CN206444796U - A kind of Workpiece coating production line - Google Patents
A kind of Workpiece coating production line Download PDFInfo
- Publication number
- CN206444796U CN206444796U CN201621252350.8U CN201621252350U CN206444796U CN 206444796 U CN206444796 U CN 206444796U CN 201621252350 U CN201621252350 U CN 201621252350U CN 206444796 U CN206444796 U CN 206444796U
- Authority
- CN
- China
- Prior art keywords
- workpiece
- passage
- bearing platform
- spray
- processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Spray Control Apparatus (AREA)
Abstract
The utility model proposes a kind of Workpiece coating production line, including pre-treatment component, spray assembly and temporary component, pre-treatment component is connected with material platform, workpiece is through expecting that platform is pre-processed into pre-treatment component, the discharge end of pre-treatment component is connected with spray assembly, the premenstrual processing assembly of workpiece enters spray assembly and carries out spray treatment, and the discharge end of spray assembly is connected with temporary component;The discharge end of bearing platform is connected with levelling passage, workpiece enters levelling passage through bearing platform and carries out levelling processing, the discharge end of levelling passage is connected with infrared surface drying passage, processing is dried into infrared surface drying passage through levelling passage in workpiece, the discharge end of infrared surface drying passage is connected with temporary component and backflow cooling duct respectively, the workpiece that spraying is completed enters temporary component and kept in, the workpiece for continuing to spray is cooled down into backflow cooling duct, the discharge end of backflow cooling duct is connected with bearing platform, workpiece is delivered into bearing platform by cooling duct of flowing back and carries out spraying preparation next time.
Description
Technical field
The utility model is related to coating equipment, more particularly to a kind of Workpiece coating production line.
Background technology
As automobile industry increasingly increases the demand of plastic products, anti-corrosion and modification of the coating process in working of plastics
Start to play more and more significant effect in performance.Many appearance members, to applying such as bumper, spoiler, body-finishing bar
Appearance requirement after dress is all very strict.And for each auto producer, obtain good painting quality and outward appearance
The product of quality is the key factor for improving the vehicle market competitiveness.In general, the working of plastics for belonging to vehicle body entire body color is general
Multicoat is used, it is the most typical with bumper product., will with coloured match of vehicle body because this product painting area is big
Ask, therefore typically use three coating sprayings.The method of usual plastic products application has injection in aerial spraying, electrostatic spraying and film to apply
Dress.Three kinds of methods respectively have advantage and disadvantage, but also respectively have applicable object, to coating and also different by the requirement of painting working of plastics, wherein should
With it is most commonly used be aerial spraying.
Aerial spraying is coating atomization is nebulized with the air-flow of compressed air, and is coated onto coated article table under air-flow drive
A kind of mode in face.Aerial spraying coating efficiency is higher, per hour sprayable 50~100m2.Aerial spraying strong adaptability, to applying
Material and workpiece require relatively low, and paint even uniform, can reach good dicoration.It has the disadvantage that spraying coating cloud disperses
Greatly, coating loss is big, and utilization rate is no more than 50%.Realizing the equipment of this spray form at present has Control During Paint Spraying by Robot, artificial mark spraying
Rifle is sprayed.Control During Paint Spraying by Robot can carry out anti-shape with relative program to product, and paint amount, spray time, atomization are sprayed out by control
The control of pressure etc. parameter, can obtain uniform, the stable paint film of surface quality.And manually spray gun equipment investment cost is low, but
It is that its atomizing effect is bad while ratio of defects is higher.In the production process of existing paint line, each processing unit is sequentially held in the mouth
Connect, workpiece movement route is long, and equipment occupation space is larger, is unfavorable for installing with using.Therefore, it is necessary to enter to this production line
Row structure optimization, to overcome drawbacks described above.
Utility model content
The purpose of this utility model is to provide Workpiece coating production line, to reduce equipment occupation space, improves production efficiency.
The utility model for solve its technical problem the technical scheme adopted is that
Workpiece coating production line, including pre-treatment component, spray assembly and temporary component, pre-treatment component connect with material platform
Logical, workpiece is through expecting that platform is pre-processed into pre-treatment component, and the discharge end of pre-treatment component is connected with spray assembly, workpiece warp
Pre-treatment component enters spray assembly and carries out spray treatment, and the discharge end of spray assembly is connected with temporary component, and workpiece is through spraying
Component enters temporary component and kept in;
Specifically, spray assembly includes bearing platform, and the feeding end of bearing platform is connected with pre-treatment component, premenstrual processing assembly
Carry out pretreated workpiece to enter provided with spray room on the outside of bearing platform, bearing platform, transfer equipment be provided between bearing platform and spray room,
The workpiece feeding spray room on bearing platform is subjected to spray painting processing by transfer equipment, and the workpiece after spray painting is handled is returned to bearing material
Platform;
The discharge end of bearing platform is connected with levelling passage, and workpiece enters levelling passage through bearing platform and carries out levelling processing, stream
The discharge end of flat passage is connected with infrared surface drying passage, and workpiece enters infrared surface drying passage through levelling passage and carries out infrared ray surface
Drying process, the discharge end of infrared surface drying passage is connected with temporary component and backflow cooling duct respectively, sprays the work completed
Part enters temporary component and kept in, and the workpiece for continuing to spray is cooled down into backflow cooling duct, backflow cooling duct
Discharge end is connected with bearing platform, and workpiece is delivered into bearing platform by cooling duct of flowing back carries out spraying preparation next time.
Further, pre-treatment component includes washing equipment, and cleaning treatment is carried out to workpiece by washing equipment, washing equipment
Discharging opening is connected with blowing wetting system, and the residual water blowing processing in surface is carried out to the workpiece after cleaning by blowing wetting system, wetting system is blown
Discharging opening is connected with blast heater, carries out hot blast drying processing to the workpiece after residual water blowing processing by blast heater, hot blast is set
Standby discharging opening is cut stove with water and connected, and cut stove by water is further dried processing to the workpiece after the processing of hot blast drying, and water is cut
The discharging opening of stove is connected with cooling duct, workpiece is cooled down in the cooling channel, the discharging opening of cooling duct and dedusting and
Static removal equipment is connected, and is carried out dedusting to the workpiece after cooling and is destaticed processing;
Further, keeping in component includes the discharging opening of jacking equipment and material stock passage, jacking equipment one end and spray assembly
Connection, its other end is connected with material stock passage, and the discharging opening of material stock passage is connected with material platform, and material stock passage is by some Transfer pipes
Constitute, be parallel to each other between each Transfer pipe, it is end to end between adjacent Transfer pipe, workpiece is moved on Transfer pipe;
In one embodiment of the present utility model, transfer equipment is manipulator.
The utility model has the advantage of, the discharge end of the bearing platform of the Workpiece coating production line is connected with levelling passage,
Workpiece enters levelling passage through bearing platform and carries out levelling processing, and the discharge end of levelling passage is connected with infrared surface drying passage, workpiece
Enter infrared surface drying passage through levelling passage and carry out infrared ray dry tack free processing, the discharge end of infrared surface drying passage respectively with temporarily
Component and the connection of backflow cooling duct are deposited, the workpiece that spraying is completed enters temporary component and kept in, and continues the workpiece sprayed
Cooled down into backflow cooling duct, the discharge end of backflow cooling duct is connected with bearing platform, by backflow cooling duct by work
Part delivers to bearing platform and carries out spraying preparation next time, outfit in multiple application, spray room can be carried out according to the coating specification of workpiece many
Kind of shower nozzle, is conducive to adapting to various production requirements, workpiece loopy moving between devices, is not required to be equipped with more spraying equipments,
Be conducive to saving production space, reduce production cost, improve production efficiency.
Brief description of the drawings
Fig. 1 be the utility model proposes Workpiece coating production line structural representation.
Embodiment
In order that technological means, creation characteristic, reached purpose and effect that the utility model is realized are easy to understand, under
Face combines diagram and specific embodiment, and the utility model is expanded on further.
As shown in figure 1, the utility model proposes Workpiece coating production line include pre-treatment component, spray assembly and temporarily
Deposit component, pre-treatment component connect with material platform, workpiece is pre-processed through material platform into pre-treatment component, pre-treatment component goes out
Material end is connected with spray assembly, and the premenstrual processing assembly of workpiece enters spray assembly and carries out spray treatment, the discharge end of spray assembly
Connected with temporary component, workpiece enters temporary component through spray assembly and kept in;Spray assembly includes bearing platform 1, and bearing platform enters
Material end is connected with pre-treatment component, and premenstrual processing assembly carries out pretreated workpiece and enters bearing platform, and bearing platform outside is provided with
Spray room 2, is provided with transfer equipment 3 between bearing platform and spray room, sprayed the workpiece feeding spray room on bearing platform by transfer equipment
Paint processing, and workpiece after spray painting is handled is returned to bearing platform;The discharge end of bearing platform is connected with levelling passage 4, workpiece warp
Bearing platform enters levelling passage and carries out levelling processing, and the discharge end of levelling passage is connected with infrared surface drying passage 5, and workpiece is through levelling
Passage enters infrared surface drying passage and carries out infrared ray dry tack free processing, the discharge end of infrared surface drying passage respectively with temporary component
And backflow cooling duct 6 is connected, the workpiece that spraying is completed enters temporary component and kept in, and the workpiece for continuing to spray enters back
Stream cooling duct is cooled down, and the discharge end of backflow cooling duct is connected with bearing platform, and by flowing back, workpiece is delivered in cooling duct
Bearing platform carries out spraying next time and prepared.
Pre-treatment component includes washing equipment 7, and cleaning treatment, the discharging opening of washing equipment are carried out to workpiece by washing equipment
Connected with blowing wetting system, the residual water blowing processing in surface is carried out to the workpiece after cleaning by blowing wetting system, the discharging opening of wetting system is blown
Connected with blast heater, by blast heater residual water blowing is handled after workpiece carry out hot blast drying processing, blast heater goes out
Material mouth is cut stove 8 with water and connected, and cut stove by water is further dried processing to the workpiece after the processing of hot blast drying, and water cuts going out for stove
Material mouth is connected with cooling duct 9, workpiece is cooled down in the cooling channel, the discharging opening of cooling duct and dedusting and is destaticed
Equipment 10 is connected, and is carried out dedusting to the workpiece after cooling and is destaticed processing;Temporary component includes jacking equipment 11 and led to material stock
Road 12, jacking equipment one end is connected with the discharging opening of spray assembly, and its other end is connected with material stock passage, the discharging of material stock passage
Mouthful with expect platform connect, material stock passage is made up of some Transfer pipes, is parallel to each other between each Transfer pipe, adjacent Transfer pipe it
Between it is end to end, workpiece is moved on Transfer pipe;Transfer equipment is filled the post of using manipulator.The Workpiece coating production line is held
The discharge end of material platform connect with levelling passage, and workpiece is through bearing platform into the progress levelling processing of levelling passage, and levelling passage goes out
Material end is connected with infrared surface drying passage, and workpiece enters infrared surface drying passage through levelling passage and carries out infrared ray dry tack free processing,
The discharge end of infrared surface drying passage is connected with temporary component and backflow cooling duct respectively, and the workpiece that spraying is completed enters temporary
Component is kept in, and the workpiece for continuing to spray is cooled down into backflow cooling duct, and the discharge end for cooling duct of flowing back is with holding
Material platform is connected, and workpiece is delivered into bearing platform by cooling duct of flowing back carries out spraying preparation next time, can be wanted according to the application of workpiece
Ask in the multiple application of progress, spray room and be equipped with a variety of shower nozzles, be conducive to adapting to various production requirements, workpiece circulates shifting between devices
It is dynamic, it is not required to be equipped with more spraying equipments, is conducive to saving production space, reduces production cost, improve production efficiency.
Embodiment of above is only to illustrate technical concepts and features of the present utility model, and its object is to allow the skill of this area
Art personnel understand content of the present utility model and are carried out, and protection domain of the present utility model, all can not be limited with this
The equivalent change or modification done according to the utility model Spirit Essence, should all cover in protection domain of the present utility model.
Claims (4)
1. Workpiece coating production line, including pre-treatment component, spray assembly and temporary component, pre-treatment component connect with material platform
Logical, workpiece is through expecting that platform is pre-processed into pre-treatment component, and the discharge end of pre-treatment component is connected with spray assembly, workpiece warp
Pre-treatment component enters spray assembly and carries out spray treatment, and the discharge end of spray assembly is connected with temporary component, and workpiece is through spraying
Component enters temporary component and kept in, it is characterised in that:
Spray assembly includes bearing platform, and the feeding end of bearing platform is connected with pre-treatment component, and premenstrual processing assembly is pre-processed
Workpiece afterwards, which enters, is provided with spray room on the outside of bearing platform, bearing platform, transfer equipment is provided between bearing platform and spray room, by transfer equipment
Workpiece feeding spray room on bearing platform is subjected to spray painting processing, and the workpiece after spray painting is handled is returned to bearing platform;
The discharge end of bearing platform is connected with levelling passage, and workpiece enters levelling passage through bearing platform and carries out levelling processing, and levelling leads to
The discharge end in road is connected with infrared surface drying passage, and workpiece enters infrared surface drying passage through levelling passage and carries out infrared ray dry tack free
Processing, the discharge end of infrared surface drying passage is connected with temporary component and backflow cooling duct respectively, and the workpiece that spraying is completed enters
Enter temporary component to be kept in, the workpiece for continuing to spray is cooled down into backflow cooling duct, the discharging for cooling duct of flowing back
End is connected with bearing platform, and workpiece is delivered into bearing platform by cooling duct of flowing back carries out spraying preparation next time.
2. Workpiece coating production line according to claim 1, it is characterised in that pre-treatment component includes washing equipment, by
Washing equipment carries out cleaning treatment to workpiece, and the discharging opening of washing equipment is connected with blowing wetting system, after blowing wetting system to cleaning
Workpiece carry out surface residual water blowing processing, the discharging opening for blowing wetting system connects with blast heater, residual water is blown by blast heater
Except the workpiece after processing carries out hot blast drying processing, discharging opening and the water of blast heater are cut stove and connected, and cut stove by water and hot blast is dried
Processing is further dried in workpiece after dry processing, and the discharging opening that water cuts stove is connected with cooling duct, makes workpiece logical in cooling
Cooled down in road, the discharging opening of cooling duct is connected with dedusting and static removal equipment, to after cooling workpiece carry out dedusting and
Destatic processing.
3. Workpiece coating production line according to claim 1, it is characterised in that temporary component includes jacking equipment and material stock
Passage, jacking equipment one end is connected with the discharging opening of spray assembly, and its other end is connected with material stock passage, the discharging of material stock passage
Mouthful with expect platform connect, material stock passage is made up of some Transfer pipes, is parallel to each other between each Transfer pipe, adjacent Transfer pipe it
Between it is end to end, workpiece is moved on Transfer pipe.
4. Workpiece coating production line according to claim 1, it is characterised in that transfer equipment is manipulator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621252350.8U CN206444796U (en) | 2016-11-16 | 2016-11-16 | A kind of Workpiece coating production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621252350.8U CN206444796U (en) | 2016-11-16 | 2016-11-16 | A kind of Workpiece coating production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206444796U true CN206444796U (en) | 2017-08-29 |
Family
ID=59662180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621252350.8U Expired - Fee Related CN206444796U (en) | 2016-11-16 | 2016-11-16 | A kind of Workpiece coating production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206444796U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108273701A (en) * | 2017-12-08 | 2018-07-13 | 沈阳天通电气有限公司 | The automatic assembly line Processes and apparatus of radiator appearance finishing coat processing |
-
2016
- 2016-11-16 CN CN201621252350.8U patent/CN206444796U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108273701A (en) * | 2017-12-08 | 2018-07-13 | 沈阳天通电气有限公司 | The automatic assembly line Processes and apparatus of radiator appearance finishing coat processing |
CN108273701B (en) * | 2017-12-08 | 2020-09-04 | 沈阳天通电气有限公司 | Process of automatic production line equipment for processing paint on outer surface of radiator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109550670A (en) | A kind of one baking coating process of the painting of cold aqueous three | |
CN102416373B (en) | High gloss coating process of surface of plastic substrate | |
CN108212718A (en) | A kind of enamelling process of environmentally protective injection molding panel | |
CN206444796U (en) | A kind of Workpiece coating production line | |
CN206716302U (en) | A kind of mobile paint spraying apparatus of wind power tower drum | |
CN108855664A (en) | Coating sprays drying unit | |
CN113798150A (en) | Method for spraying finish paint on surface of rail locomotive without shielding chromatography | |
CN114100991B (en) | Spraying method for large-scale multi-frame-groove workpiece | |
CN107051796A (en) | Workpiece coating production line | |
CN203610254U (en) | Automatic cleaning device of powder spraying gun | |
CN206315955U (en) | A kind of efficient weatherability encaustic tile coloring spray equipment | |
CN110180726B (en) | Novel double-track spraying production line | |
CN205165048U (en) | Automatic spraying line | |
CN208220131U (en) | A kind of uniform coater for wall surface of spraying | |
CN205761998U (en) | A kind of paint spray booth | |
US20040071886A1 (en) | Adhesion promoter application system and process | |
CN208771712U (en) | Servo rotation flush coater | |
CN206763246U (en) | A kind of automatic application product line of chain saw guide plate | |
CN207615071U (en) | A kind of energy conservation and environmental protection plastic toy spray equipment | |
CN108339679A (en) | A kind of painting spraying device | |
JP2017077505A (en) | Powder coating method | |
CN207204451U (en) | A kind of wheelchair frame spraying equipment | |
CN2892293Y (en) | Band tape sprayer | |
CN108940772A (en) | A kind of aluminum alloy bodywork is without coating process | |
CN221132753U (en) | Quick air-drying paint brushing device for metal plate production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170829 Termination date: 20211116 |
|