CN206347691U - Based on the prefabricated fresh air replacement device of building industrialization - Google Patents

Based on the prefabricated fresh air replacement device of building industrialization Download PDF

Info

Publication number
CN206347691U
CN206347691U CN201621406899.8U CN201621406899U CN206347691U CN 206347691 U CN206347691 U CN 206347691U CN 201621406899 U CN201621406899 U CN 201621406899U CN 206347691 U CN206347691 U CN 206347691U
Authority
CN
China
Prior art keywords
fresh air
fresh
prefabricated
air
partition wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621406899.8U
Other languages
Chinese (zh)
Inventor
马宏权
张志鹏
王儿龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING FENGSHENG NEW ENERGY TECHNOLOGY Co Ltd
Original Assignee
NANJING FENGSHENG NEW ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING FENGSHENG NEW ENERGY TECHNOLOGY Co Ltd filed Critical NANJING FENGSHENG NEW ENERGY TECHNOLOGY Co Ltd
Priority to CN201621406899.8U priority Critical patent/CN206347691U/en
Application granted granted Critical
Publication of CN206347691U publication Critical patent/CN206347691U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model provides a kind of based on the prefabricated fresh air replacement device of building industrialization, including prefabricated partition wall, fresh air supervisor, fresh air vertical tube and fresh wind port, the fresh air vertical tube is connected in the prefabricated partition wall with fresh air supervisor, the fresh wind port is on the prefabricated partition wall, the prefabricated partition wall is perpendicular to the ground to be set against metope, the fresh wind port is located at the lower section of the prefabricated partition wall, and anti-gray band is provided between the fresh wind port and the horizontal plane.The utility model has the advantages that fresh air air quality is high, construction is simple, low engineering cost.

Description

Based on the prefabricated fresh air replacement device of building industrialization
Technical field
The utility model belongs to aeration technology field, and in particular to one kind is based on the prefabricated fresh air replacement dress of building industrialization Put.
Background technology
With the development of the social economy, urban air pollution aggravates, breathing problem is multiple, and people increasingly pay attention to life Quality, pursues livable healthy residence.In recent years, VMC is widely adopted in architectural engineering, and the system is outdoor empty Gas is filtered by new wind devices, is sent to interior after purification, while the air of indoor pollution is sent to outdoor, that is, has been replaced room Interior and outdoor air, realizes the air exchange of indoor and outdoor.
Fresh air ventilating system (Application No. 201220692619.X) built in patent room, discloses a kind of indoor bottom air inlet top The mode of portion's air-out carries out fresh air replacement, belongs to aeration technology field.Including outdoor unit, blower fan main frame, controller, indoor air intake Mouth and indoor air outlet, outdoor unit and blower fan main frame are connected by blast pipe and discharge pipe, and controller is with blower fan main frame by leading Line is connected, and blower fan main frame is connected by air inlet duct with indoor air inlet, and blower fan main frame is connected by exhaust passage with indoor air outlet, Indoor air inlet is arranged on flooring, and indoor air outlet is arranged on indoor canopy.So that indoor air flows amount increases Plus, the dirty air in indoor bottom is discharged by air outlet upwards with fresh air, keeps indoor air clean.But it is easily by ground ash Dirt influences, and construction cost is high, is unfavorable for popularization and application.
Therefore it is badly in need of a kind of not influenceed by floor-dust, low cost, the VMC of easy construction.
Utility model content
The purpose of this utility model is to provide a kind of building industrialization and is based on the prefabricated fresh air replacement device of building industrialization, with Certain ground floor height need to be occupied by solving prior art, and installation difficulty is larger, cost is higher, is easily influenceed by floor-dust Problem.
The utility model provides following technical scheme:
One kind is based on the prefabricated fresh air replacement device of building industrialization, including prefabricated partition wall, fresh air supervisor, fresh air vertical tube and new Air port, the fresh air vertical tube is connected in the prefabricated partition wall with fresh air supervisor, and the fresh wind port is located at described pre- On partition wall processed, the prefabricated partition wall is perpendicular to the ground to be set against metope, and the fresh wind port is located at the lower section of the prefabricated partition wall, Anti-gray band is provided between the fresh wind port and the horizontal plane.
It is preferred that, it is described that blower fan and air inlet, the air intake are also included based on the prefabricated fresh air replacement device of building industrialization Mouth is connected with fresh air supervisor, and the blower fan is between the air inlet and fresh air supervisor.
It is preferred that, it is described that the cold and hot friendship on the blower fan is also included based on the prefabricated fresh air replacement device of building industrialization Parallel operation and filter, the air inlet, blower fan, cool-heat-exchanger, filter and fresh air supervisor are sequentially connected, and make what is got in Air themperature is suitable, and air quality is high.
It is preferred that, it is described also to include setting on backwind tube, the backwind tube based on the prefabricated fresh air replacement device of building industrialization There is return air inlet, the backwind tube is by the air in return air inlet receiving chamber, and the backwind tube is located at outdoor.
It is preferred that, the backwind tube is connected with least one return air inlet, it is possible to achieve multiple rooms share a return air Pipe.The prefabricated partition wall is prefabricated based on building industrialization, is easy to construction.
The beneficial effects of the utility model are:
1st, installation is easy, and the clear height in house and the finishing layer of flooring are not influenceed;
2nd, fresh wind port is arranged in prefabricated partition wall, is had interval from the ground, can be reduced the pollution of floor-dust, is effectively ensured new The quality of wind;
3rd, low engineering cost, is conducive to batch production and popularization and application.
Brief description of the drawings
Accompanying drawing is used for providing further understanding to of the present utility model, and constitutes a part for specification, with this practicality New embodiment is used to explain the present invention together, does not constitute to limitation of the present utility model.In the accompanying drawings:
Fig. 1 is the utility model system structure diagram;
Fig. 2 is the plan of prefabricated partition wall;
Fig. 3 is the profile of prefabricated partition wall;
1 is blower fan in figure, and 2 be cool-heat-exchanger, and 3 be filter, and 4 be fresh air supervisor, and 5 be fresh air vertical tube, and 6 be fresh air Mouthful, 7 be air inlet, and 8 be return air inlet, and 9 be prefabricated partition wall, and 10 be backwind tube.
Embodiment
As Figure 1-3, it is a kind of to be based on the prefabricated fresh air replacement device of building industrialization, including blower fan 1, cool-heat-exchanger 2, Filter 3, fresh air supervisor 4, air inlet 7, return air inlet 8, fresh air vertical tube 5 and fresh wind port 6 are embedded in prefabricated partition wall 9.
As shown in figure 1, the suction extraneous air of air inlet 7 of blower fan 1 enters cool-heat-exchanger 2, the air that heat exchange is finished By filter 3 in fresh air is responsible for the fresh air vertical tube 5 that 4 feedings are embedded in prefabricated partition wall 9, interior is sent into by fresh wind port 6, is Endlessly high-quality air is sent in interior, and foul atmosphere is sent out by return air inlet 8, is discharged into backwind tube 10.
As illustrated in fig. 1 and 2, fresh air vertical tube 5 is embedded in the prefabricated partition wall 9 based on building industrialization, installs integration, just In constructing operation, the fresh air that fresh wind port 6 is sent out is difficult to be influenceed by terrestrial dust, discharged after circulation from opposite side return air inlet 8, so that Discharged by backwind tube 10.
As illustrated in fig. 1 and 2, the VMC is displaced type working method, and fresh air sends into interior, Indoor Thermal from fresh wind port 6 Load heats fresh air, produces the air-flow risen, reaches and is discharged at the top of house by return air inlet 8.
The utility model, which can be used for single room, can be used for the different floors in multiple rooms, it is only necessary to by each room Return air inlet all connected with backwind tube, construction is simple, and the clear height in house and the finishing layer of flooring are not influenceed;Fresh wind port is pacified In prefabricated partition wall, the anti-gray band of certain altitude is provided between ground, the pollution of floor-dust can be reduced, be effectively ensured new The quality of wind;Construction costs is relatively low, does not increase construction cost, suitable for extensive use.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, although ginseng The utility model is described in detail according to previous embodiment, for those skilled in the art, it still can be with Technical scheme described in foregoing embodiments is modified, or equivalent substitution is carried out to which part technical characteristic.It is all Within spirit of the present utility model and principle, any modification, equivalent substitution and improvements made etc. should be included in this practicality Within new protection domain.

Claims (5)

1. one kind is based on the prefabricated fresh air replacement device of building industrialization, it is characterised in that be responsible for, newly including prefabricated partition wall, fresh air Wind vertical tube and fresh wind port, the fresh air vertical tube are connected in the prefabricated partition wall with fresh air supervisor, the fresh wind port On the prefabricated partition wall;The fresh wind port is located at the lower section of the prefabricated partition wall, is set between the fresh wind port and horizontal plane There is anti-gray band.
2. according to claim 1 be based on the prefabricated fresh air replacement device of building industrialization, it is characterised in that also including blower fan And air inlet, the air inlet is responsible for the fresh air to be connected, and the blower fan is between the air inlet and fresh air supervisor.
3. it is according to claim 2 be based on the prefabricated fresh air replacement device of building industrialization, it is characterised in that also including located at Cool-heat-exchanger and filter on the blower fan, the air inlet, blower fan, cool-heat-exchanger, filter and fresh air supervisor according to Secondary connection.
4. according to claim 1 be based on the prefabricated fresh air replacement device of building industrialization, it is characterised in that also including return air Pipe, the backwind tube is provided with return air inlet, and the backwind tube is located at room by the air in return air inlet receiving chamber, the backwind tube Outside.
5. according to claim 4 be based on the prefabricated fresh air replacement device of building industrialization, it is characterised in that the backwind tube It is connected with least one return air inlet.
CN201621406899.8U 2016-12-21 2016-12-21 Based on the prefabricated fresh air replacement device of building industrialization Expired - Fee Related CN206347691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621406899.8U CN206347691U (en) 2016-12-21 2016-12-21 Based on the prefabricated fresh air replacement device of building industrialization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621406899.8U CN206347691U (en) 2016-12-21 2016-12-21 Based on the prefabricated fresh air replacement device of building industrialization

Publications (1)

Publication Number Publication Date
CN206347691U true CN206347691U (en) 2017-07-21

Family

ID=59322052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621406899.8U Expired - Fee Related CN206347691U (en) 2016-12-21 2016-12-21 Based on the prefabricated fresh air replacement device of building industrialization

Country Status (1)

Country Link
CN (1) CN206347691U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109737546A (en) * 2019-03-07 2019-05-10 重庆海润节能技术股份有限公司 A kind of vertical transmission & distribution ventilating system of modular assembly formula

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109737546A (en) * 2019-03-07 2019-05-10 重庆海润节能技术股份有限公司 A kind of vertical transmission & distribution ventilating system of modular assembly formula
CN109737546B (en) * 2019-03-07 2023-09-08 重庆海润节能技术股份有限公司 Modularized assembly type vertical transmission and distribution ventilation system

Similar Documents

Publication Publication Date Title
CN103233532B (en) A kind of multistory building air conditioner body of wall
CN103591666B (en) A kind of ventilation system for buildings with temp regulating function
CN101963386A (en) Ground air supplying air conditioning line device and installation method thereof
CN205372761U (en) Wall -mounted fresh air processor
CN206222505U (en) Cabinet type new blower fan
CN206347691U (en) Based on the prefabricated fresh air replacement device of building industrialization
CN201827997U (en) Pipeline device for ground air-supply air conditioner
CN106912386A (en) The exhaust structure of animal room
CN206669962U (en) Cabinet type purifies complete-hot fresh air machine
CN105571009A (en) Clean wall-mounted air sterilizing machine and method
CN105387553A (en) Toilet fresh-air exchanging device and method
CN207350748U (en) A kind of ventilation shaft with air-cleaning function
CN204853805U (en) Novel new trend air exchange system
CN206739520U (en) Family formula VMC
CN205079389U (en) Energy -concerving and environment -protective dust removal ventilation equipment
CN205717723U (en) A kind of placement ventilation device
CN205372766U (en) Purify PM2. 5 heat recovery fresh air ventilator
CN211290440U (en) Concealed fresh air system
CN208296149U (en) It is a kind of center fresh air and dust suction combine the unit
CN204043125U (en) A kind of multilayer or skyscraper natural heat dissipation ventilating system
CN206234912U (en) New blower fan
CN208458189U (en) The vertical parallel fresh air system of teaching building
CN208595350U (en) A kind of ventilation shaft
CN203222904U (en) Multi-layer building ventilation air conditioning wall body
CN207674637U (en) It blows to a kind of exposed type the new blower fan system in center

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170721