CN206307972U - A kind of construction of hydro project is ascended a height servicing unit - Google Patents

A kind of construction of hydro project is ascended a height servicing unit Download PDF

Info

Publication number
CN206307972U
CN206307972U CN201621488264.7U CN201621488264U CN206307972U CN 206307972 U CN206307972 U CN 206307972U CN 201621488264 U CN201621488264 U CN 201621488264U CN 206307972 U CN206307972 U CN 206307972U
Authority
CN
China
Prior art keywords
construction
ascended
servicing unit
hydro project
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621488264.7U
Other languages
Chinese (zh)
Inventor
李晓波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621488264.7U priority Critical patent/CN206307972U/en
Application granted granted Critical
Publication of CN206307972U publication Critical patent/CN206307972U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

Ascended a height servicing unit the utility model discloses a kind of construction of hydro project, including hoist engine, support column, climb crossbeam, working shed, climbing device, pedestal, connector, pillar and fitting case, the hoist engine is connected with steel wire rope, the climbing device is connected with inside chain, the pedestal is connected with support column, the trailing arm is connected with draw-in groove, the connector is connected with cross bar, the upper end of the cross bar is provided with warmer, the pillar is connected with controller, and the left end of the fitting case is provided with tool box.The construction of hydro project is ascended a height servicing unit, innovative design is carried out with reference to the construction of hydro project for currently using servicing unit of ascending a height, this construction of hydro project is ascended a height, and assistant apparatus structure is simple and assembling is simple, so that the cost of construction is substantially reduced, two warmers are provided with the top of working shed, illumination can not only be provided for workman, moreover it is possible to so that workmen will not influence operating efficiency when high-altitude is constructed because of cold.

Description

A kind of construction of hydro project is ascended a height servicing unit
Technical field
The utility model is related to servicing unit technical field of ascending a height, and specially a kind of construction of hydro project is ascended a height and aids in dress Put.
Background technology
Construction of hydro project servicing unit of ascending a height is a kind of device for aiding in ascending a height during construction of hydro project, its It is main that by hoist engine, the groove that climbs, lightning rod, climbing device, warmer, tool box, fitting case and controller, this eight parts constitute, With the development of science and technology construction of hydro project ascend a height servicing unit species it is more and more, ascended a height for construction of hydro project Servicing unit demand more and more higher.
Servicing unit also the coming with some shortcomings more or less and the construction of hydro project for currently using is ascended a height, such as now The auxiliary aerial device complex structure that uses and install fixed difficult so that the cost of construction increases, being not provided with of having is taken shelter from the thunder Pin so that the safety of workmen cannot be ensured during the thunderstorm weather of burst, what is had is not provided with warmer so that constructor Member is in work high above the ground due to cold easily influence operating efficiency, it is impossible to the need for meeting use, so for such case In the presence of, it is now desired to carry out the innovative design of relevant device.
Utility model content
The purpose of this utility model is to provide a kind of construction of hydro project to ascend a height servicing unit, to solve above-mentioned background skill The auxiliary aerial device complex structure for currently using and installation proposed in art are fixed difficult so that the cost of construction increases, and has Be not provided with lightning rod so that the safety of workmen cannot be ensured during the thunderstorm weather of burst, and being not provided with of having takes Warmer so that workmen is in work high above the ground due to the problem of cold easily influence operating efficiency.
To achieve the above object, the utility model provides following technical scheme:A kind of construction of hydro project is ascended a height and aids in dress Put, including hoist engine, support column, climb crossbeam, working shed, climbing device, pedestal, connector, pillar and fitting case, the hoist engine It is connected with steel wire rope, the support column is internally provided with the groove that climbs, and the groove that climbs is internally provided with chain, the crossbeam and branch Dagger is connected, and is provided with lightning rod and fixed pulley, and guardrail and connection ring, and connection ring are provided with the working shed It is connected with safety rope, the climbing device is connected with inside chain, and its trailing arm is connected, the pedestal is connected with support column Connect, and it is internally provided with hoist engine, the trailing arm is connected with draw-in groove, and draw-in groove is connected with base plate, the connector with Cross bar is connected, and connector is connected with protection rope, and the upper end of the cross bar is provided with warmer, and warmer and controller It is connected, the pillar is connected with controller, the left end of the fitting case is provided with tool box.
Preferably, the support column material is I-steel, and it is demountable structure.
Preferably, the climbing device moves up and down the length that scope is support column.
Preferably, the lightning rod is provided with two on the top of support column, and it is connected with pedestal.
Preferably, the connector is bascule, and it moves left and right the length that distance range is cross bar.
Preferably, the warmer is provided with two on the top of working shed, and it is to electrically connect between controller.
Compared with prior art, the beneficial effects of the utility model are:The construction of hydro project is ascended a height servicing unit, with reference to The construction of hydro project for currently using servicing unit of ascending a height carries out innovative design, and this construction of hydro project is ascended a height assistant apparatus structure Simple and assembling is simply so that the cost of construction is substantially reduced, and lightning rod is provided with the top of it, is running into the thundery sky of burst Can be good at ensureing the safety of workmen during gas, two warmers are provided with the top of working shed, can not only be work People provides illumination, moreover it is possible to so that workmen will not influence operating efficiency when high-altitude is constructed because of cold.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is utility model works booth structure schematic diagram.
In figure:1st, hoist engine, 2, steel wire rope, 3, support column, 4, climb groove, 5, fixed pulley, 6, crossbeam, 7, safety rope, 8, Lightning rod, 9, working shed, 10, chain, 11, climbing device, 12, trailing arm, 13, pedestal, 14, connector, 15, cross bar, 16, connection Ring, 17, warmer, 18, pillar, 19, controller, 20, fitting case, 21, base plate, 22, guardrail, 23, tool box, 24, protection rope, 25th, draw-in groove.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of construction of hydro project is ascended a height servicing unit, Including hoist engine 1, steel wire rope 2, support column 3, the groove 4 that climbs, fixed pulley 5, crossbeam 6, safety rope 7, lightning rod 8, working shed 9, chain Bar 10, climbing device 11, trailing arm 12, pedestal 13, connector 14, cross bar 15, connection ring 16, warmer 17, pillar 18, controller 19th, fitting case 20, base plate 21, guardrail 22, tool box 23, protection rope 24 and draw-in groove 25, hoist engine 1 are connected with steel wire rope 2, prop up Dagger 3 is internally provided with the groove 4 that climbs, and the groove 4 that climbs is internally provided with chain 10, and the material of support column 3 is I-steel, and its be can Detaching structure, crossbeam 6 is connected with support column 3, and is provided with lightning rod 8 and fixed pulley 5, and lightning rod 8 is in support column 3 Top is provided with two, and it is connected with pedestal 13, and guardrail 22 and connection ring 16, and connection ring 16 are provided with working shed 9 It is connected with safety rope 7, climbing device 11 is connected with inside chain 10, and its trailing arm 12 is connected, climbing device 11 is moved up and down Scope is the length of support column 3, and pedestal 13 is connected with support column 3, and it is internally provided with hoist engine 1, trailing arm 12 and draw-in groove 25 are connected, and draw-in groove 25 is connected with base plate 21, and connector 14 is connected with cross bar 15, and connector 14 and protection 24 phases of rope Connection, connector 14 is bascule, and it moves left and right the length that distance range is cross bar 15, and the upper end of cross bar 15 is provided with Warmer 17, and warmer 17 is connected with controller 19, warmer 17 is provided with two on the top of working shed 9, and its with It is electrical connection between controller 19, pillar 18 is connected with controller 19, and the left end of fitting case 20 is provided with tool box 23.
Operation principle:, it is necessary to whole construction of hydro project before servicing unit of being ascended a height using the construction of hydro project Servicing unit of ascending a height carries out simple structure understanding, first installs whole device, and then staff enters working shed 9 It is interior, and fasten protection rope and 24 avoid occurring accident during device climbs, then guardrail 22 is loaded onto, then start climbing device 11 So that working shed 9 reaches specified location, staff can start working from taking-up instrument in tool box 23, storage in fitting case 20 Standby device is had, staff is changed the device of damage in time, it is ensured that the facility of hydraulic engineering normally runs, Enable to keep warm in working shed 9 in the presence of warmer 17, it is to avoid staff catches cold and influences operating efficiency, and this is just It is that whole construction of hydro project is ascended a height the workflow of servicing unit.
Although being described in detail to the utility model with reference to the foregoing embodiments, come for those skilled in the art Say, it can still be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered Row equivalent, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvements made etc. all should It is included within protection domain of the present utility model.

Claims (6)

1. a kind of construction of hydro project is ascended a height servicing unit, including hoist engine (1), support column (3), climbs crossbeam (6), working shed (9), climbing device (11), pedestal (13), connector (14), pillar (18) and fitting case (20), it is characterised in that:The hoist engine (1) it is connected with steel wire rope (2), the support column (3) is internally provided with the groove that climbs (4), and the groove that climbs (4) is internally provided with chain Bar (10), the crossbeam (6) is connected with support column (3), and is provided with lightning rod (8) and fixed pulley (5), the work Guardrail (22) and connection ring (16) are provided with canopy (9), and connection ring (16) is connected with safety rope (7), the climbing device (11) it is connected with inside chain (10), and its trailing arm (12) is connected, the pedestal (13) is connected with support column (3), and It is internally provided with hoist engine (1), and the trailing arm (12) is connected with draw-in groove (25), and draw-in groove (25) is connected with base plate (21) Connect, the connector (14) is connected with cross bar (15), and connector (14) is connected with protection rope (24), the cross bar (15) Upper end be provided with warmer (17), and warmer (17) is connected with controller (19), the pillar (18) and controller (19) it is connected, the left end of the fitting case (20) is provided with tool box (23).
2. a kind of construction of hydro project according to claim 1 is ascended a height servicing unit, it is characterised in that:The support column (3) material is I-steel, and it is demountable structure.
3. a kind of construction of hydro project according to claim 1 is ascended a height servicing unit, it is characterised in that:The climbing device (11) length that scope is support column (3) is moved up and down.
4. a kind of construction of hydro project according to claim 1 is ascended a height servicing unit, it is characterised in that:The lightning rod (8) top of support column (3) is provided with two, and it is connected with pedestal (13).
5. a kind of construction of hydro project according to claim 1 is ascended a height servicing unit, it is characterised in that:The connector (14) it is bascule, and it moves left and right the length that distance range is cross bar (15).
6. a kind of construction of hydro project according to claim 1 is ascended a height servicing unit, it is characterised in that:The warmer (17) top of working shed (9) is provided with two, and it is to electrically connect between controller (19).
CN201621488264.7U 2016-12-16 2016-12-16 A kind of construction of hydro project is ascended a height servicing unit Expired - Fee Related CN206307972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621488264.7U CN206307972U (en) 2016-12-16 2016-12-16 A kind of construction of hydro project is ascended a height servicing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621488264.7U CN206307972U (en) 2016-12-16 2016-12-16 A kind of construction of hydro project is ascended a height servicing unit

Publications (1)

Publication Number Publication Date
CN206307972U true CN206307972U (en) 2017-07-07

Family

ID=59248132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621488264.7U Expired - Fee Related CN206307972U (en) 2016-12-16 2016-12-16 A kind of construction of hydro project is ascended a height servicing unit

Country Status (1)

Country Link
CN (1) CN206307972U (en)

Similar Documents

Publication Publication Date Title
CN204804298U (en) Building material hoist and mount construction scaffold
CN207390946U (en) It is a kind of to lift stable communication maintenance platform
CN204629404U (en) Gear-driven navigational lighting aid tower fragile stem jacking system
CN204626930U (en) Integrated lifting frame operating platform
CN204629405U (en) Navigational lighting aid tower fragile stem jacking system
CN212002458U (en) Climb tower crane pedestrian passageway on frame
CN206307972U (en) A kind of construction of hydro project is ascended a height servicing unit
CN203766589U (en) Power construction vehicle
CN206753471U (en) A kind of power construction repairing ladder
CN202627461U (en) Moving platform for construction
CN205314654U (en) Reinforcement iron tower of power transmission sequence
CN207158651U (en) Modular assembly formula automatic lifting tower crane attached wall workbench
CN107795185A (en) Chimney reinforces pylon high-altitude installation node security construction method
CN106930528B (en) The production method of the architectural engineering processing workshop of top cover lifting
CN201883932U (en) Hoop-type vertical insulating single ladder
CN213654192U (en) Landscape lighting high-altitude construction device
CN105565155A (en) Temporary lifting construction method for construction site
CN205100579U (en) A supplementary safe anti -falling device for steel structure installation overhauls
CN204251234U (en) For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance
CN201261939Y (en) Overhead trolley for construction
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN111173315A (en) Climb tower crane pedestrian access structure on frame
CN208056602U (en) Tool adhesion type material automatic climbing mechanism
CN104355241A (en) Multifunctional high-altitude operation crane for overhauling and maintaining wind power generator
CN213812849U (en) Integral static load test device of safety belt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20181216

CF01 Termination of patent right due to non-payment of annual fee