CN206428970U - A kind of constructional column top tool formula steel form - Google Patents

A kind of constructional column top tool formula steel form Download PDF

Info

Publication number
CN206428970U
CN206428970U CN201621071974.XU CN201621071974U CN206428970U CN 206428970 U CN206428970 U CN 206428970U CN 201621071974 U CN201621071974 U CN 201621071974U CN 206428970 U CN206428970 U CN 206428970U
Authority
CN
China
Prior art keywords
angle
side plate
welded
constructional column
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621071974.XU
Other languages
Chinese (zh)
Inventor
游宇
肖朝霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Tianjin Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201621071974.XU priority Critical patent/CN206428970U/en
Application granted granted Critical
Publication of CN206428970U publication Critical patent/CN206428970U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to a kind of constructional column top tool formula steel form, include the side plate of two isosceles triangles, rotary shaft is welded at the drift angle in side plate interior sides face, rotary shaft is connected with front face template, plate-side plate welding limited post one, and the side plate is provided with neck, neck is detachably connected limit steel bar;The lateral surface of side plate is welded with angle steel, angle steel includes orthogonal two right-angle surfaces, one right-angle surface of angle steel is welded on lateral surface, and limited post two is welded with the middle part of the right-angle surface, the face of cylinder of limited post two and the right waist of the side plate are tangent, and pulling eye is provided with the middle part of another right-angle surface of angle steel;Front face template is welded with L-shaped handle.Make simple, it is easy for installation, while constructional column top concrete Forming Quality and efficiency of construction can be improved;The difficulty that model sheetinstallat is reinforced is reduced, at the same problem of putting and ending to waste, and the expense that building waste is cleared is reduced, reach cost efficiency green construction purpose.

Description

A kind of constructional column top tool formula steel form
Technical field
The utility model is related to technical field of building construction, it particularly relates to a kind of constructional column top tool formula punching block Plate.
Background technology
In current architectural engineering, secondary structure is important working procedure in construction unit, the construction matter of constructional column Amount directly affects the shock resistance of masonry project, and capital part is even more stress key position.Capital concrete pouring quality was once Annoying, the construction technical staff for a line of constructing.It is substantially in project management department's constructional column top concrete of some sloppy managements Plug mouth is carried out compared with dry pea gravel concreten with some, concrete leakiness is caused, Forming Quality is poor.Shape between capital and beam bottom It is very big to the capacity of providing fortification against earthquakes of constructional column into crack.Management preferably some projects are required to subpackage unit in construction Wooden template is installed as charging aperture (being commonly called as horn mouth) in column top, and vibrating spear is stretched into constructional column by charging aperture shaken Smash, by form removable after concrete initial set, and the concrete bracket that charging aperture is formed is rejected.Although this construction technology Concrete quality can be ensured, but wooden model sheetinstallat reinforces difficult, while causing wooden template and flitch, bracket coagulation Soil, pick chisel electricity consumption, the waste in terms of the duration.The expense that building waste is cleared can also be produced.
Therefore, a kind of template for improving constructional column top concrete Forming Quality is developed, is become as professional urgently The problem of need to solving.
Utility model content
The utility model proposes a kind of constructional column top tool formula steel form, above-mentioned aspect in existing product is overcome It is not enough.
The purpose of this utility model is achieved through the following technical solutions:
A kind of constructional column top tool formula steel form, includes the side plate of two isosceles triangles, the side plate interior sides face Rotary shaft is welded at drift angle, the rotary shaft is connected with front face template corresponding with the waist of the side plate, the side plate Weld the face of cylinder and the tangent limited post one of the left waist, and the base of the side plate and right waist phase in the position at the nearly left base angle of left Lumbar The position of friendship is provided with neck, and the neck is detachably connected with limit steel bar corresponding with the front face template;The side The lateral surface of plate is welded with angle steel close to the position of right waist, and the angle steel includes orthogonal two right-angle surfaces, the angle One right-angle surface of steel is welded on the lateral surface of the side plate, and limited post two is welded with the middle part of the right-angle surface, described spacing The face of cylinder of post two and the right waist of the side plate are tangent, and pulling eye is provided with the middle part of another right-angle surface of the angle steel;It is described just Face die plate is welded with L-shaped handle in the middle part of the side of limited post one.
Further, the front face template is welded with sleeve pipe close to the side of the rotary shaft, and described sleeve pipe is socketed in the rotation In rotating shaft.
Further, the L-shaped handle is L-shaped reinforcing bar.
Further, the drift angle of the side plate is 45 degree.
The beneficial effects of the utility model are:Front face template, angle steel leftover pieces and the waste and old steel used using job site Muscle processing and fabricating, makes simple, easy for installation, while constructional column top concrete Forming Quality and efficiency of construction can be improved;Drop The difficulty that low model sheetinstallat is reinforced, while preventing to cause template and flitch, bracket concrete due to Constructional Col-umn Construction, picking chisel and use Waste problem in terms of electricity, duration, and the expense that building waste is cleared is reduced, reach cost efficiency green construction purpose.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art In required for the accompanying drawing that uses be briefly described, it should be apparent that, drawings in the following description are only of the present utility model Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other accompanying drawings.
Fig. 1 is the front view of the constructional column top tool formula steel form described in the utility model embodiment;
Fig. 2 is the right view of the constructional column top tool formula steel form according to Fig. 1;
Fig. 3 is the top view of the constructional column top tool formula steel form according to Fig. 1;
Fig. 4 is the construction pre-structure figure of the constructional column top tool formula steel form described in the utility model embodiment;
Fig. 5 is that the construction of the constructional column top tool formula steel form according to Fig. 4 completes structure chart;
Fig. 6 is enlarged drawing at the A of the constructional column top tool formula steel form according to Fig. 5.
In figure:
1st, side plate;2nd, rotary shaft;3rd, front face template;4th, limited post one;5th, neck;6th, limit steel bar;7th, angle steel;8th, L-shaped Handle;9th, limited post two;10th, L-shaped screw rod.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, the every other embodiment that those of ordinary skill in the art are obtained all belongs to The scope protected in the utility model.
As Figure 1-3, a kind of constructional column top tool formula steel form according to the utility model embodiment, including Rotary shaft 2 is welded at the side plate 1 of two isosceles triangles, the drift angle of the medial surface of side plate 1, the activity of rotary shaft 2 is even Front face template 3 corresponding with the waist of the side plate 1 is connected to, the face of cylinder is welded in the position at the nearly left base angle of left Lumbar of the side plate 1 The limited post one 4 tangent with the left waist, and the base of the side plate 1 is provided with neck 5, the neck with the position that right waist intersects 5 are detachably connected with limit steel bar 6 corresponding with the front face template 3;The lateral surface of the side plate 1 is equal close to the position of right waist Angle steel 7 is welded with, the angle steel 7 includes orthogonal two right-angle surfaces, and a right-angle surface of the angle steel 7 is welded on the side Limited post 29, the face of cylinder of the limited post 29 and the side plate 1 are welded with the lateral surface of plate 1, and in the middle part of the right-angle surface Right waist it is tangent, be provided with pulling eye in the middle part of another right-angle surface of the angle steel 7;The front face template 3 is close to limited post 1 Side in the middle part of be welded with L-shaped handle 8.
In a specific embodiment of the present utility model, the front face template 3 is welded with close to the side of the rotary shaft 2 Sleeve pipe, described sleeve pipe is socketed in the rotary shaft 2.
In a specific embodiment of the present utility model, the L-shaped handle 8 is L-shaped reinforcing bar.
In a specific embodiment of the present utility model, the drift angle of the side plate 1 is 45 degree.
Above-mentioned technical proposal of the present utility model is understood for convenience, below by way of new to this practicality in specifically used mode The above-mentioned technical proposal of type is described in detail.
It is long that two pieces of waists are cut into using the offcut of steel plate of job site (processing discharging platform, elevator platform etc.) Steel plate is as side plate 1 for 200mm isosceles triangle (drift angle is 45 °), and one block of wide steel plate of the high 300mm of 200mm is used as positive face mould Plate 3 (this steel plate width can make the appropriate adjustments according to live constructional column cross-sectional width).One is welded at the drift angle of two blocks of side plates 1Long 300mm reinforcing bars will cover the long 280mm sleeve pipes of DN14 before welding as rotary shaft 2 on reinforcing bar.In the left waist of side plate 1 The position welding long reinforcing bars of 300mm (limited post 1) close to left base angle are used as the spacing of front face template 3.Front face template 3 is welded On sleeve pipe.WithReinforcement fabrication L-shaped handle 8, long side 500mm, short side 150mm, and the short side of L-shaped handle 8 are welded on In the middle of the left surface (close to the side of limited post 1) of front face template 3.200mm length is welded at the right waist of lateral surface of side plate 1 3mm*30mm*30mm angle steel reinforced, the centre position welding for the right-angle surface being in contact with lateral surfaceLong 300mm reinforcing bars, It is used as the drawknot node of L-shaped handle 8.A wide 15mm is cut at the right base angle of side plate 1, deep 25mm gap is used as neck 5, card Groove 5 can fix the left surface of front face template 3 after concreting is complete with limit steel bar 6.Opened up on angle steelPair Pulling eye.In addition, rotary shaft 2 can also be flexibly connected front face template 3 by usual manners such as bearing, through hole, hinges.
UseWaste and old screw rod cephalic par weldingLong 50mm reinforcing bars make L-shaped screw rod 10, L-shaped spiral shell as short side Bar 10 is used to fix angle steel 7 in work progress.L-shaped screw rod 10 is unfettered in the horizontal direction can to avoid constructional column reinforcing bar, suitable Profit passes through constructional column.
When specifically used, as Figure 4-Figure 6, the steel form made (constructional column top tool formula steel form) is brushed de- Mould agent, is furnished with highly less than the 200mm of plank sheathing one in the side full configuration plank sheathing one of constructional column, and in the opposite side of constructional column Plank sheathing two.Steel form is directly placed above plank sheathing two, the long side of L-shaped screw rod 10 is passed through to the pulling eye of angle steel 7, directly Angle steel 7 is adjacent to by the short side of L-shaped screw rod 10, is then covered on the long side of L-shaped screw rod 10PVC sleeve pipes, steel plate washer, logical Silk nut draws fixation a pair with plank sheathing, the both sides angle steel 7 of steel form is tightly clipped on masonry.Poured above steel form mixed Solidifying soil, and by vibrating spear go deep into constructional column by concrete vibrating it is closely knit after, L-shaped handle 8 is carried upwards, until front face template 3 is propped up Limited post 29, unnecessary a small amount of concrete is recycled after the gap outflow between front face template 3 and side plate 1.Pass through meter Calculate, by concrete added to the volume after concordant with the level height of left drift angle be 0.0042m3, and from Zuo Ding at the top of constructional column Amount of concrete needed for the level height at angle to the top of plank sheathing one is 0.0028m3Compare 0.0042m3It is smaller, do not result in construction The problem of column top produces space because of few concrete.Front face template 3 is 45 ° with metope angle before concreting, is supported Firmly limited post 29 now will so as to be 0 ° by the angle after the compacted reality of concreteLimit steel bar 6 put in neck 5, and with The left surface of front face template 3 is in close contact, and front face template 3 is limited reinforcing bar 6 and the fixation of limited post 29, finally treats coagulation Steel form, plank sheathing one and plank sheathing two are removed into maintenance after native initial set.
In summary, by above-mentioned technical proposal of the present utility model, the front face template used using job site, angle steel Leftover pieces and waste steel bar processing and fabricating, make simple, easy for installation, while constructional column top concrete Forming Quality can be improved With efficiency of construction;The difficulty that model sheetinstallat is reinforced is reduced, while preventing because Constructional Col-umn Construction causes template to be mixed with flitch, bracket Coagulate soil, pick chisel electricity consumption, the waste problem in terms of the duration, and reduce the expense that building waste is cleared, reach cost efficiency green Construction purpose.
The utility model is not limited to above-mentioned preferred forms, and anyone can draw under enlightenment of the present utility model Other various forms of products, however, make any change in its shape or structure, it is every that there is same as the present application or phase Approximate technical scheme, all falls within protection domain of the present utility model.

Claims (4)

1. a kind of constructional column top tool formula steel form, it is characterised in that including two isosceles triangle side plates(1), the side Plate(1)Rotary shaft is welded at the drift angle of medial surface(2), the rotary shaft(2)It is connected with and the side plate(1)Waist correspondence Front face template(3), the side plate(1)The nearly left equal welded limiting post one in base angle position of left Lumbar(4), the limited post one (4)The face of cylinder and the left waist it is tangent, and the side plate(1)Base be provided with neck with the position that right waist intersects(5), it is described Neck(5)It is detachably connected with and the front face template(3)Corresponding limit steel bar(6);The side plate(1)Lateral surface it is close The position of right waist is welded with angle steel(7), the angle steel(7)Including orthogonal two right-angle surfaces, the angle steel(7)One Individual right-angle surface is welded on the side plate(1)Lateral surface on, and limited post two is welded with the middle part of the right-angle surface(9), it is described spacing Post two(9)The face of cylinder and the side plate(1)Right waist it is tangent, the angle steel(7)Another right-angle surface in the middle part of be provided with to draw Hole;The front face template(3)Close to limited post one(4)Side in the middle part of be welded with L-shaped handle(8).
2. a kind of constructional column top tool formula steel form according to claim 1, it is characterised in that the front face template (3)Close to the rotary shaft(2)Side be welded with sleeve pipe, described sleeve pipe is socketed in the rotary shaft(2)On.
3. a kind of constructional column top tool formula steel form according to claim 2, it is characterised in that the L-shaped handle(8) For L-shaped reinforcing bar.
4. a kind of constructional column top tool formula steel form according to claim 3, it is characterised in that the side plate(1)'s Drift angle is 45 degree.
CN201621071974.XU 2016-09-22 2016-09-22 A kind of constructional column top tool formula steel form Active CN206428970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621071974.XU CN206428970U (en) 2016-09-22 2016-09-22 A kind of constructional column top tool formula steel form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621071974.XU CN206428970U (en) 2016-09-22 2016-09-22 A kind of constructional column top tool formula steel form

Publications (1)

Publication Number Publication Date
CN206428970U true CN206428970U (en) 2017-08-22

Family

ID=59588161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621071974.XU Active CN206428970U (en) 2016-09-22 2016-09-22 A kind of constructional column top tool formula steel form

Country Status (1)

Country Link
CN (1) CN206428970U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301618A (en) * 2018-02-01 2018-07-20 中国建筑第二工程局有限公司 A kind of steel and wood composite construction column template and its construction method
CN108612260A (en) * 2018-07-05 2018-10-02 江苏省苏中建设集团股份有限公司 A kind of constructional column top concrete pours once-molding construction process and its device
CN110145121A (en) * 2019-05-30 2019-08-20 中冶建工集团有限公司 The construction method of constructional column concreting
CN110158959A (en) * 2019-05-30 2019-08-23 中冶建工集团有限公司 Switchable formula pours mouth structure
CN110230394A (en) * 2019-06-24 2019-09-13 中冶建工集团有限公司 The construction method of constructional column
CN111058632A (en) * 2019-11-28 2020-04-24 中冶天工集团天津有限公司 Constructional column formwork supporting dustpan opening device and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301618A (en) * 2018-02-01 2018-07-20 中国建筑第二工程局有限公司 A kind of steel and wood composite construction column template and its construction method
CN108612260A (en) * 2018-07-05 2018-10-02 江苏省苏中建设集团股份有限公司 A kind of constructional column top concrete pours once-molding construction process and its device
CN110145121A (en) * 2019-05-30 2019-08-20 中冶建工集团有限公司 The construction method of constructional column concreting
CN110158959A (en) * 2019-05-30 2019-08-23 中冶建工集团有限公司 Switchable formula pours mouth structure
CN110230394A (en) * 2019-06-24 2019-09-13 中冶建工集团有限公司 The construction method of constructional column
CN111058632A (en) * 2019-11-28 2020-04-24 中冶天工集团天津有限公司 Constructional column formwork supporting dustpan opening device and construction method thereof

Similar Documents

Publication Publication Date Title
CN206428970U (en) A kind of constructional column top tool formula steel form
CN103696359B (en) A kind of prefabricated and cast-in-place bridge pier body structure of combining and construction method
CN106088530A (en) Large area method for constructing terrace
CN105780976B (en) Compound concrete shear wall structure and its concreting method
CN108019054A (en) A kind of wall hole to be provided antiseep plugging device
CN104594633B (en) The construction method and its formwork structure of umbrella shape space curved surface clear-water concrete
CN206844138U (en) A kind of bar construction of domatic isolated footing
CN206957222U (en) A kind of material transfer mouth mold tool
CN103590599A (en) Self-compaction mode locking device and using method
CN203924669U (en) A kind of precast concrete scaffold base and making mould thereof
CN205776797U (en) The preburied component of secondary structure tension rib
CN209163138U (en) A kind of reservation device of the floor reserved steel bar for climbing formwork for construction
CN207685853U (en) Anti-floating is exempted to tear type concrete equipment basis hole to be provided template open
CN207582946U (en) Plate typified form drops in a kind of assembled toilet structure
CN207484941U (en) A kind of closed cover of the outer builder's jack of architectural engineering
CN206329035U (en) Can discharging dustpan mouth template system at the top of a kind of constructional column
CN206001126U (en) A kind of floor sealing hole sizing gasifying device
CN104631675B (en) A kind of two-sided prefabricated superimposed sheet
CN104912209B (en) Bars In Poured Concrete Slab reserved holes of pipes plugging device and processing and plugging construction method
CN208215615U (en) For making the plate device of catch-basin concrete lintel
CN207999092U (en) A kind of wall hole to be provided antiseep plugging device
CN206636237U (en) Piping lane concrete cover smooth beam manually
CN207177095U (en) Building precast template and building
CN207392752U (en) For preventing the constructing device of grout leakage of formwork root
CN206941628U (en) A kind of construction site enclosing prefabricated foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200429

Address after: 100043 No. 20, Shijingshan Road, Beijing, Shijingshan District

Co-patentee after: China Railway Construction Group Tianjin Engineering Co., Ltd

Patentee after: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd.

Address before: 100131 No. 20, Shijingshan Road, Beijing, Shijingshan District

Patentee before: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd.

TR01 Transfer of patent right