CN206220091U - CFG for easily blocking - Google Patents

CFG for easily blocking Download PDF

Info

Publication number
CN206220091U
CN206220091U CN201621314823.2U CN201621314823U CN206220091U CN 206220091 U CN206220091 U CN 206220091U CN 201621314823 U CN201621314823 U CN 201621314823U CN 206220091 U CN206220091 U CN 206220091U
Authority
CN
China
Prior art keywords
wedge
bore
expanded bore
pile body
expanded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621314823.2U
Other languages
Chinese (zh)
Inventor
刘福鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201621314823.2U priority Critical patent/CN206220091U/en
Application granted granted Critical
Publication of CN206220091U publication Critical patent/CN206220091U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of the CFG for easily blocking, including pile body, expanded bore is offered on the pile crown side wall of pile body, be provided with making expansion bore expansion in expanded bore so that the expanding part that is broken by the expansion of the expanded bore of the pile crown of pile body.The utility model simple structure, it is easy to use, expanded bore is produced breach by expansion bore expansion, and then pile crown is broken, while pile body does not result in damage yet.

Description

CFG for easily blocking
Technical field
The utility model is related to a kind of engineering pile, and in particular to a kind of the CFG for easily blocking.
Background technology
CFG means CFG, and it is to add water to mix and stir by cement, flyash, rubble, aggregate chips or sand to be formed High bond strength stake, and inter-pile soil, mattress layer form compound foundation together.CFG pile composite foundations are by mattress layer and basis Connection, no matter stake end falls in general soil layer or hard soil layer, can ensure that inter-pile soil participates in work all the time.It is strong due to pile body Degree and modular ratio inter-pile soil are big, and under load action, stake top stress ratio inter-pile soil surface stress is big.The load that to can bear of stake to Transmitted in deeper soil layer and accordingly reduce the load that inter-pile soil undertakes.So, because the effect of stake carries composite foundation Power is improved, and deformation reduces, and along with CFG not arrangement of reinforcement, pile body is greatly reduced by the use of industrial waste flyash as admixture Construction costs.
In follow-up pile crown cutting, one kind is that pile crown is cut off with cutting tools such as saw blades, and the method is in construction When can send larger noise, easily the hearing of operating personnel is caused to damage.Another is straight using Miniature digging machine Deduction is connect, but so easily causes damage to form broken pile pile body, cause the unqualified of pile quality.
Utility model content
For above-mentioned the deficiencies in the prior art, technical problem to be solved in the utility model is:How a kind of knot is provided Structure is simple, and operation is easy, and pile crown does not cause damage and CFG easily blocked after blocking to pile body.
In order to solve the above-mentioned technical problem, the utility model employs following technical scheme:
A kind of the CFG for easily blocking, including pile body, it is characterised in that:Expanded bore is offered on the pile crown side wall of pile body, is expanded It is provided with making expansion bore expansion in hole so that the expanding part that is broken by the expansion of the expanded bore of the pile crown of pile body.
In the utility model, pile body is embedded in ground, when needing to block pile crown, using expanding part Expanded bore is expanded, pile crown is broken when bore expansion is expanded, and then reach the purpose for cutting stake.The letter of its structure Single, easy to use, pile crown does not cause to damage after blocking to pile body.
Used as optimization, the length of the expanded bore is the half of the pile body radius, and the expanding part is wedge I, More than the area of section in the expanded bore aperture, the small bore end of wedge I is inserted in the expansion to the maximum cross-section area of wedge I Open in hole, heavy in section end is stretched out in outside the pile body, the length that the wedge I is inserted into the expanded bore is less than the expansion Open the length in hole.Wedge is usually stuck in expanded bore, bears a part of load, it is to avoid reduce self-strength because of expanded bore. When stake is cut, part of the wedge I outside pile body is beaten by along expanded bore length direction, make wedge I towards expansion Open the movement of hole bottom hole.During wedge I is moved, the lozenges of wedge II is connected to the aperture upper end of expanded bore, root According to effect force resolution, wedge I acts on expanded bore aperture obliquely to the extruding force of expanded bore along the lozenges of wedge I Upper end, then allow for pile crown by an active force obliquely.When bending strength of this active force more than pile crown, Pile crown will produce horizontal crackle from the both sides of expanded bore, until pile crown is broken.
Used as optimization, the expanded bore is rectangular opening, and a lozenges wedge-like engagement of the wedge I has wedge II, the heavy in section end of wedge II is located in the expanded bore, and small bore end is stretched out in outside the pile body, wedge I and wedge II each back to lozenges fitted with two internal faces up and down of expanded bore respectively.Single wedge I is squeezed to expanded bore When pressure, the position for only being contacted with expanded bore can transmitting forces.Set again on a lozenges of wedge I One with the wedge II of its wedge-like engagement, two support or oppose of wedge lozenges is fitted in rectangle expanded bore respectively Two inwalls up and down on, during such wedge I is extruded, wedge II is transferred the force to first, then by wedge shape Block II passes to pile crown, and impetus is transferred on the hole wall of expanded bore by the orifice position of expanded bore, and torque is converted, and more can Enough it is broken pile crown.
Used as optimization, the expanded bore is multiple and the circumferential uniform intervals along the pile body are set, each described expansion The expanding part is provided with hole.Active force is applied to pile crown by multiple orientation, it is easier to be that pile crown is broken.
In sum, the beneficial effects of the utility model are:The utility model simple structure, it is easy to use, by right Expansion bore expansion makes expanded bore produce breach, and then is broken pile crown, while pile body does not result in damage yet.
Brief description of the drawings
In order that the purpose, technical scheme and advantage of utility model are clearer, it is new to this practicality below in conjunction with accompanying drawing Type is described in further detail, wherein:
Fig. 1 is schematic cross-section of the present utility model;
Fig. 2 is enlarged drawing at the A in Fig. 1.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, the CFG for easily blocking in this specific embodiment, including pile body 1, the pile crown of pile body 1 Offered on the wall of side and be provided with expanding expanded bore 2 in expanded bore 2, expanded bore 2 so that the pile crown of pile body 1 is because of the expanded bore 2 expansion and the expanding part that is broken.
In this specific embodiment, the length of the expanded bore 2 is the half of the radius of the pile body 1, the expanding part It is wedge I 3, the area of section of the maximum cross-section area more than the aperture of the expanded bore 2 of wedge I 3, the small bore of wedge I 3 End is inserted in the expanded bore 2, and heavy in section end is stretched out in outside the pile body 1, and the wedge I 3 is inserted into the expansion Length of the length in hole 2 less than the expanded bore 2.
In this specific embodiment, the expanded bore 2 is rectangular opening, a lozenges wedge-like engagement of the wedge I 3 There is wedge II 4, the heavy in section end of wedge II 4 is located in the expanded bore 2, and small bore end is stretched out in outside the pile body 1, wedge shape Block I 3 and wedge II 4 each back to lozenges fitted with two internal faces up and down of expanded bore 2 respectively.
In this specific embodiment, the expanded bore 2 is set for multiple and along the pile body 1 circumferential uniform intervals, often The expanding part is provided with the individual expanded bore 2.
Can also so when specific implementation, the heavy in section end of wedge I 3 is provided with percussion portion 5, percussion portion 5 Center is fixedly connected with wedge I 3, and percussion portion 5 is the percussion face being vertically arranged, percussion portion back to the side side of wedge I 3 Maximum cross-section area of 5 areas of section vertically gone up more than wedge I 3.By increasing the percussion portion 5 of larger cross-section, It is easy to operator to be tapped, can avoids being tapped during percussion to pile body, pile body is caused to damage.
Finally illustrate, above example is only used to illustrate the technical solution of the utility model and unrestricted, although logical Cross the utility model is described with reference to preferred embodiment of the present utility model, but one of ordinary skill in the art It should be appreciated that various changes can be made to it in the form and details, without departing from appended claims institute The spirit and scope of the present utility model for limiting.

Claims (4)

1. a kind of the CFG for easily blocking, including pile body, it is characterised in that:Expanded bore is offered on the pile crown side wall of pile body, is expanded It is provided with making expansion bore expansion in hole so that the expanding part that is broken by the expansion of the expanded bore of the pile crown of pile body.
2. the CFG for easily blocking according to claim 1, it is characterised in that:The length of the expanded bore is the pile body The half of radius, the expanding part is wedge I, maximum cross-section area the cutting more than the expanded bore aperture of wedge I Face area, the small bore end of wedge I is inserted in the expanded bore, and heavy in section end is stretched out in outside the pile body, the wedge I It is inserted into the length of the length less than the expanded bore of the expanded bore.
3. the CFG for easily blocking according to claim 2, it is characterised in that:The expanded bore is rectangular opening, the wedge shape One lozenges wedge-like engagement of block I has wedge II, and the heavy in section end of wedge II is located in the expanded bore, and small bore end is stretched Outside for the pile body, wedge I and wedge II each back to lozenges respectively with two internal faces up and down of expanded bore Fit.
4. the CFG for easily blocking as claimed in any of claims 1 to 3, it is characterised in that:The expanded bore is many Individual and along the pile body circumferential uniform intervals are set, and the expanding part is provided with each described expanded bore.
CN201621314823.2U 2016-12-02 2016-12-02 CFG for easily blocking Active CN206220091U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621314823.2U CN206220091U (en) 2016-12-02 2016-12-02 CFG for easily blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621314823.2U CN206220091U (en) 2016-12-02 2016-12-02 CFG for easily blocking

Publications (1)

Publication Number Publication Date
CN206220091U true CN206220091U (en) 2017-06-06

Family

ID=58784350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621314823.2U Active CN206220091U (en) 2016-12-02 2016-12-02 CFG for easily blocking

Country Status (1)

Country Link
CN (1) CN206220091U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185036A (en) * 2019-05-31 2019-08-30 五冶集团上海有限公司 A kind of concrete filling pile head restructuring bankrupt

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185036A (en) * 2019-05-31 2019-08-30 五冶集团上海有限公司 A kind of concrete filling pile head restructuring bankrupt

Similar Documents

Publication Publication Date Title
WO2019148812A1 (en) Jetting, expansion and extrusion combined pile, construction method thereof and spiral jetting, expansion and extrusion drilling rig used in method
CN103628473A (en) Composite type combined piles and construction method thereof
WO2017049809A1 (en) Cement-soil mixing pile having stiffening core pile with variable diameter
CN203569564U (en) Combined type composite pile
CN109972627A (en) A kind of fashioned iron assembled foundation pit enclosure structure and its construction method
CN206220091U (en) CFG for easily blocking
CN201581394U (en) Large pile toe grout-injection precast pile
CN106400792A (en) Mechanical equipment for manufacturing buckling combinational T-shaped piles
CN106400796A (en) Mechanical equipment for manufacturing buckling combinational piles
CN103437547B (en) A kind of aluminum alloy pattern plate
CN204510194U (en) Biting connecions connects piling wall construction chestnut shape reinforcing cage and guided mode steel plate
CN102155011A (en) Fish-shaped steel tube pile
CN101666085A (en) Prefabricated part composite cement soil wall and construction method thereof
CN105862801A (en) Rectangular engagement connecting pile wall
CN105862803A (en) Rectangular locking and buckling connecting pile wall
CN102235017B (en) Lateral force resisting method for soft soil foundation building
CN204551470U (en) A kind of envelope stake device of anchor jacked pile of improvement
CN212336330U (en) Shear connector for wood-concrete composite structure
CN102888841A (en) End part thread five-pointed-star-shaped variable-section prefabricated pipe pile and construction method thereof
CN208933966U (en) A kind of hydraulic broken stake machine of variable area formula
CN2153578Y (en) High efficiency ground pile
CN208734111U (en) A kind of rotary digging stake sealing hole grid
CN207063097U (en) A kind of side slope packaged type gutter structure
CN103835290A (en) Pile foundation structure suitable for marine soft soil and design method thereof
CN109385999A (en) A kind of shovel pawl adjustable hydraulic crushing stake machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant