CN206331011U - A kind of novel high-pressure measures box structure - Google Patents

A kind of novel high-pressure measures box structure Download PDF

Info

Publication number
CN206331011U
CN206331011U CN201621174165.1U CN201621174165U CN206331011U CN 206331011 U CN206331011 U CN 206331011U CN 201621174165 U CN201621174165 U CN 201621174165U CN 206331011 U CN206331011 U CN 206331011U
Authority
CN
China
Prior art keywords
chamber
electric energy
energy metrical
network data
metering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621174165.1U
Other languages
Chinese (zh)
Inventor
赵滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingyuan Network Information Technology Co Ltd
Original Assignee
Qingyuan Network Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingyuan Network Information Technology Co Ltd filed Critical Qingyuan Network Information Technology Co Ltd
Priority to CN201621174165.1U priority Critical patent/CN206331011U/en
Application granted granted Critical
Publication of CN206331011U publication Critical patent/CN206331011U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

Originally it is new to be related to a kind of novel high-pressure metering box structure, including base, casing, guided way, dividing plate, temperature-adjusting device, it is electromagnetically shielded net, electric energy metered system, computer network metering system and complex control system, in casing mounting seat, and including hard protection layer, hard bearing bed, heat-insulated cushion and heat exchanger tube, temperature-adjusting device is arranged on base, and be interconnected by mozzle and heat exchanger tube, lead to dividing plate in casing and be divided into a Comprehensive Control chamber, at least one electric energy metrical chamber and at least one network data measurement chamber, electromagnetic shielding net is at least one layer of and is arranged on Comprehensive Control chamber by collets, on electric energy metrical chamber and network data metering inner cavity surface.This new one side has compact conformation, the characteristics of rationally distributed, can effectively save and install and use space, it is to avoid batch meter destroys the aesthetic feeling of scenic spot surrounding enviroment, and asking for electric energy metrical and network communication data metering operation on the other hand can be effectively met simultaneously.

Description

A kind of novel high-pressure measures box structure
Technical field
The utility model is related to a kind of measuring equipment, is exactly a kind of novel high-pressure metering box structure.
Background technology
Current electric energy is one of current important power, and usage amount is huge, but, it is necessary to right when to the concrete application of electric energy The electric energy service condition of user is supervised, and collects corresponding service fee, and Computer Communication Networks is current important letter One of communication channel is ceased, it is in use, it is also desirable to which network data resource is monitored accordingly, on the one hand monitoring letter The security and legitimacy of breath, on the other hand provide foundation to collect service fee and improving network service quality, and for this One problem, currently generally uses in scenic spot and builds measurement of power case and network system batch meter respectively, although can Needs are used to meet, but on the one hand cause the measuring equipment complex structure in scenic spot, aesthetic property and the association at scenic spot is have impact on Tonality, on the other hand also causes metering system to need to take larger space, and regular maintenance cost is also of a relatively high, therefore works as Preceding traditional batch meter can not have effectively been met the need for foreground zone develops, for this present situation, in the urgent need to exploitation one Kind of Novel measuring box, with meet it is actually used the need for.
Utility model content
For a kind of not enough present on prior art, novel high-pressure metering box structure of the utility model offer, this is new Knot, can effectively save and install and use space, it is to avoid batch meter destroys the aesthetic feeling of scenic spot surrounding enviroment, and can be prevented effectively from outside Environment is polluted and disturbed to circuit arrangement.
To achieve these goals, the utility model is to realize by the following technical solutions:
A kind of novel high-pressure measures box structure, including base, casing, guided way, dividing plate, temperature-adjusting device, electromagnetic screen Net, electric energy metered system, computer network metering system and complex control system are covered, wherein casing is airtight cavity structure, is led to Cross in guided way mounting seat, and be slidably connected with base, and at least one casing is all provided with each base, casing includes hard Overcoat, hard bearing bed, heat-insulated cushion and heat exchanger tube, hard protection layer are coated on hard bearing bed outer surface and by strong Change gusset be connected with hard bearing bed, hard protection layer, hard bearing bed be parallel to each other distribution and minimum spacing be not less than 5 in the least Rice, heat-insulated cushion is embedded between hard protection layer, hard bearing bed, and described heat exchanger tube at least one is embedded in heat-insulated buffering Layer is simultaneously interconnected by heat exchanger plates and hard bearing bed, and temperature-adjusting device is arranged on base, and by mozzle with changing Heat pipe is interconnected, and interior sets some dividing plates, and described dividing plate is connected by guided way with interior, dividing plate Box house is divided into a Comprehensive Control chamber, at least one electric energy metrical chamber and at least one network data measurement chamber, comprehensive control It is interconnected between chamber processed, electric energy metrical chamber and network data measurement chamber by metallic channel, electric energy metered system, computer network meter Amount system and complex control system are located in electric energy metrical chamber, network data measurement chamber and Comprehensive Control chamber respectively, and comprehensive control System processed is electrically connected with electric energy metered system, computer network metering system respectively, and electromagnetic shielding net is at least one layer of and passes through Collets are arranged on Comprehensive Control chamber, electric energy metrical chamber and network data metering inner cavity surface.
Further, described temperature-adjusting device includes ventilating fan, semiconductor cooling device and electric heater unit, its Described in semiconductor cooling device and electric heater unit it is parallel with one another, and connected respectively by ventilating fan with heat exchanger tube.
Further, described electromagnetic shielding net outer surface separately sets flame-resistant insulation overcoat, and described fire retardant insulating is prevented Sheath measures inner cavity surface by chute and Comprehensive Control chamber, electric energy metrical chamber and network data and is slidably connected.
Further, in described Comprehensive Control chamber, electric energy metrical chamber and network data measurement chamber, wherein described synthesis Control chamber is located between electric energy metrical chamber and network data measurement chamber.
Further, described complex control system is the data processing and control circuit based on FPGA bases, and control is electric Separately include at least one Automated condtrol subsystem and at least one net based on DSP bases based on programmable controller in road Network communication subsystem, the Automated condtrol subsystem based on programmable controller and the network communication based on DSP bases Subsystem is connected by metal-oxide-semiconductor drive circuit with the data processing and control circuit based on FPGA bases.
This new structure is simple, and for the use of flexible just, versatility is good, on the one hand with compact conformation, rationally distributed Feature, can effectively save and install and use space, it is to avoid batch meter destroys the aesthetic feeling of scenic spot surrounding enviroment, on the other hand can be simultaneously Asking for electric energy metrical and network communication data metering operation is effectively met, and effectively overcomes electromagnetic interference to metering work Interference, so as to greatly improve the precision of metering work, and is effectively reduced number of devices, reduces the work of metering work Make cost, and external environment condition can be prevented effectively from circuit arrangement is polluted and disturbed.
Brief description of the drawings
Describe the utility model in detail with reference to the accompanying drawings and detailed description;
Fig. 1 is this new structure schematic diagram;
Fig. 2 is body structure schematic diagram.
Embodiment
For make the utility model realize technological means, creation characteristic, reached purpose and effect be easy to understand, below With reference to embodiment, the utility model is expanded on further.
A kind of novel high-pressure metering box structure as described in Fig. 1 and 2, including base 1, casing 2, guided way 3, dividing plate 4, temperature Adjusting means 5, electromagnetic shielding net 6, electric energy metered system 7, computer network metering system 8 and complex control system 9 are spent, wherein Casing 2 is airtight cavity structure, by the mounting seat 1 of guided way 3, and is slidably connected with base 1, and on each base 1 If at least one casing 2, casing 2 includes hard protection layer 21, hard bearing bed 22, heat-insulated cushion 23 and heat exchanger tube 24, firmly Matter overcoat 21 is coated on the outer surface of hard bearing bed 22 and is connected by strengthening gusset 25 with hard bearing bed 22, hard protection Layer 21, hard bearing bed 22 be parallel to each other distribution and minimum spacing be not less than 5 millimeters, heat-insulated cushion 23 be embedded in hard protection layer 21st, between hard bearing bed 22, heat exchanger tube 24 at least one is embedded in heat-insulated cushion 23 and carried by heat exchanger plates 26 and hard Layer 22 is interconnected, and temperature-adjusting device 5 is arranged on base 1, and is interconnected by mozzle 10 and heat exchanger tube 24, casing 2 inner surfaces set some dividing plates 4, and dividing plate 4 is connected by guided way 3 with the inner surface of casing 2, and dividing plate 4 will be divided into one inside casing 2 Comprehensive Control chamber 11, at least one electric energy metrical chamber 12 and at least one network data measurement chamber 13, Comprehensive Control chamber 11, electric energy It is interconnected between measurement chamber 12 and network data measurement chamber 13 by metallic channel 14, electric energy metered system 7, computer network metering System 8 and complex control system 9 are located in electric energy metrical chamber 12, network data measurement chamber 13 and Comprehensive Control chamber 11 respectively, and Complex control system 9 is electrically connected with electric energy metered system 7, computer network metering system 8 respectively, and electromagnetic shielding net 6 is at least One layer and by collets 15 be arranged on Comprehensive Control chamber 11, electric energy metrical chamber 12 and the inner surface of network data measurement chamber 13 on.
In the present embodiment, described temperature-adjusting device 5 includes ventilating fan 51, semiconductor cooling device 52 and electrical heating Device 53, wherein described semiconductor cooling device 52 and electric heater unit 53 is parallel with one another, and passes through ventilating fan 51 respectively Connected with heat exchanger tube 24.
In the present embodiment, the described outer surface of electromagnetic shielding net 6 separately sets flame-resistant insulation overcoat 16, and it is described it is fire-retardant absolutely Edge overcoat logical 16, which is crossed chute 17 and slided with Comprehensive Control chamber 11, electric energy metrical chamber 12 and the inner surface of network data measurement chamber 13, to be connected Connect.
In the present embodiment, in described Comprehensive Control chamber 11, electric energy metrical chamber 12 and network data measurement chamber 13, wherein institute The Comprehensive Control chamber 11 stated is located between electric energy metrical chamber 12 and network data measurement chamber 13.
In the present embodiment, described complex control system 9 is the data processing and control circuit based on FPGA bases, and is controlled Separately include at least one Automated condtrol subsystem based on programmable controller in circuit with least one based on DSP bases Network communication subsystem, the Automated condtrol subsystem based on programmable controller and the network based on DSP bases lead to News subsystem is connected by metal-oxide-semiconductor drive circuit with the data processing and control circuit based on FPGA bases.
In the present embodiment, described electric energy metered system 7 is based on the civil power electric energy based on kilowatt-hour meter, current transformer Metering system.
In the present embodiment, described computer network metering system 8 is to be inputted based on computer networking technology, automatic identification Aggregation of data monitoring system based on technology and infrared ray control technology and network traffic data monitor supervision platform.
This is new in the specific implementation, according to particular condition in use, first by adjusting partition position, to Comprehensive Control Chamber, the quantity of electric energy metrical chamber and network data measurement chamber, position and bearing space are adjusted, then respectively by electric energy metrical System, computer network metering system and complex control system are installed in corresponding cavity and established a connection, and finally will The heat exchanger tube connection of temperature-adjusting device and casing on base.
This new structure is simple, and for the use of flexible just, versatility is good, on the one hand with compact conformation, rationally distributed Feature, can effectively save and install and use space, it is to avoid batch meter destroys the aesthetic feeling of scenic spot surrounding enviroment, on the other hand can be simultaneously Asking for electric energy metrical and network communication data metering operation is effectively met, and effectively overcomes electromagnetic interference to metering work Interference, so as to greatly improve the precision of metering work, and is effectively reduced number of devices, reduces the work of metering work Make cost, and external environment condition can be prevented effectively from circuit arrangement is polluted and disturbed.
General principle of the present utility model and principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within the range of claimed the utility model.The utility model Claimed scope is by appending claims and its equivalent thereof.

Claims (5)

1. a kind of novel high-pressure measures box structure, it is characterised in that:Described novel high-pressure metering box structure includes base, case Body, guided way, dividing plate, temperature-adjusting device, electromagnetic shielding net, electric energy metered system, computer network metering system and synthesis Control system, wherein described casing is airtight cavity structure, by guided way mounting seat, and is slidably connected with base, And be all provided with least one casing on each base, described casing include hard protection layer, hard bearing bed, heat-insulated cushion and Heat exchanger tube, described hard protection layer is coated on hard bearing bed outer surface and is connected by strengthening gusset with hard bearing bed, Described hard protection layer, hard bearing bed are parallel to each other distribution and minimum spacing is not less than 5 millimeters, described heat-insulated cushion It is embedded between hard protection layer, hard bearing bed, described heat exchanger tube at least one is embedded in heat-insulated cushion and by heat exchanger plates It is interconnected with hard bearing bed, described temperature-adjusting device is arranged on base, and mutual with heat exchanger tube by mozzle Connection, described interior sets some dividing plates, and described dividing plate is connected by guided way with interior, described Box house is divided into a Comprehensive Control chamber, at least one electric energy metrical chamber and at least one network data measurement chamber, institute by dividing plate It is interconnected between Comprehensive Control chamber, electric energy metrical chamber and the network data measurement chamber stated by metallic channel, described electric energy metrical System, computer network metering system and complex control system are located at electric energy metrical chamber, network data measurement chamber and synthesis respectively In control chamber, and described complex control system is electrically connected with electric energy metered system, computer network metering system respectively, institute The electromagnetic shielding net stated is at least one layer of and is arranged on Comprehensive Control chamber, electric energy metrical chamber and network data measurement chamber by collets On inner surface.
2. a kind of novel high-pressure metering box structure according to claim 1, it is characterised in that:Described temperature-adjusting device Including ventilating fan, semiconductor cooling device and electric heater unit, wherein described semiconductor cooling device and electric heater unit It is parallel with one another, and connected respectively by ventilating fan with heat exchanger tube.
3. a kind of novel high-pressure metering box structure according to claim 1, it is characterised in that:Outside described electromagnetic shielding net Surface separately sets flame-resistant insulation overcoat, and described fire retardant insulating overcoat passes through chute and Comprehensive Control chamber, electric energy metrical chamber It is slidably connected with network data metering inner cavity surface.
4. a kind of novel high-pressure metering box structure according to claim 1, it is characterised in that:Described Comprehensive Control chamber, In electric energy metrical chamber and network data measurement chamber, wherein described Comprehensive Control chamber is located at electric energy metrical chamber and network data is measured Between chamber.
5. a kind of novel high-pressure metering box structure according to claim 1, it is characterised in that:Described complex control system Separately to include at least one in the data processing and control circuit based on FPGA bases, and control circuit based on programmable controller Automated condtrol subsystem and at least one network communication subsystem based on DSP bases, it is described based on programmable controller Automated condtrol subsystem and network communication subsystem based on DSP bases by metal-oxide-semiconductor drive circuit with based on FPGA The data processing and control circuit connection on basis.
CN201621174165.1U 2016-10-25 2016-10-25 A kind of novel high-pressure measures box structure Expired - Fee Related CN206331011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621174165.1U CN206331011U (en) 2016-10-25 2016-10-25 A kind of novel high-pressure measures box structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621174165.1U CN206331011U (en) 2016-10-25 2016-10-25 A kind of novel high-pressure measures box structure

Publications (1)

Publication Number Publication Date
CN206331011U true CN206331011U (en) 2017-07-14

Family

ID=59287331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621174165.1U Expired - Fee Related CN206331011U (en) 2016-10-25 2016-10-25 A kind of novel high-pressure measures box structure

Country Status (1)

Country Link
CN (1) CN206331011U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109030893A (en) * 2018-08-31 2018-12-18 嘉兴市正辉电力设备有限公司 A kind of new electric energy batch meter
CN111766419A (en) * 2020-06-30 2020-10-13 国网山东省电力公司莱阳市供电公司 Electric power operation and inspection protection ammeter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109030893A (en) * 2018-08-31 2018-12-18 嘉兴市正辉电力设备有限公司 A kind of new electric energy batch meter
CN111766419A (en) * 2020-06-30 2020-10-13 国网山东省电力公司莱阳市供电公司 Electric power operation and inspection protection ammeter

Similar Documents

Publication Publication Date Title
CN102937799B (en) Data center energy saving method
CN206331011U (en) A kind of novel high-pressure measures box structure
CN105207222B (en) A kind of intelligent electric power load mixing system and method
CN109358677B (en) Temperature and humidity sensor distribution method of automatic environment adjusting system of transformer substation distribution room
CN105307439A (en) Noise and electromagnetic radiation monitoring and shielding apparatus for electrical control cabinet in communication base station
CN108253521A (en) Heat distribution pipe network adaptive flow balance method and device
CN104633846A (en) Control method and device of air conditioner system
CN107565421A (en) A kind of electrical energy metering tank
CN110907731B (en) Transformer substation thermal state evaluation method and system based on temperature sensing
Lan et al. Experimental and numerical investigation on thermal performance of data center via fan-wall free cooling technology
CN104731037A (en) Energy-saving monitoring and controlling system
Liu et al. Ventilation optimization for reduction of indoor air temperature of main transformer room in urban indoor substation by the variational method
CN106501694B (en) Ring network cabinet shelf depreciation and temperature real time on-line monitoring system
CN107889423A (en) A kind of air-flow intelligent control module and data center's rack high efficiency and heat radiation cooling system
CN107689284A (en) Power matching network potential device and transformer Cooling method
CN108562785A (en) A kind of wireless networking formula multi-functional counter
CN108988362A (en) A kind of three-phase imbalance regulating device of power plant's distribution
CN107565428A (en) A kind of low voltage complete set ventilation heat abstractor
CN110165781B (en) Magnetic valve type controllable reactor wireless temperature state monitoring system and method
CN203324865U (en) Monitoring system for temperature and humidity in electric power tool cabinet
CN201585234U (en) Air supply device of air conditioning unit
Liu et al. Structure parameters optimization of the rain cover and ventilation duct of dry air core reactor under the forced air cooling condition
CN104132732B (en) Based on screen cabinet temperature Real-time Collection transformer station's convergence control cabinet temperature monitoring system and method
CN105955336A (en) Semiconductor-cooling-based shielded cabinet temperature control apparatus and method
KR20130117117A (en) Device and method for controlling inlet temperature of cooling water in network operating center building energy management system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170714

Termination date: 20191025