CN206419031U - A kind of tunnel double-lining chassis steel and wood composite end head formwork - Google Patents

A kind of tunnel double-lining chassis steel and wood composite end head formwork Download PDF

Info

Publication number
CN206419031U
CN206419031U CN201621405427.0U CN201621405427U CN206419031U CN 206419031 U CN206419031 U CN 206419031U CN 201621405427 U CN201621405427 U CN 201621405427U CN 206419031 U CN206419031 U CN 206419031U
Authority
CN
China
Prior art keywords
lining chassis
stock
steel
model
end head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621405427.0U
Other languages
Chinese (zh)
Inventor
耿国强
翟德平
王晓华
赵朋涛
冀卫青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Priority to CN201621405427.0U priority Critical patent/CN206419031U/en
Application granted granted Critical
Publication of CN206419031U publication Critical patent/CN206419031U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of tunnel double-lining chassis steel and wood composite end head formwork, internal model and external mold including burying waterstop both sides in being separately positioned on, the wooden model being arranged between external mold and back of the body patch waterstop and the fixed mechanism being arranged on two lining chassis flanged plates, between the internal model and external mold, connected between internal model and two lining chassis flanged plates by articulated elements, the fixed mechanism includes the support being arranged on two lining chassis flanged plates, sleeve pipe on the bracket is installed, the stock being sleeved in sleeve pipe and the timber wedge for fixing stock, the stock is extended on preliminary bracing face.The utility model is simple in construction, reasonable in design, it is ensured that in bury waterstop and install straight and do not shifted in construction Concrete, it is ensured that concrete is symmetrical placed in the middle in whole casting process, and reduces the faces end head plugging time, and reinforces firm, and labor intensity is small.

Description

A kind of tunnel double-lining chassis steel and wood composite end head formwork
Technical field
The utility model belongs to technical field of tunnel construction, is related to a kind of tunnel double-lining chassis steel and wood composite termination mould Plate.
Background technology
Secondary lining is as the safety stock of composite lining of tunnel structure, and its self waterproofing effect is the weight of tunnel water handling Want part.But the symmetrical problem placed in the middle of waterstop is buried in can not being met using traditional wooden model in two lining work progress, may be led The failure of waterstop waterproof effect is buried in cause, so as to trigger the insoluble problems such as two lining percolating waters.Novel steel wood combined termination point Template overcomes disadvantage mentioned above, can be good at solving the problem not placed in the middle of the ring waterstop in two lining work progress, simultaneously There is easy installation and removal, reinforce rapid, accelerate two linings while effectively circular construction joint water-stagnating effect is ensured and apply Work progress.Tradition two is served as a contrast termination and processed using pure wooden model form, there is following items shortcoming:1st, construction speed is slow, in reality In work progress, preliminary bracing profiled may be less smoother, and end head formwork width differs when causing the termination to construct, so as to cause end Pollard number of modules is more, and cutting wooden model workload is big, constructs more slow;2nd, labor intensity is big, and wooden model at least needs 6 when blocking People could complete for 6 hours, and every piece of wooden model firmly must just can guarantee that and not run the quick-fried mould of mould in reinforcing process, reinforce particularly It is cumbersome;3rd, closed matereial cycle rate is low, and wooden model is cut when blocking according to section configuration, and next time constructs utilization rate quite after form removal It is low, cause wood consumption greatly, add construction cost, 4, in bury waterstop can not be symmetrically placed in the middle, because wood-mode technology can not Waterstop is carried out effectively to fix, impact of the concrete to waterstop may cause it to be shifted in work progress, and then lead Waterproof effect failure is caused to trigger two to serve as a contrast percolating water.Accordingly, it is desirable to provide a kind of tunnel double-lining chassis steel and wood composite end head formwork.
Utility model content
The purpose of this utility model is to overcome that above-mentioned of the prior art not enough there is provided a kind of tunnel double-lining chassis steel Wooden combined termination point template, its is simple in construction, reasonable in design, simple in construction, reasonable in design, it is ensured that in bury waterstop install it is straight and Do not shifted in construction Concrete, it is ensured that concrete is symmetrical placed in the middle in whole casting process, and reduces faces end head plugging Time, and reinforce firm, labor intensity is small.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of tunnel double-lining chassis steel wood Combined termination point template, it is characterised in that:Including burying internal model inside and outside waterstop in being radially laid in along tunnel cross-section and outer Mould, the wooden model being arranged between external mold and back of the body patch waterstop and the fixed mechanism being arranged on two lining chassis flanged plates, it is described Between internal model and external mold, internal model and two lining chassis flanged plates between connected by articulated elements, the fixed mechanism include install Support on two lining chassis flanged plates, sleeve pipe on the bracket, the stock being sleeved in sleeve pipe are installed and for fixing The timber wedge of stock, the stock is extended on preliminary bracing face.
A kind of above-mentioned tunnel double-lining chassis steel and wood composite end head formwork, it is characterised in that:The support uses channel-section steel, The side of the channel-section steel is fixedly mounted on two lining chassis flanged plates by strengthening stud.
A kind of above-mentioned tunnel double-lining chassis steel and wood composite end head formwork, it is characterised in that:The channel-section steel and two lining platforms Gap is reserved between car flanged plate.
A kind of above-mentioned tunnel double-lining chassis steel and wood composite end head formwork, it is characterised in that:Described sleeve pipe passes through welding Mode be connected to the outside of the channel-section steel.
A kind of above-mentioned tunnel double-lining chassis steel and wood composite end head formwork, it is characterised in that:The quantity of the timber wedge is At least three, be separately positioned on inner mould surface and stock it is cylindrical between, outer mould surface and stock it is cylindrical between and wooden model surface with Between stock is cylindrical.
A kind of above-mentioned tunnel double-lining chassis steel and wood composite end head formwork, it is characterised in that:Described sleeve pipe and stock are equal Using seamless steel pipe.
The utility model has advantages below compared with prior art:
1st, the utility model is fixed between internal model and external mold using burying waterstop by, it is ensured that in bury waterstop and install suitable It is straight and do not shifted in construction Concrete, it is ensured that concrete is symmetrical placed in the middle in whole casting process so that in bury sealing Band serves effective waterproof action.
2nd, between the utility model internal model and chassis flanged plate, connected, only needed by hinged component between internal model and external mold Space between external mold and preliminary bracing face is used into wooden model completion, and using timber wedge by the stock in fixed mechanism and internal model, Space between external mold, wooden model is stoppered, you can is carried out two and is served as a contrast concreting, reduces the faces end head plugging time, and reinforce steady Gu, labor intensity is small.
3rd, the space between the utility model external mold and preliminary bracing face uses thickness for 5cm wooden model completion, and wooden model is cut Cut that number of times is few, improve the utilization rate of wooden model, reduce the consumption of timber, reduce construction cost, and cutting wooden model work Amount reduces, and reinforces simple, convenient and rapid, reduces the filling between wooden model gap and form removal speed is fast.
In summary, the utility model is simple in construction, reasonable in design, it is ensured that in bury waterstop and install straight and mixed in construction Do not shifted during solidifying soil, it is ensured that concrete is symmetrical placed in the middle in whole casting process, and reduces the faces end head plugging time, and Reinforce firm, labor intensity is small.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Brief description of the drawings
Fig. 1 is the distribution schematic diagram of the utility model internal model and external mold.
Fig. 2 is structural representation of the present utility model.
Fig. 3 is Fig. 2 A-A sectional views.
Description of reference numerals:
1-in bury waterstop;2-internal model;3-external mold;
4-back of the body patch waterstop;5-wooden model;6-articulated elements;
7-two lining chassis flanged plates;8-channel-section steel;9-strengthening stud;
10-sleeve pipe;11-stock;12-timber wedge.
Embodiment
As shown in Figure 1, Figure 2 and Figure 3, the utility model includes burying inside and outside waterstop 1 in being radially laid in along tunnel cross-section The internal model 2 and external mold 3 of both sides, be arranged on external mold 3 and the back of the body patch waterstop 4 between wooden model 5 and be arranged on two lining chassis flanges Fixed mechanism on plate 7, articulated elements 6 is passed through between the internal model 2 and external mold 3, between the lining chassis of internal model 2 and two flanged plate 7 Connection, support that the fixed mechanism includes being arranged on two lining chassis flanged plates 7, install sleeve pipe 10 on the bracket, The stock 11 being sleeved in sleeve pipe 10 and the timber wedge 12 for fixing stock 11, the stock 11 are extended on preliminary bracing face, Waterstop 1 is buried by be fixed between internal model 2 and external mold 3, it is ensured that in bury waterstop 1 install it is straight and construction Concrete In do not shift, it is ensured that concrete is symmetrical placed in the middle in whole casting process.
In the present embodiment, the support uses channel-section steel 8, and the side of the channel-section steel 8 is fixedly mounted on by strengthening stud 9 On two lining chassis flanged plates 7, simple in construction, convenient material drawing.
In the present embodiment, gap is reserved between the lining chassis of channel-section steel 8 and two flanged plate 7, the setting in the gap is In order to ensure that channel-section steel 8 is rotated around strengthening stud 9, convenient dismounting internal model 2, external mold 3 and wooden model 5.
In the present embodiment, described sleeve pipe 10 is connected to the outside of the channel-section steel 8 by way of welding, and connection is solid can Lean on.
In the present embodiment, the quantity of the timber wedge 12 is at least three, is separately positioned on the surface of internal model 2 and stock 11 is cylindrical Between, the surface of external mold 3 and stock 11 it is cylindrical between and the surface of wooden model 5 and stock 11 it is cylindrical between, using timber wedge 12 by stock 11 Space between internal model 2, external mold 3, wooden model 5 is stoppered, you can is carried out two and is served as a contrast concreting, reduces the faces end head plugging time, And reinforce firm, labor intensity is small.
In the present embodiment, described sleeve pipe 10 and stock 11 use seamless steel pipe, it is preferred that described sleeve pipe 10 uses diameter For φ 60 seamless steel pipe, the stock 11 is using a diameter of φ 50 seamless steel pipe, light weight and rigidity is good.
It is preferred that, the internal model 2 and external mold 3 all use thickness for 12mm steel plate, the wooden model 5 use thickness for 5cm plank.
When actual use, under tunnel double-lining chassis walking states, fixed mechanism is rotated to without prejudice to internal model 2 and external mold 3 The position packed up, internal model 2 and external mold 3 are packed up by hinged component 6, are completed after the walking positioning of tunnel double-lining chassis, from positive vault to The right and left wall buries waterstop 1 and back of the body patch waterstop 4 in being symmetrically installed, in bury waterstop 1 and be fixed between internal model 2 and external mold 3, Buried in after waterstop 1 installs with back of the body patch waterstop 4, rotation channel-section steel 8 makes stock 11 be in horizontality, and extends to Wooden model 5 is filled up in preliminary bracing face, the space between external mold 3 and preliminary bracing face, and timber wedge is used between wooden model 5 and stock 11 12 are fixed.After the completion of lining concrete is poured, rotation channel-section steel 8 makes stock 11 be in plumbness, dismantles internal model 2 and outer Mould 3, tunnel double-lining chassis runs to the construction that next construction section drops into the next paragraph lining cutting process of row.
It is described above, only it is preferred embodiment of the present utility model, not the utility model is imposed any restrictions, every Any simple modification, change and the equivalent structure change made according to the utility model technical spirit to above example, still Belong in the protection domain of technical solutions of the utility model.

Claims (6)

1. a kind of tunnel double-lining chassis steel and wood composite end head formwork, it is characterised in that:Including being radially laid in along tunnel cross-section In the wood that buries internal model (2) and external mold (3) inside and outside waterstop (1), be arranged on external mold (3) between back of the body patch waterstop (4) Mould (5) and the fixed mechanism being arranged on two lining chassis flanged plates (7), between the internal model (2) and external mold (3), internal model (2) It is connected between two lining chassis flanged plates (7) by articulated elements (6), the fixed mechanism includes being arranged on two lining chassis flanges Support on plate (7), the stock (11) installed sleeve pipe (10) on the bracket, be sleeved in sleeve pipe (10) and for fixing The timber wedge (12) of stock (11), the stock (11) is extended on preliminary bracing face.
2. according to a kind of tunnel double-lining chassis steel and wood composite end head formwork described in claim 1, it is characterised in that:The branch Frame uses channel-section steel (8), and the side of the channel-section steel (8) is fixedly mounted on two lining chassis flanged plates (7) by strengthening stud (9).
3. according to a kind of tunnel double-lining chassis steel and wood composite end head formwork described in claim 2, it is characterised in that:The groove Gap is reserved between steel (8) and two lining chassis flanged plates (7).
4. according to a kind of tunnel double-lining chassis steel and wood composite end head formwork described in claim 3, it is characterised in that:The set Pipe (10) is connected to the outside of the channel-section steel (8) by way of welding.
5. according to a kind of tunnel double-lining chassis steel and wood composite end head formwork described in claim 4, it is characterised in that:The wood The quantity of wedge (12) is at least three, be separately positioned on internal model (2) surface and stock (11) it is cylindrical between, external mold (3) surface and Between between stock (11) is cylindrical and wooden model (5) surface and stock (11) are cylindrical.
6. according to a kind of tunnel double-lining chassis steel and wood composite end head formwork described in claim 5, it is characterised in that:The set Manage (10) and stock (11) and use seamless steel pipe.
CN201621405427.0U 2016-12-20 2016-12-20 A kind of tunnel double-lining chassis steel and wood composite end head formwork Active CN206419031U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621405427.0U CN206419031U (en) 2016-12-20 2016-12-20 A kind of tunnel double-lining chassis steel and wood composite end head formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621405427.0U CN206419031U (en) 2016-12-20 2016-12-20 A kind of tunnel double-lining chassis steel and wood composite end head formwork

Publications (1)

Publication Number Publication Date
CN206419031U true CN206419031U (en) 2017-08-18

Family

ID=59575560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621405427.0U Active CN206419031U (en) 2016-12-20 2016-12-20 A kind of tunnel double-lining chassis steel and wood composite end head formwork

Country Status (1)

Country Link
CN (1) CN206419031U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401414A (en) * 2017-09-13 2017-11-28 中交公局桥隧工程有限公司 A kind of scalable waterstop fixing mould of tunnel ring and application method
CN107842376A (en) * 2017-12-12 2018-03-27 中国水利水电第四工程局有限公司 A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction
CN107975381A (en) * 2017-09-19 2018-05-01 中铁隧道集团二处有限公司 Trolley filling template
CN108301847A (en) * 2018-03-28 2018-07-20 中铁八局集团第三工程有限公司 A kind of Tunnel Second Lining trolley hydraulic end head mould and its construction method
CN108386210A (en) * 2018-04-26 2018-08-10 中国水利水电第四工程局有限公司 Length pipe plug template blocks ruggedized construction
CN109404016A (en) * 2018-12-10 2019-03-01 中交公局桥隧工程有限公司 Method for reducing over-square of two-lining concrete construction
CN110080804A (en) * 2018-12-13 2019-08-02 四川皓德斯新材料科技有限公司 The transparent plug panel assembly of tunnel double-lining macromolecule

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401414A (en) * 2017-09-13 2017-11-28 中交公局桥隧工程有限公司 A kind of scalable waterstop fixing mould of tunnel ring and application method
CN107401414B (en) * 2017-09-13 2023-11-07 中交中南工程局有限公司 Tunnel annular telescopic water stop fixing die and application method
CN107975381A (en) * 2017-09-19 2018-05-01 中铁隧道集团二处有限公司 Trolley filling template
CN107975381B (en) * 2017-09-19 2024-05-10 中铁隧道集团二处有限公司 Trolley filling template
CN107842376A (en) * 2017-12-12 2018-03-27 中国水利水电第四工程局有限公司 A kind of power tunnel telescoping steel form locking plug template installs ruggedized construction
CN108301847A (en) * 2018-03-28 2018-07-20 中铁八局集团第三工程有限公司 A kind of Tunnel Second Lining trolley hydraulic end head mould and its construction method
WO2019184791A1 (en) * 2018-03-28 2019-10-03 中铁八局集团第三工程有限公司 Hydraulic end die of tunnel secondary lining trolley and construction method therefor
US11098585B2 (en) 2018-03-28 2021-08-24 No. 3 Engineering Company Of China Railway No 8 Engineering Group Co., Ltd. Hydraulic end die of tunnel secondary lining trolley and construction method therefor
CN108301847B (en) * 2018-03-28 2024-02-02 中铁八局集团第三工程有限公司 Hydraulic end mould of tunnel secondary lining trolley and construction method thereof
CN108386210A (en) * 2018-04-26 2018-08-10 中国水利水电第四工程局有限公司 Length pipe plug template blocks ruggedized construction
CN109404016A (en) * 2018-12-10 2019-03-01 中交公局桥隧工程有限公司 Method for reducing over-square of two-lining concrete construction
CN110080804A (en) * 2018-12-13 2019-08-02 四川皓德斯新材料科技有限公司 The transparent plug panel assembly of tunnel double-lining macromolecule

Similar Documents

Publication Publication Date Title
CN206419031U (en) A kind of tunnel double-lining chassis steel and wood composite end head formwork
CN106869172A (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN203755334U (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN206189455U (en) Piping lane
CN204877493U (en) Soft rock tunnel supporting construction
CN109083658A (en) Using concrete filled steel tube as the Tunnel Second Lining structure and its construction method of skeleton
CN104405411A (en) Oversized variable cross section tunnel supporting structure
CN110409900A (en) Hybrid connection precast prestressed concrete circle warehouse structure
CN204716253U (en) Circular major diameter diversion tunnel structure
CN107313787A (en) A kind of tunnel lining trolley end mould and construction method
CN104612708A (en) Supporting device and method for loess tunnel
CN105178503B (en) A kind of prefabricated strap-on insulation wallboard
CN206090617U (en) Novel assembled piping lane
CN206071601U (en) The device that a kind of prevention tunnel double-lining vault comes to nothing
CN211286028U (en) Connection node of assembled floor and roof beam
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN203594050U (en) Novel internal bracing wall
CN209384249U (en) A kind of high intensity ground pattern foundation pit supporting structure
CN209568450U (en) A kind of connection structure for foundation pit assembled inner bracing member and crown beam
CN208328901U (en) A kind of civil engineering reinforcement stake
CN205840082U (en) A kind of BRT Lightweight core mould close rib composite floor structure
CN103437349B (en) The construction method of steel concrete perfusion shaped pile
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN206769202U (en) Concrete prefabricated constructional column and the constructional column for including concrete prefabricated constructional column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant