bearing, the first left-hand thread bar bottom Simultaneously spiral shell is filled to inside the first left-hand thread tube top end for end insertion, and right connection board is arranged on the top of right pillar, and right connection board top is set The first right standing groove is equipped with, and the first right ball bearing is provided with the first right standing groove, the first right-hand thread ttom of pipe end is inserted To the first right ball bearing, simultaneously spiral shell is filled to inside the first right-hand thread tube top end the insertion of the first right-hand thread bar bottom, the first left spiral shell Rasp bar and the first right-hand thread bar top are connected with handrail left end and right-hand member respectively;Also include the second left-hand thread pipe 16, the second left spiral shell Rasp bar, the second right-hand thread pipe 17 and the second right-hand thread bar 18, left pillar right-hand member are provided with the second left standing groove, and are put on second left side Put and the second left ball bearing is provided with groove, the second left-hand thread pipe left end is inserted into the second left ball bearing, the second left-hand thread Simultaneously spiral shell is filled to inside the second left-hand thread pipe right-hand member the insertion of bar left end, and left connecting pole is arranged on the second left-hand thread bar right-hand member, right pillar Left end is provided with the second right standing groove, and is provided with the second right standing groove the second right ball bearing 19, the second right-hand thread pipe Right-hand member is inserted into the second right ball bearing, and simultaneously spiral shell is filled to inside the second right-hand thread pipe left end the insertion of the second right-hand thread bar right-hand member, Right connecting pole is arranged on the second right-hand thread bar left end;By above-mentioned setting, the first left-hand thread pipe and the first right-hand thread can be passed through The synchronous rotary of pipe carries out the height regulation of handrail, and can be carried out by the rotation of the second left-hand thread pipe and the second right-hand thread pipe The distance between left-hand tread plate and right-hand tread plate are adjusted, so that the effect for the user for adapting to different high height and long arm is reached, it is more practical.
Running training equipment of the present utility model, in addition to left rack and right rack 20, left rack are arranged on a left side Pillar left end, right rack is arranged on right pillar right-hand member, and left rack is internally provided with left placed cavity, the inside of right rack Right placed cavity is provided with, beverage, cup and other items can be placed.
Running training equipment of the present utility model, in addition to left spring 21, left clamp 22, right spring and right clamp 23, it is left Spring and left clamp are respectively positioned in left placed cavity, and left spring bottom is connected with left placed cavity inner bottom wall, left spring top and left card Plate is connected, and right spring and right clamp are respectively positioned in right placed cavity, and right spring bottom end is connected with right placed cavity inner bottom wall, right spring top End is connected with right clamp, and placement can be supported by left clamp and right clamp when cup is highly different with beverage and other items, It is more convenient to use.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model technical principle is not departed from, some improvement and modification can also be made, these change Enter and protection domain of the present utility model is also should be regarded as with modification.

Claims (3)

1. a kind of running training equipment, including left pillar(1), right pillar(2), handrail(3), left connecting pole(4), left bearing(5)、 Left connection leg(6), left-hand tread plate(7), right connecting pole(8), right bearing, right connection leg and right-hand tread plate(9), left bearing(5)It is rotatable Installed in left connecting pole(4)On, left connection leg(6)Top and left bearing(5)Connection, left connection leg(6)Bottom and left-hand tread plate(7) Connection, right bearing is rotatably mounted to right connecting pole(8)On, right connection leg top is connected with right bearing, right connection leg bottom with Right-hand tread plate(9)Connection;Characterized in that, also including left connection board(10), right connection board(11), the first left-hand thread pipe(12), One left-hand thread bar(13), the first right-hand thread pipe(14)With the first right-hand thread bar(15), the left connection board(10)Installed in left branch Post(1)Top, left connection board(10)Top is provided with the first left standing groove, and it is left to be provided with the first left standing groove first Ball bearing, the first left-hand thread pipe(12)Bottom is inserted into the first left ball bearing, the first left-hand thread bar(13)Bottom Insert and spiral shell is filled to the first left-hand thread pipe(12)Inside top, the right connection board(11)Installed in right pillar(2)Top, it is right Connecting plate(11)Top is provided with the first right standing groove, and is provided with the first right ball bearing in the first right standing groove, described First right-hand thread pipe(14)Bottom is inserted into the first right ball bearing, the first right-hand thread bar(15)Bottom insertion and spiral shell is filled to the One right-hand thread pipe(14)Inside top, the first left-hand thread bar(13)With the first right-hand thread bar(15)Top respectively with handrail(3)It is left End and right-hand member connection;Also include the second left-hand thread pipe(16), the second left-hand thread bar, the second right-hand thread pipe(17)With the second right-hand thread Bar(18), the left pillar(1)Right-hand member is provided with the second left standing groove, and is provided with the second left standing groove second and rolls left pearl Bearing, the second left-hand thread pipe(16)Left end is inserted into the second left ball bearing, the insertion of the second left-hand thread bar left end and spiral shell It is filled to the second left-hand thread pipe(16)Inside right-hand member, left connecting pole(4)Installed in the second left-hand thread bar right-hand member, the right pillar(2) Left end is provided with the second right standing groove, and is provided with the second right standing groove the second right ball bearing(19), described second is right Screwed pipe(17)Right-hand member is inserted into the second right ball bearing(19)It is interior, the second right-hand thread bar(18)Simultaneously spiral shell is filled to second for right-hand member insertion Right-hand thread pipe(17)Inside left end, right connecting pole(8)Installed in the second right-hand thread bar(18)Left end.
2. running training equipment as claimed in claim 1, it is characterised in that also including left rack and right rack(20), The left rack is arranged on left pillar(1)Left end, right rack(20)Installed in right pillar(2)Right-hand member, the left rack Be internally provided with left placed cavity, right rack(20)Be internally provided with right placed cavity.
3. running training equipment as claimed in claim 2, it is characterised in that also including left spring(21), left clamp(22), it is right Spring and right clamp(23), the left spring(21)With left clamp(22)It is respectively positioned in left placed cavity, left spring(21)Bottom with Left placed cavity inner bottom wall connection, left spring(21)Top and left clamp(22)Connection, the right spring and right clamp(23)Equal position In in right placed cavity, right spring bottom end is connected with right placed cavity inner bottom wall, right spring top and right clamp(23)Connection.
CN201720149903.5U 2017-02-20 2017-02-20 Running training equipment Expired - Fee Related CN206473712U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720149903.5U CN206473712U (en) 2017-02-20 2017-02-20 Running training equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720149903.5U CN206473712U (en) 2017-02-20 2017-02-20 Running training equipment

Publications (1)

Publication Number Publication Date
CN206473712U true CN206473712U (en) 2017-09-08

Family

ID=59748883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720149903.5U Expired - Fee Related CN206473712U (en) 2017-02-20 2017-02-20 Running training equipment

Country Status (1)

Country Link
CN (1) CN206473712U (en)

Similar Documents

Publication Publication Date Title
CN206454192U (en) A kind of physical culture push-up apparatus
CN206781411U (en) A kind of art tool box
CN206075573U (en) A kind of multimedia teaching instrument
CN206229411U (en) Physical electronic experimental provision
CN206119699U (en) Domestic combination TV bench
CN206473712U (en) Running training equipment
CN206667380U (en) Bathroom shower device
CN207075786U (en) A kind of basketball showcase
CN206650619U (en) A kind of telescopic solar panels support
CN207041231U (en) Ideological and politics teaching lectern
CN106898212A (en) Physical Experiment operating desk
CN207084740U (en) Household bath-tub
CN206850313U (en) Insulated communication cable clip
CN206712408U (en) Aerial insulated cable is linked up with
CN206292701U (en) A kind of computer case structure
CN206664126U (en) A kind of art tool box
CN206421691U (en) A kind of English study device
CN206489364U (en) Think political affairs training projection arrangement
CN206441356U (en) Accounting training servicing unit
CN206162933U (en) Special supplementary teaching device of high school
CN207168436U (en) Multilayer bathroom cabinet
CN206516143U (en) Mathematic(al) construction Graphic Panel
CN206979284U (en) Children have a meal spoon
CN206205764U (en) Sapling grafting special-purpose ladder
CN207084492U (en) A kind of lectern of convenient teaching

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170908

Termination date: 20190220