CN206406243U - Reinforced concrete closed guard gate solid maintenance rack - Google Patents

Reinforced concrete closed guard gate solid maintenance rack Download PDF

Info

Publication number
CN206406243U
CN206406243U CN201720023268.6U CN201720023268U CN206406243U CN 206406243 U CN206406243 U CN 206406243U CN 201720023268 U CN201720023268 U CN 201720023268U CN 206406243 U CN206406243 U CN 206406243U
Authority
CN
China
Prior art keywords
connecting rod
guard gate
closed guard
metope
shim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720023268.6U
Other languages
Chinese (zh)
Inventor
黎端午
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Weiye Defense Equipment Co Ltd
Original Assignee
Tianjin Weiye Defense Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Weiye Defense Equipment Co Ltd filed Critical Tianjin Weiye Defense Equipment Co Ltd
Priority to CN201720023268.6U priority Critical patent/CN206406243U/en
Application granted granted Critical
Publication of CN206406243U publication Critical patent/CN206406243U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model discloses a kind of reinforced concrete closed guard gate solid maintenance rack, its drip irrigation device is to include support body, contact at the knee wall of support body periphery, the support body includes the side arm for being vertically to ground, connect the connecting rod of adjacent side arm, the connecting rod is provided with the shim perpendicular to connecting rod away from the side of knee wall, the shim is connected in connecting rod by sliding assembly, the sliding assembly includes the chute being located in connecting rod, the positive stop end stretched into positioned at shim in chute, fastening nail is equipped with the positive stop end, the fastening nail is penetrated in connecting rod.It is arranged such, when being sprayed to closed guard gate, closed guard gate is located between the shim in connecting rod, it is just spacing by adjacent two shims, closed guard gate is set to be near vertical in the state on ground, so when being sprayed to closed guard gate, the two sides of closed guard gate can be enable two sides by identical hydration as far as possible by impartial water impact.

Description

Reinforced concrete closed guard gate solid maintenance rack
Technical field
The utility model is related to people's air defense field, more particularly to a kind of reinforced concrete closed guard gate solid maintenance rack.
Background technology
Closed guard gate is the door of people's protection works gateway, and this closed guard gate typically many poured using cement is formed, poured After the completion of, it is necessary to closed guard gate carry out spray maintenance, periodically on closed guard gate spray water, to cement carry out hydration.
At present, Publication No. CN205238254U Chinese patent discloses a kind of spray maintenance platform, and it includes level The workbench of placement, described workbench is provided with several roller bearing grooves, and the roller bearing groove two ends are provided with bearing, and the bearing connects Roller bearing is connect, the lower section of the spray head connecting water pipe, the water pipe is provided with flow controller.
When maintaining platform using this spray, by closed guard gate's horizontal positioned on the table, spray head sprays current, falls On closed guard gate.During using this modes of emplacement, current largely act on the one side towards spray head, and the both sides of closed guard gate are by water Change effect is uneven.
Utility model content
The purpose of this utility model is to provide a kind of reinforced concrete closed guard gate solid maintenance rack, and it, which has, to make The advantage that the both sides of closed guard gate are uniformly sprayed.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of reinforced concrete closed guard gate solid maintenance rack, including support body, the knee wall for contacting at support body periphery, institute Stating support body includes being vertically to the side arm on ground, the connecting rod of the adjacent side arm of connection, and the connecting rod is set away from the side of knee wall There is the shim perpendicular to connecting rod, the shim is connected in connecting rod by sliding assembly, and the sliding assembly includes Fastening nail is equipped with chute in connecting rod, the positive stop end stretched into positioned at shim in chute, the positive stop end, it is described Fastening nail is penetrated in connecting rod.
Be arranged such, when being sprayed to closed guard gate, support body closed guard gate is carried out it is spacing, closed guard gate be located at connecting rod on It is just spacing by adjacent two shims between shim, closed guard gate is near vertical in the state on ground, So when being sprayed to closed guard gate, the two sides of closed guard gate can by equalization water impact, enable two sides by To identical hydration as far as possible.
Further set:The side arm is set to triangle, and the side arm includes being vertically to first branch arm on ground, supported Touch in the second branch arm being connected on ground with the first branch arm, be connected the 3rd branch of the first branch arm and the second branch arm Arm.
It is arranged such, the side arm of triangle can increase the contact surface between closed guard gate compared to linear side arm Product, makes closed guard gate be not susceptible to relative displacement;The Stability Analysis of Structures of triangle, is also less prone to the feelings for causing stress excessive and deforming upon Condition.
Further set:The knee wall include contact in connecting rod the first metope, contact on the side arm of both sides The second metope, the 3rd metope, first metope, the second metope, the 3rd metope are fixed on ground vertically.
It is arranged such, each side arm, connecting rod are equipped with a face knee wall and support spacing, improve entirety The stability of structure.
Further set:The positive stop end is on shim, during the both sides of the positive stop end are using shim to be symmetrical The heart, it is symmetrical arranged in shim both sides.
It is arranged such, when positive stop end reciprocatingly slides in chute, the both sides stress of positive stop end is impartial, is not susceptible to spacing End side stress it is unstable and make shim lean forward or after the possibility turned over.
Further set:The both sides of the positive stop end are equipped with fastening nail.
It is arranged such, when shim is contradicted by closed guard gate, closed guard gate is exerted a force to it, and now positive stop end both sides are limited Position, is difficult because relative displacement or deformation are occurred by the pressure of closed guard gate.
Further set:Cork bed course is provided between the connecting rod and the first metope.
It is arranged such, when fastening nail is through connecting rod, if still there is surplus, can continue to stretch at cork bed course, Cork bed course contacts at what is caused on the first metope to fastening spacing effect of reinforcing of playing of following closely, and can also reduce fastening nail Damage.
Further set:The shim is set to rectangular metal sheet, and the shim is arranged away from one end of connecting rod There is gum cover.
It is arranged such, when closed guard gate is struck on shim, gum cover reduces damage of the shim to closed guard gate, reduces people The possibility that anti-door is scratched.
Further set:Rhone is dug on the ground that the knee wall is crossed, the rhone is from the first metope Draw and perpendicular to the first metope.
Be arranged such, when water impact on closed guard gate, flow on ground after, flowed away by rhone, keep ground Neatly, workman is reduced because the possibility fallen down is slided on ground.
In summary, the utility model has the advantages that:Can be spacing vertically by closed guard gate, in spray water flow During, make the hydration of closed guard gate both sides uniform, it is ensured that product quality.
Brief description of the drawings
Fig. 1 is to be used in embodiment 1 embody integrally-built schematic diagram;
Fig. 2 is the structural representation for being used in embodiment 1 embody connecting rod upper-part;
Fig. 3 is the structural representation for being used in embodiment 1 embody spray head.
In figure, 1, support body;1-1, side arm;1-11, the first branch arm;1-12, the second branch arm;1-13, the 3rd branch arm; 1-2, connecting rod;2nd, knee wall;21st, the first metope;22nd, the second metope;23rd, the 3rd metope;3rd, shim;4th, sliding assembly; 41st, chute;42nd, positive stop end;43rd, fastening nail;5th, cork bed course;6th, gum cover;7th, rhone;8th, screw;9th, shower;10th, enter Water pipe;11st, spray head;111st, nozzle body;112nd, the water surface is gone out;113rd, apopore;12nd, bending tube;121st, metal bellows; 122nd, spacing ring;13rd, detachable member;131st, internal thread segment;132nd, external thread section;14th, bull shunt valve;15th, the first branch Face;16th, the second branch face;17th, rotation slot;18th, moving block;19th, position-limited edge;20th, the first branched hole;21st, the second branched hole.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment 1:A kind of reinforced concrete closed guard gate solid maintenance rack, as shown in figure 1, including being vertically to ground Knee wall 2, knee wall 2 has three faces, " U "-shaped setting, and both sides are respectively the second metope 22 and the 3rd metope 23, positioned at the Between two metopes 22 and the 3rd metope 23 is the first metope 21.
As illustrated in fig. 1 and 2, it is provided with connecting rod 1- towards the side of the second metope 22 and the 3rd metope 23 in the first metope 21 Pad sets cork bed course 5, the width of cork bed course 5 and connecting rod 1-2 width phase between 2, connecting rod 1-2 and the first metope 21 Deng.
As shown in figure 1, for laying the support body 1 of closed guard gate in addition to connecting rod 1-2, in addition to connecting rod 1-2 both sides Side arm 1-1, side arm includes the first branch arm 1-11 earthward drawn vertically from connecting rod 1-2 two ends, in the first branch arm 1-11 is connected with the second branch arm 1-12 being placed horizontally on ground close to ground one end, and the second branch arm 1-12 is from first point Support arm 1-11 extends to away from the side of the first metope 21.Connect in the second branch arm 1-12 away from the first branch arm 1-11 one end It is connected to the 3rd branch arm 1-13, the 3rd branch arm 1-13 is connected to connecting rod 1-2 and the away from the second branch arm 1-12 one end One branch arm 1-11 intersection, makes the first branch arm 1-11, the second branch arm 1-12, the 3rd branch arm 1-13 form stabilization Triangle.
As shown in figure 1, the first metope 21 towards also dug on the ground of connecting rod 1-2 side some perpendicular to It is parallel to each other, is drawn from the bottom of the first metope 21 between the rhone 7 of first metope 21, rhone 7.
As illustrated in fig. 1 and 2, the sliding in connecting rod 1-2 offers chute 41, chute 41 away from the side of the first metope 21 It is connected with shim 3.Connected between shim 3 and connecting rod 1-2 by sliding assembly 4, sliding assembly 4 includes stretching into chute 41 In positive stop end 42, positive stop end 42 is set perpendicularly to the sheet metal of shim 3, and shim 3 is set with positive stop end 42 in " T " shape Put, positive stop end 42 is symmetrical centre with shim 3, equal length is extended at the two ends of shim 3.The cross section of chute 41 is It is "T"-shaped, positive stop end 42 can be just accommodated, fastening nail 43 is equipped with the positive stop end 42 of the both sides of shim 3.Fastening nail 43 is adopted With screw, the screw 8 being engaged with screw of several linear arrays is provided with the bottom of chute 41, screw 8 runs through connecting rod 1-2, after fastening nail 43 penetrates screw 8, if having a surplus the length, is penetrated in cork bed course 5.
It is relative between 43 and connecting rod 1-2 of regulation fastening nail when closed guard gate is placed at the position that shim 3 is separated out Position relationship, makes at the diverse location that shim 3 is limited on connecting rod 1-2, adjusts the distance between adjacent banking stop, with Just it is applied to various sizes of closed guard gate.
As shown in Fig. 2 in order to reduce scratch during transport closed guard gate, being arranged in banking stop away from connecting rod 1-2 one end There is gum cover 6.
As shown in figure 1, being additionally provided with shower 9 away from connecting rod 1-2 one side in the first metope 21, shower 9 includes perpendicular Directly in the water inlet pipe 10 on ground, water inlet pipe 10 is communicated close to one end embedment ground on ground with water pipe;Water inlet pipe 10 deviates from ground One end on be connected with bull shunt valve 14, bull shunt valve 14 is away from the end connection bending tube 12 of water inlet pipe 10, bending tube 12 be to be connected with two spray heads 11 away from one end of bull shunt valve 14.
As shown in figs. 1 and 3, wherein, bending tube 12 use metal bellows 121, in the outer round surface of metal bellows 121 On be also arranged with the gap that 3cm to 5cm is reserved between several spacing rings 122, adjacent spacing ring 122.
As shown in figs. 1 and 3, connected between spray head 11 and bending tube 12 by detachable member 13, detachable member 13 Including the internal thread segment 131 positioned at the conical small end of spray head 11, positioned at bending tube 12 close to the outer of one end of spray head 11 Thread segment 132.When external thread section 132 is tightened in internal thread segment 131, spray head 11 is fixedly connected with bending tube 12, is difficult Release.
As shown in figs. 1 and 3, the tapered segment of spray head 11 is to be set on nozzle body 111, the big end of nozzle body 111 Have the water surface 112, wherein, be fixedly connected in nozzle body 111 for the first branch face 15, be rotationally connected with nozzle body On 111 for the second branch face 16, wherein, the first branch face 15 is provided with several apopores 113, and apopore 113 is arranged in Several circles, these circles are in arranged concentric.Second branch face 16 is provided with straight with apopore 113 on the first branch face 15 The first branched hole of footpath identical 20, diameter are less than the second branched hole 21 of the first branched hole 20, the first branched hole 20 and second point Branch hole 21 is is arranged at intervals, i.e., provided with second branched hole 21 between two adjacent the first branched holes 20.
As shown in figs. 1 and 3, it is additionally provided with the excircle configuration in the second branch face 16 vertical perpendicular to the second branch face 16 Position-limited edge 19, position-limited edge 19 is provided with moving block 18 away from the side in the second branch face 16, and moving block 18 is located at the spacing of circle shape Side 19, just being capable of rotation slot of the inlay card at the big end of nozzle body 111 towards the central axis side in the second branch face 16 In 17.Rotation slot 17 is set to circle shape, and moving block 18 has four, and arcuate array is on position-limited edge 19.
When needing regulation current size, the second branch face 16 is rotated, when on the first branched hole 20 and the first branch face 15 When apopore 113 is relative, current are larger;When the second branched hole 21 is relative with the apopore 113 on the first branch face 15, current By the obstruction of the second branched hole 21, current diminish.
The above embodiments are only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.

Claims (8)

1. a kind of reinforced concrete closed guard gate solid maintenance rack, including support body(1), contact at support body(1)The support of periphery Wall(2), it is characterised in that:The support body(1)Side arm including being vertically to ground(1-1), the adjacent side arm of connection connecting rod(1- 2), the connecting rod(1-2)Away from knee wall(2)Side be provided with perpendicular to connecting rod(1-2)Shim(3), described point Partition(3)Pass through sliding assembly(4)It is connected to connecting rod(1-2)On, the sliding assembly(4)Including positioned at connecting rod(1-2) On chute(41), positioned at shim(3)Stretch into chute(41)In positive stop end(42), the positive stop end(42)On be equipped with it is tight Gu nail(43), the fastening nail(43)Penetrate connecting rod(1-2)In.
2. reinforced concrete closed guard gate solid maintenance rack according to claim 1, it is characterised in that:The side arm (1-1)It is set to triangle, the side arm(1-1)The first branch arm including being vertically to ground(1-11), contact on ground With the first branch arm(1-11)The second connected branch arm(1-12), connection the first branch arm(1-11)With the second branch arm(1- 12)The 3rd branch arm(1-13).
3. reinforced concrete closed guard gate solid maintenance rack according to claim 2, it is characterised in that:The knee wall (2)Including contacting at connecting rod(1-2)On the first metope(21), the second metope for contacting on the side arm of both sides(22), Three metopes(23), first metope(21), the second metope(22), the 3rd metope(23)It is fixed on vertically on ground.
4. reinforced concrete closed guard gate solid maintenance rack according to claim 1, it is characterised in that:The positive stop end (42)Perpendicular to shim(3)On, the positive stop end(42)Both sides with shim(3)For symmetrical centre, in shim(3)Two Side is symmetrical arranged.
5. reinforced concrete closed guard gate solid maintenance rack according to claim 4, it is characterised in that:The positive stop end (42)Both sides be equipped with fastening nail(43).
6. reinforced concrete closed guard gate solid maintenance rack according to claim 3, it is characterised in that:The connecting rod (1-2)With the first metope(21)Between be provided with cork bed course(5).
7. reinforced concrete closed guard gate solid maintenance rack according to claim 1, it is characterised in that:The banking stop Rectangular metal sheet is set to, the banking stop deviates from connecting rod(1-2)One end be arranged with gum cover(6).
8. reinforced concrete closed guard gate solid maintenance rack according to claim 3, it is characterised in that:The knee wall (2)Rhone has been dug on the ground crossed(7), the rhone(7)From the first metope(21)Draw and perpendicular to first at place Metope(21).
CN201720023268.6U 2017-01-09 2017-01-09 Reinforced concrete closed guard gate solid maintenance rack Expired - Fee Related CN206406243U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720023268.6U CN206406243U (en) 2017-01-09 2017-01-09 Reinforced concrete closed guard gate solid maintenance rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720023268.6U CN206406243U (en) 2017-01-09 2017-01-09 Reinforced concrete closed guard gate solid maintenance rack

Publications (1)

Publication Number Publication Date
CN206406243U true CN206406243U (en) 2017-08-15

Family

ID=59553553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720023268.6U Expired - Fee Related CN206406243U (en) 2017-01-09 2017-01-09 Reinforced concrete closed guard gate solid maintenance rack

Country Status (1)

Country Link
CN (1) CN206406243U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110712279A (en) * 2019-10-23 2020-01-21 北京力拓铭达机电安装工程有限公司 Maintenance processing technology of reinforced concrete airtight door leaf and maintenance frame thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110712279A (en) * 2019-10-23 2020-01-21 北京力拓铭达机电安装工程有限公司 Maintenance processing technology of reinforced concrete airtight door leaf and maintenance frame thereof
CN110712279B (en) * 2019-10-23 2021-07-27 北京力拓铭达机电安装工程有限公司 Maintenance processing technology of reinforced concrete airtight door leaf and maintenance frame thereof

Similar Documents

Publication Publication Date Title
CN205628370U (en) Building site removes dust and uses high -efficient water jet equipment
CN210834086U (en) Horizontal water tunnel device
CN207515992U (en) A kind of test model box for vibrating table manually rainfall system
CN107060352A (en) Movably foot bolt locating rack
CN206406243U (en) Reinforced concrete closed guard gate solid maintenance rack
CN207287505U (en) A kind of fire-fighting medicament fire fighting test platform being accurately positioned
CN103609392A (en) Adjustable pitching angle sprinkler spray gun
CN206406242U (en) Closed guard gate intelligently conserves spray equipment
CN206308622U (en) A kind of Bailey truss camber adjusts lowering device
CN206382344U (en) Milling train and its blow device
CN209228006U (en) A kind of Collapsible rack
CN211377532U (en) Support type cable trench construction support
CN207185499U (en) A kind of fruits and vegetables gardens watering device of adjustable spraying range
CN209704622U (en) A kind of dust falling device used for constructing tunnel
CN106702904A (en) Pre-camber adjustment and unloading device for Bailey supports and method of using same
CN207076590U (en) I-steel rotary spraying device is used in one kind test
CN206369010U (en) A kind of construction gib frame
CN206747196U (en) A kind of pharmacy test tube high-temperature steam cleaning device
CN206763649U (en) A kind of steel pipe straightening machine
CN206316937U (en) Steel band conveying transfer
CN205805813U (en) Novel single tube making-up air device
CN206821542U (en) A kind of height-adjustable forestry water sprayer
CN205767457U (en) A kind of stretching-machine for preparing nanometer saving pipe of water
CN221168856U (en) Building construction strutting arrangement
CN210474522U (en) Inner wall spraying device for galvanized steel pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170815

Termination date: 20210109

CF01 Termination of patent right due to non-payment of annual fee