CN206247990U - 一种物理模型试验监测位移的结构 - Google Patents

一种物理模型试验监测位移的结构 Download PDF

Info

Publication number
CN206247990U
CN206247990U CN201621298514.0U CN201621298514U CN206247990U CN 206247990 U CN206247990 U CN 206247990U CN 201621298514 U CN201621298514 U CN 201621298514U CN 206247990 U CN206247990 U CN 206247990U
Authority
CN
China
Prior art keywords
test model
physical test
physical
displacement
gauge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621298514.0U
Other languages
English (en)
Inventor
史文兵
向喜琼
胡洪森
杨绿炜
肖庆方
吴江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou University
Original Assignee
Guizhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou University filed Critical Guizhou University
Priority to CN201621298514.0U priority Critical patent/CN206247990U/zh
Application granted granted Critical
Publication of CN206247990U publication Critical patent/CN206247990U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本实用新型公开一种物理模型试验监测位移的结构,它包括框架(1),在框架(1)中设有煤炭开采的物理试验模型(2),其特征在于:在物理试验模型(2)上方和侧方分别设有百分表固定杆(3),在百分表固定杆(3)上均布设有竖直指向物理试验模型(2)上端面和侧面的百分表(4),在物理试验模型(2)右侧设有固定板(5),在固定板(5)上设有收敛计挂钩(6),在物理试验模型(2)的上表面均布设有螺钉测点(7),在测量水平位移时,在螺钉测点(7)与收敛计挂钩(6)之间放置收敛计(8)。本实用新型能准确测量煤炭开采的物理试验模型中斜坡岩体的移动和变形情况。

Description

一种物理模型试验监测位移的结构
技术领域
本实用新型涉及一种物理模型试验监测位移的结构,属于物理模型位移监测技术领域。
背景技术
为验证前述地下采空条件下煤洞坡斜坡变形破坏特征,进一步揭示采空区上覆岩体冒落、离层、错动、沉降变形的空间发展规律,将煤洞坡岩体按一定的比例用相似材料制成物理模型,在满足相似的初始及边界条件下,对模型进行实际的开采活动模拟,通过量测和分析斜坡岩体的的移动和变形情况,揭示多煤层重复采动条件下煤洞坡斜坡变形破坏规律,因此,在试验时,对斜坡岩体的移动和变形情况的准确测量的准确度对试验结果有着直接的影响,即需要一种能准确测量在煤炭开采的物理试验模型中斜坡岩体移动和变形情况。
发明内容
本实用型要解决的技术问题是提供一种物理模型试验监测位移的结构,能准确测量煤炭开采的物理试验模型中斜坡岩体的移动和变形情况,可以克服现有技术的不足。
本实用新型的技术方案是:一种物理模型试验监测位移的结构,它包括框架,在框架中设有煤炭开采的物理试验模型,在物理试验模型上方和侧方分别设有百分表固定杆,在百分表固定杆上均布设有竖直指向物理试验模型上端面和侧面的百分表,在物理试验模型右侧设有固定板,在固定板上设有收敛计挂钩,在物理试验模型的上表面均布设有螺钉测点,在测量水平位移时,在螺钉测点与收敛计挂钩之间放置收敛计。
上述的煤炭开采的物理试验模型包括模拟的砂岩、页岩及用石蜡模拟的煤层。
前述的螺钉测点与收敛计挂钩处同一水平面。
现有技术比较,本实用新型物理模型试验监测位移的结构,在框架中设有煤炭开采的物理试验模型,在物理试验模型上方和侧方分别设有百分表固定杆,在百分表固定杆上均布设有竖直指向物理试验模型上端面和侧面的百分表,这样的结构能对斜坡岩体的下沉位移和侧面的变形情况进行准确测定;
在物理试验模型的上表面均布设有螺钉测点,在测量水平位移时,在螺钉测点与收敛计挂钩之间放置收敛计,这样的结构能对斜坡岩体表面的水平位移进行测定;
用石蜡模拟的煤层,这样通过融化石蜡的方式,来模拟对煤层的开采,更加贴近真实场景,增加试验结果的准确度。
前述的螺钉测点与收敛计挂钩处同一水平面,这样在量测坡表岩层的水平位移时,不用计算相关角度问题。
附图说明
图1是本实用新型的连接结构示意图。
具体实施方式
实施例1. 如图1所示,一种物理模型试验监测位移的结构,它包括框架1,在框架1中设有煤炭开采的物理试验模型2,其特征在于:在物理试验模型2上方和侧方分别设有百分表固定杆3,在百分表固定杆3上均布设有竖直指向物理试验模型2上端面和侧面的百分表4,在物理试验模型2右侧设有固定板5,在固定板5上设有收敛计挂钩6,在物理试验模型2的上表面均布设有螺钉测点7,在测量水平位移时,在螺钉测点7与收敛计挂钩6之间放置收敛计8,煤炭开采的物理试验模型2包括模拟的砂岩9、页岩10及用石蜡模拟的煤层11,所述的螺钉测点7与收敛计挂钩6处同一水平面,因为模拟物理试验模型2的砂岩9、页岩10及煤层11为倾斜状,所以为保证螺钉测点7与与收敛计挂钩6处同一水平面,水平位置较低一端的螺钉测点7的螺钉要求具有较高的高度。

Claims (3)

1.一种物理模型试验监测位移的结构,它包括框架(1),在框架(1)中设有煤炭开采的物理试验模型(2),其特征在于:在物理试验模型(2)上方和侧方分别设有百分表固定杆(3),在百分表固定杆(3)上均布设有竖直指向物理试验模型(2)上端面和侧面的百分表(4),在物理试验模型(2)右侧设有固定板(5),在固定板(5)上设有收敛计挂钩(6),在物理试验模型(2)的上表面均布设有螺钉测点(7),在测量水平位移时,在螺钉测点(7)与收敛计挂钩(6)之间放置收敛计(8)。
2.根据权利要求1所述的物理模型试验监测位移的结构,其特征在于:所述的煤炭开采的物理试验模型(2)包括模拟的砂岩(9)、页岩(10)及用石蜡模拟的煤层(11)。
3.根据权利要求1所述的物理模型试验监测位移的结构,其特征在于:所述的螺钉测点(7)与收敛计挂钩(6)处同一水平面。
CN201621298514.0U 2016-11-30 2016-11-30 一种物理模型试验监测位移的结构 Expired - Fee Related CN206247990U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621298514.0U CN206247990U (zh) 2016-11-30 2016-11-30 一种物理模型试验监测位移的结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621298514.0U CN206247990U (zh) 2016-11-30 2016-11-30 一种物理模型试验监测位移的结构

Publications (1)

Publication Number Publication Date
CN206247990U true CN206247990U (zh) 2017-06-13

Family

ID=59002992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621298514.0U Expired - Fee Related CN206247990U (zh) 2016-11-30 2016-11-30 一种物理模型试验监测位移的结构

Country Status (1)

Country Link
CN (1) CN206247990U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109579657A (zh) * 2019-01-10 2019-04-05 杭州市电力设计院有限公司 一种边坡位移监测装置及监测方法
CN110297070A (zh) * 2019-06-27 2019-10-01 中国矿业大学 一种用于煤层开挖的三维固液耦合相似模拟***及方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109579657A (zh) * 2019-01-10 2019-04-05 杭州市电力设计院有限公司 一种边坡位移监测装置及监测方法
CN110297070A (zh) * 2019-06-27 2019-10-01 中国矿业大学 一种用于煤层开挖的三维固液耦合相似模拟***及方法

Similar Documents

Publication Publication Date Title
CN107907180A (zh) 封闭式煤矿地下水库相似模拟试验装置及方法
CN103615238B (zh) 一种等比例缩小的洞穴地层双侧向测井物理模拟装置及实验方法
CN201437724U (zh) 三维高温高压油气运移物理模拟装置
CN103983516B (zh) 一种测算土体泊松比的方法
AU2015345707A1 (en) Method for determining earth surface interpenetrated crack distribution and air leakage characteristics in shallow burial coal mining
CN204359308U (zh) 井下巷道多功能测量工具
CN105021662B (zh) 采动工作面水情实时动态监测试验装置及试验方法
CN202974813U (zh) 裂隙岩体渗流特性室内试验装置
CN103791884A (zh) 一种煤矿开采覆岩及地表移动变形一体化规律的研究方法
WO2021042631A1 (zh) 三维移动变形测量***及其在三维相似模拟实验中的应用
CN206247990U (zh) 一种物理模型试验监测位移的结构
CN103866736A (zh) 一种矿震对煤矿地下水库影响的物理模拟试验***及方法
CN103760096B (zh) 一种侧向加压相似模拟实验装置及实验方法
CN109461359A (zh) 一种隧道含水地质构造超前探测方法
CN206292139U (zh) 室内土壤入渗率测量装置
CN105649603A (zh) 一种实时测试气井井筒积液量的方法
CN202853914U (zh) 相似材料模拟试验***
CN108051304A (zh) 一种多功能三维可视结构界面的实验装置及实验方法
CN207515863U (zh) 封闭式煤矿地下水库相似模拟试验装置
CN204728182U (zh) 路面标高控制装置
CN203964852U (zh) 一种新型巷道顶板下沉量和底板底鼓量测量仪
CN204253026U (zh) 定向井相对井斜角对电阻率测井影响的模拟实验装置
CN204329952U (zh) 一种路基沉降监测装置
CN108242069B (zh) 基于地震剖面及时深关系的油藏剖面编绘方法
CN206505073U (zh) 一种用于巷道围岩支护与变形的相似模拟材料实验装置

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613

Termination date: 20181130