CN206245648U - A kind of composite wallboard structure for metope Fast Installation - Google Patents

A kind of composite wallboard structure for metope Fast Installation Download PDF

Info

Publication number
CN206245648U
CN206245648U CN201621362162.0U CN201621362162U CN206245648U CN 206245648 U CN206245648 U CN 206245648U CN 201621362162 U CN201621362162 U CN 201621362162U CN 206245648 U CN206245648 U CN 206245648U
Authority
CN
China
Prior art keywords
metal layers
types
type
sheet
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621362162.0U
Other languages
Chinese (zh)
Inventor
程文立
梁志鹏
罗泽平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Zhong Mao Building Materials Co Ltd
Original Assignee
Zhengzhou Zhong Mao Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Zhong Mao Building Materials Co Ltd filed Critical Zhengzhou Zhong Mao Building Materials Co Ltd
Priority to CN201621362162.0U priority Critical patent/CN206245648U/en
Application granted granted Critical
Publication of CN206245648U publication Critical patent/CN206245648U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a kind of composite wallboard structure for metope Fast Installation, it includes wallboard body, and for installing the mounting structure of wallboard body;The wallboard body includes the outer sheet-metal layers, carbon magnesium plate layer and the interior sheet-metal layers that set gradually from outside to inside;The mounting structure includes being fixed in the T-shaped plug-in unit on interior sheet-metal layers inner face periphery, is disposed in the interior the W type clamping joists on cement wall surface, and be installed on the W type inner blocking type spring leafs in two draw-in grooves of W type clamping joists;The outer end of the T-shaped plug-in unit is with having arrowhead-shaped structure, dop for being installed in the draw-in groove of W type inner blocking type spring leafs;The opening passed through for dop is provided with outside the W types clamping joist;The W types inner blocking type spring leaf is made by spring steel plate material, and its cross section is in three diamond structures, and its width is less than the draw-in groove width of W type clamping joists.

Description

A kind of composite wallboard structure for metope Fast Installation
Technical field
The utility model belongs to wall body decoration field, and in particular to a kind of composite wall for metope Fast Installation is hardened Structure.
Background technology
Traditional wallboard and installation probably has three kinds, and a kind of installed by the artificial dry doubling of great Sha cement, and this cement is big Husky conventional mounting arrangements waste substantial amounts of manpower and materials and financial resources, and the weight that also result in entire building is increased considerably, and And with urbanization process, transported in city substantial amounts of cement great Sha to the regional cell in city turned into one it is great Large-engineering, nor meet national house finished product, the idea of development of batch production.Second is to use steel skeleton centering metope, Breach is ground with angle grinder on institute's wallboard to be mounted again after centering metope, then installs installation corner brace, cladding in metope On, then foam glue strip, then T-me line paper are installed, then beat structure glue.This metope mounting process is arduously time-consuming to take material, only installs Take just up to every square metre 180 yuan or so, and centering steel joist has with a distance from 5 centimeters from wall, the metope after so installing from Original metope will have the distance of 80mm, greatly reducing the utilization rate of the house area in house, greatly reduce real in room With area, this installation method is kind of the surprising decoration of waste, the theory of serious non-compliance national energy-saving emission reduction really.The third Installation is that rough ground is all stamped on the metope of required decoration, then could installation surface decorative panel, this installation method It is also a kind of installation method for exhausting the people and draining the treasury, is also substantial amounts of wasting manpower and material resources and financial resources, and rough ground wood class used Plate does not meet the fire protection requirement of country, rough ground and wooden class plate electrode easy firing and release formaldehyde also, so as to cause fire-protection rating Not environmentally situation of not enough and easily going mouldy occurs, and is a kind of installation method that should be eliminated.
Prior art and method and defect:(1) metope paving walltile will pre-purchase and to relocate to substantial amounts of cement upstairs big Sand, wastes substantial amounts of manpower and materials and causes substantial amounts of environmental pollution.(2) due to the needs of mating formation of conventional cement great Sha It is dry-laid technique, whole metope is all levelling, completes cement great Sha screed-coats and be typically necessary the thick left and right of 30-50mm, so The load of entire building, and substantial amounts of waste of resource are just greatly aggravated.(3) because 2 kinds of other methods are also intended to whole Welding steel structure on the metope to be decorated, and the workman of welding steel frame also will be entirely band card on duty, all using technical work People carries out metope installation, and it is very rare that the result so installed allows for welder.The metope carried out using poly-talented workman is filled Decorations meeting is rare because poly-talented workman's, is exactly greatly so that metope installs decorative engineering to drag to complete for a long time Big delays the duration.(4) 3 kinds of metope installation methods all seriously consume substantial amounts of manpower and materials and financial resources more than.This is several The need for metope is installed and process all cannot meet social high speed development, the Green Development of society is also seriously constrained, The green construction specification of country is run counter to.
Utility model content
The purpose of this utility model is directed to above-mentioned the deficiencies in the prior art and provides a kind of for metope Fast Installation Composite wallboard structure.
What the purpose of this utility model was realized in:A kind of composite wallboard structure for metope Fast Installation, it is wrapped Wallboard body is included, and for installing the mounting structure of wallboard body;The wallboard body includes what is set gradually from outside to inside Outer sheet-metal layers, carbon magnesium plate layer and interior sheet-metal layers, the first foamed glue is passed through between the outer sheet-metal layers and carbon magnesium plate layer Adhesive layer is combined together, and is combined together by the second foamed adhesive layer between carbon magnesium plate layer and interior sheet-metal layers;It is described Mounting structure includes being fixed in the T-shaped plug-in unit on interior sheet-metal layers inner face periphery, is disposed in the interior the W types cassette dragon on cement wall surface Bone, and it is installed on the W type inner blocking type spring leafs in two draw-in grooves of W type clamping joists;The outer end of the T-shaped plug-in unit be with There are arrowhead-shaped structure, dop for being installed in the draw-in groove of W type inner blocking type spring leafs;The outside of the W types clamping joist It is provided with the opening passed through for dop;The W types inner blocking type spring leaf is made by spring steel plate material, and its cross section is in Three diamond structures, and its width is less than the draw-in groove width of W type clamping joists.
Further, the T-shaped plug-in unit is provided with for wrapping up metallic plate in clamp with the plate face that interior sheet-metal layers are combined Layer is in face when pulling.
Composite wallboard structure of the present utility model has the advantages that:
1st, in terms of manpower consumption:Technical requirements to workman are not high, and layman can also complete peace to specifications Dress so that install expenses of labour and substantially reduce, becomes technical staff and is installed as common laborer's installation, and only this item is just for society saves a large amount of Human resources.In addition, its installation steps facilitate it is understandable, be easy to construction, install convenient efficiently, social cost reduction, thoroughly accuse In the other cement great Sha epoch, the green energy conservation of society is conducive to develop.2 in terms of installation cost:Convenience quick for installation, mounting cost Fitted up well below traditional wet combining dry doubling with recruitment, mounting cost saves more than 50%.3 in terms of fault of construction:Avoid Traditional wet combining dry doubling method, it is to avoid carry the arduous of cement great Sha toward a large amount of upstairs, can factory formed standardization, industrialization, High-volume production, forms modularized production, and goods to building site can be mounted directly, real to belong to efficiently erecting device and method, Er Qieyi Remove, save a large amount of manpower, material resources and financial resources.4th, in terms of service life and later maintenance cost:Long service life, after installation such as There is water circuit problem in fruit, can arbitrarily move any one piece of wall surface composite board, can also be moved during removal of home, cycling and reutilization, nothing Professional is needed to remove, later maintenance cost is extremely low.
This wall surface composite board and erecting device method are " fool's wallboards " truly.Biography is fundamentally overturned Unite the installation method and structure of wallboard, be revolution that metope overhauls installation, be a kind of landmark combined wall board industry.
Brief description of the drawings
Fig. 1 is the cross-sectional view of the first embodiment of the utility model.
Fig. 2 is the cross-sectional view of second embodiment of the utility model.
Fig. 3 is the section structure schematic diagram of wallboard body.
Fig. 4 is the cross-section structure of W type clamping joists.
Fig. 5 is the cross-section structure of W type inner blocking type spring leafs.
Fig. 6 is the cross-section structure after W types clamping joist is installed with W type inner blocking types spring leaf.
Fig. 7 is the sectional schematic diagram of T-shaped the first structure of plug-in unit.
Fig. 8 is the sectional schematic diagram of second structure of T-shaped plug-in unit.
Specific embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
As shown in Fig. 1,3-7, the composite wallboard structure for metope Fast Installation of the present utility model, it includes wallboard sheet Body, and for installing the mounting structure of wallboard body;The wallboard body includes the outer metallic plate for setting gradually from outside to inside Layer 1, carbon magnesium plate layer 3 and interior sheet-metal layers 4, the first foamed adhesive is passed through between the outer sheet-metal layers 1 and carbon magnesium plate layer 3 Layer 2 is combined together, and is combined together by the second foamed adhesive layer 5 between carbon magnesium plate layer 3 and interior sheet-metal layers 4;It is described Mounting structure includes being fixed in the T-shaped plug-in unit 6 on the inner face periphery of interior sheet-metal layers 4, is disposed in the interior the W type cassettes on cement wall surface Keel 7, and it is installed on the W type inner blocking types spring leaf 8 in two draw-in grooves of W types clamping joist 7;The outer end of the T-shaped plug-in unit 6 It is with having arrowhead-shaped structure, dop 9 for being installed in the draw-in groove of W type inner blocking types spring leaf 8;The W types cassette dragon The outside of bone 7 is provided with the opening passed through for dop;The W types inner blocking type spring leaf 8 is made by spring steel plate material, Its cross section is in three diamond structures, and its width is less than the draw-in groove width of W type clamping joists.
The T-shaped plug-in unit 6 is provided with for wrapping up wallboard body in face when pulling with the plate face that interior sheet-metal layers 4 are combined 10, the height for pulling side after installation combined wall board, can have one less than the thickness of wallboard body between combined wall board Fixed fixing clearance, now only need to insert adhesive tape 11 in fixing clearance.
Embodiment 2
As shown in Fig. 2 the main part of the composite wallboard structure for metope Fast Installation of the present utility model is with implementation Example 1, its difference is:The T-shaped plug-in unit 6 is higher than wallboard sheet with the height for pulling side 10 that the plate face that wallboard body is combined is set The thickness of body, and the seamed edge of wallboard body is installed on interior cell body with pulling side and having, so adjacent combined wall board it Between will not have space, after installation is complete can be before guarantee entirety by mating formation wallpaper decoration in the outside of outer sheet-metal layers 1 Flatness.
Installation process of the present utility model is:First point:First by special metal aluminum alloy W types keel proportionally size Advance unwrapping wire is fixed on metope, and the clipping room of W type aluminium alloy joists is away from being split according to the drawing requirement of Party A or proprietor Good Size Distribution, with expandable nail every stamping swell fixture on standard profile dimension line when fixed, then special W types aluminium is closed Golden keel are firmly locked on metope.Second point:The requirement that special W types spring card is distributed according to plate face, is sequentially placed In W type aluminium alloy joists, gently clashed into rubber hammer when placing W type spring cards, until W types spring card enters positioning In groove, the installation W type aluminium alloy joists on metope, use to be installed have so been sequentially arranged.Thirdly:Cold-hot pressure is combined Wall surface composite board back side surrounding install special T-shaped plug-in unit (aluminum) successively, first with electric drill coordinate the drill bits of Φ 3, first The holes of Φ 3 will be drilled on special T-shaped plug-in unit, T-shaped plug-in unit is then uniformly coated with structure glue again, then coordinate Φ 3 with electric drill again Screw is successively the institute wall surface composite board back side to be mounted successively first-class T-shaped plug-in unit, use to be installed.4th point:To install T-shaped The wall surface composite board of plug-in unit is in turn mounted to install the W type aluminium of W type spring cards according to lattice size and distribution map successively In alloy keel untill all wallboard is installed successively, just all finish the installation of wall surface composite board.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (2)

1. a kind of composite wallboard structure for metope Fast Installation, it is characterised in that:It includes wallboard body, and for pacifying Fill the mounting structure of wallboard body;The wallboard body includes the outer sheet-metal layers (1), the carbon magnesium plate layer that set gradually from outside to inside (3) and interior sheet-metal layers (4), by the first foamed adhesive layer between the outer sheet-metal layers (1) and carbon magnesium plate layer (3) (2) it is combined together, is combined one by the second foamed adhesive layer (5) between carbon magnesium plate layer (3) and interior sheet-metal layers (4) Rise;The mounting structure includes being fixed in the T-shaped plug-in unit (6) on interior sheet-metal layers (4) inner face periphery, is disposed in the interior cement wall surface On W types clamping joist (7), and be installed on W type inner blocking types spring leaf (8) in two draw-in grooves of W types clamping joist (7); The outer end of the T-shaped plug-in unit (6) be with have arrowhead-shaped structure, for being installed in the draw-in groove of W type inner blocking types spring leaf (8) Dop (9);The opening passed through for dop is provided with outside the W types clamping joist (7);The W types inner blocking type spring Piece (8) is made by spring steel plate material, and its cross section is in three diamond structures, and its width is less than W type clamping joists Draw-in groove width.
2. the composite wallboard structure for metope Fast Installation according to claim 1, it is characterised in that:It is described T-shaped slotting Part (6) is provided with for wrapping up sheet-metal layers in clamp (4) in face when pulling with the plate face that interior sheet-metal layers (4) are combined (10)。
CN201621362162.0U 2016-12-06 2016-12-06 A kind of composite wallboard structure for metope Fast Installation Expired - Fee Related CN206245648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621362162.0U CN206245648U (en) 2016-12-06 2016-12-06 A kind of composite wallboard structure for metope Fast Installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621362162.0U CN206245648U (en) 2016-12-06 2016-12-06 A kind of composite wallboard structure for metope Fast Installation

Publications (1)

Publication Number Publication Date
CN206245648U true CN206245648U (en) 2017-06-13

Family

ID=59006496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621362162.0U Expired - Fee Related CN206245648U (en) 2016-12-06 2016-12-06 A kind of composite wallboard structure for metope Fast Installation

Country Status (1)

Country Link
CN (1) CN206245648U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265934A (en) * 2017-08-08 2018-07-10 傅明 Trim components

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265934A (en) * 2017-08-08 2018-07-10 傅明 Trim components
CN108265934B (en) * 2017-08-08 2024-01-23 傅明 Decorative plate assembly

Similar Documents

Publication Publication Date Title
CN102777103B (en) Energy-saving door and window attached frame and door and window installation method
CN104179321B (en) A kind of wallboard mounting system and an mounting method thereof
CN106760348A (en) A kind of insulation and decoration acoustic wall board and its construction method of installation
CN204282709U (en) Diatom veneer rock wool composite wall
CN206538969U (en) Assembled wall decoration structure
CN206245648U (en) A kind of composite wallboard structure for metope Fast Installation
CN208088773U (en) A kind of raised flooring Fast Installation structure
CN206957099U (en) A kind of insulation and decoration acoustic wall board
CN203452314U (en) Simply-installed decorative board
CN102277936A (en) Grade A fireproof light thermal insulating decorative integrated plate and production process thereof
CN206538901U (en) A kind of assembling type partition wall
CN205134635U (en) Permanent stone that is full of fire prevention heat insulation structure
CN204531118U (en) A kind of indoor decoration furred ceiling load-bearing connecting board structure
CN204023953U (en) A kind of wallboard installation system
CN212002008U (en) Wall brick combination paving and pasting platform
CN2860782Y (en) Artificial board
CN206337775U (en) A kind of quick leveling structure for interior decoration
CN206625477U (en) A kind of novel wall rock wool heat-preservation decoration integrated board
CN206987402U (en) Decoration hangs the mounting structure of wall with HPL plates
CN110042997A (en) A kind of wall and its mounting means of fireproof decoration plate
CN104005530A (en) Novel foam cement aluminum decoration heat insulation integral plate and installation process
CN205348655U (en) External wall insulation decorates production board's mounting structure
CN204960225U (en) Irregular bits of broken glass is pieced together material and is hung structure futilely
CN216142311U (en) Hanging plate wall
CN220395074U (en) Assembled wall panel material

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613

Termination date: 20191206