CN206289476U - The construction beam of railroad track is changed under the conditions of for not stopping transport - Google Patents

The construction beam of railroad track is changed under the conditions of for not stopping transport Download PDF

Info

Publication number
CN206289476U
CN206289476U CN201621403346.7U CN201621403346U CN206289476U CN 206289476 U CN206289476 U CN 206289476U CN 201621403346 U CN201621403346 U CN 201621403346U CN 206289476 U CN206289476 U CN 206289476U
Authority
CN
China
Prior art keywords
track
crossbeam
longeron
rail
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621403346.7U
Other languages
Chinese (zh)
Inventor
常晓东
韩治平
魏朝雄
谭忠盛
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenshuo Railway Branch of China Shenhua Energy Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shenshuo Railway Branch of China Shenhua Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shenshuo Railway Branch of China Shenhua Energy Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201621403346.7U priority Critical patent/CN206289476U/en
Application granted granted Critical
Publication of CN206289476U publication Critical patent/CN206289476U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model is related to construction of railways field, and the construction beam of railroad track is changed under the conditions of disclosing for not stopping transport, and construction beam is used to be arranged at track to be replaced, including:Roadbed beam support, longeron, crossbeam and track support component;Under installment state, roadbed beam support is arranged at below the road bed of track to be replaced, and railroad track both sides are respectively disposed with longeron, and each longeron is along railroad track orientation stand between adjacent roadbed beam support, the many crossbeams being parallel to each other are set up between longeron, is removably secured between crossbeam and longeron;Track support component is set between crossbeam and rail, rail is fixed on crossbeam.By construction beam supporting rail at track to be replaced, normally run in the case of train load with being met.After to rail brace, in the empty window time, original orbital facilities are removed, and lay the orbital facilities of non-fragment orbit, and final Demolition Construction just beam, and then realize that the railroad track under the conditions of not stopping transport is changed, it is safe and stable, efficient.

Description

The construction beam of railroad track is changed under the conditions of for not stopping transport
Technical field
The utility model is related to construction of railways field, in particular it relates to a kind of be used to change rail under the conditions of not stopping transport The construction beam in road.
Background technology
At present both at home and abroad in railway, high-speed railway uses non-fragment orbit, and passenger-cargo fortune railway and heavy haul railway altogether are in bridge And non-fragment orbit, such as Xikang line Qinling Mountains, peaceful western line East Qinling Range, the Wuqiaoling tunnel of Lan Xin line and Guizhou Province are used in major long tunnel more Non-fragment orbit pattern is used in the main line railway major long tunnels such as osmanthus line, big beautiful line, the weight such as Sinorael road, Shanxi middle and south passage is covered Carry railway and non-fragment orbit pattern is also all used in tunnel.Non-fragment orbit is with good structural continuity, stability;Durability By force, maintainability is good, the features such as maintenance work amount is small, increasing extensive use is at home and abroad obtained in railway.
Built heavy haul railway continuing to increase with freight volume demand domestic at present, can not increasingly meet operation demand, Simultaneously in tunnel Ballast track it is different degrees of there are problems that Base pond.In order to improve railway carrying capacity, it is necessary to increase machine Axletree weight, renovates Disease in Tunnel Base, and its most basic solution can be just that Ballast track in tunnel is replaced by without the tiny fragments of stone, coal, etc. Track, can both improve railway carrying capacity, and Base pond problem in tunnel can be reduced again.And how not influence to run bar Ballast track in tunnel is carried out under part and is replaced by Construction of Ballastless Track, the constructing device and method of maturation are not yet formed at present.
Utility model content
The purpose of this utility model be to provide it is a kind of for not stopping transport under the conditions of change railroad track construction beam, the skill Art can solve the problem that under the conditions of not stopping transport the rail brace problem replaced with Ballast track in non-fragment orbit.
To achieve these goals, the construction of railroad track is changed under the conditions of the utility model offer is a kind of for not stopping transport Just beam, for being arranged at track to be replaced, it includes:Roadbed beam support, longeron, crossbeam and track support component;Wherein, exist Under installment state, the roadbed beam support is arranged at below the road bed of track to be replaced, and the both sides of railroad track are respectively arranged There is the longeron, each longeron is erected between two adjacent roadbed beam supports along the direction of railroad track, the longeron The many crossbeams being parallel to each other are set up, is removably secured between the crossbeam and the longeron;Between the crossbeam and rail Track support component is set, rail is fixed on the crossbeam.
Preferably, in being the rectangle like on side long with two longerons, the difference of diagonal is less than or equal to 15 millimeters.
Preferably, the longeron multigroup first mounting hole of spaced set in the axial direction, the two ends of the crossbeam set respectively Put one group of second mounting hole;Iron seat is set on the first mounting hole described in every group, the crossbeam, described first are placed on the iron seat Mounting hole is corresponding with second position of mounting hole, is used to wear attachment bolt.
Preferably, the track support component includes:Rubber mat plate, Insulation rail distance keeper, steel rail spring-bar fastener, the rubber Backing plate is in the rail installation position of the crossbeam, and the rail is placed on the rubber mat plate, and the rail installation position is flat Row also sets up the steel rail spring-bar fastener in the both sides on the crossbeam direction, the inner side of two steel rail spring-bar fasteners and institute The Insulation rail distance keeper is set between the side for stating rail, and the steel rail spring-bar fastener is fixed on the crossbeam by fastener iron seat On.
Preferably, when the applied environment of the construction beam is curved section track, the longeron top adds horizontal branch Support, the roadbed beam support sets super-high structure.
By above-mentioned technical proposal, by construction beam supporting rail at track to be replaced, to meet train load feelings Normal operation under condition.After to rail brace, in the empty window time, original orbital facilities are removed, and lay the track of non-fragment orbit Facility, and final Demolition Construction just beam, and then realize that the railroad track under the conditions of not stopping transport is changed, it is safe and stable, efficient.
Other features and advantages of the utility model will be described in detail in subsequent specific embodiment part.
Brief description of the drawings
Accompanying drawing is further understood to of the present utility model for providing, and constitutes a part for specification, and following Specific embodiment be used to explain the utility model together, but do not constitute to limitation of the present utility model.In the accompanying drawings:
Fig. 1 is the structural representation of construction beam in the utility model one embodiment;
The enlarged drawing in Tu2Shi Tu1Zhong A areas;
The enlarged drawing in Tu3Shi Tu1Zhong B areas;
Fig. 4 is the erection schematic diagram of construction beam in the utility model one embodiment;
Fig. 5 is the scheme of installation of longeron in the utility model one embodiment;
Fig. 6 is the installation longitudinal profile schematic diagram of the utility model one embodiment middle cross beam;
Fig. 7 is that the utility model one embodiment middle cross beam installs horizontal section schematic diagram.
Description of reference numerals
1 longeron;2 crossbeams;3 iron seat;4 roadbed beam supports;5 track support components;6 road beds;7 sleepers;2.1 rubber blankets Plate;2.2 fastener iron seat;2.3 Insulation rail distance keepers;2.4 rail;2.5 bolts;2.6 steel rail spring-bar fasteners.
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.It should be appreciated that herein Described specific embodiment is merely to illustrate and explains the utility model, is not limited to the utility model.
In the utility model, in the case where opposite explanation is not made, the noun of locality for using such as " upper and lower, left and right " is generally Refer to orientation when article is normally placed, " inside and outside " refers to the inner space of object, exterior space.
Based on there presently does not exist ripe, effective, Ballast track carried out under the conditions of not stopping transport and is replaced to non-fragment orbit Technology.This programme be given it is a kind of for not stopping transport under the conditions of change railroad track construction beam.
The construction beam is used to be arranged at track to be replaced, and it includes:Roadbed beam support, longeron, crossbeam and track branch Support component;Wherein, in the mounted state, roadbed beam support is arranged at below the road bed of track to be replaced, and the two of railroad track Side is respectively disposed with longeron, and each longeron is erected between two adjacent roadbed beam supports along the direction of railroad track, longeron frame If many crossbeams being parallel to each other, are removably secured between crossbeam and longeron;Track support group is set between crossbeam and rail Part, rail is fixed on crossbeam.
By construction beam supporting rail at track to be replaced, to meet the normal operation in the case of train load.It is right After rail brace, in empty window time, the original orbital facilities of dismounting, and the orbital facilities of non-fragment orbit are laid, and finally dismounting is applied Work just beam, and then realize that the railroad track under the conditions of not stopping transport is changed, it is safe and stable, efficient.
Next, describing the technology in detail by some specific embodiments:
The construction beam that this programme is provided, changes the constructing operation of railroad track under the conditions of being applied to not stop transport.The construction Just beam is arranged at track to be replaced in use, and as Figure 1-3, it includes:Roadbed beam support 4, longeron 1, crossbeam 2 and rail Road support component 5.Longeron is arranged at the both sides of railroad track, can be side one, it is also possible to many of side.Crossbeam 2 is many Root.Wherein, roadbed beam support 4 is arranged at the road bed of track to be replaced below 6, plays a part of support, the roadbed beam support 4 There can be a variety of presentation modes, such as:Mode one, complete strip solid bearing along the installation direction of longeron 1, both sides are indulged Beam 1 is directly arranged on;Mode two, respectively along the strip solid bearing that two on the installation direction of two side girder 1 are independent, two Root longeron 1 is correspondingly arranged on a strip solid bearing respectively;Mode three, based on mode one or mode two on the basis of, Overall structure is uniformly broken as Split type structure, uniform (being based on uniform force, preferably) of multiple Split type structures or uneven arrangement. Illustrated with the longeron of every side one, two longerons 1 are erected between two adjacent roadbed beam supports 4 along the direction of railroad track, By bolt 2.5, (a kind of mode being detachably connected in other embodiments, can be adopted between longeron 1 and roadbed beam support 4 It is in other ways) fixed;Two longerons 1 set up many crossbeams 2 being parallel to each other, and bolt 2.5 is passed through between crossbeam 2 and longeron 1 It is fixed;Track support component 5 is set between crossbeam 2 and rail 2.4, rail 2.4 is fixed on crossbeam 2.Wherein roadbed beam Bearing 4, longeron 1, the size of crossbeam 2, type, arrangement are (such as:Highly, width, spacing distance etc.) it is required for according to more The scene at scene and the line conditions of railroad track are changed specifically to determine.
By taking 5.85m subgrade constructions just beam as an example, piece table is shown in Table 1.
Table 1
, it is necessary to position relationship between considering two longerons 1 in the erection process of longeron 1, and longeron 1 and roadbed beam branch Position relationship between seat 4, first longeron 1 need to be in the middle part of roadbed beam support 4, and two longerons 1 stand on roadbed beam support 4 On can form rectangle like structure, two longerons 1 are two sides long of rectangle like, in order to reach two longerons 1 as far as possible It is parallel to each other, it is determined that with two longerons 1 in the rectangle like on side long, the difference of diagonal is less than or equal to 15 millimeters.
Multigroup first mounting hole of spaced set in the axial direction of longeron 1, every group of first mounting hole can be 4,6, often Multiple first mounting holes of group constitute a force structure for stabilization.The two ends of crossbeam 2 are respectively provided with one group of second mounting hole, the Two mounting holes keep corresponding (position, size etc.) with the first mounting hole.In the junction of both longeron 1 and crossbeam 2, the two Between set iron seat 3.Specifically, on every group of first mounting hole set iron seat 3, iron seat 3 on place crossbeam 2, the first mounting hole and Second position of mounting hole correspondence, attachment bolt 2.5 is extended there through, and is tightened.
Similarly, it is also required to above-mentioned similar limit standard between two crossbeams 2.But based on being provided with multigroup on longeron 1 One mounting hole, therefore, the distribution to multigroup first mounting hole then requires the mounting hole of two adjacent groups first on longeron 1, vertical with another The difference of the diagonal of the rectangle like of two group of first mounting hole composition corresponding on beam 1 is within a preset range.
Relevant track support component 5 mentioned above, it is mainly by rubber mat plate 2.1, Insulation rail distance keeper 2.3, rail bullet Bar fastener 2.6 is constituted, and two rail installation positions for being used to place rail 2.4 are set on crossbeam 2, and rubber mat plate 2.1 is in crossbeam 2 Rail installation position on, rail 2.4 is placed on rubber mat plate 2.1, and both sides of the rail installation position on parallel to the direction of crossbeam 2 are also There is provided steel rail spring-bar fastener 2.6, insulation rail is set between two inner sides and the side of rail 2.4 of steel rail spring-bar fastener 2.6 Away from block 2.3, steel rail spring-bar fastener 2.6 is fixed on crossbeam 2 by fastener iron seat 2.2.
In other embodiments, such as when the applied environment of construction beam is curved section track, the top of longeron 1 adds horizontal stroke To support, roadbed beam support 4 sets super-high structure.
Next in being given by taking the longeron of every side one as an example to this technology using above-mentioned construction beam under the conditions of not stopping transport The construction method of replacing railroad track be described in detail.The construction method it include:
Step 110, the technical parameter of construction beam is determined according to railroad track situation;
Railroad track situation includes:The affiliated environment of track, track condition;Wherein, the affiliated environment of track includes:Railway road Base, tunnel overhead transmission line, small culvert construction;Affiliated track condition includes:Circuit rail is not lighter than 43kg/m, straight line and curve ground Section driving Maximum speed limit 35km/h;Gapless track location concrete tie temperature approach is ± 10 DEG C;Allow the minimum of the construction of line Sweep is 180m, and sweep is less than 600m;
The technical parameter of construction beam includes:Length, width, the width of the longeron 1 of construction beam, the width of crossbeam 2, steel Rail elastic bar fastener 2.6, iron seat 3, bearing, Insulation rail distance keeper 2.3, the fastener iron seat 2.2, size of rubber mat plate 2.1.
Step 210, at track to be replaced, erection construction just beam;
As shown in Figure 4,5, the step includes installing longeron 1, crossbeam 2 and increases transverse direction and longitudinal direction support.Specially:
Step 210-1, multiple roadbed beam supports 4 of preset height are positioned over the lower section of road bed 6 of track to be replaced;
Height of support is calculated, roadbed beam support 4 is placed, big bearing or small bearing may be selected according to foundation bearing capacity 0.6x0.6m.Such as in curved section, superelevation is set by roadbed beam support 4;The top of longeron 1 adds cross-brace.
Step 210-2, two longerons 1 are positioned on roadbed beam support 4;
Two panels longeron 1 is placed on the carrier 4, its diagonal difference cannot be greater than 15mm.
Step 210-3, places iron seat 3 on each group of the first mounting hole of longeron 1;
Iron seat 3 is placed on longeron 1 has the side of hole portion position standby.
Step 210-4, multiple crossbeams 2 are erected between two longerons 1 one by one, and a group second of the two ends of crossbeam 2 is installed The position of mounting hole of Kong Yuyi groups first correspondence, wears connecting bolt 2.5 and tightens;Crossbeam 2 is between sleeper 7;
As shown in Figure 6,7, between the position of installation crossbeam 2 is installed in two sleepers 7.Excavated between sleeper 7 0.35m × 0.35m translots, while excavating translot should be spaced 1 position of crossbeam 2;
Crossbeam 2 is penetrated into translot, the connection hole position of longeron 1 is directed at, iron seat 3 is placed between longeron 1 and crossbeam 2 and by four Hole position is aligned, adjustment crossbeam 2 position, tightens attachment bolt 2.5.
Step 210-5, installs rubber mat plate 2.1 and Insulation rail distance keeper in the installation position of rail 2.4 of each crossbeam 2 2.3, rail 2.4 is placed on rubber mat plate 2.1, and steel rail spring-bar fastener 2.6 is installed between crossbeam 2 and rail 2.4.
Rubber mat plate 2.1 and Insulation rail distance keeper 2.3 are installed, steel rail spring-bar fastener 2.6 is installed using special spring spanner.By It is secondary to remove ballast aggregate, all crossbeams 2 are coupled in place as shown in Figure 6.In erection process, all bolts 2.5, rubber mat plate 2.1 and Steel rail spring-bar fastener 2.6 must not neglected loading.
In other embodiments, stull should be added by stock longeron on curve using subgrade construction beam on curve, increases its transverse direction Resistance, prevents rail expansion.
Step 310, carries out non-fragment orbit replacing;
The replacing of non-fragment orbit includes the construction of preparative work before construction and non-fragment orbit.
Preparative work before construction comprises the following steps:
310-1, confirms that construction beam being capable of safety supports under High-speed Train Loads.
310-2, removes original concrete sleeper 7, and is transported to safety zone, and train leading in the construction intermittent phase is not influenceed OK.
310-3, excludes the whole rubbles for changing railway roadbed paragraph, and transport.
310-4, the distance of measurement tunnel bottom to rail level, it is ensured that track plates base, track plates elastic inserts, track plates Installing space.
The construction of non-fragment orbit is illustrated by taking the plate-type fragment-free track slabs of CRTS 1 as an example, its main construction procedure bag Include:
310-5, attachment rail board concrete base template, casting concrete.
310-6, after track plates base possesses some strength, lays track plates.
Laying track plates mainly comprise the following steps:
1) construction beam crossbeam is removed
Because of the crossbeam of construction beam 30cm high, and spacing is smaller, it is necessary to first remove crossbeam.Selection Window time section more long Point construction, removes the crossbeam in 10m length ranges, it is contemplated that change 2 pieces of track plates.
2) track plates slightly spread
Track plates preferably use special construction apparatus to lay, and after being spread at the beginning of track plates, personnel and instrument are arranged immediately to track plates Just successive step is carried out, track plates are adjusted to profile line position as far as possible.
3) track slab precision adjustment
Track slab precision adjustment is used from motion tracking total powerstation matches somebody with somebody velocity modulation frame, and the adjustment amount of track plates is adjusted by three-way jack Section, stroke 0.5mm.3 in Curve Segment will adjust every piece of drift angle of track plates, and be checked with chord measurement.
4) temporary support track plates
Adjustable track board spacer, makes cushion block full of rail longitudinal direction, and horizontal each side more than 30cm enables train load Enough uniformly transfer to bearing and tunnel bottom.Increase lateral rails plate stabilization to support.
5) CA mortar injections
The parameter that the stirring technique of mortar must set in strict accordance with mortar vehicle is stirred, and forbids anyone to adjust.
6) convex blocking platform concrete construction and perfusion resin
Afterwards during construction convex blocking platform, after 3 days, concrete is poured into a mould in the position of setting-out convex blocking platform to track plates perfusion mortar;First During construction convex blocking platform, perfusion mortar carries out the resin infusion between track plates and convex blocking platform, it is ensured that gap is in 3- after 3 days Between 6cm.
Step 410, Demolition Construction just beam.
After the completion of ballastless track structure construction, after mortar strength reaches design requirement, temporary construction just beam is removed.
After the completion of ballastless track structure construction, after mortar strength reaches design requirement, train passage need to be recovered, remove rail Guidance tape is vertically and horizontally supported, and removes temporary construction just beam.Main to remove longeron and roadbed beam support, crossbeam is installed after all removing Into track plates, you can remove main longitudinal grider.Then it is rapid to remove roadbed beam support.Polishing line facility, strengthens maintenance, in time treatment Transfinite place.After circuit change tends towards stability, into next section of cycle operation.
Preferred embodiment of the present utility model is described in detail above in association with accompanying drawing, but, the utility model is not limited Detail in above-mentioned implementation method, in range of the technology design of the present utility model, can be to skill of the present utility model Art scheme carries out various simple variants, and these simple variants belong to protection domain of the present utility model.
It is further to note that each particular technique feature described in above-mentioned specific embodiment, in not lance In the case of shield, can be combined by any suitable means.In order to avoid unnecessary repetition, the utility model is to each Possible combination is planted no longer separately to illustrate.
Additionally, can also be combined between a variety of implementation methods of the present utility model, as long as it is not disobeyed Thought of the present utility model is carried on the back, it should equally be considered as content disclosed in the utility model.

Claims (5)

1. it is a kind of for not stopping transport under the conditions of change railroad track construction beam, it is characterised in that it is to be replaced for being arranged at At track, it includes:Roadbed beam support (4), longeron (1), crossbeam (2) and track support component (5);Wherein, in installment state Under, the roadbed beam support (4) is arranged at the road bed (6) of track to be replaced below, and the both sides of railroad track are respectively disposed with The longeron, each longeron (1) is erected between adjacent roadbed beam support (4) along the direction of the railroad track, described The many crossbeams being parallel to each other (2) are set up between longeron (1), is removably secured between the crossbeam (2) and the longeron (1); Track support component (5) is set between the crossbeam (2) and rail (2.4), rail (2.4) is fixed on the crossbeam (2) On.
2. construction beam as claimed in claim 1, it is characterised in that with the rectangle like that two longerons (1) are side long In, the difference of diagonal is less than or equal to 15 millimeters.
3. construction beam as claimed in claim 1, it is characterised in that spaced set is multigroup in the axial direction for the longeron (1) First mounting hole, the two ends of the crossbeam (2) are respectively provided with one group of second mounting hole;Iron is set on first mounting hole described in every group Seat (3), the crossbeam (2) is placed on iron seat (3), and first mounting hole is corresponding with second position of mounting hole, uses To wear bolt (2.5).
4. construction beam as claimed in claim 1, it is characterised in that the track support component (5) includes:Rubber mat plate (2.1), Insulation rail distance keeper (2.3), steel rail spring-bar fastener (2.6), the steel of the rubber mat plate (2.1) in the crossbeam (2) In rail installation position, the rail (2.4) is placed on the rubber mat plate (2.1), and the rail installation position is parallel to the horizontal stroke Both sides on beam (2) direction also set up the steel rail spring-bar fastener (2.6), two inner sides of the steel rail spring-bar fastener (2.6) The Insulation rail distance keeper (2.3) is set and the side of the rail (2.4) between, and the steel rail spring-bar fastener (2.6) is by button Part iron seat (2.2) is fixed on the crossbeam (2).
5. the construction beam as described in claim any one of 1-4, it is characterised in that when the applied environment of the construction beam is During curved section track, longeron (1) top adds cross-brace, and the roadbed beam support (4) sets super-high structure.
CN201621403346.7U 2016-12-20 2016-12-20 The construction beam of railroad track is changed under the conditions of for not stopping transport Active CN206289476U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621403346.7U CN206289476U (en) 2016-12-20 2016-12-20 The construction beam of railroad track is changed under the conditions of for not stopping transport

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621403346.7U CN206289476U (en) 2016-12-20 2016-12-20 The construction beam of railroad track is changed under the conditions of for not stopping transport

Publications (1)

Publication Number Publication Date
CN206289476U true CN206289476U (en) 2017-06-30

Family

ID=59105163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621403346.7U Active CN206289476U (en) 2016-12-20 2016-12-20 The construction beam of railroad track is changed under the conditions of for not stopping transport

Country Status (1)

Country Link
CN (1) CN206289476U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758590A (en) * 2016-12-20 2017-05-31 中国神华能源股份有限公司 The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport
CN110374018A (en) * 2019-06-17 2019-10-25 中铁六局集团呼和浩特铁路建设有限公司 A kind of combined steel cross bearer sets up multispan just beam track strengthening method
CN110512528A (en) * 2019-08-29 2019-11-29 广州宏途设备工程有限公司 A kind of attachment device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758590A (en) * 2016-12-20 2017-05-31 中国神华能源股份有限公司 The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport
CN106758590B (en) * 2016-12-20 2020-09-04 中国神华能源股份有限公司 Construction temporary beam for replacing railway track under non-stop condition and construction method
CN110374018A (en) * 2019-06-17 2019-10-25 中铁六局集团呼和浩特铁路建设有限公司 A kind of combined steel cross bearer sets up multispan just beam track strengthening method
CN110512528A (en) * 2019-08-29 2019-11-29 广州宏途设备工程有限公司 A kind of attachment device and method

Similar Documents

Publication Publication Date Title
CN106758590A (en) The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport
CN101503870B (en) Construction method for two-block unballasted track bed board
CN102926299B (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN101418535B (en) Construction method of monolithic road-bed in rail tunnel
CN104131498B (en) A kind of for curved section sedimentation non-fragment orbit lifting restorative procedure
CN103174071B (en) Construction technology of short sleeper vibration attenuation fastener with improved structure replacing elasticity short sleeper
CN206289476U (en) The construction beam of railroad track is changed under the conditions of for not stopping transport
WO2011079677A1 (en) Construction method for double-block ballastless track bed on subgrade
CN102653931B (en) Elastic supporting vibration isolation member ballast bed
CN107268348B (en) Subway column check pit construction method
CN103452018B (en) Track gauge correction method for double-block type ballastless track construction
CN207047613U (en) A kind of railway roadbed changeover portion support meanss and railway roadbed changeover portion support system
CN107059506A (en) A kind of plate-type ballastless track track plates replacing options
CN106192620B (en) A kind of railway ballastless track supporting layer and substructure change method
CN106049209A (en) Temporary steel rail supporting device for disassembling and replacing railway ballastless track supporting layers
CN103243621B (en) Method for mounting integrated steel rail supporting frame for adjustment of groove type steel rails of tramcar
CN103469726A (en) Large-displacement railroad bridge end expansion device
CN105908583A (en) System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition
CN202969177U (en) Combined type track framed bent for paving ballastless track
CN110106751B (en) Settlement adjustment method suitable for CRTS II type plate ballastless track
CN107905046A (en) The magnetic railway track of track deformation adjusting apparatus and application described device
CN105926381A (en) Method for changing ballast track bed of tunnel to ballastless track under condition of uninterrupted train working
CN202298390U (en) Ballastless track rush repair device
CN216141819U (en) Sleeper tamping device
CN205893837U (en) A interim rail strutting arrangement that is used for railway ballastless track supporting layer to tear open trading

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant