CN206376507U - Prefabrication outrigger - Google Patents

Prefabrication outrigger Download PDF

Info

Publication number
CN206376507U
CN206376507U CN201621419319.9U CN201621419319U CN206376507U CN 206376507 U CN206376507 U CN 206376507U CN 201621419319 U CN201621419319 U CN 201621419319U CN 206376507 U CN206376507 U CN 206376507U
Authority
CN
China
Prior art keywords
prefabrication
mounting bracket
bracket component
outrigger
base assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621419319.9U
Other languages
Chinese (zh)
Inventor
陈文�
刘建芬
姜能
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan 31 Construction Co Ltd
Original Assignee
Hunan 31 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan 31 Construction Co Ltd filed Critical Hunan 31 Construction Co Ltd
Priority to CN201621419319.9U priority Critical patent/CN206376507U/en
Application granted granted Critical
Publication of CN206376507U publication Critical patent/CN206376507U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of prefabrication outrigger, including:Base assembly, the base assembly can be fixed on external wall by fixture, and the base assembly is provided with the fender rod for being used for installing steel plate protection network;Mounting bracket component, is arranged on the base assembly by the first connector;Scaffold board, is arranged on the mounting bracket component by the second connector;The steel plate protection network, on the fender rod.This programme realizes the modularized production of construction exterior rack, the prefabrication outrigger completes assembly work when dispatching from the factory, prefabrication outrigger is transported after engineering site, directly according to the size and shape of external wall, it is installed to what the prefabrication outrigger head and the tail of respective number leant on external wall, the workload for building construction exterior rack is so substantially reduced, engineering time is saved.

Description

Prefabrication outrigger
Technical field
The utility model is related to construction exterior rack field, more specifically, is related to a kind of prefabrication outrigger.
Background technology
At present, the construction exterior rack often having in architectural engineering has two kinds of floor stand and jack up climbing frame, wherein, floor stand needs Build, first connect frame pipe one by one in engineering site, re-lay scaffold board, hang safety net, workload is very big, waste work The journey time, and build that the consumption of the materials such as floor stand tubing and scaffold board is very big, the cost of outrigger is high.Jack up climbing frame is by carrying The elevating movement that cucurbit drives up and down relative motion of the guide wheel group along guide rail to realize climbing frame is risen, but its is complicated, construction management It is required that high, cost is also high.
Utility model content
The utility model aims to solve the problem that at least one technical problem present in prior art.
Therefore, the purpose of this utility model is that there is provided a kind of prefabrication outrigger.
To achieve the above object, the embodiment of the utility model first aspect is provided outside a kind of prefabrication Frame, including:Base assembly, the base assembly can be fixed on external wall by fixture, and on the base assembly Provided with the fender rod for installing steel plate protection network;Mounting bracket component, is arranged on the base assembly by the first connector; Scaffold board, is arranged on the mounting bracket component by the second connector;The steel plate protection network, installed in the fender rod On;Wherein, the mounting bracket component can be realized to be fastenedly connected by first connector with the base assembly (refers to installation Frame group is fixedly connected with base assembly, and the two can not relative motion) or be flexibly connected and (refer to the company of mounting bracket group and base assembly Connect and do not fix, the two can be with relative motion), when the mounting bracket component is fastenedly connected with the base assembly, the installation Frame component is mutually fixed with the base assembly, when the mounting bracket component is flexibly connected with the base assembly, can adjust institute State mounting bracket component and the base assembly relative position.
Specifically, it can also be one piece of whole plate that scaffold board, which can include polylith daughter board,.
This programme realizes the modularized production of construction exterior rack, and the prefabrication outrigger completes assembling when dispatching from the factory Work, prefabrication outrigger is transported after engineering site, directly according to the size and shape of external wall, will be corresponding What the prefabrication outrigger head and the tail of number leant is installed on external wall, so substantially reduces to build and builds The workload of outrigger is built, engineering time is saved.In this programme, the build process of construction exterior rack is as follows, first by the pre- of respective numbers Assembled architecture outrigger processed is installed one around the exterior wall of building bottom and enclosed, then again by outside the prefabrication of respective numbers Frame is installed one around the exterior wall of the building second layer and enclosed, and so just completes building for construction exterior rack, completes the construction of bottom exterior wall After operation, all prefabrication outriggers on bottom exterior wall are pulled down, afterwards by these prefabrication outriggers Bypass upper strata prefabrication outrigger and hang and rise to building third layer position, finally pacify these prefabrication outriggers On third layer exterior wall, to being constructed on third layer exterior wall, by that analogy, by two layers of prefabrication outside Frame alternate cycles, which are climbed, just can make the construction of workman's completion whole building exterior wall, substantially reduce the consumption of construction exterior rack material, drop The low cost for building outrigger.Wherein, wall corner part, first adjusts the side walls of turning one and tightens the prefabricated assembled of adjacent turning The first connector in construction exterior rack, makes mounting bracket component be flexibly connected with base assembly, and the position of mounting bracket component is adjusted afterwards Put, the mounting bracket component is stretched out exterior wall turning, so that the scaffold board on the mounting bracket component is tightened with another side walls in turning The scaffold board of the prefabrication outrigger at adjacent turning is contradicted, and first connector is then adjusted again makes the mounting bracket group Part is fixedly connected with base assembly.
Also, the prefabrication outrigger that this programme is provided is reusable, the construction of an external wall is completed After work, the prefabrication outrigger pulled down can also be used on other external walls, be installed outside prefabrication Frame, can adjust mounting bracket group according to the concrete shape size of external wall and the installation site of contiguous prefabricated assembled architecture outrigger The relative position of part and base assembly, so that product is applied to the various sizes of exterior wall of different shape, it is outer this avoid building The waste of frame material, significantly reduces the cost of engineering.
In any of the above-described technical scheme, it is preferable that the base assembly includes two tripods, each tripod On be respectively equipped with the fender rod, the fender rod is close to the front end of the tripod.
The simple in construction and support effect of tripod is good, and base group can be had from two tripods ensureing base assembly The cost of product is reduced while excellent support effect.Alternatively, tripod can be formed by two channel-section steels and a tube-welding, two grooves One end of steel welds together at a right angle, and welded tube two ends are respectively welded in the other end of two channel-section steels, and fender rod is welded on horizontally disposed Channel-section steel on, and fender rod and channel-section steel junction are provided with reinforcement, and the such design cost of tripod is low and support effect is good, wherein The welded tube of tripod generally selects φ 48.3 × 3.5 fluid welded tube.
In the above-mentioned technical solutions, it is preferable that the mounting bracket component includes:Two mounting rods, two mounting rods Parallel and interval setting, the every mounting rod is connected by first connector with described two tripods respectively;At least A piece support bar, the they sup-port is between two mounting rods.
In the program, two mounting rods are used to install scaffold board, and the support bar being supported between two mounting rods increases The big intensity of mounting bracket component, such the simple in construction of design and installation part, cost are low, and structural stability is high.
Specifically, the length of scaffold board is more than or equal to the length of mounting rod, so that two prefabrication outriggers are supported Rearward, gap is not present between two scaffold boards.
In any of the above-described technical scheme, it is preferable that the rear and front end of each tripod respectively sets a hanger.
This programme hangs liter prefabrication outrigger and hanger is provided with tripod for convenience, can so be lifted prefabricated Assembled architecture outrigger hangs the efficiency risen, so as to speed up the work.
In any of the above-described technical scheme, it is preferable that the fender rod upper and lower part respectively sets a railing, described in every Railing is connected with the fender rod on described two tripods respectively, and the steel plate protection network passes through the first U bolt and institute State railing connection.
In this programme, railing is added on fender rod, and steel plate protection network is arranged on the safety that railing improves product Property, steel plate protection network is connected by the first U bolt with railing, such workman can be adjusted according to actual conditions steel plate protection network with The relative position of railing.
In the above-mentioned technical solutions, it is preferable that the scaffold board can be with the mounting bracket by second connector Component realizes that being fastenedly connected (refer to mounting bracket group to be fixedly connected with scaffold board, the two can not relative motion) or flexible connection (refers to The connection of mounting bracket group and scaffold board is not fixed, and the two can be with relative motion), the scaffold board and the mounting bracket component are tight When being solidly connected, the scaffold board is mutually fixed with the mounting bracket component, and the scaffold board is flexibly connected with the mounting bracket component When, the scaffold board and the mounting bracket component relative position can be adjusted.
In the program, scaffold board and mounting bracket component relative position are adjustable, install prefabrication outrigger, can basis The concrete shape size of external wall and the installation site of contiguous prefabricated assembled architecture outrigger adjustment mounting bracket component and pin hand The relative position of plate, so that product better adapts to the various sizes of exterior wall of different shape.
In any of the above-described technical scheme, it is preferable that first connector includes multiple second U bolts, described many Half in individual second U bolt is sleeved on one in two mounting rods and connected respectively with described two tripods Connect, second half in the multiple second U bolt be sleeved on another in two mounting rods and respectively with it is described Two tripod connections.
Specifically, the second U bolt of correspondence respectively sets the mounting hole group of respective number, each peace on each tripod Filling hole group includes two through holes, and the two ends of second U bolt are screwed after being each passed through two through holes with nut.Tighten nut When, mounting rod is fixedly connected with tripod, when unscrewing nut, and mounting rod is flexibly connected with tripod, can adjust mounting rod and three The relative position of foot stool.
In the program, mounting rod is connected by the second U bolt with tripod, and tripod is located at the lower section of mounting rod, the Two U bolts are centered around the front of mounting rod, above and behind, and such second U bolt can be prevented effectively from mounting rod from three pin The problem of being come off on frame, improves the security of product.Wherein preferably, the two ends of support bar are sleeved on by set piece On two mounting rods, the two ends of support bar and the relative position of mounting rod can be adjusted respectively, and so design causes two to install Bar can be adjusted according to the actual requirements respectively with respect to the position of tripod, and the relative position of two mounting rods and tripod can be with It is different.
In any of the above-described technical scheme, it is preferable that second connector includes multiple 3rd U bolts, described many Half in individual 3rd U bolt is sleeved on one in two mounting rods, another in the multiple 3rd U bolt Half is sleeved on another in two mounting rods, and the multiple 3rd U bolt connects with the scaffold board respectively Connect.
Specifically, left and right ends the 3rd U bolt of correspondence of scaffold board respectively sets the mounting hole group of respective number, Mei Gesuo Stating mounting hole group includes two through holes, and the two ends of the 3rd U bolt are screwed after being each passed through two through holes with nut.Tighten During nut, mounting rod is fixedly connected with scaffold board, when unscrewing nut, and mounting rod is flexibly connected with scaffold board, can adjust scaffold board With the relative position of mounting rod.
In correlation technique, generally set and link up with scaffold board both sides, scaffold board is by hanging on construction exterior rack, so Scaffold board easily comes off from construction exterior rack, there is potential safety hazard.In this programme, scaffold board is by the 3rd U bolt with installing Bar is connected, and the 3rd U bolt is set on mounting rod and is connected with scaffold board, it is ensured that the 3rd U bolt will not be from mounting rod Come off, so as to be prevented effectively from the problem of scaffold board comes off from mounting rod, improve the security of product.
In any of the above-described technical scheme, it is preferable that angle steel is respectively welded in the left and right ends of the lower surface of the scaffold board, The mounting hole group coordinated with the 3rd U bolt is arranged on angle steel.
Mounting hole group be set directly at the 3rd U bolt on angle steel two ends can be reached through mounting hole scaffold board it On, workman is so easily tripped, there is potential safety hazard, angle bar is welded on scaffold board, mounting hole group is arranged on angle bar and solved Determine above mentioned problem, improved the security of product.
In any of the above-described technical scheme, it is preferable that the fixture is to be arranged with pad on bolt, the bolt.
In the program, cavity is reserved on exterior wall and tripod, bolt passes through cavity and nut on exterior wall and tripod Screw, so that the installation for completing tripod is fixed.Specifically, bolt can select the special exterior wall connecting bolts such as HOOK BOLTS, be Avoid the occurrence of that pressure that bolt head produces to wall is excessive to cause the problem of wall is damaged, pad can be set with bolt.And And, pad can also prevent the problem of screw rod is deviate from from exterior wall hole, improve the security of product.
In any of the above-described technical scheme, it is preferable that the prefabrication outrigger also includes:At least one reinforcement Bar, described bracing piece one end is connected with the tripod, and the other end is connected with the support bar.
Bracing piece increases the intensity of prefabrication outrigger, improves the stability of product structure.Preferably, plus The two ends of strong bar are connected by fastener with tripod and support bar respectively, wherein, bracing piece is generally from φ's 48.3 × 3.5 Fluid welded tube.
Additional aspect and advantage of the present utility model will become obvious in following description section, or new by this practicality The practice of type is recognized.
Brief description of the drawings
Of the present utility model above-mentioned and/or additional aspect and advantage will from description of the accompanying drawings below to embodiment is combined Become substantially and be readily appreciated that, wherein:
Fig. 1 is the structural representation for the prefabrication outrigger that the embodiment of the utility model one is provided;
Fig. 2 is the structural representation of main view of the prefabrication outrigger on exterior wall shown in Fig. 1;
Fig. 3 is the structural representation of vertical view of the prefabrication outrigger on exterior wall shown in Fig. 1;
Fig. 4 is the partial enlargement structural representation of the prefabrication outrigger shown in Fig. 1;
Fig. 5 is the partial structural diagram that the tripod shown in Fig. 1 is connected with exterior wall;
Fig. 6 is the structural representation of the tripod shown in Fig. 1.
Wherein, the corresponding relation between references and component names of the Fig. 1 into Fig. 6 is:
1 exterior wall, 2 tripods, 201 channel-section steels, 2011 reinforcements, 202 welded tubes, 3 fixtures, 301 pads, 4 mounting rods, 5 Strut, 6 second U bolts, 7 the 3rd U bolts, 8 scaffold boards, 9 hangers, 10 fender rods, 11 steel plates install net, 12 railings, 13 Bracing piece, 14 first U bolts.
Embodiment
In order to be more clearly understood that above-mentioned purpose of the present utility model, feature and advantage, below in conjunction with the accompanying drawings and tool The utility model is further described in detail body embodiment.It should be noted that in the case where not conflicting, this Shen The feature in embodiment and embodiment please can be mutually combined.
Many details are elaborated in the following description to fully understand the utility model, still, this practicality It is new to be different from mode described here using other and implement, therefore, protection domain of the present utility model not by The limitation of following public specific embodiment.
As shown in Figures 1 to 5, the embodiment of the utility model first aspect is provided outside a kind of prefabrication Frame, including:Base assembly, the base assembly can be fixed on external wall 1 by fixture 3, and on the base assembly Provided with the fender rod 10 for installing steel plate protection network 11;Mounting bracket component, the base group is arranged on by the first connector On part;Scaffold board 8, is arranged on the mounting bracket component by the second connector;The steel plate protection network 11, installed in described On fender rod 10;Wherein, the mounting bracket component can be realized with the base assembly by first connector and is fastenedly connected (referring to mounting bracket group to be fixedly connected with base assembly, the two not can be movable relatively) or flexible connection (refer to mounting bracket group and base group The connection of part is not fixed, and the two can be with relative motion), it is described when the mounting bracket component is fastenedly connected with the base assembly Mounting bracket component is mutually fixed with the base assembly, when the mounting bracket component is flexibly connected with the base assembly, can adjust The mounting bracket component and the base assembly relative position.
Specifically, it can also be one piece of whole plate that scaffold board 8, which can include polylith daughter board,.
