CN206359842U - Room formula access bridge and combinations thereof formula viaduct - Google Patents

Room formula access bridge and combinations thereof formula viaduct Download PDF

Info

Publication number
CN206359842U
CN206359842U CN201621292909.XU CN201621292909U CN206359842U CN 206359842 U CN206359842 U CN 206359842U CN 201621292909 U CN201621292909 U CN 201621292909U CN 206359842 U CN206359842 U CN 206359842U
Authority
CN
China
Prior art keywords
bridge
formula
arch
access bridge
reversed beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621292909.XU
Other languages
Chinese (zh)
Inventor
王爱民
张益中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621292909.XU priority Critical patent/CN206359842U/en
Application granted granted Critical
Publication of CN206359842U publication Critical patent/CN206359842U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to traffic bridge technical field of buildings, particularly room formula access bridge and combinations thereof formula city arch steel structure viaduct.Including main bridge and access bridge, the access bridge includes access bridge road surface and room formula supporting mechanism, and access bridge road surface bottom sets multiple room formula supporting mechanisms, and room formula supporting mechanism is arranged side by side, and room formula supporting mechanism is made up of eaves, house beam and wall.Host bridge includes arch steel structure reversed beam, cambered road panel, bridge post and bridge pier, the arch steel structure reversed beam includes reversed beam interior lining panel, reversed beam arch sheet, reversed beam curtain plate and crossbeam, the utility model has used for reference building building technology, works out room formula access bridge and combinations thereof formula viaduct.Stake fixed bridge body of digging a well is no longer rely on using room formula access bridge structure, no longer needs to carry out full width or half range road closure when building access bridge, improves road passage capability, construction congestion is greatly decreased.Room formula access bridge can increase prefabricated jacking pocket under access bridge stability, bridge pier in the prefabricated rear hoisting transportation in building site to construction ground by amplifying pin, padded with the easy jack-up of jack when pier sinking or position adjustments.Pontic safety is effectively ensured, is particularly suitable for yellow soil horizon of collapsibility and uses.

Description

Room formula access bridge and combinations thereof formula viaduct
Technical field
The utility model is related to traffic bridge technical field of buildings, particularly room formula access bridge and combinations thereof formula viaduct.
Background technology
Increase year by year with the car ownership in each city, congestion in road difficulty of governance and town road build pressure by The setting link such as subway, elevated overpass urban traffic pressure is all being built in year aggravation, many cities, by facts have proved laying Elevated overpass is to administer one of traffic above-ground congestion best bet, but a lot of reasons governs building for urban interchange Make, trace it to its cause in terms of mainly including following four:
1st, building viaduct needs to carry out full width or half range road closure, and road closure generally requires the 1-2 years, and narrow road surface is made Into vehicle pass-through inconvenience, declined by efficiency and be further exacerbated by congestion.
2nd, viaduct is bulky, to realize that three-dimensional multi-direction current often design-build draws with more number over long distances Bridge, the distance of access bridge is long not only to hinder the appearance of the city, and seriously increases the engineering time.
3rd, construction viaduct needs stake of digging a well in advance, and well stake quantity is more close, it is easy to supplying water, firing below urban road Gas, communication pipes intersect, and construction environment complex jamming is more, easily damages other pipelines, further increase difficulty of construction and time.
4th, single bridge investment generally requires several ten million yuan, and its access bridge construction accounts for the 70% of total operating expenses, high cost cost Greatly.
Utility model content
The utility model solves the deficiencies in the prior art and provides a kind of room formula that construction is quick, with low cost, combination is various Access bridge and combinations thereof formula city arch steel structure viaduct.
The utility model solve technical scheme that its technical problem used for:
Room formula access bridge and combinations thereof formula viaduct, including main bridge and access bridge, the access bridge include access bridge road surface and room formula branch Support mechanism, access bridge road surface bottom sets multiple room formula supporting mechanisms, and room formula supporting mechanism is made up of eaves, house beam and wall.
Host bridge includes arch steel structure reversed beam, cambered road panel, bridge post and bridge pier, the arch steel structure reversed beam bag Reversed beam interior lining panel, reversed beam arch sheet, reversed beam curtain plate and crossbeam are included, provided with upper between the reversed beam interior lining panel and reversed beam curtain plate Horizontal reinforcing plates, lower horizontal reinforcing plates and vertical reinforcing plates, the reversed beam arch sheet two ends are located on small tension board and form arch, Connected between reversed beam arch sheet by big tension board, big tension board top is by supporting transverse slat and support riser and cambered road panel Connection, big tension board bottom is connected with crossbeam, and bridge pier connecting plate, adjacent crossbeam are provided between adjacent arch steel structure reversed beam It is provided with lateral connection bolt and longitudinally connected bolt.
It is provided between the room formula supporting mechanism on centre gangway, wall and opens up import and export, passway respectively, is imported and exported logical Passway is crossed to connect with centre gangway;Wall bottom sets wall to amplify pin;Eaves sidepiece connects reinforcing bar provided with eaves end face, leads to Cross welding eaves end face connection reinforcing bar both sides eaves link into an integrated entity, wall amplification pin sidepiece connects reinforcing bar provided with amplification pin, Wall amplification pin in both sides is linked into an integrated entity by amplifying pin connection reinforcing bar;Room formula supporting mechanism is provided with electric wire through-hole and lifting Hole.
Access bridge road surface both sides set crash barrier and mounting seat, and mounting seat is provided with guard rail, and access bridge road surface is provided with Expansion joint.
Expansion bend is provided between the arch steel structure reversed beam and bridge post, the expansion bend support block support of expansion bend upper end is horizontal Beam, bridge post is connected by bridge post base and bridge pier.
The arch steel structure reversed beam top is provided with lifting suspension ring, and arch steel structure reversed beam bottom is provided with multiple bridge posts and bridge Pier, bridge pier, which is provided between jacking pocket, bridge post, sets oblique pull support frame and pontic bridge intercolumniation gap jacking pocket.
Also include snow canopy, snow canopy includes carriage, supporting sleeve, crossbeam and arch capplce, supporting sleeve by carriage and Crossbeam links into an integrated entity, insertion canopy post in supporting sleeve, fixing screws locking canopy post and supporting sleeve, carriage top connection arch Shape capplce and snow refractory slab, arch capplce and snow refractory slab are fixed by rivet, and upper pillar stand is set between carriage and arch capplce, is propped up Lower pillar stand and carriage inclined support bar are set between support frame and crossbeam.
The arch capplce, which is provided between canopy eaves inclined strut and canopy eaves horizontal strut, canopy post, is provided with snow board and handrail.
Also include snow net, snow net includes arch grid structure and tread plate, arch grid structure splicing waviness net, arch grid structure Top is provided with many tread plates.
The utility model has the beneficial effect that:
1st, the utility model has used for reference building building technology, works out room formula access bridge and combinations thereof formula viaduct.Using room Formula access bridge structure is no longer rely on stake fixed bridge body of digging a well, and no longer needs to carry out full width or half range road closure when building access bridge, typically needs Take 7 days.Road passage capability is improved, construction congestion is greatly decreased.Room formula access bridge can be in the prefabricated rear hoisting transportation in building site to applying Building site, increases prefabricated jacking pocket under access bridge stability, bridge pier, when pier sinking or position adjustments with thousand by amplifying pin The easy jack-up in jin top is padded.Pontic safety is effectively ensured, is particularly suitable for yellow soil horizon of collapsibility and uses.
2nd, necessarily Long span is constructed for the realization left-hand bend that arch steel structure reversed beam can be both economical, thick reducing pontic The length of access bridge is shortened while degree, deadweight, the pontic slope control that connects is 8%.Reduce bridge floor stress torque, so can Reach that pontic is not thick, across footpath is big, from heavy and light, eliminate build the conventional well-digging stake of viaduct on this basis.According to pressure etc. In pressure divided by compression area formula, on the basis of existing bituminous paving bears automobile pressure, overstriking bridge pier and set up amplification Pin, and at the envisaged underneath reparation special jack seat of bridge pier, when setting of ground, can jack-up bridge pier it is padded, tiltedly Top can also be shifted, and this is to administer the best approach without well stake viaduct disadvantage.The approximate rainbow of shape of arch viaduct is graceful beautiful See, set up the functional parts such as protective plate, sound panel, can also be publicized as advertisement position, can more be formed by the viaduct dressed up One of city landscape.
3rd, bridge construction is no longer rely on stake of digging a well, and construction is greatly reduced with engineering equipment, and construction costs is greatly reduced, constructed Technical threshold is reduced, can it is prefabricated, can lift, installs soon, can move, it is shockproof all right, can be greatly lowered and invest and the duration.Room It can also make storehouse, switchgear house, office etc. in son, just in case there is setting of ground, can be padded with jack-up house.Underground piping has During problem, mobile trenchless rehabilitation can be removed at any time.
4th, Xue Peng ensure that northern area winter driving safety, and snow canopy has preferably blocked sleet, and the gradient of viaduct is carried 10% is risen, the length of access bridge can shorten, fault-tolerant amount increase of designing and constructing.Snow net is further set up simultaneously, road surface is effectively prevent Frost zone is formed by rolling repeatedly for automobile, pre- anti-slip.
Particular technique parameter is as follows in summary:
1st, construction-time significantly shortens, and round-the-clock job is about once that can complete pontic construction week.
2nd, operating expenses reduces 70%.
3rd, track quantity can be built as needed.
4th, the main gradient 8%, is easy to vehicle pass-through and construction needs, and shorten access bridge length.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 for Fig. 1 A-A to schematic diagram;
Fig. 3 is Fig. 1 B-B direction schematic diagram;
Fig. 4 for Fig. 2 C-C to schematic diagram;
Fig. 5 is snow booth structure schematic diagram;
Fig. 6 is snow canopy side view;
Fig. 7 is Fig. 6 partial enlarged drawings;
Fig. 8 is snow web frame schematic diagram.
