CN206318425U - The Upper gasket feeding device of compressor crank shaft riveting press equipment - Google Patents

The Upper gasket feeding device of compressor crank shaft riveting press equipment Download PDF

Info

Publication number
CN206318425U
CN206318425U CN201621195214.XU CN201621195214U CN206318425U CN 206318425 U CN206318425 U CN 206318425U CN 201621195214 U CN201621195214 U CN 201621195214U CN 206318425 U CN206318425 U CN 206318425U
Authority
CN
China
Prior art keywords
upper gasket
plate
delivery chute
cylinder
gasket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621195214.XU
Other languages
Chinese (zh)
Inventor
鲍敏辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Guanhaosi Precision Machinery Co Ltd
Original Assignee
Suzhou Guanhaosi Precision Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Guanhaosi Precision Machinery Co Ltd filed Critical Suzhou Guanhaosi Precision Machinery Co Ltd
Priority to CN201621195214.XU priority Critical patent/CN206318425U/en
Application granted granted Critical
Publication of CN206318425U publication Critical patent/CN206318425U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a kind of Upper gasket feeding device of compressor crank shaft riveting press equipment, the Upper gasket feeding device of the compressor crank shaft riveting press equipment includes installing Upper gasket on the ground and shaken charging tray, Upper gasket to shake and be placed with Upper gasket in charging tray, the shake discharging opening of charging tray of Upper gasket is provided with Upper gasket delivery chute, the inner sidewall upper portion of Upper gasket delivery chute is provided with two groups of relative Upper gasket delivery chute limiting plates, Upper gasket discharging opening is left between the output end of two groups of Upper gasket delivery chute limiting plates and the madial wall of Upper gasket delivery chute, two groups of Upper gasket delivery chute limiting plates are provided with corresponding opening.Through the above way, the utility model is simple in construction, reasonable in design, stable mechanical performance, can complete getting the raw materials ready for second workpiece while unit one feeding is completed, can continuously production operation, significantly improve production efficiency.

Description

The Upper gasket feeding device of compressor crank shaft riveting press equipment
Technical field
The utility model is related to field of machinery automation, more particularly to a kind of Upper gasket of compressor crank shaft riveting press equipment Feeding device.
Background technology
At present, the numerical controlled machinery of domestic and international Duo Jia machine tool plants and batch production processing enterprise is processed to machine tooling raw material Feeding is still manually completed, it is impossible to which the need for realizing full-automatic production, cost of labor is high, and labor intensity is big, constrains enterprise The development of industry, the home built workpiece feeding equipment of part producer can only can not also reduce reduction people in two equipment room conveyings Number amount, labour cost is higher, and the quality of production is unstable, and production cost is high, and can not complete requirements of mass production, produces Speed can not be improved, and equipment has potential safety hazard, have a strong impact on production operation.
Utility model content
The utility model is mainly solving the technical problems that provide a kind of simple in construction, compressor crank shaft of high working efficiency The Upper gasket feeding device of riveting press equipment.
In order to solve the above technical problems, the technical scheme that the utility model is used is:A kind of compressor crank shaft is provided The Upper gasket feeding device of riveting press equipment, the Upper gasket feeding device of the compressor crank shaft riveting press equipment includes installing on the ground Upper gasket shake charging tray, Upper gasket shakes the Upper gasket that be placed with charging tray, and the shake discharging opening of charging tray of Upper gasket is provided with Upper gasket conveying Groove, the inner sidewall upper portion of Upper gasket delivery chute is provided with two groups of relative Upper gasket delivery chute limiting plates, two groups of Upper gasket conveyings Upper gasket discharging opening, two groups of Upper gasket delivery chutes are left between the output end of groove limiting plate and the madial wall of Upper gasket delivery chute Limiting plate is provided with corresponding opening, opening and Upper gasket delivery chute formation waste outlet groove, one of which Upper gasket delivery chute The position being located on baffle plate, ground below waste outlet groove is installed at the opening of limiting plate Upper gasket garbage collection branch is installed It is provided with Upper gasket garbage collection plate, Upper gasket garbage collection plate and is located on the outside of baffle plate on frame, Upper gasket garbage collection support Position be provided with Upper gasket push-and-pull cylinder mounting bracket, Upper gasket push-and-pull cylinder mounting bracket Upper gasket push-and-pull gas be installed Plane is provided with Upper gasket push-and-pull cylinder, Upper gasket by cylinder fixed seat on cylinder installing plate, Upper gasket push-and-pull cylinder installing plate First connecting rod is connected with by cylinder connector on the piston rod of push-and-pull cylinder, the other end of first connecting rod is provided with driving wheel peace The position on axle, Upper gasket push-and-pull cylinder installing plate positioned at Upper gasket push-and-pull cylinder side is filled to be provided with guide pad, guide pad Provided with guide chute, it is provided with guide chute on bearing pin, bearing pin and is connected with second connecting rod, driven pulley is installed on second connecting rod Waste material push pedal is installed, the upper plane of waste material push pedal is fitted with baffle plate in installation axle, driven pulley installation axle and driving wheel installation axle And the front end of waste material push pedal is extend into waste outlet groove, the front end of waste material push pedal is provided with the neck matched with Upper gasket, The upper end of driven pulley installation axle and driving wheel installation axle both passes through waste material push pedal, driven pulley installation axle and driving wheel installation axle it is upper End is respectively fixed with driven pulley and driving wheel, and driven pulley is engaged with driving wheel, is located on Upper gasket garbage collection plate on another group Position below the opening of pad delivery chute limiting plate be provided with buffer spring installing plate, buffer spring installing plate be provided with it is slow Rush and buffer spring is installed in spring mounting post, buffer spring mounting post, it is spacing that the upper end of buffer spring post is provided with Upper gasket Plate, the upper end of Upper gasket limiting plate is the inclined plane with fold-type and identical with the openings of sizes of Upper gasket delivery chute limiting plate, Inclined plane with fold-type is located at the position on the outside of buffer spring installing plate towards Upper gasket delivery chute, on Upper gasket garbage collection plate The position being located on Upper gasket collection basket, ground below Upper gasket delivery chute is installed linear vibrator mounting bracket is installed, Linear vibrator is installed, the lower plane of linear vibrator and Upper gasket delivery chute is fixed, ground in linear vibrator mounting bracket It is located at the position on the outside of linear vibrator on face and Upper gasket slider cylinder installing plate is provided with by Upper gasket transposition fixed mount, on The lower plane of pad slider cylinder installing plate, which is provided with Upper gasket transposition slider cylinder, Upper gasket transposition slider cylinder, passes through cunning Platform cylinder connecting plate is provided with pad transposition rotary cylinder, the turntable of Upper gasket transposition rotary cylinder to be connected by rotary cylinder Fishplate bar is provided with Upper gasket transposition lift cylinder, the push pedal of Upper gasket transposition lift cylinder and is provided with electromagnet, electromagnet position In the top of Upper gasket delivery chute, the both sides of electromagnet are mounted on lifting and are oriented to axle installing plate, and two pieces of lifting axis of guides are installed It is mounted on slidably lifting the axis of guide on plate, the circular hole pair of two lifting axis of guides and the Upper gasket in Upper gasket discharging opening Should, the lower end of two lifting axis of guides is intilted cone, and the upper end of two lifting axis of guides is mounted on retainer ring, two The bottom of the root lifting axis of guide is mounted on Upper gasket location-plate, and the lower end of two lifting axis of guides passes through corresponding upper pad The position being located on piece location-plate, two lifting axis of guides between Upper gasket location-plate and lifting guiding axle installing plate is mounted on Spring.
The beneficial effects of the utility model are:A kind of Upper gasket feeding dress of compressor crank shaft riveting press equipment of the utility model Put, its is simple in construction, reasonable in design, stable mechanical performance, second can be completed while unit one feeding is completed Workpiece is got the raw materials ready, can continuous production operation, significantly improve production efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of the Upper gasket feeding device of the utility model compressor crank shaft riveting press equipment;
Fig. 2 is the partial enlarged drawing of the Upper gasket feeding device of the utility model compressor crank shaft riveting press equipment;
Fig. 3 is the partial schematic diagram of the Upper gasket feeding device of the utility model compressor crank shaft riveting press equipment;
Fig. 4 is another part schematic diagram of the Upper gasket feeding device of the utility model compressor crank shaft riveting press equipment.
Embodiment
The utility model preferred embodiment is described in detail below in conjunction with the accompanying drawings, so that advantage and the spy of utility model Levying can be easier to be readily appreciated by one skilled in the art, so as to make apparent clear and definite boundary to protection domain of the present utility model It is fixed.
Fig. 1 to Fig. 4 is referred to, the utility model embodiment includes:
On a kind of Upper gasket feeding device of compressor crank shaft riveting press equipment, the Upper gasket of the compressor crank shaft riveting press equipment Material device includes installing Upper gasket on the ground and shaken charging tray 510, and Upper gasket to shake and be placed with Upper gasket in charging tray 510, and Upper gasket shakes The discharging opening of charging tray 510 is provided with Upper gasket delivery chute 511, and the inner sidewall upper portion of Upper gasket delivery chute 511 is provided with relative Two groups of Upper gasket delivery chute limiting plates 512, output end and the Upper gasket delivery chute of two groups of Upper gasket delivery chute limiting plates 512 Upper gasket discharging opening is left between 511 madial wall, two groups of Upper gasket delivery chute limiting plates 512 are provided with corresponding opening, opened It is provided with mouth and the formation waste outlet groove of Upper gasket delivery chute 511, the opening of one of which Upper gasket delivery chute limiting plate 512 It is located at the position below waste outlet groove on baffle plate 513, ground and Upper gasket garbage collection support 514, Upper gasket waste material is installed Collect to be provided with support 514 and be located at the outside of baffle plate 513 on Upper gasket garbage collection plate 515, Upper gasket garbage collection plate 515 Position, which is provided with, to be provided with Upper gasket in Upper gasket push-and-pull cylinder mounting bracket 516, Upper gasket push-and-pull cylinder mounting bracket 516 and pushes away Draw plane on cylinder mounting plate 517, Upper gasket push-and-pull cylinder installing plate 517 that Upper gasket push-and-pull gas is installed by cylinder fixed seat First connecting rod 519, first connecting rod 519 are connected with by cylinder connector on cylinder 518, the piston rod of Upper gasket push-and-pull cylinder 518 The other end be provided with driving wheel installation axle, Upper gasket push-and-pull cylinder installing plate 517 be located at the side of Upper gasket push-and-pull cylinder 518 Position guide pad 5112 is installed, guide pad 5112, which is provided with guide chute, guide chute to be provided with bearing pin, bearing pin, to be sold It is connected on second connecting rod 5113, second connecting rod 5113 and driven pulley installation axle is installed, driven pulley installation axle and driving wheel installation axle On waste material push pedal 5111 is installed, the upper plane of waste material push pedal 5111 fitted with baffle plate 513 and waste material push pedal 5111 front end Extend into waste outlet groove, the front end of waste material push pedal 5111 is provided with the neck matched with Upper gasket, driven pulley installation axle and The upper end of driving wheel installation axle both passes through waste material push pedal 5111, and the upper end of driven pulley installation axle and driving wheel installation axle is fixed respectively There are driven pulley 5114 and driving wheel 5110, driven pulley 5114 is engaged with driving wheel 5110, be located on Upper gasket garbage collection plate 515 Position below the opening of another group of Upper gasket delivery chute limiting plate 512 is provided with buffer spring installing plate 5115, buffer spring It is provided with installing plate 5115 in buffer spring mounting post, buffer spring mounting post and buffer spring is installed, buffer spring post Upper end is provided with Upper gasket limiting plate 5116, and the upper end of Upper gasket limiting plate 5116 is the inclined plane with fold-type and and Upper gasket The openings of sizes of delivery chute limiting plate 512 is identical, and the inclined plane with fold-type is received towards Upper gasket delivery chute 511, Upper gasket waste material The position for being located at the outside of buffer spring installing plate 5115 on collection plate 515 is provided with Upper gasket collection basket 5117, ground positioned at upper The position of the lower section of pad delivery chute 511 is provided with linear vibrator mounting bracket 5118, linear vibrator mounting bracket 5118 Linear vibrator 5119 is installed, the lower plane of linear vibrator 5119 and Upper gasket delivery chute 511 is fixed, be located on ground straight The position in the outside of linearly coupled device 5119 is provided with Upper gasket slider cylinder installing plate 5121 by Upper gasket transposition fixed mount 5120, The lower plane of Upper gasket slider cylinder installing plate 5121 is provided with Upper gasket transposition slider cylinder 5122, Upper gasket transposition slide unit gas Upper pad transposition rotary cylinder 5123 is provided with by slider cylinder connecting plate on cylinder 5122, Upper gasket transposition rotary cylinder 5123 Upper gasket transposition lift cylinder 5124, Upper gasket transposition lift cylinder 5124 are provided with by rotary cylinder connecting plate on turntable Push pedal on electromagnet 5125 is installed, electromagnet 5125 is located at the top of Upper gasket delivery chute 511, the both sides of electromagnet 5125 It is mounted on lifting and is oriented to axle installing plate 5126, two pieces of liftings is oriented in axle installing plates 5126 to be mounted on slidably lifting and led To axle 5127, two lifting axis of guides 5127 are corresponding with the circular hole of the Upper gasket in Upper gasket discharging opening, two lifting axis of guides 5127 lower end is intilted cone, and the upper end of two lifting axis of guides 5127 is mounted on retainer ring, and two liftings are led Upper gasket location-plate 5128 is mounted on to the bottom of axle 5127, two lower ends for lifting the axis of guides 5127 pass through corresponding It is located at Upper gasket location-plate 5128 on Upper gasket location-plate 5128, two lifting axis of guides 5127 and lifting is oriented to axle installing plate Position between 5126 is mounted on spring.
During utility model works, Upper gasket delivery chute 511 transfers out Upper gasket, if the direction of Upper gasket is put back, So Upper gasket push-and-pull cylinder 518 drives first connecting rod 519 make it that driving wheel 5110 drives waste material push pedal 5111 forward by reversely Upper gasket be pushed into Upper gasket collect basket 5117 in, if Upper gasket is in the right direction, then when Upper gasket delivery chute 511 will When Upper gasket is transported to the underface of electromagnet 5125, Upper gasket transposition lift cylinder 5124 downwards will be upper with motor magnet 5125 Pad is held, and the slide downward of electromagnet 5125 drives lifting to be oriented to axle installing plate 5126 so that the lower end of the lifting axis of guide 5127 is stretched Enter into the circular hole of Upper gasket, Upper gasket replaces lift cylinder 5124 with the upward sliding of motor magnet 5125, and Upper gasket transposition is slided Platform cylinder 5122 drives the pad transposition level of rotary cylinder 5123 to slide into the surface of processed workpiece, and upper pad, which replaces, to be rotated Cylinder 5123 rotates the direction one of workpiece that causes the direction of Upper gasket and processed to the Upper gasket transposition band of lift cylinder 5124 Downwards, Upper gasket is put on bent axle motor magnet 5125 by electromagnet 5125.
A kind of Upper gasket feeding device of compressor crank shaft riveting press equipment of the utility model, its is simple in construction, reasonable in design, Stable mechanical performance, can be while unit one feeding be completed, and getting the raw materials ready for second workpiece of completion can continuously produce work Industry, significantly improves production efficiency.
Embodiment of the present utility model is the foregoing is only, the scope of the claims of the present utility model is not thereby limited, it is every The equivalent structure or equivalent flow conversion made using the utility model specification and accompanying drawing content, or be directly or indirectly used in Other related technical fields, are similarly included in scope of patent protection of the present utility model.

Claims (1)

1. a kind of Upper gasket feeding device of compressor crank shaft riveting press equipment, it is characterised in that:The compressor crank shaft riveting press equipment Upper gasket feeding device include installing Upper gasket on the ground and shake charging tray, Upper gasket to shake and be placed with Upper gasket, upper pad in charging tray The shake discharging opening of charging tray of piece is provided with Upper gasket delivery chute, and the inner sidewall upper portion of Upper gasket delivery chute is provided with relative two groups Pad delivery chute limiting plate, is stayed between the output end of two groups of Upper gasket delivery chute limiting plates and the madial wall of Upper gasket delivery chute There is Upper gasket discharging opening, two groups of Upper gasket delivery chute limiting plates are provided with corresponding opening, and opening is formed with Upper gasket delivery chute It is provided with waste outlet groove, the opening of one of which Upper gasket delivery chute limiting plate on baffle plate, ground and is located at waste outlet groove The position of lower section is provided with Upper gasket garbage collection support, Upper gasket garbage collection support and is provided with Upper gasket garbage collection It is located at the position on the outside of baffle plate on plate, Upper gasket garbage collection plate and Upper gasket push-and-pull cylinder mounting bracket is installed, Upper gasket is pushed away Plane on Upper gasket push-and-pull cylinder installing plate, Upper gasket push-and-pull cylinder installing plate is installed on drawing Cylinder mount bracket and passes through cylinder Fixed seat is provided with Upper gasket push-and-pull cylinder, the piston rod of Upper gasket push-and-pull cylinder and is connected with the first company by cylinder connector Bar, the other end of first connecting rod, which is provided with driving wheel installation axle, Upper gasket push-and-pull cylinder installing plate, is located at Upper gasket push-and-pull gas The position of cylinder side is provided with guide pad, and guide pad is provided with guide chute, guide chute and is provided with pin joint on bearing pin, bearing pin Have and driven pulley installation axle is installed on second connecting rod, second connecting rod, be provided with driven pulley installation axle and driving wheel installation axle useless Expect push pedal, the upper plane of waste material push pedal is fitted with baffle plate and the front end of waste material push pedal is extend into waste outlet groove, and waste material is pushed away The front end of plate is provided with the neck that matches with Upper gasket, and the upper end of driven pulley installation axle and driving wheel installation axle both passes through waste material and pushed away The upper end of plate, driven pulley installation axle and driving wheel installation axle is respectively fixed with driven pulley and driving wheel, and driven pulley is nibbled with driving wheel Close, the position below the opening of another group of Upper gasket delivery chute limiting plate is located on Upper gasket garbage collection plate buffering elastic is installed It is provided with spring installing plate, buffer spring installing plate in buffer spring mounting post, buffer spring mounting post and buffer spring is installed, The upper end of buffer spring post is provided with Upper gasket limiting plate, the upper end of Upper gasket limiting plate for the inclined plane with fold-type and with it is upper The openings of sizes of pad delivery chute limiting plate is identical, and the inclined plane with fold-type is towards Upper gasket delivery chute, Upper gasket garbage collection It is located at the position on the outside of buffer spring installing plate on plate to be provided with Upper gasket collection basket, ground below Upper gasket delivery chute Position be provided with linear vibrator mounting bracket, linear vibrator mounting bracket linear vibrator, straight-line oscillation be installed The lower plane of device and Upper gasket delivery chute is fixed, and the position on the outside of linear vibrator is located on ground and is fixed by Upper gasket transposition Frame is provided with Upper gasket slider cylinder installing plate, and the lower plane of Upper gasket slider cylinder installing plate is provided with Upper gasket transposition slide unit Upper pad transposition rotary cylinder, Upper gasket transposition are provided with by slider cylinder connecting plate in cylinder, Upper gasket transposition slider cylinder Upper gasket transposition lift cylinder, Upper gasket transposition lifting air are provided with by rotary cylinder connecting plate on the turntable of rotary cylinder Electromagnet is installed, electromagnet is located at the top of Upper gasket delivery chute, and the both sides of electromagnet are mounted on lifting in the push pedal of cylinder Axle installing plate is oriented to, two pieces of liftings are oriented in axle installing plate and are mounted on slidably lifting the axis of guide, two lifting axis of guides Circular hole with the Upper gasket in Upper gasket discharging opening is corresponding, and the lower end of two lifting axis of guides is intilted cone, two The upper end of the lifting axis of guide is mounted on retainer ring, and the bottom of two lifting axis of guides is mounted on Upper gasket location-plate, two Lift the axis of guide lower end pass through corresponding Upper gasket location-plate, two lifting the axis of guides on be located at Upper gasket location-plate and The position that lifting is oriented between axle installing plate is mounted on spring.
CN201621195214.XU 2016-11-07 2016-11-07 The Upper gasket feeding device of compressor crank shaft riveting press equipment Withdrawn - After Issue CN206318425U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621195214.XU CN206318425U (en) 2016-11-07 2016-11-07 The Upper gasket feeding device of compressor crank shaft riveting press equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621195214.XU CN206318425U (en) 2016-11-07 2016-11-07 The Upper gasket feeding device of compressor crank shaft riveting press equipment

Publications (1)

Publication Number Publication Date
CN206318425U true CN206318425U (en) 2017-07-11

Family

ID=59263904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621195214.XU Withdrawn - After Issue CN206318425U (en) 2016-11-07 2016-11-07 The Upper gasket feeding device of compressor crank shaft riveting press equipment

Country Status (1)

Country Link
CN (1) CN206318425U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106315185A (en) * 2016-11-07 2017-01-11 苏州冠浩斯精密机械有限公司 Upper gasket feeding device for compressor crank shaft riveting pressure equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106315185A (en) * 2016-11-07 2017-01-11 苏州冠浩斯精密机械有限公司 Upper gasket feeding device for compressor crank shaft riveting pressure equipment
CN106315185B (en) * 2016-11-07 2018-07-27 芜湖航天特种电缆厂股份有限公司 The Upper gasket feeding device of compressor crank shaft riveting press equipment

Similar Documents

Publication Publication Date Title
CN206824200U (en) A kind of building waste sorting unit
CN106334921A (en) Compressor crankshaft riveting device
CN210730486U (en) Weaving equipment with dust removal function
CN206318425U (en) The Upper gasket feeding device of compressor crank shaft riveting press equipment
CN106315185B (en) The Upper gasket feeding device of compressor crank shaft riveting press equipment
CN106334920A (en) Lower gasket feeding mechanism of compressor crankshaft riveting device
CN206140076U (en) Lower gasket feed mechanism of compressor crankshaft riveting equipment
CN204148482U (en) Spray is separated extractor automatically
CN207001614U (en) A kind of bamboo processing waste material induction system
CN206140081U (en) Last gasket material loading subassembly of compressor crankshaft riveting equipment
CN206140074U (en) Compressor crankshaft riveting equipment
CN211003677U (en) Sealed baffle box convenient to combination
CN205165169U (en) Shaking screen
CN206140075U (en) Lower gasket material loading subassembly of compressor crankshaft riveting equipment
CN208345359U (en) One kind producing dustless feeder based on solid waste steam pressure sand-lime reincarnation
CN106363393B (en) The Upper gasket loading assemblies of compressor crank shaft riveting press equipment
CN206005760U (en) A kind of tea processing device
CN106425365B (en) The lower gasket loading assemblies of compressor crank shaft riveting press equipment
CN204746834U (en) Domestic fungus culture medium sieving mechanism
CN209287659U (en) A kind of jujube size classifier
CN209049426U (en) A kind of damping jaw crusher
CN204606399U (en) Environment-friendly and energy-efficient jumbo bag machine
CN208450734U (en) Cutter device is used in a kind of production and processing of petroleum pipeline
CN209077561U (en) A kind of semi-automatic perforating press with damping device
CN209255183U (en) A kind of removable dust protected sand sieving machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170711

Effective date of abandoning: 20180727

AV01 Patent right actively abandoned