CN206331011U - A kind of novel high-pressure measures box structure - Google Patents
A kind of novel high-pressure measures box structure Download PDFInfo
- Publication number
- CN206331011U CN206331011U CN201621174165.1U CN201621174165U CN206331011U CN 206331011 U CN206331011 U CN 206331011U CN 201621174165 U CN201621174165 U CN 201621174165U CN 206331011 U CN206331011 U CN 206331011U
- Authority
- CN
- China
- Prior art keywords
- chamber
- electric energy
- energy metrical
- network data
- metering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Arrangements For Transmission Of Measured Signals (AREA)
Abstract
Originally it is new to be related to a kind of novel high-pressure metering box structure, including base, casing, guided way, dividing plate, temperature-adjusting device, it is electromagnetically shielded net, electric energy metered system, computer network metering system and complex control system, in casing mounting seat, and including hard protection layer, hard bearing bed, heat-insulated cushion and heat exchanger tube, temperature-adjusting device is arranged on base, and be interconnected by mozzle and heat exchanger tube, lead to dividing plate in casing and be divided into a Comprehensive Control chamber, at least one electric energy metrical chamber and at least one network data measurement chamber, electromagnetic shielding net is at least one layer of and is arranged on Comprehensive Control chamber by collets, on electric energy metrical chamber and network data metering inner cavity surface.This new one side has compact conformation, the characteristics of rationally distributed, can effectively save and install and use space, it is to avoid batch meter destroys the aesthetic feeling of scenic spot surrounding enviroment, and asking for electric energy metrical and network communication data metering operation on the other hand can be effectively met simultaneously.
Description
Technical field
The utility model is related to a kind of measuring equipment, is exactly a kind of novel high-pressure metering box structure.
Background technology
Current electric energy is one of current important power, and usage amount is huge, but, it is necessary to right when to the concrete application of electric energy
The electric energy service condition of user is supervised, and collects corresponding service fee, and Computer Communication Networks is current important letter
One of communication channel is ceased, it is in use, it is also desirable to which network data resource is monitored accordingly, on the one hand monitoring letter
The security and legitimacy of breath, on the other hand provide foundation to collect service fee and improving network service quality, and for this
One problem, currently generally uses in scenic spot and builds measurement of power case and network system batch meter respectively, although can
Needs are used to meet, but on the one hand cause the measuring equipment complex structure in scenic spot, aesthetic property and the association at scenic spot is have impact on
Tonality, on the other hand also causes metering system to need to take larger space, and regular maintenance cost is also of a relatively high, therefore works as
Preceding traditional batch meter can not have effectively been met the need for foreground zone develops, for this present situation, in the urgent need to exploitation one
Kind of Novel measuring box, with meet it is actually used the need for.
Utility model content
For a kind of not enough present on prior art, novel high-pressure metering box structure of the utility model offer, this is new
Knot, can effectively save and install and use space, it is to avoid batch meter destroys the aesthetic feeling of scenic spot surrounding enviroment, and can be prevented effectively from outside
Environment is polluted and disturbed to circuit arrangement.
To achieve these goals, the utility model is to realize by the following technical solutions:
A kind of novel high-pressure measures box structure, including base, casing, guided way, dividing plate, temperature-adjusting device, electromagnetic screen
Net, electric energy metered system, computer network metering system and complex control system are covered, wherein casing is airtight cavity structure, is led to
Cross in guided way mounting seat, and be slidably connected with base, and at least one casing is all provided with each base, casing includes hard
Overcoat, hard bearing bed, heat-insulated cushion and heat exchanger tube, hard protection layer are coated on hard bearing bed outer surface and by strong
Change gusset be connected with hard bearing bed, hard protection layer, hard bearing bed be parallel to each other distribution and minimum spacing be not less than 5 in the least
Rice, heat-insulated cushion is embedded between hard protection layer, hard bearing bed, and described heat exchanger tube at least one is embedded in heat-insulated buffering
Layer is simultaneously interconnected by heat exchanger plates and hard bearing bed, and temperature-adjusting device is arranged on base, and by mozzle with changing
Heat pipe is interconnected, and interior sets some dividing plates, and described dividing plate is connected by guided way with interior, dividing plate
Box house is divided into a Comprehensive Control chamber, at least one electric energy metrical chamber and at least one network data measurement chamber, comprehensive control
It is interconnected between chamber processed, electric energy metrical chamber and network data measurement chamber by metallic channel, electric energy metered system, computer network meter
Amount system and complex control system are located in electric energy metrical chamber, network data measurement chamber and Comprehensive Control chamber respectively, and comprehensive control
System processed is electrically connected with electric energy metered system, computer network metering system respectively, and electromagnetic shielding net is at least one layer of and passes through
Collets are arranged on Comprehensive Control chamber, electric energy metrical chamber and network data metering inner cavity surface.
Further, described temperature-adjusting device includes ventilating fan, semiconductor cooling device and electric heater unit, its
Described in semiconductor cooling device and electric heater unit it is parallel with one another, and connected respectively by ventilating fan with heat exchanger tube.
Further, described electromagnetic shielding net outer surface separately sets flame-resistant insulation overcoat, and described fire retardant insulating is prevented
Sheath measures inner cavity surface by chute and Comprehensive Control chamber, electric energy metrical chamber and network data and is slidably connected.
Further, in described Comprehensive Control chamber, electric energy metrical chamber and network data measurement chamber, wherein described synthesis
Control chamber is located between electric energy metrical chamber and network data measurement chamber.
Further, described complex control system is the data processing and control circuit based on FPGA bases, and control is electric
Separately include at least one Automated condtrol subsystem and at least one net based on DSP bases based on programmable controller in road
Network communication subsystem, the Automated condtrol subsystem based on programmable controller and the network communication based on DSP bases
Subsystem is connected by metal-oxide-semiconductor drive circuit with the data processing and control circuit based on FPGA bases.
This new structure is simple, and for the use of flexible just, versatility is good, on the one hand with compact conformation, rationally distributed
Feature, can effectively save and install and use space, it is to avoid batch meter destroys the aesthetic feeling of scenic spot surrounding enviroment, on the other hand can be simultaneously
Asking for electric energy metrical and network communication data metering operation is effectively met, and effectively overcomes electromagnetic interference to metering work
Interference, so as to greatly improve the precision of metering work, and is effectively reduced number of devices, reduces the work of metering work
Make cost, and external environment condition can be prevented effectively from circuit arrangement is polluted and disturbed.
Brief description of the drawings
Describe the utility model in detail with reference to the accompanying drawings and detailed description;
Fig. 1 is this new structure schematic diagram;
Fig. 2 is body structure schematic diagram.
Embodiment
For make the utility model realize technological means, creation characteristic, reached purpose and effect be easy to understand, below
With reference to embodiment, the utility model is expanded on further.
A kind of novel high-pressure metering box structure as described in Fig. 1 and 2, including base 1, casing 2, guided way 3, dividing plate 4, temperature
Adjusting means 5, electromagnetic shielding net 6, electric energy metered system 7, computer network metering system 8 and complex control system 9 are spent, wherein
Casing 2 is airtight cavity structure, by the mounting seat 1 of guided way 3, and is slidably connected with base 1, and on each base 1
If at least one casing 2, casing 2 includes hard protection layer 21, hard bearing bed 22, heat-insulated cushion 23 and heat exchanger tube 24, firmly
Matter overcoat 21 is coated on the outer surface of hard bearing bed 22 and is connected by strengthening gusset 25 with hard bearing bed 22, hard protection
Layer 21, hard bearing bed 22 be parallel to each other distribution and minimum spacing be not less than 5 millimeters, heat-insulated cushion 23 be embedded in hard protection layer
21st, between hard bearing bed 22, heat exchanger tube 24 at least one is embedded in heat-insulated cushion 23 and carried by heat exchanger plates 26 and hard
Layer 22 is interconnected, and temperature-adjusting device 5 is arranged on base 1, and is interconnected by mozzle 10 and heat exchanger tube 24, casing
2 inner surfaces set some dividing plates 4, and dividing plate 4 is connected by guided way 3 with the inner surface of casing 2, and dividing plate 4 will be divided into one inside casing 2
Comprehensive Control chamber 11, at least one electric energy metrical chamber 12 and at least one network data measurement chamber 13, Comprehensive Control chamber 11, electric energy
It is interconnected between measurement chamber 12 and network data measurement chamber 13 by metallic channel 14, electric energy metered system 7, computer network metering
System 8 and complex control system 9 are located in electric energy metrical chamber 12, network data measurement chamber 13 and Comprehensive Control chamber 11 respectively, and
Complex control system 9 is electrically connected with electric energy metered system 7, computer network metering system 8 respectively, and electromagnetic shielding net 6 is at least
One layer and by collets 15 be arranged on Comprehensive Control chamber 11, electric energy metrical chamber 12 and the inner surface of network data measurement chamber 13 on.
In the present embodiment, described temperature-adjusting device 5 includes ventilating fan 51, semiconductor cooling device 52 and electrical heating
Device 53, wherein described semiconductor cooling device 52 and electric heater unit 53 is parallel with one another, and passes through ventilating fan 51 respectively
Connected with heat exchanger tube 24.
In the present embodiment, the described outer surface of electromagnetic shielding net 6 separately sets flame-resistant insulation overcoat 16, and it is described it is fire-retardant absolutely
Edge overcoat logical 16, which is crossed chute 17 and slided with Comprehensive Control chamber 11, electric energy metrical chamber 12 and the inner surface of network data measurement chamber 13, to be connected
Connect.
In the present embodiment, in described Comprehensive Control chamber 11, electric energy metrical chamber 12 and network data measurement chamber 13, wherein institute
The Comprehensive Control chamber 11 stated is located between electric energy metrical chamber 12 and network data measurement chamber 13.
In the present embodiment, described complex control system 9 is the data processing and control circuit based on FPGA bases, and is controlled
Separately include at least one Automated condtrol subsystem based on programmable controller in circuit with least one based on DSP bases
Network communication subsystem, the Automated condtrol subsystem based on programmable controller and the network based on DSP bases lead to
News subsystem is connected by metal-oxide-semiconductor drive circuit with the data processing and control circuit based on FPGA bases.
In the present embodiment, described electric energy metered system 7 is based on the civil power electric energy based on kilowatt-hour meter, current transformer
Metering system.
In the present embodiment, described computer network metering system 8 is to be inputted based on computer networking technology, automatic identification
Aggregation of data monitoring system based on technology and infrared ray control technology and network traffic data monitor supervision platform.
This is new in the specific implementation, according to particular condition in use, first by adjusting partition position, to Comprehensive Control
Chamber, the quantity of electric energy metrical chamber and network data measurement chamber, position and bearing space are adjusted, then respectively by electric energy metrical
System, computer network metering system and complex control system are installed in corresponding cavity and established a connection, and finally will
The heat exchanger tube connection of temperature-adjusting device and casing on base.
This new structure is simple, and for the use of flexible just, versatility is good, on the one hand with compact conformation, rationally distributed
Feature, can effectively save and install and use space, it is to avoid batch meter destroys the aesthetic feeling of scenic spot surrounding enviroment, on the other hand can be simultaneously
Asking for electric energy metrical and network communication data metering operation is effectively met, and effectively overcomes electromagnetic interference to metering work
Interference, so as to greatly improve the precision of metering work, and is effectively reduced number of devices, reduces the work of metering work
Make cost, and external environment condition can be prevented effectively from circuit arrangement is polluted and disturbed.
General principle of the present utility model and principal character and advantage of the present utility model has been shown and described above.One's own profession
The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification
Simply illustrate principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model is also
Various changes and modifications are had, these changes and improvements are both fallen within the range of claimed the utility model.The utility model
Claimed scope is by appending claims and its equivalent thereof.
Claims (5)
1. a kind of novel high-pressure measures box structure, it is characterised in that:Described novel high-pressure metering box structure includes base, case
Body, guided way, dividing plate, temperature-adjusting device, electromagnetic shielding net, electric energy metered system, computer network metering system and synthesis
Control system, wherein described casing is airtight cavity structure, by guided way mounting seat, and is slidably connected with base,
And be all provided with least one casing on each base, described casing include hard protection layer, hard bearing bed, heat-insulated cushion and
Heat exchanger tube, described hard protection layer is coated on hard bearing bed outer surface and is connected by strengthening gusset with hard bearing bed,
Described hard protection layer, hard bearing bed are parallel to each other distribution and minimum spacing is not less than 5 millimeters, described heat-insulated cushion
It is embedded between hard protection layer, hard bearing bed, described heat exchanger tube at least one is embedded in heat-insulated cushion and by heat exchanger plates
It is interconnected with hard bearing bed, described temperature-adjusting device is arranged on base, and mutual with heat exchanger tube by mozzle
Connection, described interior sets some dividing plates, and described dividing plate is connected by guided way with interior, described
Box house is divided into a Comprehensive Control chamber, at least one electric energy metrical chamber and at least one network data measurement chamber, institute by dividing plate
It is interconnected between Comprehensive Control chamber, electric energy metrical chamber and the network data measurement chamber stated by metallic channel, described electric energy metrical
System, computer network metering system and complex control system are located at electric energy metrical chamber, network data measurement chamber and synthesis respectively
In control chamber, and described complex control system is electrically connected with electric energy metered system, computer network metering system respectively, institute
The electromagnetic shielding net stated is at least one layer of and is arranged on Comprehensive Control chamber, electric energy metrical chamber and network data measurement chamber by collets
On inner surface.
2. a kind of novel high-pressure metering box structure according to claim 1, it is characterised in that:Described temperature-adjusting device
Including ventilating fan, semiconductor cooling device and electric heater unit, wherein described semiconductor cooling device and electric heater unit
It is parallel with one another, and connected respectively by ventilating fan with heat exchanger tube.
3. a kind of novel high-pressure metering box structure according to claim 1, it is characterised in that:Outside described electromagnetic shielding net
Surface separately sets flame-resistant insulation overcoat, and described fire retardant insulating overcoat passes through chute and Comprehensive Control chamber, electric energy metrical chamber
It is slidably connected with network data metering inner cavity surface.
4. a kind of novel high-pressure metering box structure according to claim 1, it is characterised in that:Described Comprehensive Control chamber,
In electric energy metrical chamber and network data measurement chamber, wherein described Comprehensive Control chamber is located at electric energy metrical chamber and network data is measured
Between chamber.
5. a kind of novel high-pressure metering box structure according to claim 1, it is characterised in that:Described complex control system
Separately to include at least one in the data processing and control circuit based on FPGA bases, and control circuit based on programmable controller
Automated condtrol subsystem and at least one network communication subsystem based on DSP bases, it is described based on programmable controller
Automated condtrol subsystem and network communication subsystem based on DSP bases by metal-oxide-semiconductor drive circuit with based on FPGA
The data processing and control circuit connection on basis.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621174165.1U CN206331011U (en) | 2016-10-25 | 2016-10-25 | A kind of novel high-pressure measures box structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621174165.1U CN206331011U (en) | 2016-10-25 | 2016-10-25 | A kind of novel high-pressure measures box structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206331011U true CN206331011U (en) | 2017-07-14 |
Family
ID=59287331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621174165.1U Expired - Fee Related CN206331011U (en) | 2016-10-25 | 2016-10-25 | A kind of novel high-pressure measures box structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206331011U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109030893A (en) * | 2018-08-31 | 2018-12-18 | 嘉兴市正辉电力设备有限公司 | A kind of new electric energy batch meter |
CN111766419A (en) * | 2020-06-30 | 2020-10-13 | 国网山东省电力公司莱阳市供电公司 | Electric power operation and inspection protection ammeter |
-
2016
- 2016-10-25 CN CN201621174165.1U patent/CN206331011U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109030893A (en) * | 2018-08-31 | 2018-12-18 | 嘉兴市正辉电力设备有限公司 | A kind of new electric energy batch meter |
CN111766419A (en) * | 2020-06-30 | 2020-10-13 | 国网山东省电力公司莱阳市供电公司 | Electric power operation and inspection protection ammeter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102937799B (en) | Data center energy saving method | |
CN206331011U (en) | A kind of novel high-pressure measures box structure | |
CN105207222B (en) | A kind of intelligent electric power load mixing system and method | |
CN109358677B (en) | Temperature and humidity sensor distribution method of automatic environment adjusting system of transformer substation distribution room | |
CN105307439A (en) | Noise and electromagnetic radiation monitoring and shielding apparatus for electrical control cabinet in communication base station | |
CN108253521A (en) | Heat distribution pipe network adaptive flow balance method and device | |
CN104633846A (en) | Control method and device of air conditioner system | |
CN107565421A (en) | A kind of electrical energy metering tank | |
CN110907731B (en) | Transformer substation thermal state evaluation method and system based on temperature sensing | |
Lan et al. | Experimental and numerical investigation on thermal performance of data center via fan-wall free cooling technology | |
CN104731037A (en) | Energy-saving monitoring and controlling system | |
Liu et al. | Ventilation optimization for reduction of indoor air temperature of main transformer room in urban indoor substation by the variational method | |
CN106501694B (en) | Ring network cabinet shelf depreciation and temperature real time on-line monitoring system | |
CN107889423A (en) | A kind of air-flow intelligent control module and data center's rack high efficiency and heat radiation cooling system | |
CN107689284A (en) | Power matching network potential device and transformer Cooling method | |
CN108562785A (en) | A kind of wireless networking formula multi-functional counter | |
CN108988362A (en) | A kind of three-phase imbalance regulating device of power plant's distribution | |
CN107565428A (en) | A kind of low voltage complete set ventilation heat abstractor | |
CN110165781B (en) | Magnetic valve type controllable reactor wireless temperature state monitoring system and method | |
CN203324865U (en) | Monitoring system for temperature and humidity in electric power tool cabinet | |
CN201585234U (en) | Air supply device of air conditioning unit | |
Liu et al. | Structure parameters optimization of the rain cover and ventilation duct of dry air core reactor under the forced air cooling condition | |
CN104132732B (en) | Based on screen cabinet temperature Real-time Collection transformer station's convergence control cabinet temperature monitoring system and method | |
CN105955336A (en) | Semiconductor-cooling-based shielded cabinet temperature control apparatus and method | |
KR20130117117A (en) | Device and method for controlling inlet temperature of cooling water in network operating center building energy management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170714 Termination date: 20191025 |