CN206368367U - A kind of pattern foundation pit supporting structure soil nailing - Google Patents

A kind of pattern foundation pit supporting structure soil nailing Download PDF

Info

Publication number
CN206368367U
CN206368367U CN201621264776.5U CN201621264776U CN206368367U CN 206368367 U CN206368367 U CN 206368367U CN 201621264776 U CN201621264776 U CN 201621264776U CN 206368367 U CN206368367 U CN 206368367U
Authority
CN
China
Prior art keywords
rod
soil nailing
supporting structure
foundation pit
pit supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621264776.5U
Other languages
Chinese (zh)
Inventor
毕晶晶
陈喜友
杨帆
张红涛
杨东
刘志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING GEO-ENGINEERING Co
Original Assignee
BEIJING GEO-ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GEO-ENGINEERING Co filed Critical BEIJING GEO-ENGINEERING Co
Priority to CN201621264776.5U priority Critical patent/CN206368367U/en
Application granted granted Critical
Publication of CN206368367U publication Critical patent/CN206368367U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of pattern foundation pit supporting structure soil nailing, its drip irrigation device is to include the body of rod, one end of the body of rod is welded with first brace rod and second brace rod parallel with the body of rod, the axis of first brace rod and the second brace rod is overlapped, the neck being adapted to horizontal beading is formed between first brace rod and the second brace rod, the firmness of soil nailing and horizontal beading welding position can be improved.

Description

A kind of pattern foundation pit supporting structure soil nailing
Technical field
The utility model is related to architectural engineering pit supporting apparatus field, more particularly to a kind of pattern foundation pit supporting structure soil nailing.
Background technology
Pattern foundation pit supporting structure is to ensure the safety of Underground Construction and foundation ditch surrounding enviroment, to foundation pit side-wall and surrounding enviroment Supporting and retaining system, reinforcing and the safeguard measure of use.
Application of the soil-nail wall support in pattern foundation pit supporting structure is very universal, and technology is also quite ripe.Soil nail wall is a kind of in situ Soil body reinforcement technology.It is configured to be arranged on reinforcement rod member (i.e. soil nailing or anchor pole) and its surrounding soil secure bond in slopes The complex of formation, and the supporting construction of similar Form Gravity Breast Wall that surface layer is constituted.
Soil-nail wall support construction procedure is as follows:1st, slope excavating;2nd, manual amendment side slope is domatic;3rd, line setting, really The position of fixed each soil nailing and mark;4th, manual pore-forming;5th, soil nailing cage bar is made(The body of rod)And place in muscle hole, the outer end of cage bar End sets reserved section to be used to weld with horizontal beading;6th, to aerial slip casting;7th, linked network;8th, jetting cement.
But in the prior art, as shown in figure 1, most using single " L " type construction, bending during the design of the end of the soil nailing body of rod 1 Welded with horizontal beading 2 in portion 12.This way is present with drawback:
Reinforcing bar has infringement when cold bend(ing) is into " L " type to reinforcing bar, and after " L " type crotch is welded with horizontal beading 2, soil nailing is in tension Force part is the flex point weld 11 of " L " type crotch first during power, is extended back successively, and the position beyond overlapping part can not Equably while stress, can cause " L " type crotch to be torn with the horizontal weld of beading 2, cause the accident.
Utility model content
The purpose of this utility model is to provide a kind of pattern foundation pit supporting structure soil nailing, can improve soil nailing and horizontal beading welding position Firmness.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of pattern foundation pit supporting structure soil nailing, including the body of rod, one end of the body of rod be welded with first brace rod parallel with the body of rod and The axis of second brace rod, the first brace rod and the second brace rod is overlapped, formed between the first brace rod and the second brace rod with The neck of horizontal beading adaptation.
By using above-mentioned technical proposal, the first brace rod and the second brace rod is each parallel to the body of rod and is welded on the body of rod On, it is to avoid it is direct to the body of rod to bend, can it reduce due to directly carrying out the infringement that bending is caused to the body of rod, but by horizontal stroke Beading can improve the firmness of soil nailing and horizontal beading welding position directly through welding together after neck with the body of rod;It is existing Have in technology, when carrying out single-sided welding, the hook length of general L-type is five times of shank diameter, causes the wave of reinforcing bar main material Take, the utility model direct to the body of rod need not be bent, and reduce the waste of reinforcing bar main material.
Preferably, the length of first brace rod and the second brace rod is identical.
By using above-mentioned technical proposal, in the prior art, the body of rod is bent into l-shaped, not only waste of materials also wastes people The length of power, first support bar and second support bar is identical, then can disposably make more first support bar and second Strut, operation is easy, saves manpower.
Preferably, the length of the first brace rod is two to three times of shank diameter.
By using above-mentioned technical proposal, it is ensured that while the body of rod is with horizontal beading weld firmness, also reduce The consumption of first brace rod and the second brace rod, has saved material.
Preferably, being welded with pernetti on the body of rod.
By using above-mentioned technical proposal, if the body of rod stretches into Kong Zhonghou, periphery and the hole of the body of rod fit, then rear During continuous slip casting, the position that the body of rod fits with hole can be because the concrete injected be less and insecure, and the setting of pernetti can be with The body of rod is supported so that gap is formed between the body of rod and hole.
Preferably, the pernetti includes multigroup support bar perpendicular to the body of rod, every group of support bar is included along body of rod axle To arrangement and the first pole and the second pole of equal length.
By using above-mentioned technical proposal, after the body of rod is stretched into hole, end and the hole inwall of support bar fit, can be by Separate, while being formed with gap between adjacent support bar, follow-up slip casting will not be caused between the body of rod and the inwall in hole Influence;The equal length of first pole and the second pole, then can cause the body of rod to be located at the center in hole as far as possible.
Preferably, the pernetti includes the support that multigroup centering is welded.
By using above-mentioned technical proposal, the support that centering is set can be prevented in body of rod offset bore to a certain extent The heart so that the body of rod is as equal as possible with the distance between hole wall, contributes to the progress of follow-up slip casting work.
Preferably, the section of the support is isosceles trapezoid.
By using above-mentioned technical proposal, the contact area of support and hole wall can be increased, body of rod axle is further increased The Aligning degree at Xian Yukong centers.
Preferably, the distance between described adjacent pernetti is 1m.
By using above-mentioned technical proposal, while effectively can realizing pernetti, pernetti and the body of rod can be reduced again Weld.
In summary, the utility model has the advantages that:It is formed between first brace rod and the second brace rod Neck, improves the firmness of the body of rod and horizontal beading weld;Save material.
Brief description of the drawings
Fig. 1 is the sectional view that soil nailing welds together with horizontal beading in the prior art;
Fig. 2 is the overall structure diagram of embodiment 1;
Fig. 3 is to embody the partial sectional view that horizontal beading is placed into neck;
Fig. 4 is to embody the structural representation that soil nailing is stretched into hole;
Fig. 5 is the structural representation of embodiment 2.
In figure, 1, the body of rod;11st, flex point weld;12nd, kink;2nd, horizontal beading;3rd, the first brace rod;4th, the second support Muscle;5th, neck;6th, pernetti;61st, support bar;611st, the first pole;612nd, the second pole;62nd, support;621st, left frame;622、 Right shelf 7, the soil body in situ;71st, hole.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing Mark is represented.It should be noted that the word "front", "rear", "left", "right", the "up" and "down" that are used below in description refer to It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outer " are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment 1, a kind of pattern foundation pit supporting structure soil nailing, as shown in Fig. 2 including the body of rod 1, one end of the body of rod 1 is welded with parallel In the first brace rod 3 and the second brace rod 4 of the body of rod 1, the first brace rod 3 and the axis of second support bar 4 coincide.
Neck 5 is formed between first brace rod 3 and the second brace rod 4, with reference to Fig. 2, neck 5 is adapted with horizontal beading 2.
The equal length of first brace rod 3 and the second brace rod 4, the length of first support bar 61 can be the diameter of the body of rod 1 Twice to three times.
Pernetti 6 is welded with the body of rod 1, pernetti 6 includes the support 62 that multigroup centering is welded, i.e.,:Support 62 includes a left side Frame 621 and right shelf 622, left frame 621 are consistent with the size and shape of right shelf 622.
The section of left frame 621 is isosceles trapezoid, and the end of left 621 liang of waists of frame is together with the welding of the body of rod 1, left frame 621 Upper bottom in hole 71 when and the inwall in hole fit(As shown in Figure 4).
Distance is 1 meter between adjacent left frame 621.
When in use, manually the body of rod 1 is stretched into hole 71, then left frame 621 and right shelf 622 fit with hole wall, can be with The body of rod 1 and hole wall are separated.
The end of the body of rod 1 is reserved in the outside in hole 71, and horizontal beading 2 is passed through into neck 5, can be tentatively by horizontal beading 2 and bar Body 1 is fixed(The relation that horizontal beading 2 is fixed in neck 5 is as shown in Figure 3), then horizontal beading 2 and the body of rod 1 are consolidated using spot welding It is fixed.
Embodiment 2, as shown in figure 5, as different from Example 1, pernetti 6 includes multigroup being radially arranged along the body of rod 1 Support bar 61, every group of support bar 61 includes the first pole 611 and the second pole 612 of equal length, the first pole 611 and Two poles 612 can be provided with two, and be located at the axis of the both sides of the body of rod 1, the first pole 611 and the second pole 612 respectively It is misaligned.
The distance between first adjacent pole 611 is 1 meter.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.

Claims (8)

1. a kind of pattern foundation pit supporting structure soil nailing, including the body of rod (1), it is characterised in that:One end of the body of rod (1) is welded with and the body of rod (1) The axis of parallel the first brace rod (3) and the second brace rod (4), the first brace rod (3) and the second brace rod (4) is overlapped, the The neck (5) being adapted to horizontal beading (2) is formed between one brace rod (3) and the second brace rod (4).
2. pattern foundation pit supporting structure soil nailing according to claim 1, it is characterised in that:First brace rod (3) and second The length for supportting muscle (4) is identical.
3. pattern foundation pit supporting structure soil nailing according to claim 2, it is characterised in that:The length of first brace rod (3) is the body of rod (1) two to three times of diameter.
4. pattern foundation pit supporting structure soil nailing according to claim 1, it is characterised in that:Pernetti is welded with the body of rod (1) (6)。
5. pattern foundation pit supporting structure soil nailing according to claim 4, it is characterised in that:The pernetti (6) includes multigroup vertical Support bar (61) in the body of rod (1), every group of support bar (61) includes first along the arrangement of the body of rod (1) axial direction and equal length Pole(611)With the second pole (612).
6. pattern foundation pit supporting structure soil nailing according to claim 4, it is characterised in that:The pernetti (6) includes multigroup centering The support (62) of welding.
7. pattern foundation pit supporting structure soil nailing according to claim 6, it is characterised in that:The section of the support (62) is isosceles ladder Shape.
8. pattern foundation pit supporting structure soil nailing according to claim 7, it is characterised in that:Between the adjacent pernetti (6) away from From for 1m.
CN201621264776.5U 2016-11-22 2016-11-22 A kind of pattern foundation pit supporting structure soil nailing Expired - Fee Related CN206368367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621264776.5U CN206368367U (en) 2016-11-22 2016-11-22 A kind of pattern foundation pit supporting structure soil nailing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621264776.5U CN206368367U (en) 2016-11-22 2016-11-22 A kind of pattern foundation pit supporting structure soil nailing

Publications (1)

Publication Number Publication Date
CN206368367U true CN206368367U (en) 2017-08-01

Family

ID=59389541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621264776.5U Expired - Fee Related CN206368367U (en) 2016-11-22 2016-11-22 A kind of pattern foundation pit supporting structure soil nailing

Country Status (1)

Country Link
CN (1) CN206368367U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222021A (en) * 2018-02-28 2018-06-29 中国五冶集团有限公司 It is a kind of for soil nailing device of deep foundation pit support and preparation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222021A (en) * 2018-02-28 2018-06-29 中国五冶集团有限公司 It is a kind of for soil nailing device of deep foundation pit support and preparation method thereof

Similar Documents

Publication Publication Date Title
CN104831818B (en) The connecting node of precast reinforced concrete beam and superposed column
CN206189647U (en) Novel infilled wall brickwork drawknot muscle structure
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN104295112B (en) A kind of reinforced concrete post connects steel core concrete column syndeton and construction method
CN106759858A (en) The connecting node and preparation method of a kind of H profile steel beam and rectangular steel-tube concrete column
CN204753836U (en) Connected node of precast reinforced concrete roof beam and coincide post
CN207277691U (en) A kind of concrete column position apparatus for form
CN206368367U (en) A kind of pattern foundation pit supporting structure soil nailing
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN104295001B (en) The construction technology of variable cross-section prestressing force cant beam
CN109578011A (en) Supporting construction and its construction method in a kind of municipal tunnel
CN103882808B (en) Ramp bridge and main line bridge join the construction method across erecting beam support system
CN209397712U (en) The connection structure of antidetonation steel pipe in a kind of shear wall
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN207314348U (en) A kind of fixed structure of flare template
CN205476507U (en) Inside pump line fixing device of jacking platform
CN203866972U (en) Embedded component for filler wall tie bars
CN107460879A (en) A kind of fixed structure of flare template
CN208072414U (en) A kind of deep foundation pit support bar planting linked network fixing device
CN208267393U (en) Electrical wire tube one-time reserved pre-buried finished product protection device
CN207700198U (en) A kind of advanced support supporting construction
CN207277864U (en) A kind of concrete temporary support moulding bed for large-scale steel structure assembly
CN206941961U (en) A kind of reinforced concrete support post

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170801

Termination date: 20211122

CF01 Termination of patent right due to non-payment of annual fee