CN206385411U - It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement - Google Patents

It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement Download PDF

Info

Publication number
CN206385411U
CN206385411U CN201621023713.0U CN201621023713U CN206385411U CN 206385411 U CN206385411 U CN 206385411U CN 201621023713 U CN201621023713 U CN 201621023713U CN 206385411 U CN206385411 U CN 206385411U
Authority
CN
China
Prior art keywords
embankment
height
differential settlement
steep
structural layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621023713.0U
Other languages
Chinese (zh)
Inventor
梁瑶
侯中学
蔡先庆
吴晓春
唐晓波
鲜苗
向飞
赵洪湖
梁秀雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Communication Surveying and Design Institute Co Ltd
Original Assignee
Sichuan Communication Surveying and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Communication Surveying and Design Institute Co Ltd filed Critical Sichuan Communication Surveying and Design Institute Co Ltd
Priority to CN201621023713.0U priority Critical patent/CN206385411U/en
Application granted granted Critical
Publication of CN206385411U publication Critical patent/CN206385411U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement, suitable for the bottom stab ilization structure of the steep embankment of the larger height of both sides hypsography, reliable supporting and retaining system is provided for the high steep embankment in mountain area, it is prevented effectively from excessive differential settlement, improve the running comfort of highway or high-speed railway, it is to avoid occur security incident.Including filling in being longitudinally, laterally arranged at intervals reinforcing pile in the embankment embankment in the side slope of both sides, the embankment embankment, the lower anchor of each reinforcing pile is in embankment embankment.Rigid structural layer is set on the top surface of the embankment embankment, and rigid structural layer and the stake top of each reinforcing pile are consolidated.Filled on the rigid structural layer and construct pavement structure on bed course, bed course.

Description

It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement
Technical field
The utility model is related to railway, Reinforcement of Highway structure, and more particularly to a kind of height for reducing differential settlement is steep Embankment is reinforced.
Background technology
In recent years, infrastructure construction enters the high-speed developing period, and railway, road event are built on a large scale, positioned at mountain area Railway, highway, due to the violent fluctuating of landform, it is inevitable the need for drop into filling for walking along the street dike in steep slope section.In landform The low-lying place of landforms, because long-term charge for remittance or farmland planting need, is commonly formed soft foundation, and it settles higher much larger than physical features The embankment of side.
At present, railway, the desin speed of highway, which have, is substantially improved, and higher design speed per hour not only needs to control embankment Bulk settling, to prevent the cracking of pavement structure, the differential settlement of embankment is also the factor for needing to control.For such both sides The steep embankment of the larger height of hypsography, it is main at present that basement process is carried out using the embankment to hypsography low-lying side, reduce work at this After settle, do not consider caused by embankment both sides embankment difference that lateral variation is settled.Landform is higher compared with the embankment raising of downside, due to The influence of soft foundation discharging consolidation, settling amount will be much larger than landform upper side., certainly will due to embankment both sides height of embankment difference Cause the relative settlement of embankment both sides, i.e. differential settlement.Differential settlement is bigger, will cause the cracking destruction of pavement structure, Influence operation comfortableness, excessive differential settlement is also possible to trigger security incident.Therefore, risen and fallen for both sides landform height High steep embankment is, it is necessary to seek a kind of can effectively control the bottom stab ilization structure of embankment differential settlement.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of steep embankment of height for preventing differential settlement and reinforces knot Structure, it is adaptable to the bottom stab ilization structure of the steep embankment of the larger height of both sides hypsography, reliable branch is provided for the high steep embankment in mountain area Gear, is prevented effectively from excessive differential settlement, improves the running comfort of highway or high-speed railway, it is to avoid occur safe thing Therefore.
It is as follows that the utility model solves the technical scheme that its technical problem used:
The utility model is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement, including fills in the side slope of both sides Embankment embankment, it is characterized in that:Longitudinally, laterally be arranged at intervals reinforcing pile in the embankment embankment, the lower anchor of each reinforcing pile in In embankment embankment;Rigid structural layer is set on the top surface of the embankment embankment, and rigid structural layer and the stake top of each reinforcing pile are consolidated Knot;Filled on the rigid structural layer and construct pavement structure on bed course, bed course.
The beneficial effects of the utility model are to have laid bed course, rigid structural layer and its underpart below road surface structare layer Reinforcing pile, the horizontal settlement after construction of the high steep embankment of tunable greatly reduces the differential settlement on embankment top, effectively improves The running comfort of highway or high-speed railway, it is to avoid occur security incident.
Brief description of the drawings
This specification includes following two width accompanying drawing:
Fig. 1 is a kind of cross-sectional view of lateral pile slab structure suitable for steep rocky slope embankment of the utility model;
Fig. 2 is the enlarged drawing of A parts in Fig. 1
Component and corresponding mark are shown in figure:Pavement structure 1, bed course 2, rigid structural layer 3, reinforcing pile 4, embankment Embankment 5.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
Referring to Figures 1 and 2, the utility model is a kind of prevents the steep embankment ruggedized construction of height of differential settlement, including fills Embankment embankment 5 in the larger side slope of both sides hypsography.Reinforcing pile 4 is longitudinally, laterally arranged at intervals in the embankment embankment 5, The lower anchor of each reinforcing pile 4 is reinforced to embankment embankment in embankment embankment 5, embankment is formed overall stress, it is to avoid roadbed is whole The difference of body lateral stiffness.Rigid structural layer 3 is set on the top surface of the embankment embankment 5, and rigid structural layer 3 is reinforced with each The stake top consolidation of stake 4, effectively to control the displacement at pile top of reinforcing pile 4, improves the stability and reliability of ruggedized construction.It is described firm Property structure sheaf 3 on fill constructed on bed course 2, bed course 2 pavement structure 1 reduce roadbed differential settlement.
The bed course 2 is usually permeable structure layer, is filled and is formed by crushed-gravel or piece rubble, 0.8~2.5m of thickness, depending on Depending on the roadbed work area depth of highway or railway, the additional stress for undertaking vehicular load generation.
The rigid structural layer 3 can generally use armoured concrete slab, and 1~2m of thickness is the vertical of 5~7m by longitudinal length Constituted to plate, expansion joint is set between each longitudinal plate.The length that the stake top of the reinforcing pile 4 is stretched into rigid structural layer 3 is not less than 100mm。
The reinforcing pile 4 is one kind in reinforced concrete pile, mini pile, reinforced anchor bolt or aggregate pile, depending on high steep embankment Depending on height of embankment, both sides topographical elevation difference and embankment lateral stability.
Certain highway high roadbed work point, substantially, left side landform is high for left and right sides hypsography, and right side landform is low, in embankment Heart raising 10.63m.Left side height of embankment 5.5m, right side height of embankment 20.5m, both sides embankment slope height difference 15m.Right side base Bottom is soft foundation, and silty clay, soft modeling~stream modeling shape, weak soil thickness about 6m is handled using cement mixing pile.Left side substrate is covered Cap rock is relatively thin, about 0.3~0.8m, and subterrane is Soil Developed From Suining Group sand shale of being united on sieve dwarf.
Scheme 1:Traditional design, cape rammer is layered to high side slope of embankment.
The non-soft foundation part in left side, because height of embankment is relatively low, base property is good, and the settling amount of filler and substrate is relative It is smaller.Right side soft foundation is after complex ground treatment, under the compaction up banketed, substrate discharging consolidation will produce compared with Big sedimentation;Because right side height of embankment is higher, the sedimentation of its filler is also corresponding larger.Toe, center and right side slope on the left of embankment The settling amount of pin is respectively 1.35cm, 4.62cm and 10.4cm, and differential settlement is obvious.
Scheme 2:Using the technical scheme of the application
Roadbed part below road surface structare layer, changes back-up sand gravel blanket, and sets armoured concrete slab below bed course, under it For mini pile, in stake-middle spacing 3m.The settling amount of toe, center and right side toe is respectively 1.25cm, 4.24cm on the left of embankment And 7.51cm, differential settlement greatly reduces.It is another uneven in the range of road surface structare layer lower section, roadbed due to this structure setting Sedimentation is much smaller than 1cm, can effectively prevent because pavement cracking caused by differential settlement is destroyed.
The utility model described above that simply explains through diagrams is a kind of to be applied to prevent the Steep Slope Embankment of differential settlement from adding Some principles of fixing structure, are not intended to the utility model being confined in shown and described concrete structure and the scope of application, Therefore every corresponding modification for being possible to be utilized and equivalent, belong to the apllied the scope of the claims of the utility model.

Claims (5)

1. the steep embankment ruggedized construction of height of differential settlement is prevented a kind of, including is filled in the embankment embankment (5) in the side slope of both sides, It is characterized in that:Longitudinally, laterally be arranged at intervals reinforcing pile (4) in the embankment embankment (5), the lower anchor of each reinforcing pile (4) in In embankment embankment (5);Rigid structural layer (3) is set on the top surface of the embankment embankment (5), and rigid structural layer (3) is with respectively adding Gu the stake top consolidation of stake (4);Bed course (2) is filled on the rigid structural layer (3), bed course constructs pavement structure on (2) (1)。
2. a kind of as claimed in claim 1 prevent the steep embankment ruggedized construction of height of differential settlement, it is characterized in that:The rigidity Structure sheaf (3) is armoured concrete slab, and 1~2m of thickness is made up of longitudinal length for 5~7m longitudinal plate, between each longitudinal plate If expansion joint.
3. a kind of as claimed in claim 1 prevent the steep embankment ruggedized construction of height of differential settlement, it is characterized in that:It is described to reinforce The length that the stake top of stake (4) is stretched into rigid structural layer (3) is not less than 100mm.
4. a kind of as claimed in claim 3 prevent the steep embankment ruggedized construction of height of differential settlement, it is characterized in that:It is described to reinforce Stake (4) is one kind in reinforced concrete pile, mini pile, reinforced anchor bolt or aggregate pile.
5. a kind of as claimed in claim 1 prevent the steep embankment ruggedized construction of height of differential settlement, it is characterized in that:The bed course (2) it is permeable structure layer, is filled and formed by crushed-gravel or piece rubble, 0.8~2.5m of thickness.
CN201621023713.0U 2016-08-31 2016-08-31 It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement Active CN206385411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621023713.0U CN206385411U (en) 2016-08-31 2016-08-31 It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621023713.0U CN206385411U (en) 2016-08-31 2016-08-31 It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement

Publications (1)

Publication Number Publication Date
CN206385411U true CN206385411U (en) 2017-08-08

Family

ID=59487514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621023713.0U Active CN206385411U (en) 2016-08-31 2016-08-31 It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement

Country Status (1)

Country Link
CN (1) CN206385411U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192652A (en) * 2016-08-31 2016-12-07 四川省交通运输厅交通勘察设计研究院 A kind of high steep embankment ruggedized construction preventing differential settlement
CN109811607A (en) * 2019-02-26 2019-05-28 四川省交通运输厅公路规划勘察设计研究院 Conducive to the light-duty high embankment structure in mountain area escarpment section and construction method taken precautions against natural calamities
CN110670433A (en) * 2019-10-08 2020-01-10 广东乾兴建设工程有限公司 Construction structure for constructing road on soft soil foundation
CN110952386A (en) * 2019-12-17 2020-04-03 同济大学 Micro pile reinforcing method for controlling transverse uneven settlement of high-speed rail wide embankment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192652A (en) * 2016-08-31 2016-12-07 四川省交通运输厅交通勘察设计研究院 A kind of high steep embankment ruggedized construction preventing differential settlement
CN109811607A (en) * 2019-02-26 2019-05-28 四川省交通运输厅公路规划勘察设计研究院 Conducive to the light-duty high embankment structure in mountain area escarpment section and construction method taken precautions against natural calamities
CN110670433A (en) * 2019-10-08 2020-01-10 广东乾兴建设工程有限公司 Construction structure for constructing road on soft soil foundation
CN110670433B (en) * 2019-10-08 2021-05-11 广东乾兴建设工程有限公司 Construction structure for constructing road on soft soil foundation
CN110952386A (en) * 2019-12-17 2020-04-03 同济大学 Micro pile reinforcing method for controlling transverse uneven settlement of high-speed rail wide embankment

Similar Documents

Publication Publication Date Title
CN203174453U (en) Light-mass embankment structure for managing bump at bridge head
CN206385411U (en) It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement
CN107905089A (en) A kind of reinforcement platform back of the body for preventing bumping at bridge-head and its construction method
CN104746501B (en) Treatment method and structure of bridge-head foundation sliding settlement
CN103046446B (en) Highway reconstruction and extension project joint portion treatment structure
CN203960883U (en) One both wired high embankment is helped wide ruggedized construction
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN106676994B (en) The adjustable foam concrete embankment of load and construction method
CN108560349A (en) The high embankment retaining structure in soft clay area
CN205399090U (en) On stride highway's pile foundation reinforced concrete railway roadbed structure
CN106192652A (en) A kind of high steep embankment ruggedized construction preventing differential settlement
CN104358196B (en) Highway open to traffic Embankment Subsidence disposes the construction method of structure
CN207727452U (en) A kind of back filling behind abutment structure sheaf for preventing culvert jump vehicle
CN201530961U (en) Transition section structure of liquefying soil foundation anti-seismic road and bridge of high-speed railway ballastless track
CN204570720U (en) A kind of widening of subgrade culvert foundation
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN208869894U (en) The reinforced structure for preventing and treating old widening of subgrade position sedimentation and deformation
CN220202717U (en) Construction structure for fast reinforcing high-fill side slope by high polymer grouting
CN203034328U (en) Highway reconstruction and extension project joint portion treatment structure
CN105804101A (en) Load-reducing retaining system capable of reducing stress of retaining structure, construction method and applications
CN207228101U (en) A kind of sand compaction pile for being used in the soft soil foundation of deep water off-lying sea reinforce vertical type shore protection
CN206553853U (en) Filled-up ground on a kind of subway line
CN206233257U (en) Combined composite foundation for reinforcing inclined soft foundation
CN105544334B (en) One kind is used for vehicle jumping at bridge head of highway Treatment Methods
CN213507862U (en) Municipal administration road widen structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 610000 No. 35 Taisheng North Road, Chengdu, Sichuan Province

Patentee after: Sichuan Transportation Survey and Design Research Institute Co., Ltd.

Address before: 610031 No. 35 Taisheng North Road, Chengdu, Sichuan Province

Patentee before: SICHUAN COMMUNICATION SURVEYING&DESIGN INSTITUTE