CN206332689U - A kind of Intelligent internet of things gateway with power-off protection function - Google Patents

A kind of Intelligent internet of things gateway with power-off protection function Download PDF

Info

Publication number
CN206332689U
CN206332689U CN201720045928.0U CN201720045928U CN206332689U CN 206332689 U CN206332689 U CN 206332689U CN 201720045928 U CN201720045928 U CN 201720045928U CN 206332689 U CN206332689 U CN 206332689U
Authority
CN
China
Prior art keywords
discharge
charge
switch
gateway
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720045928.0U
Other languages
Chinese (zh)
Inventor
孟立峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hi Tech Co Ltd
Original Assignee
Hangzhou Hi Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Hi Tech Co Ltd filed Critical Hangzhou Hi Tech Co Ltd
Priority to CN201720045928.0U priority Critical patent/CN206332689U/en
Application granted granted Critical
Publication of CN206332689U publication Critical patent/CN206332689U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The utility model discloses a kind of intelligent things gateway with power-off protection function; the intelligent things gateway is made up of gateway mainboard, rechargeable battery and charge-discharge protection circuit; wherein; charge-discharge protection circuit includes charging control switch, discharge control switch, battery protection chip and sampling resistor, and charging control switch includes charge switch diode, charge switch FET and recharge logic door;Discharge control switch includes discharge switch diode, discharge switch FET and electric discharge gate.By increasing charge-discharge protection circuit and rechargeable battery; the utility model can guarantee that all rechargeable batteries are full of in charging; it can support that Intelligent internet of things gateway works on a period of time after power-off; so as to help service end accurately to judge the working condition of Intelligent internet of things gateway, so that staff takes measures in time, it is to avoid loss of data; improve the reliability and stability of whole Internet of things system; it is with low cost with simple in construction, it is easy to the advantages of using.

Description

A kind of Intelligent internet of things gateway with power-off protection function
Technical field
The utility model is related to a kind of things-internet gateway, and in particular to a kind of Intelligent internet of things net with power-off protection function Close, belong to Internet of Things correlative technology field.
Background technology
With the high speed development of wireless communication technology, mobile network's technology and electronic information technology, Internet of Things (The Internet of Things) it is that " the connected internet of thing thing " arises at the historic moment, the important composition as generation information technology Part, Internet of Things has two layers of meaning:First, the core of Internet of Things and basis are still internet, it is on Internet basic Extension and the network of extension;Second, the extension of its user terminal and extend to enter between any article and article row information exchange and Communication.In Internet of Things, by the agreement of agreement, any article and internet can be connected, with realize Weigh sensor, Positioning, tracking, monitoring and management.It is logical its essence is using the cognition technology that communicate such as Intellisense, identification technology and general fit calculation Cross computer internet realize article automatic identification and information interconnection with it is shared.Internet of Things is the important of " informationization " epoch Developing stage, is referred to as the third wave that world information industry develops after computer, internet, gradually gos deep into people's Daily life.
Things-internet gateway is important part in Internet of Things, mainly plays transfer sensor information and service end control information Communication function, obtained universal promotion and application, still, existing things-internet gateway do not possess generally power-off after continue The ability of work, after service end and things-internet gateway are out of touch, service end can not judge it is between things-internet gateway The problem of network communication problem or things-internet gateway power-off cause, and then the working condition of things-internet gateway can not be judged.
The content of the invention
The problem of the utility model exists for above-mentioned prior art is made improvements there is provided a kind of with power-off protection function Intelligent internet of things gateway, can still support Intelligent internet of things gateway work a period of time, help service end accurately to judge after a loss of power The reason for failure, to take measures in time, it is to avoid loss of data.
In order to realize above-mentioned target, the technical scheme that the utility model is used is:
A kind of Intelligent internet of things gateway with power-off protection function, including gateway mainboard (1), charge-discharge protection circuit (2) With several rechargeable batteries (3), wherein, the gateway mainboard (1) is connected with the charge-discharge protection circuit (2), the charging It is connected after battery (3) is in parallel with the charge-discharge protection circuit (2), it is characterised in that
The charge-discharge protection circuit (2) includes charging control switch (4), discharge control switch (5), several batteries and protected Protect chip (6) and several sampling resistors (7), wherein, the charging control switch (4) including charge switch diode (41), Charge switch FET (42) and recharge logic door (43), the charge switch diode (41) imitate with the charge switch Source electrode and the drain electrode that (42) should be managed are in parallel, the output stage of the recharge logic door (43) and the charge switch FET (42) Grid connection;
The discharge control switch (5) includes discharge switch diode (51), discharge switch FET (52) and electric discharge Gate (53), the discharge switch diode (51) is in parallel with the source electrode of the discharge switch FET (52) and drain electrode, The output stage of the electric discharge gate (53) is connected with the grid of the discharge switch FET (52);
The charging control switch (4) is connected with the discharge control switch (5), wherein, the charge switch diode (41) negative pole of the positive pole correspondence rechargeable battery (3), the negative pole correspondence charging of the discharge switch diode (51) The negative pole of battery (3);
It is connected after the rechargeable battery (3) is in parallel with the sampling resistor (7) with the battery protection chip (6);It is described Input of the battery protection chip (6) respectively with recharge logic door (53) and the electric discharge gate (43) is connected.
The foregoing Intelligent internet of things gateway with power-off protection function, it is characterised in that the charge-discharge protection circuit (2) Be connected with the gateway mainboard (1) by plug-in type connection terminal or the charge-discharge protection circuit (2) be directly integrated in it is described On gateway mainboard (1).
The foregoing Intelligent internet of things gateway with power-off protection function, it is characterised in that the battery protection chip (6) with The rechargeable battery (3) corresponds.
The foregoing Intelligent internet of things gateway with power-off protection function, it is characterised in that the battery protection chip (6) with The sampling resistor (7) corresponds.
The foregoing Intelligent internet of things gateway with power-off protection function, it is characterised in that recharge logic door (43) is With door or NAND gate.
The foregoing Intelligent internet of things gateway with power-off protection function, it is characterised in that described recharge logic Men Weiyu When, electric discharge gate is NAND gate.
The foregoing Intelligent internet of things gateway with power-off protection function, it is characterised in that the recharge logic Men Weiyu is non- Men Shi, electric discharge gate be and door.
Compared with prior art, the utility model has the advantage of:
(1) by increasing charge-discharge protection circuit and rechargeable battery, the utility model can ensure that all chargings in charging Battery is full of;It can support that Intelligent internet of things gateway works on a period of time after a loss of power, so as to help service end accurate The working condition for judging Intelligent internet of things gateway, be the communication disruption or intelligent things between service end and Intelligent Network GateWay Net gateway is powered off, so that staff takes measures in time, it is to avoid loss of data;
(2) before electric quantity of rechargeable battery exhausts, the power supply of Intelligent internet of things gateway may recover normal, or by tieing up Shield personnel take measures Intelligent internet of things gateway handoff to other emergency electric systems, so, the utility model can be carried significantly The reliability and stability of high whole Internet of things system;
(3) it is with low cost, it is easy to the advantages of using with simple in construction.
Brief description of the drawings
Fig. 1 is the schematic diagram of the Intelligent internet of things gateway of the present utility model with power-off protection function;
Fig. 2 is the circuit theory diagrams under the charged state of Fig. 1 Intelligent internet of things gateway with power-off protection function;
Fig. 3 is the circuit theory diagrams under the discharge condition of Fig. 1 Intelligent internet of things gateway with power-off protection function.
Wherein:
1- gateway mainboard 2- charge-discharge protection circuits
3- rechargeable battery 4- charging control switches
41- charge switch diode 42- charge switch FETs
43- recharge logics door 5- discharge control switches
51- discharge switch diode 52- discharge switch FETs
53- electric discharge gate 6- battery protection chips
7- sampling resistors
Embodiment
Make specific introduce to the present invention below in conjunction with the drawings and specific embodiments.
Referring to Figures 1 and 2, the utility model includes gateway mainboard 1, charge-discharge protection circuit 2 and several rechargeable batteries 3, wherein, charge-discharge protection circuit 2 is connected with gateway mainboard 1, is connected after the parallel connection of rechargeable battery 3 with charge-discharge protection circuit 2.
Charge-discharge protection circuit 2 includes charging control switch 4, discharge control switch 5, three battery protection chips 6 and three Individual sampling resistor 7, wherein, charging control switch 4 includes charge switch diode 41, a charge switch FET 42 With a recharge logic door 43, charge switch diode 41 is in parallel with the source electrode of charge switch FET 42 and drain electrode, charging The output stage of gate 43 is connected with the grid of charge switch FET 42.Discharge control switch 5 includes a discharge switch Diode 51, a discharge switch FET 52 and electric discharge gate 53, discharge switch diode 51 are imitated with discharge switch Should pipe 52 source electrode and drain electrode it is in parallel, the output stage of electric discharge gate 53 is connected with the grid of discharge switch FET 52.
Charging control switch 4 is connected with discharge control switch 5, wherein, the positive pole of charge switch diode 41 is to inductive charging The negative pole of battery 3, the negative pole of the negative pole correspondence rechargeable battery 3 of discharge switch diode 5.
Rechargeable battery 3 with being connected respectively with battery protection chip 6 after the parallel connection of sampling resistor 7, battery protection chip 6 respectively with The input connection of gate 53 of discharging and recharge logic door 43.
As a kind of preferred scheme, charge-discharge protection circuit 2 is integrated on gateway mainboard 1, can so reduce production Cost.
As a kind of preferred scheme, battery protection chip 6 is corresponded with rechargeable battery 3, and rechargeable battery 3 is by respective Battery protection chip 6 is managed, it is to avoid individual devices fault impact other devices.
As a kind of preferred scheme, battery protection chip 6 is corresponded with sampling resistor 7, battery protection chip 6 with it is each From sampling resistor 7 connect, it is to avoid individual devices fault impact other devices.
As a kind of preferred scheme, recharge logic door 43 is and door or NAND gate.
As a kind of preferred scheme, when recharge logic door 43 is with door, electric discharge gate is NAND gate.
As a kind of preferred scheme, when recharge logic door 43 is NAND gate, electric discharge gate is and door.
Operation principle:
By taking pmos type FET as an example, i.e., charge switch FET 42 and the grid of discharge switch FET 52 add low Its source electrode and gate turn-on during level.When setting rechargeable battery 3 is fully charged, battery protection chip 6 is output as high level, charging Battery 3 reaches that discharge electrode is prescribed a time limit, and battery protection chip 6 is output as low level.Now, recharge logic Men Weiyu, electric discharge is patrolled It is NAND gate to collect door.
When rechargeable battery 3 charges, the sense of current as shown in Figure 2, the discharge switch diode in discharge control switch 5 51 are operated in short-circuit condition, and discharge control switch 5 is in the conduction state;The work of charge switch diode 41 of charging control switch 4 Make in off position, the output level whether turned on by its grid level i.e. with door 43 of charge switch FET 42 is controlled. Now, battery protection chip 6 obtains the charged state of each rechargeable battery 3 by sampling resistor 7, when some rechargeable battery 3 fills Man Shi, the corresponding output of battery protection chip 6 high level gives the input of door 43, according to the logic behaviour with door 43, Only after all rechargeable batteries 3 are filled with, i.e., output level when all inputs with door 43 are all high level with door 43 High level can be just changed into from low level, the source electrode of charge switch FET 42 and drain electrode were charged in the state being not turned on Journey terminates.
When rechargeable battery 3 start electric discharge when, the sense of current as shown in Figure 3, the charge switch two in charging control switch 4 Pole pipe 41 is operated in short-circuit condition, and charging control switch 4 is in the conduction state;The discharge switch diode of discharge control switch 5 51 work in off position, discharge switch FET 52 whether turn on by its grid level be NAND gate 53 output level Control, now, battery protection chip 6 obtains the discharge condition of each rechargeable battery 3, each battery protection by sampling resistor 7 Output of the chip 6 to NAND gate 53 is high level, and NAND gate 53 is output as low level, the grid of discharge switch FET 52 Extremely upper is low level, and the source electrode of discharge switch FET 52 and drain electrode are in the conduction state, are put when some rechargeable battery 3 reaches During electric limit, corresponding battery protection chip 6 exports input of the low level to NAND gate 53, according to patrolling for NAND gate 53 Characteristic is collected, as long as have an input for low level, the output of NAND gate 53 can be changed into high level, discharge switch from low level The source electrode of FET 52 and drain electrode are in the state being not turned on, and discharge process terminates.
When using nmos type FET when, still set with rechargeable battery 3 it is fully charged when, battery protection chip 6 it is defeated Go out for high level, rechargeable battery 3 reaches that discharge electrode is prescribed a time limit, and battery protection chip 6 is output as low level.Now recharge logic door For NAND gate, electric discharge gate is and door.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modifications, equivalent substitutions and improvements made etc. should be included in guarantor of the present utility model Within the scope of shield.

Claims (7)

1. a kind of Intelligent internet of things gateway with power-off protection function, including gateway mainboard, charge-discharge protection circuit and several Rechargeable battery, wherein, the gateway mainboard is connected with the charge-discharge protection circuit, is filled after the rechargeable battery is in parallel with described Discharge protection circuit is connected, it is characterised in that
The charge-discharge protection circuit includes charging control switch, discharge control switch, several battery protection chips and some Individual sampling resistor, wherein,
The charging control switch includes charge switch diode, charge switch FET and recharge logic door, the charging Switching diode is in parallel with the source electrode of the charge switch FET and drain electrode, the output stage of recharge logic door with it is described The grid connection of charge switch FET;
The discharge control switch includes discharge switch diode, discharge switch FET and electric discharge gate, the electric discharge Switching diode is in parallel with the source electrode of the discharge switch FET and drain electrode, it is described electric discharge gate output stage with it is described The grid connection of discharge switch FET;
The charging control switch is connected with the discharge control switch, wherein, the positive pole correspondence of the charge switch diode The negative pole of the rechargeable battery, the negative pole of the negative pole correspondence rechargeable battery of the discharge switch diode;
It is connected after the rechargeable battery is in parallel with the sampling resistor with the battery protection chip;The battery protection chip point Input not with recharge logic door and the electric discharge gate is connected.
2. a kind of Intelligent internet of things gateway with power-off protection function according to claim 1, it is characterised in that described to fill Discharge protection circuit is connected with the gateway mainboard by plug-in type connection terminal or the charge-discharge protection circuit is directly integrated On the gateway mainboard.
3. a kind of Intelligent internet of things gateway with power-off protection function according to claim 1, it is characterised in that the electricity Chip is protected to be corresponded with the rechargeable battery in pond.
4. a kind of Intelligent internet of things gateway with power-off protection function according to claim 1, it is characterised in that the electricity Chip is protected to be corresponded with the sampling resistor in pond.
5. a kind of Intelligent internet of things gateway with power-off protection function according to claim 1, it is characterised in that described to fill Electric gate be and door or NAND gate.
6. a kind of Intelligent internet of things gateway with power-off protection function according to claim 5, it is characterised in that described to fill When electric gate is with door, electric discharge gate is NAND gate.
7. a kind of Intelligent internet of things gateway with power-off protection function according to claim 5, it is characterised in that described to fill When electric gate is NAND gate, electric discharge gate is and door.
CN201720045928.0U 2017-01-16 2017-01-16 A kind of Intelligent internet of things gateway with power-off protection function Active CN206332689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720045928.0U CN206332689U (en) 2017-01-16 2017-01-16 A kind of Intelligent internet of things gateway with power-off protection function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720045928.0U CN206332689U (en) 2017-01-16 2017-01-16 A kind of Intelligent internet of things gateway with power-off protection function

Publications (1)

Publication Number Publication Date
CN206332689U true CN206332689U (en) 2017-07-14

Family

ID=59293913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720045928.0U Active CN206332689U (en) 2017-01-16 2017-01-16 A kind of Intelligent internet of things gateway with power-off protection function

Country Status (1)

Country Link
CN (1) CN206332689U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024046145A1 (en) * 2022-08-30 2024-03-07 华为技术有限公司 Power supply system, battery and electronic device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024046145A1 (en) * 2022-08-30 2024-03-07 华为技术有限公司 Power supply system, battery and electronic device

Similar Documents

Publication Publication Date Title
CN204721079U (en) Dual-power automatic switching and charging circuit
CN202190065U (en) Battery protective circuit
CN102255352A (en) Distributed intelligent power battery pack management system
CN102651572B (en) Zero-time power standby system and zero-time power standby method
CN104201654A (en) Battery pack balance protecting system and method
CN104505905A (en) Single-charged and series-discharged lithium battery pack
CN104467040A (en) Vehicle-mounted uninterruptible power supply (UPS) storage battery control and management device
CN105356421A (en) Charge and discharge protective circuit for lithium battery pack
CN106394267A (en) Solar energy charging and discharging control system and method based on cloud platform for electric vehicle
CN206332689U (en) A kind of Intelligent internet of things gateway with power-off protection function
CN107221988A (en) The power circuit and its control method of a kind of under-voltage protection
CN106549469B (en) Parallel charging and serial connection using circuit structure for lithium batteries
CN106300459A (en) Electric vehicle lithium battery group intelligent protection device
CN220022390U (en) Control circuit for parallel charging and discharging of multi-battery pack and multi-parallel battery pack
CN206332464U (en) A kind of lithium battery charging management circuit
CN205388998U (en) Nickel -hydrogen battery management system
CN210327075U (en) Battery charging and discharging circuit breaker circuit
CN204290423U (en) Lithium battery charging circuit
CN201772127U (en) Solar power supply and CyFi communication technology-based valve controller
CN203536994U (en) Vehicle-mounted uninterruptible power supply storage battery control and management device
CN202474940U (en) Lithium battery miner lamp charging management switch based on current direction
CN206742911U (en) One kind is based on metal-oxide-semiconductor battery adaptive charge and discharge device in parallel
CN205406671U (en) Load detection circuitry
CN206894270U (en) Battery management system
CN107968404B (en) Power management system and method for overhead line data acquisition terminal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant