CN206229953U - Automobile intake and exhaust flange - Google Patents

Automobile intake and exhaust flange Download PDF

Info

Publication number
CN206229953U
CN206229953U CN201620501127.6U CN201620501127U CN206229953U CN 206229953 U CN206229953 U CN 206229953U CN 201620501127 U CN201620501127 U CN 201620501127U CN 206229953 U CN206229953 U CN 206229953U
Authority
CN
China
Prior art keywords
flange
mounting hole
hydraulic press
blank
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620501127.6U
Other languages
Chinese (zh)
Inventor
郭雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Kaiguo Machinery Manufacturing Co Ltd
Original Assignee
Changzhou Kaiguo Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Kaiguo Machinery Manufacturing Co Ltd filed Critical Changzhou Kaiguo Machinery Manufacturing Co Ltd
Priority to CN201620501127.6U priority Critical patent/CN206229953U/en
Application granted granted Critical
Publication of CN206229953U publication Critical patent/CN206229953U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The utility model is related to mechanical technical field of forging, and in particular to a kind of automobile intake and exhaust flange, including body, and body is provided with mesopore, and mesopore is provided with mounting hole, and the length of mounting hole is 1.3 1.5 with the aperture ratio of mounting hole:1.Automobile intake and exhaust flange of the present utility model, the length of mounting hole is 1.3 1.5 with the aperture ratio of mounting hole:1, the flange is thick flange, and the intensity of flange is effectively ensured.

Description

Automobile intake and exhaust flange
Technical field
The utility model is related to mechanical technical field of forging, and in particular to a kind of automobile intake and exhaust flange.
Background technology
Every union piece closed simultaneously using bolt connection in two planar perimeters, typically referred to as " flange ", often What is seen is the connection between pipeline and pipeline, connection between equipment and equipment etc., and flange has great practicality.Have on flange Eyelet, perforation could be completed to install, and thin-wall flange can be realized by drilling, punching press.And thick wall flange, especially punching are thick Degree is far longer than punching hole diameter, and low using drilling machine drilling efficiency, centre-to-centre spacing often changes, and precision cannot ensure;Use punch press Punching, drift is often broken, and efficiency is low, wastes huge.So how to ensure that punching precision is indeformable, punch center is away from constant High efficiency is realized just being particularly important in the case of change.
Automobile intake and exhaust flange is realized by this mode of cold punching more as the representative of shaped piece product.Because Automobile intake and exhaust flange shape is irregular, and mesopore is big, and waste material wastes serious, and stock utilization is low, causes cold drawing production cost one It can be in any more directly, and the product plane of disruption is irregular, unsightly, lacks industry competition.
The product in many fields is imperative to realize using this mode is forged, and more than 80% product can be with holding in industry Formula mould this mode realizes that open die is that raw material are put into die cavity, extrudes slitter edge, is then sliced out slitter edge, obtains desired Shape, such stock utilization is improved not substantially, and product edge density is unstable, and working environment is very poor, is not perfect forging Make the mode of production.
Utility model content
The purpose of this utility model is to provide a kind of automobile intake and exhaust flange, the length of mounting hole and the aperture ratio of mounting hole It is 1.3-1.5:1, the flange is thick flange, and the intensity of flange is effectively ensured.
To achieve the above object, the technical scheme that the utility model is used is:The flange includes body, is set on body There is mesopore, mesopore is provided with mounting hole, and the length of mounting hole is 1.3-1.5 with the aperture ratio of mounting hole:1.
Preferably, the quantity of the mounting hole is two, and mounting hole is respectively positioned at the both sides of mesopore.
Preferably, the flange is formed by closed mould forging.
Preferably, the mounting hole is stamped to form by hydraulic press.
Preferably, the hydraulic press is provided with buffer unit, and the operating pressure of the hydraulic press is 180-220T, described slow The cushion effect of flushing device is 8-12T, and the drift on hydraulic press is 140-160mm/s to the drawing velocity of mounting hole.
After adopting the above technical scheme, the utility model has the positive effect that:
(1) flange in the utility model is thick flange, and the intensity of flange has been effectively ensured, and automobile is forged using closed mould Easily there is slitter edge, lacks material, cracking, intensity shakiness in solving the forging of automobile intake and exhaust flange in the preparation technology of intake and exhaust flange The problems such as determining, the forging method of traditional open die has very big to the ambient intensity of finished product flange periphery slitter edge, cracking and flange Influence, easily produces cracking phenomena;The present invention uses process of the round bar shape material by closed mould, directly in forming cavity Punching press is obtained, and for the forging of flange especially thick flange, is greatly improved the utilization rate problem of product quality and raw material, The utilization rate of material is reached more than 80%, improve product quality, beautified product appearance, save production cost, make product Product are more competitive;
(2) closed mould forging compared with open-die forging flange, cuts off the operation of slitter edge together less in the utility model, from And operating efficiency is greatly improved, class's yield is up to 5500, and open-die forging automobile intake and exhaust flange at most can only achieve 3000, class's yield improves 83.3%, improves operating efficiency;
(3) present invention carries out the punching of thick wall flange mounting hole using hydraulic press, straight much larger than punching for punching thickness The situation in footpath, it is ensured that punching precision is indeformable, punch center, while ensureing that drift is not easy to break, uses biography away from not changing The drilling machine or punch press efficiency of system are low, waste big, and the present invention is 1.3-1.5 with the aperture ratio of mounting hole for the length of mounting hole:1 Thick wall flange, can accurately go out mounting hole, solve use drilling machine drill or punch press punched-tape come defect.
Brief description of the drawings
Fig. 1 is the structure chart of automobile intake and exhaust flange of the present utility model;
Fig. 2 is the structure chart of closed mould of the present utility model;
Fig. 3 is the structure chart of hydraulic press of the present utility model.
Wherein:1st, body, 2, mesopore, 3, mounting hole, 4, upper mould, 5, lower mould, 6, forming cavity, 7, workbench, 8, drift.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
In the utility model, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. term should broadly understood, for example, it may be fixedly connected, or be detachably connected, or integrally;Can be Mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, can be two The connection of element internal or two interaction relationships of element.For the ordinary skill in the art, can basis Concrete condition understands concrete meaning of the above-mentioned term in the utility model.
Embodiment 1
As shown in figure 1, being automobile intake and exhaust flange of the present utility model, the flange includes body 1, and body 1 is provided with Mesopore 2, mesopore 2 is respectively arranged at the two ends with a mounting hole 3.The length of mounting hole 3 is 1.3-1.5 with the aperture ratio of mounting hole 3:1, In the present embodiment, the thickness of flange is 15mm, a diameter of 11.5mm of mounting hole 3, and the length of mounting hole 3 and the ratio in aperture are 1.3, i.e. this flange are thick flange.
As shown in Fig. 2 being closed mould of the present utility model, the closed mould includes upper mould 4 and lower mould 5, upper mould 4 and lower mould 5 enclose and set to form forming cavity 6, and the shape of forming cavity 6 is adapted with the shape of the flange.
As shown in figure 3, being hydraulic press of the present utility model, the hydraulic press includes workbench 7 and drift 8, on workbench 7 Groove is provided with, blank flange to be processed is placed in the groove, the position of drift 8 is corresponding with the position of mounting hole 3.
A kind of forging technology of automobile intake and exhaust flange, comprises the following steps:
(a) blanking:Rod raw material are sawn into the standby blank of technological requirement size with blank cutter or band mill;
B () heats:By blank by intermediate frequency heating 5S, heating-up temperature is 1150 DEG C;
(c) blocking:Blank after heating is flattened using mould, the operating pressure that lathe flattens blank is 63T, after flattening Blank tapping temperature be 1200 DEG C;
(d) finish-forging:Blank after flattening is put into the processing of closed mould die cavity, lathe finish-forging operating pressure is 800T, obtains hair Base;
E () rushes mesopore:Make lathe operating pressure be the mesopore in 63T excision blanks, obtain finished product blank flange, finished product blank Surface temperature be 1050 DEG C;
(f) ball blast:The burr on removal blank flange surface;
G () puts:Blank flange is sequentially put and is moved on the work top of hydraulic press;
H () rushes mounting hole:One flange is picked up with sucker is put into the mould of the hydraulic press for being provided with buffer unit, carried out The mounting hole 3 rushed on flange, the operating pressure of hydraulic press is 200T, and the cushion effect of buffer unit is 10T, under the drift of hydraulic press Scanning frequency degree is 150mm/s.
Take the flange that the present embodiment forging is completed, method prepared by the flange prepared with traditional cold stamping technology and open type mold technique Orchid is compared, as a result as follows:
The different process of table 1 compares
Project Production cost Stock utilization Outward appearance Density strength
Traditional cold stamping technology Highest 40% The plane of disruption is irregular It is relatively low
Open die technique It is higher 50% Product has slitter edge It is higher
Closed molds technique It is relatively low More than 80% Product neat appearance slitter edge free It is higher
Embodiment 2
In the present embodiment, the structure of flange, closed mould and hydraulic press is in the same manner as in Example 1, and different places are flange The difference of forging technology, it is specific as follows:
A kind of forging technology of automobile intake and exhaust flange, comprises the following steps:
(a) blanking:Rod raw material are sawn into the standby blank of technological requirement size with blank cutter or band mill;
B () heats:By blank by intermediate frequency heating 4S, heating-up temperature is 1100 DEG C;
(c) blocking:Blank after heating is flattened using mould, the operating pressure that lathe flattens blank is 70T, after flattening Blank tapping temperature be 1200 DEG C;
(d) finish-forging:Blank after flattening is put into the processing of closed mould die cavity, lathe finish-forging operating pressure is 850T, obtains hair Base;
E () rushes mesopore:Make lathe operating pressure be the mesopore in 50T excision blanks, obtain finished product blank flange, finished product blank Surface temperature be 1050 DEG C;
(f) ball blast:The burr on removal blank flange surface;
G () puts:Blank flange is sequentially put and is moved on the work top of hydraulic press;
H () rushes mounting hole:One flange is picked up with sucker is put into the mould of the hydraulic press for being provided with buffer unit, carried out The mounting hole 3 rushed on flange, the operating pressure of hydraulic press is 180T, and the cushion effect of buffer unit is 12T, under the drift of hydraulic press Scanning frequency degree is 160mm/s.
Embodiment 3
In the present embodiment, the structure of flange, closed mould and hydraulic press is in the same manner as in Example 1, and different places are flange The difference of forging technology, it is specific as follows:
A kind of forging technology of automobile intake and exhaust flange, comprises the following steps:
(a) blanking:Rod raw material are sawn into the standby blank of technological requirement size with blank cutter or band mill;
B () heats:By blank by intermediate frequency heating 7S, heating-up temperature is 1200 DEG C;
(c) blocking:Blank after heating is flattened using mould, the operating pressure that lathe flattens blank is 50T, after flattening Blank tapping temperature be 1200 DEG C;
(d) finish-forging:Blank after flattening is put into the processing of closed mould die cavity, lathe finish-forging operating pressure is 750T, obtains hair Base;
E () rushes mesopore:Make lathe operating pressure be the mesopore in 70T excision blanks, obtain finished product blank flange, finished product blank Surface temperature be 1050 DEG C;
(f) ball blast:The burr on removal blank flange surface;
G () puts:Blank flange is sequentially put and is moved on the work top of hydraulic press;
H () rushes mounting hole:One flange is picked up with sucker is put into the mould of the hydraulic press for being provided with buffer unit, carried out The mounting hole 3 rushed on flange, the operating pressure of hydraulic press is 2200T, and the cushion effect of buffer unit is 8T, under the drift of hydraulic press Scanning frequency degree is 140mm/s.
It will be apparent to those skilled in the art that technical scheme that can be as described above and design, make other various It is corresponding to change and deformation, and all these change and deformation should all belong to the protection domain of the utility model requirement Within.

Claims (4)

1. a kind of automobile intake and exhaust flange, it is characterised in that:The flange includes body (1), and body (1) is provided with mesopore (2), Mesopore (2) is provided with mounting hole (3), and the length of mounting hole (3) is 1.3-1.5 with the aperture ratio of mounting hole (3):1, the flange Formed by closed mould forging, the closed mould includes upper mould (4) and lower mould (5), and upper mould (4) and lower mould (5) enclose and set to form shaping Chamber (6), the shape of forming cavity (6) is adapted with the shape of the flange.
2. automobile intake and exhaust flange according to claim 1, it is characterised in that:The quantity of mounting hole (3) is two, is installed Hole (3) is respectively positioned at the both sides of mesopore (2).
3. automobile intake and exhaust flange according to claim 1, it is characterised in that:Mounting hole (3) is stamped to form by hydraulic press.
4. automobile intake and exhaust flange according to claim 3, it is characterised in that:The hydraulic press is provided with buffer unit, The operating pressure of the hydraulic press is 180-220T, and the cushion effect of the buffer unit is 8-12T, and the drift on hydraulic press is to peace The drawing velocity for filling hole (3) is 140-160mm/s.
CN201620501127.6U 2016-05-27 2016-05-27 Automobile intake and exhaust flange Active CN206229953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620501127.6U CN206229953U (en) 2016-05-27 2016-05-27 Automobile intake and exhaust flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620501127.6U CN206229953U (en) 2016-05-27 2016-05-27 Automobile intake and exhaust flange

Publications (1)

Publication Number Publication Date
CN206229953U true CN206229953U (en) 2017-06-09

Family

ID=58986081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620501127.6U Active CN206229953U (en) 2016-05-27 2016-05-27 Automobile intake and exhaust flange

Country Status (1)

Country Link
CN (1) CN206229953U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116117045A (en) * 2022-11-08 2023-05-16 嘉禾精工锻铸有限公司 Die forging forming method and die forging forming equipment for hydraulic flange

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116117045A (en) * 2022-11-08 2023-05-16 嘉禾精工锻铸有限公司 Die forging forming method and die forging forming equipment for hydraulic flange
CN116117045B (en) * 2022-11-08 2024-05-31 湖南精工锻铸科技有限公司 Die forging forming method and die forging forming equipment for hydraulic flange

Similar Documents

Publication Publication Date Title
CN105921654A (en) Automobile intake and exhaust flange and forging technology thereof
CN207952316U (en) A kind of automobile die processing decompressor
CN201012375Y (en) Eyelet punching flanging composite mold
CN206229953U (en) Automobile intake and exhaust flange
CN201659207U (en) Forming mold for automobile aluminum work pieces
CN203578540U (en) Pipe clamp blanking and punching composite die
CN201768832U (en) Mold assembly for manufacturing reducing pipes
CN204135154U (en) A kind of punching type cutter sweep for cuts sheet material
CN204182767U (en) The disposable mould at angle steel upper punch different pore size
CN202825949U (en) Press-fit double-punching die
CN202825948U (en) Press-fit punching die
CN208542822U (en) A kind of sliding support stamping die on pedal assembly
CN208050696U (en) A kind of hydraulic punching and shearing machine of optimization
CN205949765U (en) Forge closed mould of flange
CN206139728U (en) Nut plate's integrated stamping die
CN105215161A (en) The processing method of a kind of monaural airtight nut height cover part
CN218744265U (en) Stamping and typing die
CN215786082U (en) Multi-purpose punching die with good compatibility
CN111482505A (en) Upper punch waste blowing device of air conditioner fin die
CN213469197U (en) Stamping cutting machine that decoration and fitment was used
CN202762833U (en) Suppressing tooling of wind-guiding blade
CN215824056U (en) Forming die of seamless steel pipe for automobile steering device connecting rod
CN104084482A (en) Loudspeaker basin frame processing method
CN202683776U (en) Precise square curling die
CN208912919U (en) A kind of automobile sprocket wheel blank punching die

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant