- CN206247517U CN206247517U CN201621255020.4U CN201621255020U CN206247517U CN 206247517 U CN206247517 U CN 206247517U CN 201621255020 U CN201621255020 U CN 201621255020U CN 206247517 U CN206247517 U CN 206247517U
- Authority
- CN
- China
- Prior art keywords
- corner post
- air
- prefabricated house
- mounting structure
- outdoor machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Other Air-Conditioning Systems (AREA)
- Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)
Abstract
The utility model discloses a kind of mounting structure of the pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house, the prefabricated house is in integrally cuboid, including four corner posts, and the bottom of each corner post side is equipped with installation fixing hole, the mounting structure is arranged on the corner post for exporting nearest apart from outdoor machine of air-conditioner, the service sleeve being connected as a single entity including being arranged on inside corner post and with corner post, service sleeve bottom and the bottom elbow that can be in communication with the outside by the installation fixing hole of the corner post are arranged on, and are arranged on service sleeve top with the indoor top elbow for connecting;The service sleeve outside is also socketed with the fixed cover in annular shape for preventing pre-buried pipe sleeve from friction is contacted with corner post inwall.The service sleeve of outdoor machine of air-conditioner pipeline is pre-installed in corner post inside and fixed by the structure, and spool need not carry out repeated disassembled and assembled in prefabricated house transportation, can also to greatest extent avoid pipeline from being damaged by external force.
Description
Technical field
The utility model is related to a kind of pipeline installation structure of prefabricated house, and in particular to a kind of pre-buried outdoor machine of air-conditioner of prefabricated house
The mounting structure of connecting pipeline.
Background technology
Prefabricated house can conveniently and efficiently carry out assembly and disassembly because of it, realize the universal standardization of temporary building, establish
Environmental protection and energy saving, efficient facade lighting is connect soon, one off houses is entered seriation exploitation, integrated production, supporting
Change supply, can stock and the approved product field that can repeatedly be used in turn.The advantage of prefabricated house causes that it is widely used, however,
Prefabricated house of the prior art also has some shortcomings, and the air conditioning piping of such as prefabricated house is typically directly to open individual on wall
Hole, then stretches out pipeline from hole, is connected with outdoor machine of air-conditioner downwards then along exterior wall, because pipeline is heavier, generally can also
Draw an iron wire to tie down pipeline at the top of prefabricated house, prevent it from being dropped because of deadweight, this set not only unsightly, also holds
Fragile pipeline.
Utility model content
The purpose of this utility model is to solve the above problems, there is provided a kind of pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house
Mounting structure, the service sleeve of outdoor machine of air-conditioner pipeline is pre-installed in corner post inside and fixed, transported in prefabricated house by the structure
Spool need not carry out repeated disassembled and assembled during defeated, can also to greatest extent avoid pipeline from being damaged by external force.
To achieve the above object, the technical solution adopted in the utility model is as follows:
The mounting structure of the pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house, the prefabricated house is integrally in cuboid, including four
Individual corner post, and the bottom of each corner post side is equipped with installation fixing hole, the mounting structure is arranged on and goes out apart from outdoor machine of air-conditioner
On mouthful nearest corner post, including be arranged on inside corner post and with the service sleeve that corner post is connected as a single entity, be arranged on service sleeve bottom
Portion and the bottom elbow that can be in communication with the outside by the installation fixing hole of the corner post, and it is arranged on service sleeve top and room
The top elbow of interior connection;The service sleeve outside is also socketed with for preventing pre-buried pipe sleeve from friction is contacted with corner post inwall
In circular fixed cover.
Preferably, the rubber fixed cover that the fixed cover is made for elastomeric material.
Preferably, the corner post includes angle steel, the channel-section steel being fixedly connected with angle steel inner side both sides;The angle steel and two grooves
There is cavity, the service sleeve is set in the cavity between steel.
Preferably, the top elbow includes bending towards the vertical elbow of channel-section steel, and is arranged on vertical elbow and bends towards
The guiding elbow of room conditioning.
Compared with prior art, the utility model has the advantages that:
(1) the utility model make use of the existing corner post of prefabricated house and be arranged on the installation fixing hole of corner post bottom, and
On the basis of this, pre-buried pipe sleeve is placed by the original cavity of corner post or follow-up special setting cavity, so that outdoor machine of air-conditioner connects
Adapter line can pass through from corner post, make pipeline without it is exposed outside, the erosion of wind and rain is avoided while not affecting the appearance.
Meanwhile, the upper and lower ends of pre-buried pipe sleeve are provided with elbow, and this kind of setting can be prevented effectively from pipeline inside pipe sleeve by corner angle
Abrasion.
(2) rubber fixed cover is also provided with outside pre-buried pipe sleeve of the present utility model, on the one hand can effectively prevents pre-buried pipe sleeve
Friction is contacted with corner post inwall, pre-buried pipe sleeve can on the one hand passed through, and rubber fixed cover is firm to be enclosed within cavity.
(3) mounting structure of outdoor machine of air-conditioner pipeline is pre-installed in corner post inside and fixed by the utility model, in activity
Spool need not carry out repeated disassembled and assembled in room transportation, give full play to and be flexibly applicable, from heavy and light, construct fast, economy, industrialization
And the advantageous feature such as environmental protection.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model service sleeve schematic view of the mounting position.
Fig. 3 is the top view of the utility model service sleeve.
Wherein, reference is corresponding entitled:
1- installs fixing hole, and 2- service sleeves, 3- bottoms elbow, the vertical elbows of 4-, 5- is oriented to elbow, and 6- corner posts, 7- is solid
Fixed set, 8- wallboards, 9- channel-section steels, 10- angle steel, 11-, 12- windows, 13- air-conditionings.
Specific embodiment
The utility model is described in further detail with embodiment for explanation below in conjunction with the accompanying drawings, and mode of the present utility model includes
But it is not limited only to following examples.
Present embodiments provide it is a kind of can be by the mounting structure of outdoor machine of air-conditioner connecting pipeline, the structure is by outdoor machine of air-conditioner pipe
The pre-buried pipe sleeve of line is pre-installed in corner post inside and fixes, for the installation of follow-up connecting pipeline.This kind of setting can make activity
Room spool in transportation need not carry out repeated disassembled and assembled, can also to greatest extent avoid pipeline from being damaged by external force.
As shown in Fig. 2 the prefabricated house is in integrally cuboid, including four sides wall all around, and positioned at four
Four corner posts in corner, and the both sides of each corner post bottom are equipped with installation fixing hole;The preceding wall is provided with door 11, back wall
Window 12 is provided with, the air-conditioning 13 in the present embodiment is installed in the top of window 12 of back wall;The installation knot of outdoor machine of air-conditioner pipeline
Structure is set in the nearest corner post of specific air-conditioning 13 that may be provided at back wall both sides.
As shown in figures 1 and 3, the corner post of the present embodiment is by being wrapped in outermost angle steel 10, being welded in angle steel 10
Side both sides simultaneously enclose a channel-section steel 9 for vertical cavity with angle steel 10, and prefabricated house inner side is provided with wallboard 8 at the channel-section steel 9,
The mounting structure is to set in the cavity.Mounting structure in the present embodiment is arranged in the corner post 6 on the right of back wall, bag
The service sleeve 2 for being arranged on inside corner post 6 and being connected as a single entity with corner post is included, the bottom of service sleeve 2 and can be by this is arranged on
The bottom elbow 3 that the installation fixing hole 1 of corner post is in communication with the outside, and the top of service sleeve 2 is arranged on the indoor top for connecting
Portion's elbow;The difference of size and the welding position of 10 both sides channel-section steel of angle steel 9 according to cavity, the top elbow can be one direct
With the indoor elbow for connecting, it is also possible to be set to include vertical elbow 4 and be oriented to the bend-head combination of elbow 5;The bend-head combination
In vertically the bottom of elbow 4 be connected with service sleeve 2, upper end bend towards on the right side of wall and with the guiding elbow 5 for bending towards air conditioner direction
Connection, is oriented to elbow 5 and is connected with interior.The installation of vertical elbow 4 for convenience, corresponding position offers hole on channel-section steel.
As shown in figure 3, in order that being enclosed within the cavity of corner post of can consolidating of pre-buried pipe sleeve 2, sets in the outside of pre-buried pipe sleeve 2
There are at least two fixed covers 7.The fixed cover 7 is made up of elastomeric material, can also effectively prevent pre-buried pipe sleeve from being contacted with corner post inwall
Friction, increases the service life of pre-buried pipe sleeve 2.
The mounting structure of the present embodiment is using the existing corner post of prefabricated house in the prior art and installs fixing hole, realize by
The mounting structure of outdoor machine of air-conditioner connecting pipeline is pre-installed in corner post inside and fixes, and spool need not in prefabricated house transportation
The beneficial effect of repeated disassembled and assembled is carried out, is suitable for popularization and application.
Above-described embodiment is only one of preferred embodiment of the present utility model, be should not be taken to limit of the present utility model
Protection domain, as long as body design thought of the present utility model and mentally make have no the change of essential meaning or profit
Color, the technical problem that it is solved is still consistent with the utility model, should be included in protection domain of the present utility model
Within.
Claims (3)
1. the mounting structure of the pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house, it is characterised in that the mounting structure is arranged on activity
On room corner post, including the service sleeve (2) for being arranged on inside corner post and being connected as a single entity with corner post, it is arranged on service sleeve (2) bottom
Portion and the bottom elbow (3) being in communication with the outside, and service sleeve (2) top is arranged on the indoor top elbow for connecting;
Service sleeve (2) outside is also socketed with the fixation in annular shape for preventing pre-buried pipe sleeve from friction is contacted with corner post inwall
Set (7).
2. the mounting structure of the pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house according to claim 1, it is characterised in that described
The rubber fixed cover that fixed cover (7) is made for elastomeric material.
3. the mounting structure of the pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house according to claim 2, it is characterised in that described
Top elbow includes bending towards the vertical elbow (4) of channel-section steel, and be arranged on vertical elbow and bend towards room conditioning guiding it is curved
Head (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621255020.4U CN206247517U (en) | 2016-11-18 | 2016-11-18 | The mounting structure of the pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621255020.4U CN206247517U (en) | 2016-11-18 | 2016-11-18 | The mounting structure of the pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206247517U true CN206247517U (en) | 2017-06-13 |
Family
ID=59002287
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621255020.4U Active CN206247517U (en) | 2016-11-18 | 2016-11-18 | The mounting structure of the pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206247517U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138145A (en) * | 2018-08-02 | 2019-01-04 | 淮阴工学院 | Structure is built in the room of machine inside and outside the pre-buried pipeline connection air-conditioning of piping lane |
-
2016
- 2016-11-18 CN CN201621255020.4U patent/CN206247517U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138145A (en) * | 2018-08-02 | 2019-01-04 | 淮阴工学院 | Structure is built in the room of machine inside and outside the pre-buried pipeline connection air-conditioning of piping lane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206247517U (en) | The mounting structure of the pre-buried outdoor machine of air-conditioner connecting pipeline of prefabricated house | |
CN204553554U (en) | For bearing gasket and the rack support assembly thereof of air conditioner panel pushing-out structure | |
CN109138235A (en) | Combined type GRC wallboard, GRC panel and GRC curtain wall | |
CN201041398Y (en) | Wind duct protective mask | |
CN105066282A (en) | Fixing pipe sleeve for air conditioner pipe | |
CN204786891U (en) | Effective fixed pipe box of air conditioner | |
CN210240773U (en) | Hoisting structure for connecting air duct sleeves in tubular mode | |
CN204424846U (en) | Pre-fabricated electric cables ditch | |
CN208431463U (en) | A kind of casing case ring | |
CN204785112U (en) | Effective fixed pipe box of air conditioner wear wall part | |
CN201953129U (en) | Beautifying structure for pipe tower connecting position | |
CN207033008U (en) | A kind of antidetonation suspension and support for building | |
CN209243889U (en) | A kind of floor drain core and the floor drain using the floor drain core | |
CN204787094U (en) | Return bend part of effective fixed pipe box of air conditioner | |
CN212273275U (en) | Air pipe with mounting structure | |
CN216620230U (en) | Auxiliary device for preventing flexible joint of air pipe from being twisted in construction site | |
CN209613874U (en) | A kind of big radian automatic pipebender | |
CN210310510U (en) | Rubber pipeline transfer device | |
CN201318763Y (en) | Novel lintel apparatus | |
CN207314543U (en) | A kind of modularized house docking structure | |
CN202384652U (en) | Cable tunnel | |
CN204898935U (en) | Interior wall body and building body with temperature controller | |
CN210372223U (en) | Novel thing networked control valve | |
CN218208340U (en) | Novel full tee bend pipe fitting | |
CN207987923U (en) | A kind of general-purpose type construction site stake fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |