CN206223960U - A kind of extra-high voltage transformer verification switching device - Google Patents

A kind of extra-high voltage transformer verification switching device Download PDF

Info

Publication number
CN206223960U
CN206223960U CN201621036429.7U CN201621036429U CN206223960U CN 206223960 U CN206223960 U CN 206223960U CN 201621036429 U CN201621036429 U CN 201621036429U CN 206223960 U CN206223960 U CN 206223960U
Authority
CN
China
Prior art keywords
binding post
voltage transformer
extra
switching device
high voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621036429.7U
Other languages
Chinese (zh)
Inventor
罗群
刘春雨
孙军
王月明
王首堃
张健
孙虹
陈江洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN PANDIAN TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
WUHAN PANDIAN TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN PANDIAN TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical WUHAN PANDIAN TECHNOLOGY Co Ltd
Priority to CN201621036429.7U priority Critical patent/CN206223960U/en
Application granted granted Critical
Publication of CN206223960U publication Critical patent/CN206223960U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Transformers For Measuring Instruments (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The utility model discloses a kind of extra-high voltage transformer verification switching device, including binding post, panel, box body, it is characterized in that, the binding post has 6, wherein 1a, the 1n of binding post 1a ', binding post 1n ' respectively with tested secondary windings of PT is connected, 2a, the 2n of binding post 2a ', binding post 2n ' respectively with tested secondary windings of PT are connected, and 3a, the 3n of binding post 3a ', binding post 3n ' respectively with tested secondary windings of PT are connected.The extra-high voltage transformer method of calibration of this switching device is connected by secondary line with the Secondary Winding of tested extra-high voltage transformer, the binding post of the device is connected by secondary line with mutual-inductor tester, voltage transformer Burden box again, only need to ground just can complete extra-high voltage transformer whole windings error test wiring work, substantially increase the security of operating efficiency and field test.

Description

A kind of extra-high voltage transformer verification switching device
Technical field
The utility model belongs to extra-high voltage transformer technical field of measurement and test, is related to a kind of extra-high voltage transformer school Test and use switching device.
Background technology
As the fast development of extra-high voltage, the quantity at extra-high voltage station are also more and more, wherein extra-high voltage transformer is The important component of electric power meter, its accuracy is directly connected to the fair, just of trade settlement, it is therefore desirable to it Carry out field-checking.Extra-high voltage transformer secondary side have 3 measure windings 1a-1n, 2a-2n, 3a-3n and 1 protection around Group da-dn, national metrological regulations regulation 1a-1n, 2a-2n, 3a-3n this 3 measure windings will carry out error checking.Extra-high voltage Voltage transformer is high because of its voltage class, is often placed on 6~7 meters of platforms high (as shown in Fig. 2 high voltage potential transformer Secondary Winding terminal box 9 is installed on overhead 10), Secondary Winding binding post is liftoff height, generally greater than more than 7 meters of ground, to 3 Individual measure winding carries out error checking, at least needs to climb 3 overhead replacings for carrying out secondary line up and down, and inefficiency is deposited In certain potential safety hazard.Extra-high voltage transformer is not only, 750kV and following capacitance type potential transformer are also mounted at branch On support, it is remote that Secondary Winding is liftoff, also all there is a problem of same.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art part, there is provided a kind of extra-high voltage transformer school Test and use switching device, it is only necessary to climb once the overhead Secondary Winding by tested voltage transformer and the switching device is connected to by secondary line On, just can be done directly more changing jobs for Secondary Winding wiring on ground.
The utility model solves its technical problem and takes following technical scheme to realize:
A kind of extra-high voltage transformer verification switching device, it is characterised in that:Switching device includes binding post, panel And box body, one-to-one three rows binding post is provided with panel uniformly at intervals, six binding posts are respectively used to connection examination The corresponding terminal of secondary windings of PT, and switching device connects corresponding voltage transformer Burden box.
And, the panel is made up of epoxy phenolic laminated glass fabric plate epoxy plate.
And, the binding post is high current fine copper banana binding post.
And, wiring construction when this switching device is verified:6 binding posts of switching device are respectively:Binding post 1a ', Binding post 1n ', binding post 2a ', binding post 2n ', binding post 3a ', binding post 3n ';
Tested extra-high voltage transformer secondary side has 4 windings, and 1a-1n, 2a-2n, 3a-3n are the wiring of measure winding Terminal, need to carry out error checking, and da-dn is non-metering winding;
Binding post 1a ', binding post 1n ' are corresponding with 1a, 1n of tested secondary windings of PT respectively to be connected, binding post 2a ', binding post 2n ' are corresponding with 2a, 2n of tested secondary windings of PT respectively to be connected, binding post 3a ', binding post 3n ' It is corresponding with 3a, 3n of tested secondary windings of PT respectively to be connected;Dn terminal grounds.
Advantage of the present utility model and good effect are:
The verification of the utility model extra-high voltage transformer is mutual with tested extra-high voltage by secondary line with switching device The Secondary Winding of sensor is connected, and the binding post of the device is again by secondary line and mutual-inductor tester, voltage transformer Burden box It is connected, it is only necessary to the wiring work of the error test of whole windings of extra-high voltage transformer just can be completed on ground, is carried significantly The security of operating efficiency and field test high.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is that schematic diagram is put at extra-high voltage transformer scene;
Fig. 3 is the high-end error of measurement method circuit theory diagrams of voltage transformer;
Fig. 4 is to be tested voltage transformer, extra-high piezoelectricity according to when carrying out voltage transformer error verification in high-end error of measurement method The wiring diagram of pressure transducer check switching device and voltage transformer Burden box.
The mark implication of accompanying drawing is as follows:
1:Binding post 1a ';2:Binding post 1n ';3:Binding post 2a ';4:Binding post 2n ';5:Binding post 3a ';6:Binding post 3n′;7:Panel;8:Box body;9:High voltage potential transformer Secondary Winding terminal box;10:It is overhead.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings and by specific embodiment, and following examples are to retouch The property stated, be not limited, it is impossible to limit protection domain of the present utility model with this.
A kind of extra-high voltage transformer verification switching device, as shown in figure 1, including binding post, panel 7 and box body 8, one-to-one three rows binding post is provided with panel uniformly at intervals;
Panel is made up of epoxy phenolic laminated glass fabric plate epoxy plate, and binding post is high current fine copper banana binding post;
The corresponding label of 6 binding posts is as follows:1:Binding post 1a ';2:Binding post 1n ';3:Binding post 2a ';4:Wiring Post 2n ';5:Binding post 3a ';6:Binding post 3n ';
High voltage potential transformer Secondary Winding terminal box 9 is installed on overhead 10, it is only necessary on it is next time overhead by extra-high piezoelectricity The Secondary Winding of transformer is pressed to be connected with the switching device, just can be in whole windings of ground completion extra-high voltage transformer The wiring work of error test.
Referring to shown in Fig. 3, Fig. 4, tested extra-high voltage transformer secondary side has 4 windings, wherein 1a-1n, 2a-2n, 3a-3n is measure winding, need to carry out error checking;Wherein, binding post 1a ', binding post 1n ' respectively with tested voltage transformer two 1a, 1n of secondary winding are connected, and 2a, the 2n of binding post 2a ', binding post 2n ' respectively with tested secondary windings of PT are connected, 3a, the 3n of binding post 3a ', binding post 3n ' respectively with tested secondary windings of PT are connected.
Only need next time overhead, the Secondary Winding of extra-high voltage transformer is connected with the switching device, on ground The wiring work of the error test of whole windings of extra-high voltage transformer is completed, specific implementation includes following step Suddenly:
(1) according to transducer check principle (error of measurement method), by Regulation Control case, exciting transformer, reactor, normal voltage Transformer, tested voltage transformer and mutual-inductor tester are sequentially connected;
(2) 1a, 2a, 3a tap of tested secondary windings of PT is connect with switching device respectively by secondary line Terminal 1a ', binding post 2a ', binding post 3a ' connections, are tested 1n, 2n, 3n tap of secondary windings of PT by secondary Line binding post 1n ' respectively with switching device, binding post 2n ', binding post 3n ' are connected,
Binding post 1a ', 1n ' are connected with voltage transformer Burden box a, binding post 2a ', 2n ' and voltage transformer Burden box b It is connected, binding post 3a ', 3n ' are connected with voltage transformer Burden box c,
And 3 Burden box and dn terminals will distinguish reliable ground above;
(3) high-end error of measurement method surveys the error of tested voltage transformer:
After by (1), (2) step, equipment is connected, by binding post 1n ', binding post 2n ', binding post 3n ' secondary lines Short circuit is simultaneously grounded, and when being verified to tested voltage transformer secondary side 1a-1n windings, extra-high voltage transformer verification is used The binding post 1a ' of switching device is connected with mutual-inductor tester;When carrying out school to tested voltage transformer secondary side 2a-2n windings When testing, the binding post 2a ' of extra-high voltage transformer verification switching device is connected with mutual-inductor tester;When to being tested voltage When transformer secondary side 3a-3n windings are verified, the binding post 3a ' of extra-high voltage transformer verification switching device with it is mutual Sensor tester is connected.
(4) low side error of measurement method surveys the error of extra-high voltage transformer:
Equipment is connected by (1), (2) step, is verified when to tested voltage transformer secondary side 1a-1n windings When, the binding post 1a ' of extra-high voltage transformer verification switching device is short with standard potential transformer Secondary Winding high-pressure side Connect and 1n ' is connected with mutual-inductor tester;It is extra-high when being verified to tested voltage transformer secondary side 2a-2n windings The binding post 2a ' and standard potential transformer Secondary Winding high-pressure side short circuit of medium-voltage potential transformers verification switching device simultaneously will 2n ' is connected with mutual-inductor tester;When being verified to tested voltage transformer secondary side 3a-3n windings, extra-high voltage The binding post 3a ' of transducer check switching device and standard potential transformer Secondary Winding high-pressure side short circuit and by 3n ' with it is mutual Sensor tester is connected.
Although disclosing embodiment of the present utility model and accompanying drawing for the purpose of illustration, those skilled in the art can be with Understand:Not departing from the utility model and spirit and scope of the appended claims, various replacements, change and modifications all be can Can, therefore, scope of the present utility model is not limited to embodiment and accompanying drawing disclosure of that.

Claims (4)

1. a kind of extra-high voltage transformer verification switching device, it is characterised in that:Switching device include binding post, panel with And box body, one-to-one three rows binding post is provided with panel uniformly at intervals, six binding posts are respectively used to connection examination electricity The corresponding terminal of pressure transformer Secondary Winding, and switching device connects corresponding voltage transformer Burden box.
2. extra-high voltage transformer verification switching device according to claim 1, it is characterised in that:The panel by Epoxy phenolic laminated glass fabric plate epoxy plate is made.
3. extra-high voltage transformer verification switching device according to claim 1, it is characterised in that:The binding post It is high current fine copper banana binding post.
4. extra-high voltage transformer verification switching device according to claim 1, it is characterised in that:This switching device Wiring construction during verification:6 binding posts of switching device are respectively:Binding post 1a ', binding post 1n ', binding post 2a ', wiring Post 2n ', binding post 3a ', binding post 3n ';
Tested extra-high voltage transformer secondary side has 4 windings, and 1a-1n, 2a-2n, 3a-3n are the terminals of measure winding Son, need to carry out error checking, and da-dn is non-metering winding;
Binding post 1a ', binding post 1n ' are corresponding with 1a, 1n of tested secondary windings of PT respectively to be connected, binding post 2a ', Binding post 2n ' is corresponding with 2a, 2n of tested secondary windings of PT respectively to be connected, and binding post 3a ', binding post 3n ' are respectively It is corresponding with 3a, 3n of tested secondary windings of PT to be connected;Dn terminal grounds.
CN201621036429.7U 2016-09-05 2016-09-05 A kind of extra-high voltage transformer verification switching device Active CN206223960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621036429.7U CN206223960U (en) 2016-09-05 2016-09-05 A kind of extra-high voltage transformer verification switching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621036429.7U CN206223960U (en) 2016-09-05 2016-09-05 A kind of extra-high voltage transformer verification switching device

Publications (1)

Publication Number Publication Date
CN206223960U true CN206223960U (en) 2017-06-06

Family

ID=58782118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621036429.7U Active CN206223960U (en) 2016-09-05 2016-09-05 A kind of extra-high voltage transformer verification switching device

Country Status (1)

Country Link
CN (1) CN206223960U (en)

Similar Documents

Publication Publication Date Title
CN105974348B (en) Low-voltage current mutual inductor comprehensive detection system and its method
CN205080251U (en) Through -flow calibration system of current transformer secondary circuit
CN102540001B (en) Method of checking alternating current loop of a 500kV transformer substation through carrying out simulated through-type three-phase short circuit
CN104330760B (en) High-tension current inductor and the error testing system and method for this transformer
CN105785157B (en) Double main transformer longitudinal differential protection cyclization test methods
CN103472433B (en) Intelligent substation electric energy measuring secondary system virtual load error detection device and method
CN101699301A (en) Method for measuring line parameter through induced electricity
CN101539616A (en) Method for detecting accuracy of optical current transformer for measuring
CN101770006A (en) Novel method for checking electronic transducer
CN102565618A (en) Method for detecting zero-sequence voltage circuit of transformer substation
CN205068942U (en) Experimental hybrid simulation system of high -voltage electrical
CN204166118U (en) A kind of lightning arrester on-line computing model performance calibration equipment on the spot
CN205620485U (en) A intelligent integrated detection device for low pressure current transformer integrates
Schöttke et al. Transfer characteristic of a MV/LV transformer in the frequency range between 2 kHz and 150 kHz
CN104777445B (en) A kind of electronic type voltage transformer on-line testing system
CN101769968A (en) Mutual inductor no-load voltage ratio tester
CN101614798A (en) Polarity detection system of electronic transformer
CN106291254A (en) A kind of automated intelligent line inspection device for intelligent substation
CN104155627B (en) Error characteristic detection method of extra high voltage capacitive voltage transformer
CN104007294B (en) Overhead line parameter measurement wiring device
CN107912059A (en) The switching device operating method of switching device, test device and transformer measuring device
CN204359883U (en) A kind of transformer multifunctional tester
CN205067670U (en) A anti -interference medium simulator for high -voltage electrical is experimental
CN102565614B (en) Alternating voltage loop test method
CN201859212U (en) Novel calibration device of electronic type mutual inductor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant