CN206241246U - A kind of continuous casting filling pipe end of new structure - Google Patents

A kind of continuous casting filling pipe end of new structure Download PDF

Info

Publication number
CN206241246U
CN206241246U CN201621358298.4U CN201621358298U CN206241246U CN 206241246 U CN206241246 U CN 206241246U CN 201621358298 U CN201621358298 U CN 201621358298U CN 206241246 U CN206241246 U CN 206241246U
Authority
CN
China
Prior art keywords
pipe end
filling pipe
metalwork
metal
plate face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621358298.4U
Other languages
Chinese (zh)
Inventor
徐叶君
王志中
顾涛军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanai International (Yixing) Advanced Ceramics Co Ltd
Original Assignee
Huanai International (Yixing) Advanced Ceramics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanai International (Yixing) Advanced Ceramics Co Ltd filed Critical Huanai International (Yixing) Advanced Ceramics Co Ltd
Priority to CN201621358298.4U priority Critical patent/CN206241246U/en
Application granted granted Critical
Publication of CN206241246U publication Critical patent/CN206241246U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Continuous Casting (AREA)

Abstract

The utility model discloses a kind of continuous casting filling pipe end of new structure, including filling pipe end(1)And metal can(4), it is characterised in that:The metal can(4)Clamper thrust support area(5)Place sets the metalwork of a semi-cylindrical(7), the metalwork(7)Both ends of the surface respectively and metal can(4)Horizontal plane and vertical plane close and firm combine so that metalwork(7)Suffered thrust can be all distributed to metal can(4)Whole surface on, so that it is guaranteed that filling pipe end(1)Filling pipe end plate face(3)Sealing property between the plate face of submersed nozzle below.Filling pipe end of the present utility model has the intensity of resistance to mechanical stress higher, all can be distributed in the whole surface of metal can suffered thrust by metalwork, so as to ensure that the sealing property between plate face, reach that the air in steel pouring process is not sucked, filling pipe end plate face is not aoxidized, finally ensure that the time of direct casting and the quality of steel billet.

Description

A kind of continuous casting filling pipe end of new structure
Technical field
The utility model high-performance steel continuous casting technology field, specifically one kind can effectively solve the problem that plate face junction is close The continuous casting filling pipe end of the new structure of secondary oxidation of steel under the conditions of sealing and prevent height from even pouring.
Background technology
Steel continuously casting is the main technique of current steel production, the ratio of current steel continuously casting be up to 98% with On, in addition to extremely indivedual steel grades, general steel grade is all that molten steel is converted into steel billet by continuously casting.But for some property high Energy steel grade, the selection of refractory material has standard higher in casting process, and ultra-low-carbon steel is poured and cast this problem.Ultra-low carbon Steel employs special technique in steel-making and refining process, it is ensured that carbon content is less than 300ppm.This steel has fabulous Deep drawability and ductility(As above the IF steel of th century America Amoca Corp exploitation is used for car panel), high-strength tenacity energy (Such as ultra-low-carbon bainite steel, the steel grade can be used for Arctic heavy caliber high pressure oil-gas pipeline), improve conventional ferrite stainless The pitting corrosion resistance of steel, toughness and processing characteristics etc.(Such as super-purity ferrite stainless steel)Etc., have in industrial trade very big Market.
Further raising with the fast development of metallurgical technology and to making the quality requirements such as steel cleanliness factor, in mesh In preceding continuous casting technology, 100% slab production casting machine employs protective casting, and 70% square billet casting machine also all employs protection Casting, its protection domain from ladle to tundish, from tundish to crystallizer, in ladle, in tundish and in crystallizer all Employ coverture in bulk, the covering slag formed with high temperature melting with air insulated layer function.
Filling pipe end is mounted in tundish bottom, in steel pouring process, is subjected to static pressure, the bottom immersion of high-temperature molten steel The mouth of a river is to its top power from bottom to top, and the disturbance that high temperature, the flow at high speed of high specific gravity molten steel cause.Existing plate face sealing Due to clamper thrust support area discontinuity, cause poor sealing, there are two defects, one is to cause the mouth of a river pouring steel During air is sucked due to suction function, cause secondary oxidation to molten steel, influence the quality of steel billet;Two is because plate face is resistance to Material produces oxidation because of high temperature action again when air is sucked, it is serious in the case of have molten steel by the seam contract after plate face oxidation Outside is seeped into, causes equipment to be damaged, or even personal safety accident can be caused.
In order to prevent molten steel from being flowed into during crystallizer because filling pipe end and the plate face of submersed nozzle two are combined by tundish Place seals bad and sucks air and produce secondary oxidation, it is necessary to develop a kind of new structure suitable for continuous casting quick-changing mechanism Continuous casting filling pipe end.
The content of the invention
The purpose of this utility model is directed to the plate face sealing problem that the Quick change upper nozzle for using in the prior art is present, and carries For it is a kind of can effectively solve the problem that plate face junction seal and prevent it is high even pour under the conditions of secondary oxidation of steel new structure company Casting filling pipe end.
The purpose of this utility model is solved by the following technical programs:
A kind of continuous casting filling pipe end of new structure, including filling pipe end and metal can, it is characterised in that:The metal can The metalwork of one semi-cylindrical is set at clamper thrust support area, the both ends of the surface of the metalwork respectively with the horizontal plane of metal can Combined with vertical plane close and firm so that all can be distributed in the whole surface of metal can suffered thrust by metalwork, So that it is guaranteed that the sealing property between the plate face of the filling pipe end plate face of filling pipe end and submersed nozzle below.
The radius R scopes of the metalwork are 5~100mm.
The radius R scopes of the metalwork are 15~20mm.
Described filling pipe end includes filling pipe end pipeline and filling pipe end plate face two parts and both all use high-performance refractory material Material one cast is formed, and the outer surface of upper of filling pipe end pipeline is in the inclined plane shape for inside contracting.
Described metalwork is located at the concave arc above filling pipe end plate face side.
The size for pouring steel passage of the filling pipe end can make according to sets requirement.
Described metal can is made of the metal material of high-termal conductivity, high temperature tolerance energy, high intensity.
The utility model has the following advantages compared to existing technology:
The metalwork that the utility model passes through one semi-cylindrical of setting at the clamper thrust support area of metal can, the gold The both ends of the surface for belonging to part are combined with the horizontal plane and vertical plane close and firm of metal can respectively so that metalwork can push away suffered Power is all distributed in the whole surface of metal can, filling pipe end is had the strong of resistance to mechanical stress higher in steel pouring process Degree, so as to ensure that the sealing property between plate face, has reached that the air in steel pouring process is not sucked, filling pipe end plate face is not aoxidized, Finally ensure that the time of direct casting and the quality of steel billet.
Brief description of the drawings
Accompanying drawing 1 is the structural representation of the continuous casting filling pipe end of new structure of the present utility model.
Wherein:1-filling pipe end;2-filling pipe end pipeline;3-filling pipe end plate face;4-metal can;5-clamper thrust branch Support area;6-pour steel passage;7-metalwork.
Specific embodiment
The utility model is further described with embodiment below in conjunction with the accompanying drawings.
As shown in Figure 1:A kind of continuous casting filling pipe end of new structure, including filling pipe end 1 and metal can 4, filling pipe end 1 include Filling pipe end pipeline 2 and the two parts of filling pipe end plate face 3 and both all formed using the one cast of high-performance refractory material, the high-performance The C content of refractory material is controlled≤5% so that submersed nozzle plate face 3 is obtained in that excellent oxidation proof propertiess, and upper water The outer surface of upper of mouth pipeline 2 is in the inclined plane shape for inside contracting;The size for pouring steel passage 6 of filling pipe end 1 can be according to sets requirement system Make;Metal can 4 is made of the metal material of high-termal conductivity, high temperature tolerance energy, high intensity.In the clamper thrust of metal can 4 The metalwork 7 of one semi-cylindrical is set at Support 5, the both ends of the surface of the metalwork 7 respectively with the horizontal plane of metal can 4 and vertically Face close and firm is combined so that all can be distributed to suffered thrust in the whole surface of metal can 4 by metalwork 7, so that Ensure the sealing property between the filling pipe end plate face 3 of filling pipe end 1 and the plate face of submersed nozzle below.The half of the metalwork 7 Footpath R scopes are 5~100mm, further for optimization;The radius R scopes of the metalwork 7 are 15~20mm, now the energy of metal can 4 Preferable stress distribution is obtained, so that it is guaranteed that the sealing property between the plate face of filling pipe end plate face 3 and submersed nozzle, it is ensured that upper water Mouth 1 is not acted on by outer high stress and causes to damage.In addition for relative filling pipe end plate face 3, metalwork 7 is located at filling pipe end plate face At concave arc above 3 sides.
Continuous casting of the invention is applied to continuous casting quick-changing mechanism with filling pipe end, when the filling pipe end is used at the scene, does not find sky Aspiration enters, plate face is aoxidized, situations such as ooze steel, reached the normal purpose for pouring steel quality, protection equipment.
The metalwork 7 that the present invention passes through one semi-cylindrical of setting at the clamper thrust support area 5 of metal can 4, the gold The both ends of the surface of category part 7 are combined with the horizontal plane and vertical plane close and firm of metal can 4 respectively so that metalwork 7 can be suffered Thrust be all distributed in the whole surface of metal can 4, make in steel pouring process filling pipe end 1 have resistance to mechanical stress higher Intensity, so as to ensure that the sealing property between plate face, reached the air in steel pouring process do not suck, filling pipe end plate face 3 not Oxidation, finally ensure that the time of direct casting and the quality of steel billet.
Above example is only explanation technological thought of the present utility model, it is impossible to limit protection model of the present utility model with this Enclose, it is every according to the utility model proposes technological thought, any change done on the basis of technical scheme each falls within this reality Within the scope of novel protected;The technology that the utility model is not directed to can be realized by prior art.

Claims (7)

1. a kind of continuous casting filling pipe end of new structure, including filling pipe end(1)And metal can(4), it is characterised in that:The metal Tank(4)Clamper thrust support area(5)Place sets the metalwork of a semi-cylindrical(7), the metalwork(7)Both ends of the surface difference And metal can(4)Horizontal plane and vertical plane close and firm combine so that metalwork(7)Suffered thrust can be all distributed To metal can(4)Whole surface on, so that it is guaranteed that filling pipe end(1)Filling pipe end plate face(3)Submersed nozzle below Plate face between sealing property.
2. the continuous casting filling pipe end of new structure according to claim 1, it is characterised in that:The metalwork(7)Half Footpath R scopes are 5~100mm.
3. the continuous casting filling pipe end of new structure according to claim 2, it is characterised in that:The metalwork(7)Half Footpath R scopes are 15~20mm.
4. the continuous casting filling pipe end of new structure according to claim 1, it is characterised in that:Described filling pipe end(1)Bag Include filling pipe end pipeline(2)With filling pipe end plate face(3)Two parts and both all using high-performance refractory material one cast form, and Filling pipe end pipeline(2)Outer surface of upper be in the inclined plane shape that inside contracts.
5. the continuous casting filling pipe end of new structure according to claim 4, it is characterised in that:Described metalwork(7)Position In filling pipe end plate face(3)At concave arc above side.
6. the continuous casting filling pipe end of the new structure according to claim 1 or 4, it is characterised in that:The filling pipe end(1)'s Pour steel passage(6)Size can be made according to sets requirement.
7. the continuous casting filling pipe end of new structure according to claim 1, it is characterised in that:Described metal can(4)Adopt It is made of the metal material of high-termal conductivity, high temperature tolerance energy, high intensity.
CN201621358298.4U 2016-12-12 2016-12-12 A kind of continuous casting filling pipe end of new structure Active CN206241246U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621358298.4U CN206241246U (en) 2016-12-12 2016-12-12 A kind of continuous casting filling pipe end of new structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621358298.4U CN206241246U (en) 2016-12-12 2016-12-12 A kind of continuous casting filling pipe end of new structure

Publications (1)

Publication Number Publication Date
CN206241246U true CN206241246U (en) 2017-06-13

Family

ID=59006683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621358298.4U Active CN206241246U (en) 2016-12-12 2016-12-12 A kind of continuous casting filling pipe end of new structure

Country Status (1)

Country Link
CN (1) CN206241246U (en)

Similar Documents

Publication Publication Date Title
CN102409236A (en) Method for producing super-thick steel plate
CN103695788B (en) The ocean flexible pipe wire rod production technique that high pressure resistant, high concentrated acid corrodes
CN201760586U (en) Argon-blowing slag dam of continuous casting tundish
CN102728827A (en) Continuous casting tundish capable of improving molten steel cleanliness
CN107321944A (en) A kind of sulfur-bearing Aluminum steel increases sulphur method
CN204912747U (en) Crystallizer vortex immersion nozzle
CN102248135B (en) Liquid steel casting equipment
CN206241246U (en) A kind of continuous casting filling pipe end of new structure
CN106181023B (en) A kind of rail aluminum weld running gate system
CN106493346B (en) A kind of immersion water gap for continuously casting
CN100560251C (en) A kind of copper and method for continuously casting copper alloy
CN210789208U (en) Continuous casting four-flow tundish with symmetrical flow field
CN207823942U (en) A kind of mouth of a river of high-strength sealing structure
CN205403476U (en) Branch storehouse seam structure of unsetting refractory material furnace wall with backward flow function
CN212761102U (en) Overflow-proof ladle long nozzle for continuous casting full-protection pouring
CN114042906A (en) Submerged nozzle and method for improving heavy rail non-metallic inclusion control
CN207127246U (en) A kind of ferronickel water ingot bar guiding device
CN202155487U (en) Liquid steel casting equipment
CN109396409B (en) Single-point non-equilibrium protection casting method for producing ultrathin large-size aluminum-containing steel special-shaped blank
CN206643344U (en) A kind of automatic slag removal steel ladle
CN206215901U (en) The multi-functional chute device of ferroalloy with fixed ladle
CN206677173U (en) Rare earth steel and the mouth of a river used for aluminum-containing steel and middle steel ladle
CN206732116U (en) One kind side, the pre-heated submersed nozzle of round billet covering slag
CN204550649U (en) A kind of Novel precise furnace feeder water-cooled wire conduit
CN105149521A (en) Subway internal steel frame casting and production technology thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant