CN206448276U - A kind of reverse construction short section borehole wall pouring structure - Google Patents

A kind of reverse construction short section borehole wall pouring structure Download PDF

Info

Publication number
CN206448276U
CN206448276U CN201621463906.8U CN201621463906U CN206448276U CN 206448276 U CN206448276 U CN 206448276U CN 201621463906 U CN201621463906 U CN 201621463906U CN 206448276 U CN206448276 U CN 206448276U
Authority
CN
China
Prior art keywords
section
keeping section
initial segment
borehole wall
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621463906.8U
Other languages
Chinese (zh)
Inventor
郑治中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Newton Shield Machine Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621463906.8U priority Critical patent/CN206448276U/en
Application granted granted Critical
Publication of CN206448276U publication Critical patent/CN206448276U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model is related to underground structrue engineering technical field, particularly relate to a kind of reverse construction short section borehole wall pouring structure, including the structure the initial segment being sequentially connected, first structure keeping section, the second structure keeping section and the 3rd structure keeping section, the structure the initial segment includes the vertical body of the initial segment and the initial segment horizontal structure body, the horizontal structure body is placed on supplemental rigid slope retaining body, and the 3rd structure keeping section is fixedly connected with bed die.Using a kind of reverse construction short section borehole wall pouring structure of the present utility model on the premise of structure safety is ensured, improve efficiency of construction, improve 100% construction speed.

Description

A kind of reverse construction short section borehole wall pouring structure
Technical field
The utility model is related to that a kind of cutting depth is deeper, the higher short section borehole wall of the cycle operation frequency, armored concrete The inverse of plate makees short section pouring structure, belongs to underground structrue engineering field.
Background technology
With economic growth and the acceleration of urbanization process, available aboveground space is fewer and fewer in city, city hair The contradiction of exhibition and land resource shortage is more protruded.The existing use insufficient space of existing building, it is necessary to reasonable development, using both There is the underground space of building.It is general to be constructed using cut and cover method in underground engineering construction.Although cut and cover method has construction letter The advantages such as list, cheap, the work progress degree of controllability height of engineering direct cost, but there is also notable deficiency at present:One is cut and cover method Construction is higher to the protection cost of existing facility, and the construction period is relatively long.Cause engineering indirect cost and auxiliary duration significantly Increase;Two be that cut and cover tunneling is very big to the normal influence on system operation in city.Traffic route, drainage pipeline networks in the range of Effects on Engineering, The existing facility such as water power coal gas, is unavoidably interfered;Three be that cut and cover tunneling influences very big to city appearance environment.Whole construction Process is in the environment of opposing open, and the influence to city appearance environment is very big.In view of this, opening for exploitation Deep underground space is explored Dig new technology new method imperative.
The excavation of foundation pit of current widely used underground engineering is mostly, along the practice, successively to excavate, successively support, and is led to Often applicable excavation of foundation pit is shallower, for excavating compared with deep basal pit, and this method has that construction period is longer, and engineering reliability is not strong, The shortcomings of technique substantially falls behind.Reverse construction is that underground space development cost is most economical, the most reliable method of technology, due to inverse Some tiny technical problems of practice construction there are not solution, cause the advantage of reverse construction unobvious, therefore, for contrary sequence method Construction is the problem of exist, and supporting construction when how to provide a kind of low underground space reverse construction of safe efficient, cost is The technical problem of those skilled in the art's urgent need to resolve.
Utility model content
It is simple the utility model proposes a kind of constructing operation, efficiency of construction and construction speed are improved, economic technology benefit shows The inverse of work makees short section pouring structure, solves the problem of prior art is present.
In order to solve the above-mentioned technical problem, the technical solution of the utility model is:
A kind of reverse construction short section borehole wall pouring structure, including the structure the initial segment, the first structure that are sequentially connected are maintained Section, the second structure keeping section and the 3rd structure keeping section, the structure the initial segment include the vertical body of the initial segment and the initial segment level Structure, the horizontal structure body is placed on supplemental rigid slope retaining body, and the 3rd structure keeping section is fixed with bed die to be connected Connect.
The supplemental rigid slope retaining body is pilework.
The structure the initial segment, first structure keeping section, the connection of the second structure keeping section and the 3rd structure keeping section structure Position is in step-like, and coupling part is provided with dowel.The dowel is in " E " type.The dowel of " E " type improves structure starting Section, first structure keeping section, the bonding strength and rigidity of the second structure keeping section and the 3rd structure keeping section connecting portion, " E " The dowel of type is arranged at the structure the initial segment, first structure keeping section, the second structure keeping section and the 3rd structure keeping section Bar construction in, can connect up and down two-part reinforcing bar, become an entirety.
The characteristics of the utility model has following and beneficial effect:
One kind that the utility model is related to is inverse to make short section pouring structure, by setting the structure the initial segment being sequentially connected, the One structure keeping section, the second structure keeping section and the 3rd structure keeping section, the side of the structure the initial segment supporting construction keeping section Pressure, structure keeping section maintains the lateral pressure for the next segment structure keeping section of rear support that expires, and the structure the initial segment completes mixed After solidifying soil pours and conserves and expire, start pouring structure keeping section, pour and prepare for next segment structure keeping section after having poured. Structure keeping section lateral pressure relies primarily on the preceding paragraph structure and is supported, when starting to pour next segment structure, structure keeping section As permanent structure, circulation construction on the premise of structure safety is ensured, improves efficiency of construction, improves 100% construction speed.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing used required in description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of inverse structural representation for making short section pouring structure of the utility model.
In figure, 1- structure the initial segments;2- first structure keeping sections;3- the second structure keeping sections;The structure keeping sections of 4- the 3rd; 5- supplemental rigid slope retaining bodies.
Embodiment
Embodiment of the present utility model is described further below in conjunction with the accompanying drawings.Herein it should be noted that Explanation for these embodiments is used to help understand the utility model, but does not constitute to restriction of the present utility model.This Outside, as long as technical characteristic involved in each embodiment of the utility model disclosed below does not constitute conflict each other It can just be mutually combined.
A kind of inverse structural representation for making short section pouring structure shown in reference picture 1.A kind of reverse construction short section borehole wall Pouring structure, structure the initial segment 1, first structure keeping section 2, the second structure that the ground prop system includes being sequentially connected is protected The structure keeping section 4 of section 3 and the 3rd is supported, the structure the initial segment 1 includes the vertical body of the initial segment and the initial segment horizontal structure body, described Horizontal structure body is placed on supplemental rigid slope retaining body 5, and the 3rd structure keeping section 4 is fixedly connected with bed die.
The supplemental rigid slope retaining body 5 is pilework.
The structure the initial segment 1, first structure keeping section 2, the second structure keeping section 3 and the 3rd structure keeping section structure 4 Connecting portion is in step-like, and coupling part is provided with dowel.
A kind of inverse construction method for making short section pouring structure technique, it is characterised in that:Comprise the following steps:
Step 1: preparation of construction:According to design drawing, smooth construction site, organizing construction's material, machinery, personnel are in place;
Step 2: construction supplemental rigid slope retaining body 5;
Step 3: pouring structure the initial segment 1, carries out concrete maintaining;
Step 4: excavating next section of cleaning pours working face;
Step 5: pouring first structure keeping section 2, concrete maintaining is carried out;
Step 6: continuing next section of excavation cleaning pours working face, the second structure keeping section 3 and the maintenance of the 3rd structure are poured Section 4, carries out the maintenance of concrete.
One kind that the utility model is related to is inverse to make short section pouring structure, by setting the structure the initial segment 1 being sequentially connected, the One structure keeping section 2, the second structure keeping section 3 and the 3rd structure keeping section 4, the structure originate 1 supporting construction keeping section Lateral pressure, structure keeping section maintains the lateral pressure for the next segment structure keeping section of rear support that expires, and the structure the initial segment 1 is completed After concreting and conserving expires, start pouring structure keeping section, pour for next segment structure keeping section after having poured and do standard It is standby.Structure keeping section lateral pressure relies primarily on the preceding paragraph structure and is supported, when starting to pour next segment structure, structure maintenance Duan Chengwei permanent structures, circulation construction, ensure structure safety on the premise of, improve efficiency of construction, improve 100% construct into Degree.
Embodiment of the present utility model is explained in detail above in association with accompanying drawing, but the utility model is not limited to be retouched The embodiment stated.For a person skilled in the art, it is right in the case where not departing from the utility model principle and spirit These embodiments carry out a variety of change, modification, replacement and modification, still fall within protection domain of the present utility model.

Claims (4)

1. a kind of reverse construction short section borehole wall pouring structure, it is characterised in that:Including be sequentially connected structure the initial segment, first Structure keeping section, the second structure keeping section and the 3rd structure keeping section, the structure the initial segment include the vertical body of the initial segment and risen Beginning section horizontal structure body, the horizontal structure body is placed on supplemental rigid slope retaining body, the 3rd structure keeping section and bottom Mould is fixedly connected.
2. reverse construction short section borehole wall pouring structure according to claim 1, it is characterised in that:The supplemental rigid side Slope prop is stake or continuous underground wall structure.
3. reverse construction short section borehole wall pouring structure according to claim 1, it is characterised in that:The structure starting Section, first structure keeping section, the connecting portion of the second structure keeping section and the 3rd structure keeping section structure are in step-like, coupling part It is provided with dowel.
4. reverse construction short section borehole wall pouring structure according to claim 3, it is characterised in that:The dowel is in " E " type.
CN201621463906.8U 2016-12-28 2016-12-28 A kind of reverse construction short section borehole wall pouring structure Active CN206448276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621463906.8U CN206448276U (en) 2016-12-28 2016-12-28 A kind of reverse construction short section borehole wall pouring structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621463906.8U CN206448276U (en) 2016-12-28 2016-12-28 A kind of reverse construction short section borehole wall pouring structure

Publications (1)

Publication Number Publication Date
CN206448276U true CN206448276U (en) 2017-08-29

Family

ID=59673271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621463906.8U Active CN206448276U (en) 2016-12-28 2016-12-28 A kind of reverse construction short section borehole wall pouring structure

Country Status (1)

Country Link
CN (1) CN206448276U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759383A (en) * 2016-12-28 2017-05-31 郑倩 A kind of reverse construction short section borehole wall pouring structure and construction method
CN108867835A (en) * 2018-08-06 2018-11-23 中国二十冶集团有限公司 A kind of pond contrary sequence method in restricted clearance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759383A (en) * 2016-12-28 2017-05-31 郑倩 A kind of reverse construction short section borehole wall pouring structure and construction method
CN108867835A (en) * 2018-08-06 2018-11-23 中国二十冶集团有限公司 A kind of pond contrary sequence method in restricted clearance

Similar Documents

Publication Publication Date Title
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
CN103215960B (en) Grouting method for high polymer vertical support system
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN108086328A (en) A kind of dynamic sealing, assembled building enclosure and its construction method from recharge
CN104652444A (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN102888847B (en) Construction method free from lowering water level for local deep foundation pit of elevator shaft
CN206448276U (en) A kind of reverse construction short section borehole wall pouring structure
CN206752667U (en) A kind of basement barrier wall structure
CN203462463U (en) Construction device of pile-peripheral cemented-soil cast-in-situ stiffening core pile
CN206448293U (en) A kind of reverse construction ground prop structure
CN203160254U (en) Pit support structure
CN109881661A (en) Assembled underground continuous wall transverse connection structure
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN106759383A (en) A kind of reverse construction short section borehole wall pouring structure and construction method
CN102493488A (en) Construction method for reverse beams and normal plates in foundation pit engineering
CN204252119U (en) The special-shaped supporting pile structure of X
CN201687480U (en) Vertical shaft penetrating thick soft soil layer integral butting steel protecting tube
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN208441083U (en) Half coercion underground continuous wall structure
CN203049588U (en) Pit-in-pit cylindrical mould
CN204457784U (en) Large-diameter shield in a kind of tunneling air channel receives and starting well
CN106592632A (en) Underground supporting structure for reverse construction method and construction method
CN210766887U (en) Face combination underground groove type structure forever
CN203321523U (en) Large-span high-side-wall underground space building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Qingdao Niusidun Intelligent Technology Co Ltd

Assignor: Hangzhou Niusidun garage Co. Ltd.|Zheng Zhizhong|Zheng Qian

Contract record no.: 2018330000001

Denomination of utility model: Short-section well wall pouring structure constructed through reverse construction method and construction method

Granted publication date: 20170829

License type: Exclusive License

Record date: 20180110

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180504

Address after: 310011 room 1010, 2 building, 99 Xiangyuan Road, Gongshu District, Hangzhou, Zhejiang.

Patentee after: Hangzhou bull Smart Technology Co., Ltd.

Address before: 310012 506 room 1, 166 Wen two road, Xihu District, Hangzhou, Zhejiang.

Patentee before: Zheng Qian

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190830

Address after: 310000 New World Wealth Center, 108 Shixinbei Road, Xiaoshan Economic and Technological Development Zone, Hangzhou City, Zhejiang Province, 2 buildings, Room 1002-33

Patentee after: Hangzhou Newton Shield Machine Co., Ltd.

Address before: 310011 Room 1010, Building No. 99, Xiangyuan Road, Gongshu District, Hangzhou City, Zhejiang Province

Patentee before: Hangzhou bull Smart Technology Co., Ltd.