This programme realizes the modularized production of construction exterior rack, and the prefabrication outrigger completes assembling when dispatching from the factory Work, prefabrication outrigger is transported after engineering site, directly according to the size and shape of external wall 1, by phase Answer number prefabrication outrigger head and the tail lean be installed on external wall 1, so substantially reduce and take The workload of construction exterior rack is built, engineering time is saved.In this programme, the build process of construction exterior rack is as follows, first by respective numbers Prefabrication outrigger around building bottom exterior wall 1 install one enclose, then again by the prefabricated assembled of respective numbers Construction exterior rack is installed one around the exterior wall 1 of the building second layer and enclosed, and so just completes building for construction exterior rack, completes bottom exterior wall After 1 construction operation, all prefabrication outriggers on bottom exterior wall 1 are pulled down, it is afterwards that these are prefabricated assembled Construction exterior rack, which bypasses upper strata prefabrication outrigger and hung, rises to building third layer position, finally prefabricated assembled builds these Outrigger is built on third layer exterior wall 1, to being constructed on third layer exterior wall 1, by that analogy, to pass through two layers of prefabricated dress Being climbed with formula construction exterior rack alternate cycles just can make the construction of workman's completion whole building exterior wall 1, substantially reduce construction exterior rack material The consumption of material, reduces the cost for building outrigger.Wherein, wall corner part, first adjusts the side walls of turning one and tightens adjacent turning Prefabrication outrigger in the first connector, mounting bracket component is flexibly connected with base assembly, afterwards adjustment peace The position of component is shelved, the mounting bracket component is stretched out the turning of exterior wall 1, so that scaffold board 8 and turning on the mounting bracket component The scaffold board 8 that another side walls tighten the prefabrication outrigger at adjacent turning is contradicted, and first connection is then adjusted again Part makes the mounting bracket component be fixedly connected with base assembly.
Also, the prefabrication outrigger that this programme is provided is reusable, the construction of an external wall 1 is completed After work, the prefabrication outrigger pulled down can also be used on other external walls 1, be installed outside prefabrication Frame, can adjust mounting bracket according to the concrete shape size of external wall 1 and the installation site of contiguous prefabricated assembled architecture outrigger The relative position of component and base assembly, so that product is applied to the various sizes of exterior wall 1 of different shape, this avoid building The waste of outer frame material, significantly reduces the cost of engineering.
As shown in Figures 1 to 6, in any of the above-described technical scheme, it is preferable that the base assembly includes two tripods 2, the fender rod 10 each is respectively equipped with the tripod 2, the fender rod 10 is close to the front end of the tripod 2.
The simple in construction and support effect of tripod 2 is good, and base group can ensure base assembly tool from two tripods 2 The cost of product is reduced while having excellent support effect.Alternatively, tripod 2 can be welded by two channel-section steels 201 and a welded tube 202 Form, one end of two channel-section steels 201 welds together at a right angle, the two ends of welded tube 202 are respectively welded in the other end of two channel-section steels 201, prevent Guard bar 10 is welded on horizontally disposed channel-section steel 201, and fender rod 10 is provided with reinforcement 2011, three pin with the junction of channel-section steel 201 The such design cost of frame 2 is low and support effect is good, and wherein the welded tube 202 of tripod 2 is generally used from φ 48.3 × 3.5 fluid Welded tube.
As shown in Figures 1 to 4, in the above-mentioned technical solutions, it is preferable that the mounting bracket component includes:Two mounting rods 4, two mounting rods 4 are parallel and are arranged at intervals, and the every mounting rod 4 passes through first connector and described two respectively Individual tripod 2 is connected;At least one support bar 5, the support bar 5 is supported between two mounting rods 4.
In the program, two mounting rods 4 are used to install scaffold board 8, are supported on the support bar between two mounting rods 4 5 increase the intensity of mounting bracket component, and such the simple in construction of design and installation part, cost are low, and structural stability is high.
Specifically, the length of scaffold board 8 is more than or equal to the length of mounting rod 4, so that two prefabrication outriggers Against rear, gap is not present between two scaffold boards 8.
As shown in fig. 6, in any of the above-described technical scheme, it is preferable that the rear and front end of each tripod 2 is respectively set One hanger 9.
This programme hangs liter prefabrication outrigger and hanger 9 is provided with tripod 2 for convenience, can so be lifted pre- Assembled architecture outrigger processed hangs the efficiency risen, so as to speed up the work.
As shown in figure 4, in any of the above-described technical scheme, it is preferable that the upper and lower part of fender rod 10 respectively sets one Railing 12, the every railing 12 is connected with the fender rod 10 on described two tripods 2 respectively, the steel plate protection network 11 are connected by the first U bolt 14 with the railing 12.
In this programme, railing 12 is added on fender rod 10, and steel plate protection network 11 is improved into production installed in railing 12 The security of product, steel plate protection network 11 is connected by the first U bolt 14 with railing 12, and such workman can adjust according to actual conditions The relative position of whole steel plate protection network 11 and railing 12.
In the above-mentioned technical solutions, it is preferable that the scaffold board 8 can be with the mounting bracket group by second connector Part, which is realized to be fastenedly connected and (refer to mounting bracket group to be fixedly connected with scaffold board 8, the two not can be movable relatively) or be flexibly connected, (refers to installation Frame group and the connection of scaffold board 8 are not fixed, and the two can be with relative motion), the scaffold board 8 is fastened with the mounting bracket component to be connected When connecing, the scaffold board 8 is mutually fixed with the mounting bracket component, when the scaffold board 8 is flexibly connected with the mounting bracket component, It can adjust the scaffold board 8 and the mounting bracket component relative position.
In the program, scaffold board 8 and mounting bracket component relative position are adjustable, install prefabrication outrigger, can root According to the concrete shape size and the installation site adjustment mounting bracket component and pin of contiguous prefabricated assembled architecture outrigger of external wall 1 The relative position of palm 8, so that product better adapts to the various sizes of exterior wall 1 of different shape.
As shown in figure 4, in any of the above-described technical scheme, it is preferable that first connector includes multiple second U-shaped spiral shells Half in bolt 6, the multiple second U bolt 6 is sleeved on one in two mounting rods 4 and respectively with described two Individual tripod 2 is connected, and second half in the multiple second U bolt 6 is sleeved on another in two mounting rods 4 And be connected respectively with described two tripods 2.
Specifically, the second U bolt of correspondence 6 respectively sets the mounting hole group of respective number on each tripod 2, each described Mounting hole group includes two through holes, and the two ends of second U bolt 6 are screwed after being each passed through two through holes with nut.Tighten During nut, mounting rod 4 is fixedly connected with tripod 2, when unscrewing nut, and mounting rod 4 is flexibly connected with tripod 2, can adjust peace Fill the relative position of bar 4 and tripod 2.
In the program, mounting rod 4 is connected by the second U bolt 6 with tripod 2, and tripod 2 is located under mounting rod 4 Side, the second U bolt 6 is centered around the front of mounting rod 4, above and behind, can so be prevented effectively from mounting rod 4 from tripod 2 On the problem of come off, improve the security of product.Wherein preferably, the two ends of support bar 5 are sleeved on by set piece On two mounting rods 4, the two ends of support bar 5 can be adjusted respectively with the relative position of mounting rod 4, and so design causes two peaces Dress bar 4 can be adjusted according to the actual requirements respectively with respect to the position of tripod 2, the relative position of two mounting rods 4 and tripod 2 Putting can be different.
As shown in figure 4, in any of the above-described technical scheme, it is preferable that second connector includes multiple 3rd U-shaped spiral shells Half in bolt 7, the multiple 3rd U bolt 7 is sleeved on one in two mounting rods 4, the multiple 3rd U Second half in shape bolt 7 is sleeved on another in two mounting rods 4, and the multiple 3rd U bolt 7 is distinguished It is connected with the scaffold board 8.
Specifically, the U bolt 7 of left and right ends correspondence the 3rd of scaffold board 8 respectively sets the mounting hole group of respective number, each The mounting hole group includes two through holes, and the two ends of the 3rd U bolt 7 are screwed after being each passed through two through holes with nut. When tightening nut, mounting rod 4 is fixedly connected with scaffold board 8, when unscrewing nut, and mounting rod 4 is flexibly connected with scaffold board 8, adjustable The relative position of whole scaffold board 8 and mounting rod 4.
In 3rd U bolt correlation technique, generally set and link up with scaffold board both sides, scaffold board is by hanging over building On outrigger, such scaffold board easily comes off from construction exterior rack, there is potential safety hazard.In this programme, scaffold board 8 passes through the 3rd U Shape bolt 7 is connected with mounting rod 4, and the 3rd U bolt 7 is set on mounting rod 4 and is connected with scaffold board 8, it is ensured that the 3rd U-shaped spiral shell Bolt 7 will not come off from mounting rod 4, so as to be prevented effectively from the problem of scaffold board 8 comes off from mounting rod 4, improve The security of product.
In any of the above-described technical scheme, it is preferable that angle is respectively welded in the left and right ends of the lower surface of the scaffold board 8 Steel, the mounting hole group coordinated with the 3rd U bolt 7 is arranged on angle steel.
The two ends that mounting hole group is set directly at the 3rd U bolt 7 on angle steel can reach scaffold board 8 through mounting hole On, workman is so easily tripped, there is potential safety hazard, angle bar is welded on scaffold board 8, mounting hole group is arranged on angle bar Above mentioned problem is solved, the security of product is improved.
As shown in figure 5, in any of the above-described technical scheme, it is preferable that the fixture 3 is to be covered on bolt, the bolt Provided with pad 301.
In the program, reserve cavity on exterior wall 1 and tripod 2, bolt through the cavity on exterior wall 1 and tripod 2 with Nut is screwed, so that the installation for completing tripod 2 is fixed.Specifically, bolt can select the special connection of exterior wall 1 spiral shell such as HOOK BOLTS Bolt, to avoid the occurrence of, pressure that bolt head produces to wall is excessive to cause the problem of wall is damaged, and pad can be set with bolt Piece 301.Also, pad 301 can also prevent the problem of screw rod is deviate from from the hole of exterior wall 1, improve the security of product.
As depicted in figs. 1 and 2, in any of the above-described technical scheme, it is preferable that the prefabrication outrigger is also wrapped Include:At least one bracing piece 13, described one end of bracing piece 13 is connected with the tripod 2, and the other end connects with the support bar 5 Connect.
Bracing piece 13 increases the intensity of prefabrication outrigger, improves the stability of product structure.Preferably, The two ends of bracing piece 13 are connected by fastener with tripod 2 and support bar 5 respectively, wherein, bracing piece 13 generally selects φ 48.3 × 3.5 fluid welded tube.
In description of the present utility model, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", etc. instruction orientation or position relationship be based on orientation shown in the drawings or position relationship, It is for only for ease of description the utility model and simplifies description, rather than indicates or imply that the device or element of meaning must have Specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.Term " the One ", " second ", " the 3rd " are only used for the purpose described, and it is not intended that relative importance is indicated or imply, unless otherwise bright True regulation and restriction.
In description of the present utility model, term " installation ", " connection ", " fixation " etc. all should be interpreted broadly, for example, " connection " can be fixedly connected or be detachably connected, or be integrally connected;Can be joined directly together, can also lead to Intermediary is crossed to be indirectly connected to.For the ordinary skill in the art, above-mentioned term can be understood as the case may be Concrete meaning in the utility model.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc. Mean that combining the embodiment or specific features, structure, material or the feature of example description is contained in of the present utility model at least one In individual embodiment or example.In this manual, identical embodiment is not necessarily referring to the schematic representation of above-mentioned term Or example.Moreover, specific features, structure, material or the feature of description can be in any one or more embodiments or examples In combine in an appropriate manner.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (10)

1. a kind of prefabrication outrigger, it is characterised in that including:
Base assembly, the base assembly can be fixed on external wall by fixture, and the base assembly is provided with Fender rod for installing steel plate protection network;
Mounting bracket component, is arranged on the base assembly by the first connector;
Scaffold board, is arranged on the mounting bracket component by the second connector;
The steel plate protection network, on the fender rod;
Wherein, the mounting bracket component can be realized with the base assembly by first connector and is fastenedly connected or activity Connection, when the mounting bracket component is fastenedly connected with the base assembly, the mounting bracket component is mutually solid with the base assembly It is fixed, when the mounting bracket component is flexibly connected with the base assembly, the mounting bracket component and the base group can be adjusted Part relative position.
2. prefabrication outrigger according to claim 1, it is characterised in that
The base assembly includes being respectively equipped with the fender rod on two tripods, each tripod.
3. prefabrication outrigger according to claim 2, it is characterised in that the mounting bracket component includes:
Two mounting rods, two mounting rods are parallel and are arranged at intervals, and the every mounting rod connects by described first respectively Fitting is connected with described two tripods;
At least one support bar, the they sup-port is between two mounting rods.
4. prefabrication outrigger according to claim 2, it is characterised in that
The rear and front end of each tripod respectively sets a hanger.
5. prefabrication outrigger according to claim 2, it is characterised in that
The fender rod upper and lower part respectively sets a railing, the every railing respectively with described two tripods described in Fender rod is connected, and the steel plate protection network is connected by the first U bolt with the railing.
6. prefabrication outrigger according to any one of claim 1 to 5, it is characterised in that
The scaffold board can be fastenedly connected or be flexibly connected with mounting bracket component realization by second connector, institute When stating scaffold board and the mounting bracket component and being fastenedly connected, the scaffold board is mutually fixed with the mounting bracket component, the pin hand When plate is flexibly connected with the mounting bracket component, the scaffold board and the mounting bracket component relative position can be adjusted.
7. prefabrication outrigger according to any one of claim 1 to 5, it is characterised in that
First connector includes multiple second U bolts.
8. prefabrication outrigger according to any one of claim 1 to 5, it is characterised in that
Second connector includes multiple 3rd U bolts.
9. prefabrication outrigger according to any one of claim 1 to 5, it is characterised in that
The fixture is to be arranged with pad on bolt, the bolt.
10. prefabrication outrigger according to claim 3, it is characterised in that also include:
At least one bracing piece, described bracing piece one end is connected with the tripod, and the other end is connected with the support bar.
CN201621419319.9U 2016-12-22 2016-12-22 Prefabrication outrigger Active CN206376507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621419319.9U CN206376507U (en) 2016-12-22 2016-12-22 Prefabrication outrigger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621419319.9U CN206376507U (en) 2016-12-22 2016-12-22 Prefabrication outrigger

Publications (1)

Publication Number Publication Date
CN206376507U true CN206376507U (en) 2017-08-04

Family

ID=59408936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621419319.9U Active CN206376507U (en) 2016-12-22 2016-12-22 Prefabrication outrigger

Country Status (1)

Country Link
CN (1) CN206376507U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108723625A (en) * 2018-05-16 2018-11-02 安徽猎豹汽车有限公司 A kind of automobile body-in-white welding technique
CN108747138A (en) * 2018-05-16 2018-11-06 安徽猎豹汽车有限公司 A kind of automobile body-in-white Welder shelves
CN110552495A (en) * 2019-09-24 2019-12-10 北京城建亚泰建设集团有限公司 assembled building combined tool type outer protective frame system and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108723625A (en) * 2018-05-16 2018-11-02 安徽猎豹汽车有限公司 A kind of automobile body-in-white welding technique
CN108747138A (en) * 2018-05-16 2018-11-06 安徽猎豹汽车有限公司 A kind of automobile body-in-white Welder shelves
CN110552495A (en) * 2019-09-24 2019-12-10 北京城建亚泰建设集团有限公司 assembled building combined tool type outer protective frame system and construction method thereof

Similar Documents

Publication Publication Date Title
CN206376507U (en) Prefabrication outrigger
CN201826525U (en) Climbing shuttering system device for buildings
CN204024005U (en) Assembly type suspension platform
CN201598820U (en) Single-point suspension external hanging rack
CN104018656A (en) Scaffold construction method for prefabricated outer wall
CN207847033U (en) A kind of scaffold for building convenient for adjusting
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN206844431U (en) A kind of curtain wall construction support
CN210947854U (en) Support frame for steel structure construction with good stability
CN203066844U (en) Folding protective-type climbing ladder
CN204024097U (en) Skin safety net bracing frame
CN207436481U (en) A kind of Novel high-rise construction external scaffolding
CN104389415B (en) Scaffold
CN208039666U (en) Assembled stairs module
CN201148726Y (en) Independent hanging scaffold super large operating platform
CN202767547U (en) Nuclear plant construction safety rope fixing clamping rod
CN205936370U (en) Module cat ladder that can disassemble
CN103966990A (en) Single-rack pile leg block closure method and single-rack pile leg block closure tool
CN207988462U (en) A kind of succinct steel construction elevator hoistway construction platform
CN209129335U (en) A kind of construction carrier
CN107269014B (en) Hydraulic climbing formwork angle-variable protective net system
CN215630675U (en) Assembled building element based on BIM
CN209114849U (en) A kind of building fabricated scaffold
CN216583766U (en) Size-adjustable laminated slab lifting appliance with lifting function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant