CN206440589U - A kind of country rock initial infiltration coefficient test structure - Google Patents

A kind of country rock initial infiltration coefficient test structure Download PDF

Info

Publication number
CN206440589U
CN206440589U CN201720010139.3U CN201720010139U CN206440589U CN 206440589 U CN206440589 U CN 206440589U CN 201720010139 U CN201720010139 U CN 201720010139U CN 206440589 U CN206440589 U CN 206440589U
Authority
CN
China
Prior art keywords
test
hole
country rock
infiltration coefficient
pressure water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720010139.3U
Other languages
Chinese (zh)
Inventor
刘宁
倪绍虎
房敦敏
潘文祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201720010139.3U priority Critical patent/CN206440589U/en
Application granted granted Critical
Publication of CN206440589U publication Critical patent/CN206440589U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model provides a kind of country rock initial infiltration coefficient test structure, including testing hole and being arranged in pressure water hole and the monitoring holes of test hole both sides, test hole bottom sets test section, the hole footpath in not less than one times test hole of the overhead height of the test section, pressure water hole top connects high-pressure hydraulic pump, arrangement current test sensor in the monitoring holes, the current test sensor is connected with data acquisition device.The utility model has effectively evaded the influence that damage zone is tested country rock infiltration coefficient, more accurately reflect the real physical mechanics state of country rock, and with original water pressure test equipment substantially always, operating process is simple, is easy to building site popularization and application for used equipment.

Description

A kind of country rock initial infiltration coefficient test structure
Technical field
The utility model is related to underground engineering field, more particularly to country rock initial infiltration coefficient measuring technology.
Background technology
Accurate geologic parameter is most important for the construction of underground engineering, especially for water power, nuclear waste srorage etc. Whether the engineering being had a major impact to environment, geologic parameter is accurately directly connected to public safety.The physical mechanics of original country rock Characteristic is mainly influenceed by self structure, fracture state and external environment.But it is due to that underground engineering is generally in crustal stress Under effect, after engineering excavation, stress is disturbed, and carries out secondary adjustment, stress concentration is produced near the underground engineering of excavation Area and stress relaxation area.Country rock is influenceed by Stress relief, and damage will be produced inside country rock, and the presence of damage will be directly affected The physico mechanical characteristic of country rock, and in damage zone country rock carry out test can not the original country rock of true representations physical force Learn characteristic.
The infiltration coefficient of country rock is to represent a strong and weak quantitative target of country rock permeability, the correct measure of its numerical value for Evaluate rock integrity it is significant, influence osmotic coefficient investigating factor it is numerous, for example rock mass structure, Fracture Networks, Hydraulic pressure etc., the exact theoretical formula that set up infiltration coefficient is relatively difficult, generally adopts experimentally, including experimental determination Method, on-the-spot test method and method for numerical simulation, wherein on-the-spot test method yardstick are bigger, can more reflect live country rock Practical structures feature, tests the infiltration coefficient obtained also more representative.
Although infiltration coefficient test is commonly used in engineering site, with the continuous increasing of underground engineering buried depth Plus, country rock inevitably will suffer from damage during Stress relief, is formed to excavate in the country rock on underground engineering periphery and damaged There is marked difference in the country rock infiltration coefficient hindered in area, damage zone, what is carried out in damage zone oozes with country rock initial infiltration coefficient Saturating coefficient test can not represent the true permeance property of country rock.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of country rock initial infiltration coefficient test structure, the test Structure can directly test the permeability of country rock in non-damage zone, evade damage zone and exist on the infiltrative influence of country rock.
The utility model solves the technical scheme that is used of above-mentioned technical problem:A kind of country rock initial infiltration coefficient test Structure, including test hole and the pressure water hole and the monitoring holes that are arranged in test hole both sides, test hole bottom set test section, The hole footpath in not less than one times test hole of the overhead height of the test section, pressure water hole top connection high-pressure hydraulic pump, the prison Arrangement current test sensor in gaging hole, the current test sensor is connected with data acquisition device.
While using above-mentioned technical proposal, the utility model can also be used or combined using further below Technical scheme:
The pressure water hole and monitoring holes at the top of the test section more than region arrange seal sleeve.
The depth of the test section is 0.5-1m.
The depth of the pressure water hole and monitoring holes tests Dong Dong footpaths more than 1 times, and the bore diameter for pressing water hole and monitoring holes is 150~180mm。
A diameter of 100 ~ 130mm of seal sleeve, more than 1 times test Dong Dong footpath of seal sleeve length, and reserved 0.5 ~ 1m Drilling depth is used as test zone.
The buried depth of current test sensor is located at the middle part of test section.
The beneficial effects of the utility model are:The utility model provides a kind of test knot of country rock initial infiltration coefficient Structure, has effectively evaded the influence that damage zone is tested country rock infiltration coefficient, more accurately reflects the real physical mechanics of country rock State, and used equipment and original water pressure test equipment are substantially always, and operating process is simple, and being easy to building site to promote should With.
Brief description of the drawings
Fig. 1 is overall structure figure of the present utility model.
Embodiment
Referring to the drawings.
Test structure of the present utility model includes two drillings excavated downwards along the bottom plate in test hole 7, and one is pressure water Hole 1 is used for packer permeability test, and one is that monitoring holes 2 are gathered for Monitoring Data.In two drill, it is both needed to from test hole bottom plate 3 4 arrange seal sleeve 5 at the top of to test section, it is to avoid current enter in non-test region, influence final test result.In monitoring Current test sensor 6 is arranged in hole 2, and is connected with data collecting instrument 8, packer permeability test is carried out in instrument connection 7, i.e. pressure water The top connection high-pressure hydraulic pump 9 in hole 1, is arranged between flowmeter 10 and stressometer 11, is noted by high-pressure hydraulic pump into pressure water hole 1 Water, so as to carry out packer permeability test to test section 12, the top of test section 12 is that rock excavates damage around hole to testing between the bottom plate of hole 7 Area.
Specific embodiment is as follows:
(1)Designated depth is got into pressure water hole and monitoring holes, this depth will more than 1 times test Dong Dong footpath, 1.5 ~ 2.0 times of holes Footpath is advisable, and the bore diameter of pressure water hole and monitoring holes is 150 ~ 180mm, to facilitate install sensor and sleeve.
(2)Seal sleeve is arranged in the borehole, and sleeve diameter is 100 ~ 130mm, and length sleeve will the hole hole of the test more than 1 times Footpath, it is to avoid sustain damage influence of the area to hydraulic pressure test, and reserves 0.5 ~ 1m drilling depths as test zone.
(3)Current test sensor is embedded in instrument connection, buried depth is located at the middle part of test zone, and and data Acquisition Instrument is connected.
(4)Carry out packer permeability test in instrument connection, the control of pressure water pressure in 0.1 ~ 0.5MPa, using connection flowmeter and Stressometer obtains the initial flow and pressure of current.
(5)Sensor test current are tested using current and pass through flow and pressure behind test section, in being drilled according to two The contrast of water flow pressure and flow, just can calculate the infiltration coefficient for obtaining test zone.Because test zone herein is avoided The Excavation damage zone in hole week, therefore the infiltration coefficient now measured, are just the initial infiltration coefficient of country rock.

Claims (6)

1. a kind of country rock initial infiltration coefficient test structure, it is characterised in that:Including testing hole and being arranged in test hole both sides Pressure water hole and monitoring holes, test hole bottom sets test section, not less than the one times test of the overhead height of the test section Arrangement current test sensor in the hole footpath in hole, pressure water hole top connection water pump, the monitoring holes, the current test is passed Sensor is connected with data acquisition device.
2. a kind of country rock initial infiltration coefficient test structure according to claim 1, it is characterised in that:The pressure water hole and Monitoring holes at the top of the test section more than region arrange seal sleeve.
3. a kind of country rock initial infiltration coefficient test structure according to claim 1, it is characterised in that:The test section Depth is 0.5-1m.
4. a kind of country rock initial infiltration coefficient test structure according to claim 1, it is characterised in that:The pressure water hole and The bore diameter of more than 1 times test Dong Dong footpath of the depth of monitoring holes, pressure water hole and monitoring holes is 150 ~ 180mm.
5. a kind of country rock initial infiltration coefficient test structure according to claim 2, it is characterised in that:Seal sleeve it is straight Footpath is 100 ~ 130mm, and seal sleeve length tests Dong Dong footpaths more than 1 times, and reserved 0.5 ~ 1m drilling depths are used as test zone.
6. a kind of country rock initial infiltration coefficient test structure according to claim 1, it is characterised in that:Current test sensing The buried depth of device is located at the middle part of test section.
CN201720010139.3U 2017-01-05 2017-01-05 A kind of country rock initial infiltration coefficient test structure Active CN206440589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720010139.3U CN206440589U (en) 2017-01-05 2017-01-05 A kind of country rock initial infiltration coefficient test structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720010139.3U CN206440589U (en) 2017-01-05 2017-01-05 A kind of country rock initial infiltration coefficient test structure

Publications (1)

Publication Number Publication Date
CN206440589U true CN206440589U (en) 2017-08-25

Family

ID=59643597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720010139.3U Active CN206440589U (en) 2017-01-05 2017-01-05 A kind of country rock initial infiltration coefficient test structure

Country Status (1)

Country Link
CN (1) CN206440589U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109470621A (en) * 2018-12-13 2019-03-15 重庆科技学院 A kind of measuring device for formation permeability
CN109975169A (en) * 2017-12-28 2019-07-05 核工业北京地质研究院 A kind of country rock gas permeability coefficient test method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975169A (en) * 2017-12-28 2019-07-05 核工业北京地质研究院 A kind of country rock gas permeability coefficient test method
CN109470621A (en) * 2018-12-13 2019-03-15 重庆科技学院 A kind of measuring device for formation permeability
CN109470621B (en) * 2018-12-13 2021-01-26 重庆科技学院 Measuring device for rock stratum permeability

Similar Documents

Publication Publication Date Title
CN110486007B (en) In-situ testing device and method for mechanical parameters of coal mine surrounding rock while drilling
CN102539652B (en) Method for monitoring response systematicness of excavation of adjacent rock of deep buried tunnel
CN106192971B (en) A kind of artesian water water-level observation well construction and the method for multilayer water-level observation
CN104500034A (en) Device and method for evaluating influence of pressure change on completeness of cement sheath
CN103471647B (en) A kind of shield tunnel remote automation monitoring method
CN104532886B (en) A kind of bored concrete pile pile bottom sediment and pile end groundwork checkout gear and method
CN204401664U (en) A kind of castinplace pile pile bottom sediment and pile end groundwork checkout gear
CN105019485B (en) A kind of excavation of foundation pit dead load test on pile foundation detection method
CN109238161A (en) A kind of observation device and observation method of tunnel surface absolute convergence amount
CN102819046B (en) Two D type coil nuclear magnetic resonance analyser is with roadway front gushing water detection method
CN107643138A (en) Miniature steel-pipe pile body stress test device
CN104929146A (en) Multilayer karst development zone pile foundation engineering construction method
CN206440589U (en) A kind of country rock initial infiltration coefficient test structure
CN103195425B (en) A kind of coal mine roadway Surrounding Rock Strength situ Rapid Determination method
CN209821195U (en) Visual shield tunnel construction slip casting effect detection test device
CN117552483B (en) Test method for foundation reinforcement influence range of dynamic compaction treatment
AU2021101678A4 (en) Method for testing soft rock ground stress in exploration engineering
CN104897321B (en) Wall shearing stress method of testing in a kind of pre-formed members concrete tubular pile pile body
CN207215329U (en) Miniature steel-pipe pile body stress test device
CN104088666A (en) In-situ test method and structure for deeply-buried soft-rock tunnel
CN204988572U (en) Skin friction testing arrangement in prefabricated opening concrete pipe pile pile body
CN204556387U (en) Complex condition Rock And Soil adit digging and surrouding rock stress, strain monitoring model test apparatus
CN204613033U (en) Original position rock mechanics system
CN108343431B (en) Method for exploring flow network of bedrock fracture underground water system
CN206959797U (en) Country rock test system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant