CN206352308U - A kind of shaped steel part constructing structure - Google Patents

A kind of shaped steel part constructing structure Download PDF

Info

Publication number
CN206352308U
CN206352308U CN201621416581.8U CN201621416581U CN206352308U CN 206352308 U CN206352308 U CN 206352308U CN 201621416581 U CN201621416581 U CN 201621416581U CN 206352308 U CN206352308 U CN 206352308U
Authority
CN
China
Prior art keywords
steel pipe
arm
steel
rubble
riser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621416581.8U
Other languages
Chinese (zh)
Inventor
王丽梅
王安鑫
张振禹
郭建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201621416581.8U priority Critical patent/CN206352308U/en
Application granted granted Critical
Publication of CN206352308U publication Critical patent/CN206352308U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a kind of shaped steel part constructing structure, it is included in the Equipment Foundations foundation trench dug at existing facility floor, being paved on the element soil of the bottom land of Equipment Foundations foundation trench has rubble, it is banded with transverse steel and longitudinal reinforcement in the horizontal direction on rubble, multiple row steel pipe riser is vertically driven underground through rubble and element soil, a steel pipe cross-arm is installed in the horizontal direction respectively in the steel pipe riser of same lateral attitude in multiple row steel pipe riser, the intersection location of each steel pipe cross-arm and the steel pipe riser being correspondingly arranged is connected by cruciform fastening for falsework, the H profile steel embedded part of left and right two is arranged on each steel pipe cross-arm according to setting position along longitudinal bracing, the H profile steel built-in fitting bottom wall both sides of left and right two are welded and fixed with steel pipe cross-arm, concrete has been poured in Equipment Foundations foundation trench, the top surface of concrete is consistent with facility floor absolute altitude.Whole H profile steel can be installed using a small amount of steel pipe riser and steel pipe cross-arm using this structure.

Description

A kind of shaped steel part constructing structure
Technical field
The utility model is related to shaped steel built-in fitting constructing structure, more particularly to the equipment basic pre-buried part construction knot of Support Method Structure.
Background technology
Constantly upgrade with the process of industrial production automation, traditional operative will be progressively by the big production institute of mechanization Substitute, increase equipment is the inexorable trend of development, and it is also inevitable to increase Equipment Foundations, as long as there are Equipment Foundations, is just had pre- The installation of embedded part.Installation of embedded parts Mass accuracy directly influences engineering construction quality, and the installation to follow-up equipment can be caused very Big influence, the Equipment Foundations particularly with gross ton position will more ensure installation quality.
1. application number:CN201110006166.0 Chinese patent discloses " ultralong device foundation platform embedded part embedding Accuracy control construction method ", comprises the following steps:First, built-in fitting and the processing of installation of embedded parts screw rod;2nd, it need to construct basic flat Platform middle and lower part reinforced concrete structure molding construction, many vertical reinforcements are from the middle and lower part reinforced concrete structure of construction molding Top is stretched out and in vertical to laying;3rd, installation of embedded parts screw rod is installed;4th, installation of embedded parts screw flight section bottom spiral shell Mother installs;5th, installation of embedded parts and positioning;6th, installation of embedded parts screw flight section top nut is installed;7th, need to construct basis Platform upper reinforced concrete structure molding construction;8th, subsequent construction is handled.It is pre- that the patent is applied to ultralong device foundation platform Embedded part, the equipment basic pre-buried part for not being suitable for gross ton position is installed.
2. application number:CN201320854312.X Chinese patent is disclosed " a kind of controllable embedded part ", including fixed seat And sliding seat, the fixed seat includes two lower floor's slotwares parallel to each other being embedded in building structure, lower floor's slotware For the channel-section steel for being provided with the flanging bent inwards of opening upwards, some earth anchors of bottom prewelding of lower floor's slotware, the slip Seat is respectively perpendicular the upper strata slotware being connected between two lower floor's slotwares including many, and upper strata slotware is provided with for opening upwards The channel-section steel of the flanging bent inwards, connects the T-shaped spiral shell in the groove of head insertion lower floor slotware between upper strata slotware and lower floor's slotware The T-bolt slided in the groove that some head insertion upper strata slotwares are set in bolt, the groove of each upper strata slotware along groove.The patent is applicable In controllable embedded part, the basic installation of embedded parts of fixing equipment of installation accuracy it is not suitable for ensureing.
The content of the invention
The purpose of this utility model is that offer is a kind of simple in construction, and construction cost is low, strong applicability shaped steel part construction Structure.
A kind of shaped steel part constructing structure, is included in the Equipment Foundations foundation trench dug at existing facility floor, is set in described Being paved on the element soil of the bottom land of standby basis foundation trench has rubble, is banded with transverse steel in the horizontal direction on described rubble and vertical To reinforcing bar, multiple row steel pipe riser is vertically driven underground through rubble and element soil, is located in multiple row steel pipe riser same A piece steel pipe cross-arm is installed in the horizontal direction respectively, steel pipe cross-arm described in each and right in the steel pipe riser of lateral attitude The intersection location for the steel pipe riser that should be set is connected by cruciform fastening for falsework, and the H profile steel embedded part of left and right two is according to setting position along vertical It is arranged on to support on the steel pipe cross-arm described in each, the described H profile steel built-in fitting bottom wall both sides of left and right two and steel pipe are horizontal Load is welded and fixed, and has poured concrete in described Equipment Foundations foundation trench, the top surface and facility floor mark of described concrete It is high consistent.
The utility model has the advantage of:Construction cost is low, and firm, position simple in construction, easy for installation is accurate.Utilize steel The strutting system of pipe standpipe and steel pipe cross-arm, cross sectional moment of inertia is big, and bending resistance is strong, recycles the bending resistance of H profile steel itself, So as to which whole H profile steel is installed using a small amount of steel pipe riser and steel pipe cross-arm.It is convenient to assemble and disassemble using cruciform fastening for falsework Feature, can controlled level cross-arm well absolute altitude, for fixing and finely tuning embedded part absolute altitude.Through metalling and foundation trench bottom element Soil squeezes into multiple row steel pipe riser, constrains the displacement of standpipe, and H profile steel position deviation is controlled well.Steel pipe riser and steel pipe are horizontal The whole mounting structure system such as the strutting system of load, adjustable cruciform fastening for falsework, armored concrete ensure that the precision of H profile steel, be Follow-up equipment, which is installed, provides Reliable guarantee.
Brief description of the drawings
Fig. 1 is to use a kind of shaped steel part constructing structure elevational schematic view of the present utility model.
Embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.
A kind of shaped steel part constructing structure as shown in Figure 1, is included in the Equipment Foundations foundation trench dug at existing facility floor 2 3, being paved on the element soil of the bottom land of described Equipment Foundations foundation trench 3 has rubble 5, is tied up in the horizontal direction on described rubble 5 Bundle has transverse steel and longitudinal reinforcement, and multiple row steel pipe riser 6 is vertically driven underground through rubble 5 and element soil 4, in multiple row A steel pipe cross-arm 7 is installed in the horizontal direction respectively in the steel pipe riser 6 of same lateral attitude in steel pipe riser 6, often The intersection location of steel pipe cross-arm 7 and the steel pipe riser 6 being correspondingly arranged described in one is connected by cruciform fastening for falsework 8.The H of left and right two Section steel embedded parts 1 are arranged on the steel pipe cross-arm 7 described in each according to setting position along longitudinal bracing, the described H of left and right two The bottom wall both sides of shaped steel built-in fitting 1 are welded and fixed with steel pipe cross-arm, have poured concrete in described Equipment Foundations foundation trench 3, institute The top surface for the concrete stated is consistent with facility floor absolute altitude.
This structure construction procedure is as follows:
(1) unwrapping wire of Equipment Foundations foundation trench 3 is carried out in existing facility floor 2, using concrete cutting machine to Equipment Foundations base Cut in the sideline of groove 3;
(2) the basic foundation trench 3 of excavation equipment to set depth, the then basic bottom land of foundation trench 3 of tamping apparatus element soil 4, then Pave and rubble and tamp on plain soil 4, finally colligation transverse steel and longitudinal reinforcement in the horizontal direction on described rubble 5;
(3) multiple row steel pipe riser 6 is vertically squeezed into through rubble 5 and element soil 4, be located in multiple row steel pipe riser 6 With a steel pipe cross-arm 7 is installed in the horizontal direction respectively in the steel pipe riser 6 of lateral attitude one by one, the steel pipe described in each is horizontal The intersection location of load 7 and the steel pipe riser 6 being correspondingly arranged is connected by cruciform fastening for falsework 8.The absolute altitude of described steel pipe cross-arm according to The H profile steel built-in fitting bottom absolute altitude for intending installing is determined.
(4) the sideline anchor point of the H profile steel embedded part 1 of left and right two is thrown and surveyed to steel pipe cross-arm 7, then by two H profile steels Embedded part 1 is arranged on the steel pipe cross-arm 7 described in each along longitudinal bracing, the position of adjustment H profile steel built-in fitting 1, makes H profile steel pre-buried The sideline of part 1 measures the point position on steel pipe cross-arm 7 with throwing and overlapped, then carries out the adjustment of the upper surface absolute altitude of H profile steel built-in fitting 1, adjusts Shi Caiyong jack set sheet metal or adjustment cruciform fastening for falsework mark by the jack-up of H profile steel built-in fitting 1, then in the bottom pad of H profile steel built-in fitting 1 Height, until the position of H profile steel built-in fitting 1 and absolute altitude meet the requirements, then welds the both sides of going to the bottom of H profile steel built-in fitting 1 with steel pipe cross-arm Connect fixation;
(5) casting concrete causes top of concrete consistent with the absolute altitude of facility floor 2 in Equipment Foundations foundation trench 3.

Claims (1)

1. a kind of shaped steel part constructing structure, it is characterised in that:It is included in the Equipment Foundations foundation trench dug at existing facility floor, Being paved on the element soil of the bottom land of described Equipment Foundations foundation trench has rubble, and transverse direction is banded with the horizontal direction on described rubble Reinforcing bar and longitudinal reinforcement, multiple row steel pipe riser are vertically driven underground through rubble and element soil, in multiple row steel pipe riser A piece steel pipe cross-arm, the steel pipe described in each are installed in the horizontal direction respectively in the steel pipe riser of same lateral attitude The intersection location of cross-arm and the steel pipe riser being correspondingly arranged is connected by cruciform fastening for falsework, and the H profile steel embedded part of left and right two is according to setting Position is arranged on the steel pipe cross-arm described in each along longitudinal bracing, the described H profile steel built-in fitting bottom wall both sides of left and right two It is welded and fixed with steel pipe cross-arm, has poured concrete in described Equipment Foundations foundation trench, the top surface of described concrete and factory Room ground elevation is consistent.
CN201621416581.8U 2016-12-21 2016-12-21 A kind of shaped steel part constructing structure Active CN206352308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621416581.8U CN206352308U (en) 2016-12-21 2016-12-21 A kind of shaped steel part constructing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621416581.8U CN206352308U (en) 2016-12-21 2016-12-21 A kind of shaped steel part constructing structure

Publications (1)

Publication Number Publication Date
CN206352308U true CN206352308U (en) 2017-07-25

Family

ID=59348259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621416581.8U Active CN206352308U (en) 2016-12-21 2016-12-21 A kind of shaped steel part constructing structure

Country Status (1)

Country Link
CN (1) CN206352308U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503441A (en) * 2017-08-30 2017-12-22 五冶集团上海有限公司 The installation method of embedded iron parts

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503441A (en) * 2017-08-30 2017-12-22 五冶集团上海有限公司 The installation method of embedded iron parts

Similar Documents

Publication Publication Date Title
CN104878835B (en) Strip footing increases basement structure behind house
US9644337B1 (en) Systems and methods for positioning and anchoring columns
CN108487256B (en) Reinforced structure and method for deepening and super-digging foundation pit
CN106759439B (en) Tower crane foundation for foundation pit and construction method thereof
CN106759448A (en) A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method
CN102071698B (en) Construction method of beddings of foundation downward overturn beam and pile cap
CN109322241A (en) Trestle work structure and construction method
CN106592990A (en) Prefabricated building foundation column bar precise positioning tool and positioning method
CN106703072A (en) Scaffolding equipment foundation embedded part construction method
CN110016919A (en) A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional
CN206352308U (en) A kind of shaped steel part constructing structure
CN108222046A (en) A kind of method of construction of prefabricated isolated footing
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN101761187B (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN106087991B (en) Stake top absolute altitude is in natural ground dug pile construction method below
CN205421321U (en) Precast reinforced concrete base
CN209412681U (en) Trestle work structure
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN106592598A (en) Same-layer double-beam large-diameter steel pipe support and deep foundation pit combined inner support formed thereby
CN110331735A (en) A kind of tower crane mounting structure for coastal region soft layer
CN108571014A (en) A kind of basement top-down method construction method of fixed lattice column
CN109594577A (en) Prefabricated assembled bar shaped composite foundation mounting structure for soft soil foundation
CN104695290A (en) Installation method of railway concrete protection fences
CN205024844U (en) Built -in fitting braced system
CN103397654B (en) Construction method for transforming reinforced concrete column into stiff column for connection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20180914

Granted publication date: 20170725

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20190618

Granted publication date: 20170725

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20210415

Granted publication date: 20170725

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20240415

Granted publication date: 20170725

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Xie Yu

Document name: Notice of Termination of Procedure