In figure:1st, reversed beam interior lining panel 2, reversed beam arch sheet 3, small tension board 4, upper horizontal reinforcing plates 5, lower horizontal reinforcing plates 6, Vertical reinforcing plates 7, reversed beam curtain plate 8, big tension board 9, support transverse slat 10, support portrait 11, cambered road panel 12, crossbeam 13, Expansion bend support block 14, expansion bend 15, bridge post 16, bridge post base 17, bridge pier 18, jacking pocket 19, pontic bridge intercolumniation gap thousand Jin footstock hole 20, oblique pull support frame 21, lateral connection bolt 22, bridge pier connecting plate 23, lifting suspension ring 24, longitudinally connected bolt 25th, guard rail 26, mounting seat;27th, crash barrier 28, eaves 29, eaves end face connection reinforcing bar 30, house beam 31, passway 32, turnover Mouth 33, wall 34, wall amplification pin 35, electric wire through-hole 36, centre gangway 37, a repeated hole 38, amplification pin connect reinforcing bar 39, stretched Seam 40, access bridge road surface 41, carriage 42, supporting sleeve 43, crossbeam 44, lower pillar stand 45, carriage inclined support bar 46, upper pillar stand 47th, canopy eaves inclined strut 48, canopy eaves horizontal strut 49, arch capplce 50, snow refractory slab 51, rivet 52, canopy post 53, handrail 54, gear snow Plate 55, fixing screws 56, arch grid structure 57, tread plate.
Embodiment
Room formula access bridge and combinations thereof formula viaduct, including main bridge and access bridge, the access bridge include access bridge road surface 40 and room formula Supporting mechanism, the bottom of access bridge road surface 40 sets multiple room formula supporting mechanisms, and room formula supporting mechanism is arranged side by side, room formula supporting mechanism It is made up of eaves 28, house beam 30 and wall 33.Host bridge includes arch steel structure reversed beam, cambered road panel 11, the and of bridge post 15 Bridge pier 17, the arch steel structure reversed beam includes reversed beam interior lining panel 1, reversed beam arch sheet 2, reversed beam curtain plate 7 and crossbeam 12, described Upper horizontal reinforcing plates 4, lower horizontal reinforcing plates 5 and vertical reinforcing plates 6 are provided between reversed beam interior lining panel 1 and reversed beam curtain plate 7, it is described The two ends of reversed beam arch sheet 2, which are located on small tension board 3, forms arch, is connected between reversed beam arch sheet 2 by big tension board 8, big to draw The top of power plate 8 is by supporting transverse slat 9 and support riser 10 to be connected with cambered road panel 11, and the big bottom of tension board 8 connects with crossbeam 12 Connect, lateral connection bolt 21 is provided with provided with bridge pier connecting plate 22, adjacent crossbeam 12 between adjacent arch steel structure reversed beam With longitudinally connected bolt 24.
It is provided between the room formula supporting mechanism on centre gangway 36, wall 33 and opens up import and export 32, passway 31 respectively, 32 are imported and exported to connect with centre gangway 36 by passway 31;The bottom of wall 33 sets wall to amplify pin 34;The sidepiece of eaves 28 is set There is eaves end face to connect reinforcing bar 29, both sides eaves 28 are linked into an integrated entity by welding eaves end face connection reinforcing bar 29, wall is put The sidepiece of big foot 34 provided with amplification pin connection reinforcing bar 38, by amplify pin connect reinforcing bar 38 by both sides wall amplification pin 34 connect into one Body;Room formula supporting mechanism is provided with electric wire through-hole 35 and plays repeated hole 37.
The both sides of access bridge road surface 40 set crash barrier 27 and mounting seat 26, and mounting seat 26 is provided with guard rail 25, access bridge Road surface 40 is provided with expansion joint 39.
Expansion bend 14, the expansion bend support block of the upper end of expansion bend 14 are provided between the arch steel structure reversed beam and bridge post 15 13 support beams 12, bridge post 15 is connected by bridge post base 16 and bridge pier 17.
The arch steel structure reversed beam top is provided with lifting suspension ring 23, and arch steel structure reversed beam bottom is provided with multiple bridge posts 15 With bridge pier 17, bridge pier 17, which is provided between jacking pocket 18, bridge post 15, sets oblique pull support frame 20 and pontic bridge intercolumniation gap thousand Jin footstock hole 19.
Also include snow canopy, snow canopy includes carriage 41, supporting sleeve 42, crossbeam 43 and arch capplce 49, supporting sleeve 42 Carriage 41 and crossbeam 43 are linked into an integrated entity, insertion canopy post 52 in supporting sleeve 42, fixing screws 55 lock canopy post 52 and branch Support set pipe 42, the top of carriage 41 connection arch capplce 49 and snow refractory slab 50, arch capplce 49 and snow refractory slab 50 pass through rivet 51 It is fixed, upper pillar stand 46 is set between carriage 41 and arch capplce 49, set between carriage 41 and crossbeam 43 lower pillar stand 44 and Carriage inclined support bar 45.
The arch capplce 49, which is provided between canopy eaves inclined strut 47 and canopy eaves horizontal strut 48, canopy post 52, is provided with snow board 54 and handrail 53.
Also include snow net, snow net includes arch grid structure 56 and tread plate 57, the splicing waviness net of arch grid structure 56, arch The top of shape rack 56 is provided with many tread plates 57.
During construction, reversed beam interior lining panel 1, reversed beam arch sheet 2, reversed beam curtain plate 7 are integrally welded, reversed beam interior lining panel 1 and anti- Upper horizontal reinforcing plates 4, lower horizontal reinforcing plates 5 and vertical reinforcing plates 6 are welded between beam curtain plate 7, strengthen reversed beam integrated connection strong Degree.The two ends of reversed beam arch sheet 2 weld to be formed on small tension board 3 between arch, reversed beam arch sheet 2 to be connected by big tension board 8 Connect, the big top of tension board 8 is by supporting transverse slat 9 and support riser 10 to be welded with cambered road panel 11, and support transverse slat 9 reduces planted agent Infringement of the power to tension board, support riser 10 causes pontic formation casing stress to be unlikely to deform, the big bottom of tension board 8 and crossbeam 12 Welding, forms complete arch girder construction.By the connection of bridge pier connecting plate 22 in one, phase between adjacent arch steel structure reversed beam Realized on adjacent crossbeam 12 by lateral connection bolt 21 and longitudinally connected bolt 24 and be bi-directionally connected locking.
During the room formula supporting mechanism can be provided with factory or ward between prefabricated rear transport, room formula supporting mechanism Entreat and open up import and export 32, passway 31 on passage 36, wall 33 respectively, import and export 32 and connected by passway 31 with centre gangway 36 It is logical, it is easy to personnel to enter, the later stage can be reconstructed as house or office space.The bottom of wall 33 sets wall to amplify pin 34, strengthens wall Body stability and fastness;The sidepiece of eaves 28 connects reinforcing bar 29 provided with eaves end face, and reinforcing bar 29 is connected by welding eaves end face Both sides eaves 28 are linked into an integrated entity, wall amplification pin 34 sidepiece connects steel provided with amplification pin connection reinforcing bar 38 by amplifying pin Muscle 38 links into an integrated entity both sides wall amplification pin 34, and upper and lower side is fixedly connected, and ensures supporting & stablizing during bad weather Property;Room formula supporting mechanism is provided with electric wire through-hole 35 and a repeated hole 37, and convenient transhipment and later stage circuit laying debugging efforts are smooth Carry out.
The both sides of access bridge road surface 40 are set can set up guard rail 25 in crash barrier 27 and mounting seat 26, mounting seat 26, increase Plus safeguard protection performance, access bridge road surface 40 is provided with expansion joint 39, the bridge floor shape effectively caused by alleviation temperature Change of expansion joint 39 Become.The arch steel structure reversed beam top is provided with lifting suspension ring 23, and the segmental hoisting of room formula access bridge and the main bridge of arch, arch can be achieved Shape steel construction reversed beam bottom is provided with multiple bridge posts 15 and bridge pier 17, and bridge pier 17 is provided with jacking pocket 18, and depression occurs for ground When can effectively adjust oblique pull support frame 20 and pontic bridge intercolumniation gap jack are set between pier location and support angle, bridge post 15 Bore 19, gap and its support angle of the fine-tuning pontic with bridge post, realizes that various dimensions are adjusted.Avenging the supporting sleeve 42 of canopy will prop up Support frame 41 and crossbeam 43 are integrally welded, insertion canopy post 52 in supporting sleeve 42, the locking canopy of fixing screws 55 post 52 and support set Pipe 42, the top of carriage 41 connection arch capplce 49 and snow refractory slab 50, arch capplce 49 and snow refractory slab 50 set riveting by multiple spot Nail 51 is fixed, and upper pillar stand 46 is welded between carriage 41 and arch capplce 49, lower pillar stand is welded between carriage 41 and crossbeam 43 44 and carriage inclined support bar 45, support frame is more stable and firm, using more safe and reliable under wind and snow environment.The arch Capplce 49 is provided with canopy eaves inclined strut 47 and canopy eaves horizontal strut 48, lifts canopy eaves wind resistance, and reduction inadvertently falls off event hair It is raw.Heavy snow weather is run into, the splicing waviness net of arch grid structure 54 realizes Multi-contact with road surface, lifts non-skid property, arch Frame mode sleet is rolled to form frost zone, many tread plates 57 of the upper weld of arch grid structure 56, lifts vehicle driving safety Property.

Claims (9)

1. room formula access bridge and combinations thereof formula viaduct, including main bridge and access bridge, it is characterised in that the access bridge includes access bridge road surface (40) and room formula supporting mechanism, access bridge road surface (40) bottom sets multiple room formula supporting mechanisms, and room formula supporting mechanism is by eaves (28), house beam (30) and wall (33) composition.
2. formula access bridge in room according to claim 1 and combinations thereof formula viaduct, it is characterised in that host bridge includes arch Steel construction reversed beam, cambered road panel (11), bridge post (15) and bridge pier (17), the arch steel structure reversed beam include reversed beam interior lining panel (1), reversed beam arch sheet (2), reversed beam curtain plate (7) and crossbeam (12), the reversed beam interior lining panel (1) and reversed beam curtain plate (7) it Between be provided with upper horizontal reinforcing plates (4), lower horizontal reinforcing plates (5) and vertical reinforcing plates (6), reversed beam arch sheet (2) two ends are set Formed on small tension board (3) between arch, reversed beam arch sheet (2) by big tension board (8) connection, big tension board (8) top By supporting transverse slat (9) and support riser (10) to be connected with cambered road panel (11), big tension board (8) bottom connects with crossbeam (12) Connect, lateral connection spiral shell is provided with provided with bridge pier connecting plate (22), adjacent crossbeam (12) between adjacent arch steel structure reversed beam Bolt (21) and longitudinally connected bolt (24).
3. formula access bridge in room according to claim 1 or 2 and combinations thereof formula viaduct, it is characterised in that the room formula supports machine It is provided between structure on centre gangway (36), wall (33) and opens up import and export (32), passway (31) respectively, is imported and exported (32) and lead to Passway (31) is crossed to connect with centre gangway (36);Wall (33) bottom sets wall to amplify pin (34);Eaves (28) sidepiece is set There is eaves end face to connect reinforcing bar (29), both sides eaves (28) linked into an integrated entity by welding eaves end face connection reinforcing bar (29), Wall amplification pin (34) sidepiece is amplified both sides wall by amplifying pin connection reinforcing bar (38) provided with amplification pin connection reinforcing bar (38) Pin (34) links into an integrated entity;Room formula supporting mechanism is provided with electric wire through-hole (35) and plays repeated hole (37).
4. formula access bridge in room according to claim 3 and combinations thereof formula viaduct, it is characterised in that the access bridge road surface (40) Both sides set crash barrier (27) and mounting seat (26), and mounting seat (26) is provided with guard rail (25), and access bridge road surface (40) are provided with Expansion joint (39).
5. formula access bridge in room according to claim 2 and combinations thereof formula viaduct, it is characterised in that the arch steel structure is anti- Provided with expansion bend (14) between beam and bridge post (15), expansion bend support block (13) support beam (12) of expansion bend (14) upper end, Bridge post (15) is connected by bridge post base (16) and bridge pier (17).
6. formula access bridge in room according to claim 2 and combinations thereof formula viaduct, it is characterised in that the arch steel structure is anti- Beam top is provided with lifting suspension ring (23), and arch steel structure reversed beam bottom is provided with multiple bridge posts (15) and bridge pier (17), bridge pier (17) It is provided between jacking pocket (18), bridge post (15) and oblique pull support frame (20) and pontic bridge intercolumniation gap jacking pocket is set (19)。
7. formula access bridge in room according to claim 2 and combinations thereof formula viaduct, it is characterised in that also including snow canopy, Xue Pengbao Include carriage (41), supporting sleeve (42), crossbeam (43) and arch capplce (49), supporting sleeve (42) is by carriage (41) and horizontal stroke Beam (43) links into an integrated entity, insertion canopy post (52) in supporting sleeve (42), fixing screws (55) locking canopy post (52) and support set Manage (42), carriage (41) top connection arch capplce (49) and snow refractory slab (50), arch capplce (49) and snow refractory slab (50) lead to Cross rivet (51) fixed, upper pillar stand (46), carriage (41) and crossbeam are set between carriage (41) and arch capplce (49) (43) lower pillar stand (44) and carriage inclined support bar (45) are set between.
8. formula access bridge in room according to claim 7 and combinations thereof formula viaduct, it is characterised in that the arch capplce (49) It is provided between canopy eaves inclined strut (47) and canopy eaves horizontal strut (48), canopy post (52) and is provided with snow board (54) and handrail (53).
9. formula access bridge in room according to claim 2 and combinations thereof formula viaduct, it is characterised in that also including snow net, snow net bag Arch grid structure (56) and tread plate (57) are included, arch grid structure (56) splices waviness net, and arch grid structure (56) top is provided with more Root tread plate (57).
CN201621292909.XU 2016-11-29 2016-11-29 Room formula access bridge and combinations thereof formula viaduct Withdrawn - After Issue CN206359842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621292909.XU CN206359842U (en) 2016-11-29 2016-11-29 Room formula access bridge and combinations thereof formula viaduct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621292909.XU CN206359842U (en) 2016-11-29 2016-11-29 Room formula access bridge and combinations thereof formula viaduct

Publications (1)

Publication Number Publication Date
CN206359842U true CN206359842U (en) 2017-07-28

Family

ID=59371742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621292909.XU Withdrawn - After Issue CN206359842U (en) 2016-11-29 2016-11-29 Room formula access bridge and combinations thereof formula viaduct

Country Status (1)

Country Link
CN (1) CN206359842U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436516A (en) * 2016-11-29 2017-02-22 王爱民 House type approach bridge and approach bridge combined interchange

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436516A (en) * 2016-11-29 2017-02-22 王爱民 House type approach bridge and approach bridge combined interchange
CN106436516B (en) * 2016-11-29 2018-10-09 王爱民 Room formula access bridge and combinations thereof formula viaduct

Similar Documents

Publication Publication Date Title
CN201221206Y (en) Movable anti-electricity protection shed rack
CN106760529B (en) Roof steel truss sliding assembly construction platform and installation method
CN109898819B (en) Foldable telescopic overhanging tool type scaffold system and installation method thereof
CN111520145B (en) Underground excavation tunnel primary support slope adjusting and arch changing construction method
CN105970811A (en) Construction technology for elevated bridge with large-span spatial 3D-surface fish-bellied box steel structure
CN104234447A (en) Tool-type suspension staircase for deep foundation pit
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN206359842U (en) Room formula access bridge and combinations thereof formula viaduct
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN106758741B (en) Modular box type plate beam structure and pontic erection method based on box type plate beam structure
CN106436516B (en) Room formula access bridge and combinations thereof formula viaduct
CN105735056A (en) Method for reinforcing railway through piling girders combined with I-steel cross girders
CN104047247B (en) Fixed central strip pier
CN106192783B (en) A kind of windy and sandy area railway shed hole structure
CN106274556B (en) A kind of contact net bar changes shifting method
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo
CN210263847U (en) Stride and establish portable construction platform on subway U type groove
CN209798517U (en) Railway rigid frame type abutment
CN208379414U (en) A kind of X-type light steel truss structure bridge effectively improving vertical rigidity
CN212801166U (en) Closed pedestrian bridge
CN111979861A (en) Integral lifting ramp door-opening type steel-structured overpass assembled by urban intersection modules
CN109972531A (en) It is a kind of for improving the external prestressing device of Bailey beam falsework span
CN102127984B (en) Underground garage
CN221373588U (en) Tunnel construction operation platform
CN109972831A (en) A kind of assembled moves integrally crosshead and its construction technique

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170728

Effective date of abandoning: 20181009

AV01 Patent right actively abandoned