CN206369038U - The fast connector for pipeline for being easily installed and repairing - Google Patents
The fast connector for pipeline for being easily installed and repairing Download PDFInfo
- Publication number
- CN206369038U CN206369038U CN201720016887.2U CN201720016887U CN206369038U CN 206369038 U CN206369038 U CN 206369038U CN 201720016887 U CN201720016887 U CN 201720016887U CN 206369038 U CN206369038 U CN 206369038U
- Authority
- CN
- China
- Prior art keywords
- gland
- pipeline
- packing ring
- sealing ring
- connector body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
A kind of fast connector for pipeline for being easily installed and repairing, including connector body, the gland being connected with connector body fits, the side of the gland is in funnel-form, the first packing ring is provided with the gland, first sealing ring and the second sealing ring, one end of first packing ring is offseted by the first sealing ring with the connector body, the other end of first packing ring is offseted by the second sealing ring with the gland, at least provided with two supporting pads on the inwall of first packing ring, the inwall of each supporting pad, which is radially provided with, is used for identical projection corresponding with the through hole on pipeline, when using, the port of pipeline flushes in the connector body port of homonymy all the time, or be always positioned at outside the connector body.The utility model have not only easily dismounting and maintenance, dismounting and maintenance and without affecting body, while gland again easily exited from pipeline, be convenient to mount and dismount, the advantage that cost is low.
Description
Technical field
The utility model is related to fast connector for pipeline field, and especially a kind of pipeline for being easily installed and repairing quickly connects
Joint.
Background technology
The U of Chinese patent literature CN 205136881 disclose a kind of fluid line snap joint, including adapter body 100
It is by screw thread between the adapter body 100 and the gland 200 with the gland 200 being set in the adapter body 100
Connection, the port of the adapter body 100 be provided with impeller 300, sealing ring 600 set the adapter body 100 with
Offseted between the impeller 300 and with the impeller 300, the port of the gland 200 is provided with the first bulge loop 700, institute
State constituted between the inner side of the first bulge loop 700 and the outer end of the impeller 300 for house the raised line 500 on pipeline first
Accommodation space 400.The fluid line snap joint of such a structure, the pipeline 800 of connection is extend into inside adapter body 100
And be proximate to the position at the center of adapter body 100(As shown in figure 1, Fig. 1 is the use state of fluid line snap joint
Sectional view), although such structure enable to the pipeline being connected to be difficult to shake off so that the connection between the pipeline being connected
More firmly, still, during use, also there are following inconvenience:First, when the fluid line in the utility model is quick
Need to disassemble after joint failure when being changed or being repaired, after maintenance personal unclamps gland 200, in addition it is also necessary to by pipeline
800 exit from adapter body 100, are at this moment accomplished by moving pipeline 800, could be successfully by whole fluid line snap joint
Disassemble, still, what pipeline 800 was usually fixed, and be connected and constitute with other pipelines one it is huge netted
Pipe-line system, therefore, pipeline 800 be not only difficult to exit, even and if exit, be also that the position for influencing whether other pipelines is consolidated
It is fixed, i.e., " pull one hair and move the whole body ", very trouble, all very big, the cost of consuming that exits engineering of any one pipeline
Height, therefore, maintenance and maintenance to daily pipe-line system bring very big trouble.Second, due to being provided with pipeline 800
Raised line 500, raised line 500 is to the conditional effect of gland 200, therefore, even if pipeline 800 unclamped from adapter body 100 or
Person exits, and gland 200 therein is difficult to be exited from pipeline 800, is unfavorable for the replacing and maintenance of gland 200.
Utility model content
In order to overcome above mentioned problem, the utility model provides a kind of not only easy dismounting and maintenance, dismounting to society and tieed up
Repair and without affecting body, at the same gland be easier again it is being exited from pipeline, be convenient to mount and dismount, cost is low is easily installed
With the fast connector for pipeline of maintenance.
The technical solution of the utility model is:A kind of fast connector for pipeline for being easily installed and repairing is provided, including even
Joint body, the gland being connected with connector body fits, the side of the gland are in funnel-form, provided with the in the gland
One packing ring, the first sealing ring and the second sealing ring, one end of first packing ring pass through the first sealing ring and the connector sheet
Body phase is supported, and the other end of first packing ring is offseted by the second sealing ring with the gland, on the inwall of first packing ring
At least provided with two supporting pads, the inwall of each supporting pad be radially provided be used for it is corresponding with the through hole on pipeline identical
Projection, in use, the port of pipeline flushes in the connector body port of homonymy all the time, or is always positioned at the connector sheet
Outside body.
Improved as to of the present utility model, the port of the connector body is provided with the first half deep-slotted chip breakers, described first
Packing ring is provided with the second half deep-slotted chip breakers, the closed space use that are corresponding with the first half deep-slotted chip breaker and collectively forming closed space
In accommodating first sealing ring.
Improved as to of the present utility model, the connector body is provided with threaded first engaging lug, the gland
Provided with threaded second engaging lug, the first engaging lug is connected by screw rod and the second engaging lug realize the connector body and
The connection of the gland.
A kind of fast connector for pipeline for being easily installed and repairing, including gland, the side of the gland is in funnel-form,
The first packing ring, the first sealing ring and the second sealing ring are provided with the gland, one end of first packing ring passes through the first sealing
Enclose for being offseted with second packing ring, the other end of first packing ring is offseted by the second sealing ring with the gland, described the
At least provided with two supporting pads on the inwall of one packing ring, the inwall of each supporting pad be radially provided with for it is logical on pipeline
The identical projection of hole correspondence, in use, the port of pipeline is flushed in or less than the inner port with the gland of pipeline homonymy all the time.
The utility model in the gland due to being provided with the first packing ring, the first sealing ring and the second sealing ring, described the
One end of one packing ring is offseted by the first sealing ring with the connector body, and the other end of first packing ring is close by second
Seal offsets with the gland, at least provided with two supporting pads on the inwall of first packing ring, and each the supporting pad is interior
Wall, which is radially provided with, is used for identical projection corresponding with the through hole on pipeline, in use, the port of pipeline flushes in homonymy all the time
Connector body port, or be always positioned at outside the connector body;Therefore, the utility model is in the process used
In, after the connection between gland and connector body is unclamped, just directly connector body can be removed, then by gland
Interior the first packing ring, the first sealing ring and the second sealing ring takes out, and the process of whole dismounting all need not be by the pipe of connection
Body is retreated, and also avoids the need for moving body, just can realize the dismounting of connection pipe joint;Simultaneously as each supporting pad
Inwall be radially provided with and be used for the projection coincideing corresponding with the through hole on pipeline, during dismounting, when by described first
After packing ring, the first sealing ring and the second sealing ring take out, just successfully gland can be taken out, relative to prior art
Gland can more successfully be taken out, also completely can just dismantled whole connector by speech, the utility model from pipeline, because
This, also more facilitates when installation, is more favorable for the maintenance and maintenance of connector of the present utility model, the cost of dismounting is more
It is low;Therefore, the utility model has not only easily dismounting and maintenance, dismounting and maintenance but also without affecting body, presses simultaneously
Lid again be easier exited from pipeline, be convenient to mount and dismount, the advantage that cost is low.
Brief description of the drawings
Fig. 1 is the sectional view of the use state of existing fluid line snap joint.
Fig. 2 is the use state sectional view of the first embodiment in the utility model.
Fig. 3 is the schematic diagram after the amplification at the A in Fig. 2.
Fig. 4 is Fig. 2 dimensional structure diagram.
Fig. 5 is the use state sectional view of second of embodiment in the utility model.
Fig. 6 is the use state sectional view of the third embodiment in the utility model.
Fig. 7 is the use state sectional view of the 4th kind of embodiment in the utility model.
Fig. 8 is the schematic diagram after amplifying at the B in Fig. 7.
Fig. 9 is Fig. 7 dimensional structure diagram.
Embodiment
In description of the present utility model, it is to be understood that " " center ", " on " in term, " under ", "front", "rear",
The orientation or position relationship of the instructions such as "left", "right" are, based on orientation shown in the drawings or position relationship, to be for only for ease of and retouch
State the utility model and simplify and describe, rather than indicate or imply signified device or element must have specific orientation, with
Specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " first ", " second "
It is only used for describing purpose, and it is not intended that indicating or implying relative importance.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model
Dress ", " connection ", " connected " should be interpreted broadly, for example, it may be being fixedly connected with or dismantling connection, or integratedly be connected
Connect;Can be mechanical connection or electrical connection;Can be joined directly together or be indirectly connected to by intermediary,
It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
Language is in concrete meaning of the present utility model.In addition, in description of the present utility model, unless otherwise indicated, " multiple ", " some "
It is meant that two or more.
Referring first to Fig. 2 to Fig. 4, what Fig. 2 to Fig. 4 was disclosed is the first of the fast connector for pipeline for being easily installed and repairing
Kind of embodiment, a kind of fast connector for pipeline for being easily installed and repairing, including connector body 1, match somebody with somebody with connector body 1
Close in the gland 2 of connection, the present embodiment, the connector body 1 is through-type connector, and the gland 2 has two, the pressure
The side of lid 2 is in funnel-form, and the gland 2 port provided with a circle bulge loop 20, in the gland 2 provided with the first packing ring 3,
First sealing ring 51 and the second sealing ring 52, one end of first packing ring 3 pass through the first sealing ring 51 and the connector sheet
Body 1 is offseted, and the other end of first packing ring 3 is offseted by the inner side of the second sealing ring 52 and the bulge loop 20 of the gland 2, institute
State at least provided with two supporting pads 4 on the inwall of the first packing ring 3, wherein, the number of the supporting pad 4 is preferably 2 to 4,
It is that provided with 4 supporting pads 4, the inwall of each supporting pad 4 is along footpath on the inwall of first packing ring 3 in the present embodiment
To provided with for identical projection 40 corresponding with the through hole 91 on pipeline 9, correspondingly, on pipeline 9 correspond to each support
The position of pad 4 is provided with through hole 91, the utility model, and the connector body 1 is provided with threaded first engaging lug 11(As schemed
Shown in 4), the gland 2 is provided with threaded second engaging lug 21, passes through first engaging lug 11 of the connection of screw rod 6 and the second connection
Ear 21 realizes the connection of the connector body 1 and the gland 2;In use, the port 90 of body flushes in homonymy all the time
Connector body port 10, or be always positioned at outside the connector body 1;The utility model during use, when
When needing that connecting tube joint disassembly is got off to be safeguarded or repaired, the spiral shell between the gland 2 and connector body 1 is unclamped
Bar 6, the connection between the gland 2 and connector body 1 is just unclamped, now because the port 90 of body flushes in homonymy all the time
Connector body port 10, or be always positioned at outside the connector body 1, therefore, just can be directly by connector sheet
Body 1 is removed, and is then taken out the first packing ring 3 in gland 2, the first sealing ring 51 and the second sealing ring 52, whole dismounting
Process all the body 9 of connection need not be retreated, also avoid the need for moving body 9, just can realize that connection pipe joint is torn open
Unload;Simultaneously as the inwall of each supporting pad 4 be radially provided be used for it is corresponding with the through hole 91 on pipeline 9 identical convex
Block 40, during dismounting, after first packing ring 3, the first sealing ring 51 and the second sealing ring 52 are taken out, just may be used
Successfully to take out gland 2, in terms of existing technologies, the utility model completely can just dismantle whole connector,
It is more favorable for safeguarding and repairs;And when installing, first gland 2 is enclosed on pipeline 9, then by the first packing ring 3, the first sealing ring 51
With the second sealing ring 52 after gland 2 is interior, directly connector body 1 is installed, the both sides of connector body 1 need not be equally moved
Body 9, just can Fast Installation;The connection pipe joint dismounting of the utility model peace is rapid, simple to operate;The utility model is relative
For prior art, when installing or dismantling connection pipe joint, the body of connection need not be all moved, is not interfered with more whole
The connection of other pipelines of pipe-line system, but also the gland 2 on pipeline 9 can be taken out, accomplish whole connector completely
Dismounting, and it is easy to operate, and dismounting is rapid, and the cost of dismounting is also just lower, advantageously in the maintenance of daily pipe-line system
And maintenance.
In the utility model, it is preferred that the port 10 of the connector body is provided with the first half deep-slotted chip breakers 100, described the
One packing ring 3 is provided with the second half deep-slotted chip breakers 30 that are corresponding with the first half deep-slotted chip breaker 100 and collectively forming closed space, described to close
Closing space is used to house first sealing ring 51, during installation, can be first by the first sealing ring 51 as the second half arc
In groove 30, then connector body 1 is installed, by the first half deep-slotted chip breakers 100 at the port 10 of the connector body with it is described
The correspondence of first sealing ring 51, thus rapidly can successfully put into the first sealing ring 51 in the closed space.
In the utility model, second of embodiment is additionally provided with(As shown in Figure 5), second embodiment and the first reality
Apply mode substantially the same, its difference is, the connector body 1 is curved head type connector.
In the utility model, the third embodiment is additionally provided with(As shown in Figure 6), the third embodiment and the first reality
Apply mode substantially the same, its difference is, the connector body 1 is triplet type connector body.
In the utility model, a kind of the 4th kind of embodiment of fast connector for pipeline for being easily installed and repairing also is provided
(As shown in Figure 7 to 9), the 4th kind of embodiment and the first embodiment be substantially the same, and its difference is, this reality
Apply in example, not including connector body 1, including gland 2, the side of the gland 2 is in funnel-form, and the port of the gland 2
Provided with a circle bulge loop 20, the first packing ring 3, the first sealing ring 51 and the second sealing ring 52, described first are provided with the gland 2
One end of packing ring 3 is used to offset with second packing ring by the first sealing ring 51, and the other end of first packing ring 3 is close by second
Seal 52 and the bulge loop 20 of the gland 2 offset, at least provided with two supporting pads 4, this implementation on the inwall of first packing ring 3
In example, the supporting pad 4 has four, and the inwall of each supporting pad 4 is radially provided with for corresponding with the through hole 91 on pipeline 9
Identical projection 40, in use, the port 90 of pipeline is flushed in or less than the inner port with the gland of the homonymy of pipeline 9 all the time
201.The specifically used process of the present embodiment is identical with the first embodiment, and here is omitted.
Claims (4)
1. a kind of fast connector for pipeline for being easily installed and repairing, including connector body(1)And connector body(1)Match somebody with somebody
Close the gland of connection(2), the gland(2)Side be in funnel-form, it is characterised in that:In the gland(2)Inside it is provided with first
Packing ring(3), the first sealing ring(51)With the second sealing ring(52), first packing ring(3)One end pass through the first sealing ring
(51)With the connector body(1)Offset, first packing ring(3)The other end pass through the second sealing ring(52)With the pressure
Lid(2)Offset, first packing ring(3)Inwall at least provided with two supporting pads(4), each supporting pad(4)It is interior
Wall, which is radially provided with, to be used for and pipeline(9)On through hole(91)The identical projection of correspondence(40), in use, the port of pipeline(90)
All the time the connector body port of homonymy is flushed in(10), or it is always positioned at the connector body(1)Outside.
2. the fast connector for pipeline according to claim 1 for being easily installed and repairing, it is characterised in that:The connector
The port of body(10)Provided with the first half deep-slotted chip breakers(100), first packing ring(3)Provided with the first half deep-slotted chip breaker
(100)Correspondence and the second half deep-slotted chip breakers for collectively forming closed space(30), the closed space is used for that to house described first close
Seal(51).
3. the fast connector for pipeline according to claim 1 for being easily installed and repairing, it is characterised in that:The connector
Body(1)Provided with threaded first engaging lug(11), the gland(2)Provided with threaded second engaging lug(21), pass through
Screw rod(6)Connect the first engaging lug(11)With the second engaging lug(21)Realize the connector body(1)With the gland(2)'s
Connection.
4. a kind of fast connector for pipeline for being easily installed and repairing, including gland(2), the gland(2)Side be in funnel
Shape, it is characterised in that:In the gland(2)Inside it is provided with the first packing ring(3), the first sealing ring(51)With the second sealing ring(52),
First packing ring(3)One end pass through the first sealing ring(51)For being offseted with second packing ring, first packing ring(3)It is another
One end passes through the second sealing ring(52)With the gland(2)Offset, first packing ring(3)Inwall at least provided with two branch
Stake pad(4), each supporting pad(4)Inwall be radially provided with and be used for and pipeline(9)On through hole(91)It is convex that correspondence is coincide
Block(40), in use, the port of pipeline(90)All the time flush in or be less than and pipeline(9)The inner port of the gland of homonymy
(201).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720016887.2U CN206369038U (en) | 2017-01-08 | 2017-01-08 | The fast connector for pipeline for being easily installed and repairing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720016887.2U CN206369038U (en) | 2017-01-08 | 2017-01-08 | The fast connector for pipeline for being easily installed and repairing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206369038U true CN206369038U (en) | 2017-08-01 |
Family
ID=59391075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720016887.2U Withdrawn - After Issue CN206369038U (en) | 2017-01-08 | 2017-01-08 | The fast connector for pipeline for being easily installed and repairing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206369038U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106499899A (en) * | 2017-01-08 | 2017-03-15 | 唐学功 | The fast connector for pipeline for being easily installed and keeping in repair |
-
2017
- 2017-01-08 CN CN201720016887.2U patent/CN206369038U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106499899A (en) * | 2017-01-08 | 2017-03-15 | 唐学功 | The fast connector for pipeline for being easily installed and keeping in repair |
CN106499899B (en) * | 2017-01-08 | 2018-06-01 | 广东福斯特流体技术有限公司 | The fast connector for pipeline for being easily installed and repairing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210179123U (en) | Flange pipe connecting structure of steel bulk container | |
CN206369038U (en) | The fast connector for pipeline for being easily installed and repairing | |
TW201040988A (en) | Sealed closure means for an opening of a junction pipe of a vessel and a conduit, and method for using such a closure means | |
CN104712863A (en) | Air pipeline fast connector | |
CN104006244A (en) | Anti-detaching pipe connection device and air conditioner | |
CN107762574A (en) | A kind of measurement structure of double shell cylinder inner casing steam pressure | |
CN106499899B (en) | The fast connector for pipeline for being easily installed and repairing | |
CN206320441U (en) | Readily removable quick Connector coupling | |
CN206929468U (en) | Easy-to-dismount fast connector for pipeline | |
CN104930274A (en) | Connecting structure of quick connector and connector thereof | |
CN107044573A (en) | Easy-to-dismount fast connector for pipeline | |
CN204302107U (en) | The pressure testing device of inspection tubing and bend pipe tools | |
CN208417838U (en) | A kind of double-wall corrugated pipe improving structure | |
CN106439300A (en) | Easy-dismounting quick connecting pipe joint | |
CN203223675U (en) | Expansion sealing device for gas turbine test bed air pipeline connection | |
CN217561064U (en) | Be used for high temperature high pressure pipeline steam sampling device mounting structure | |
CN201876052U (en) | Front safety cooler | |
CN212718534U (en) | Flange connecting pipe for flange type water meter | |
CN216951753U (en) | Ball valve convenient to dismantle | |
CN211780237U (en) | Water flow indicator convenient to install | |
CN214368345U (en) | Water supply and drainage pipeline connecting device | |
CN219222103U (en) | Gas constant pressure output energy-saving control cabinet | |
CN213954590U (en) | Pipe fitting connector convenient to detach and connect | |
CN218818807U (en) | Flange connecting piece convenient to assemble and disassemble | |
CN105424413A (en) | Detachable under-pressure pipeline sampling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171109 Address after: 523000 of Dongguan City Dalingshan Town Industrial Zone III No. 5 Patentee after: Qiao Yaobing Address before: 518000 Guangdong Province, Dongguan City Dalingshan Town by third industrial zone five Patentee before: Tang Xuegong |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170801 Effective date of abandoning: 20180601 |