CN206219935U - A kind of permeable pavement structure of high intensity, high osmosis - Google Patents

A kind of permeable pavement structure of high intensity, high osmosis Download PDF

Info

Publication number
CN206219935U
CN206219935U CN201621207541.2U CN201621207541U CN206219935U CN 206219935 U CN206219935 U CN 206219935U CN 201621207541 U CN201621207541 U CN 201621207541U CN 206219935 U CN206219935 U CN 206219935U
Authority
CN
China
Prior art keywords
permeable
water
pavement structure
precipitation
high intensity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621207541.2U
Other languages
Chinese (zh)
Inventor
苏谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621207541.2U priority Critical patent/CN206219935U/en
Application granted granted Critical
Publication of CN206219935U publication Critical patent/CN206219935U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high intensity, the permeable pavement structure of high osmosis, including it is sequentially arranged in water proof sealing on soil matrix, basic unit and surface layer;The surface layer includes permeable skeleton and the concrete between permeable matrix porosity;The permeable skeleton includes the horizontal permeability cell being interconnected and the vertical water-permeable pipe for being vertically installed in horizontal permeability cell;The basic unit includes the metalling on upper strata and the sand bedding course of lower floor;The water proof sealing includes impermeable film.Dense concrete in surface layer has the advantages that high intensity and high-durability, and precipitation can be imported basic unit by the permeable skeleton between concrete, prevent precipitation from gathering on road surface.Rubble in metalling is stacked with, and forms the flow channel of precipitation, plays a part of water delivery and improves foundation base intension.Rubble in sand bedding course can slow down the speed oozed under precipitation, play a part of water storage, draining and improve foundation base intension;Impermeable film can prevent precipitation from penetrating into soil matrix.

Description

A kind of permeable pavement structure of high intensity, high osmosis
Technical field
The application belongs to urban pavement technical field of structures, and in particular to a kind of high intensity, the porous pavement of high osmosis Structure.
Background technology
Current urban pavement is all substantially stop water layer, and accounts for the city gross area of significant proportion.Easily traffic base Although Infrastructure, smooth road give people trip and bring great convenience, but these non-porous pavements are to the ecological ring in city Border also brings greatly negative effect.
First, the impermeability of paving by valuable natural precipitation completely with lower soil and underground water blocking, drop Water major part is entered in the earth surface water sources such as rivers,lakes and seas by sewerage system pipe network, and the excess of urban groundwater is taken out in addition Take, cause Urban Underground water level more and more lower, form " funnel type " level of ground water geologically, trigger ground to decline, edge Haiti area also results in inwelling.Precipitation is usually that the drainage grade or ground for first passing through ground show that ditch enters sewer, Need that by the rainwash of relatively long distance Urban Underground drainage system could be entered before into sewer, around here in the feelings of heavy showers Larger flow path surface will be produced under condition, the burden of Cheng Yi cities drainage pipeline networks is increased, or even causes urban type rain flood Occur.Rainwash process makes the rainwater of initial relative clean dissolve in substantial amounts of urban surface pollutant, in this runoff process The secondary pollution of generation, peripheral ground natural water is entered by sewerage system, has aggravated the pollution level of natural water. Secondly, the ground pavement of this surface compact is unfavorable for alleviating the noise pollution in city, is mainly produced from road traffic Noise;The rainy day due to hardened ground can not draining in time, cause surface gathered water, " drift is sliding, splash, night the rainy day is driven a vehicle and is produced Between dazzle " etc. phenomenon, to pedestrian trip and vehicle traveling make troubles and potential safety hazard.Furthermore, it is this it is fluid-tight mat formation with Collective effect is built in surrounding cities, can increase city " tropical island effect ".Also because its color is gloomy, lack angry, it is existing The city in generation is also referred to as " heat island of grey ".
Porous pavement is completely different with compact-type pavement structure before.Porous pavement is using the stronger infiltration of celluar concrete Ability, stores in the hole of road surface structare layer by Rainfall Infiltration to soil matrix or by rainfall, forms groundwater reservoir.The permeable road of tradition Face has the following disadvantages that one is limiting due to the celluar concrete by low intensity, can be only applied to parking lot, pavement, The places such as meeting exhibition section pavement, the urban recreative square of exhibition, two are collected inside pavement structure because substantial amounts of precipitation is long-term It is poly-, cause pavement structure immersion for a long time and damage.Accordingly, it would be desirable to one kind both can apply to each grade city row such as primary and secondary main line Bus or train route face, while can be again the permeable pavement structure of the mankind's comfortable living environment of construction with natural environment coordinated growth.
Utility model content
Technical problems to be solved in this application be to provide a kind of simple structure, easy construction, good water permeability, intensity it is high, Can be with the pavement structure of natural coordinated growth.The application also provides the laying method of the pavement structure.
The technical scheme that the application solution above-mentioned technical problem is used is as follows:
A kind of permeable pavement structure of high intensity, high osmosis, including be sequentially arranged in water proof sealing on soil matrix, basic unit and Surface layer;The surface layer includes permeable skeleton and the concrete between permeable matrix porosity;The permeable skeleton includes mutual The horizontal permeability cell of connection and it is vertically installed in the vertical water-permeable pipe of horizontal permeability cell;The basic unit includes the metalling on upper strata With the sand bedding course of lower floor;The water proof sealing includes impermeable film.
First, the dense concrete in surface layer has the advantages that high intensity and high-durability, and is located between concrete Precipitation can be imported basic unit by permeable skeleton, prevent precipitation from gathering on road surface.Vertically arranged vertical water-permeable pipe can solve to pass The system fluid-tight defect in road surface, can effectively reduce the pore water pressure caused during Driving Loading, it is ensured that precipitation is imported into base Layer, the horizontal permeability cell of horizontally set can exclude the air in surface layer, prevent from being blocked in vertical water-permeable pipe, and can be with Absorption vehicle exhaust, purify air, therefore, permeable skeleton acts synergistically with concrete, is ensureing infiltrative while significantly carrying Rise the intensity of permeable pavement structure.The material of permeable skeleton can select waste plastic, by the reasonable utilization of waste recovery and ring Border develops in harmony.Secondly, basic unit plays a part of water storage and bears certain load, and the ballast grain sizes in metalling are relatively large simultaneously It is stacked with, forms the flow channel of precipitation, plays a part of water delivery and improve foundation base intension, the ballast grain sizes in sand bedding course It is relatively small, the speed oozed under precipitation can be slowed down, play a part of water storage, draining and improve foundation base intension;Furthermore, soil matrix surface Impermeable film can prevent precipitation penetrate into soil matrix, it is to avoid soil matrix changes its appearance structure stability because of retaining.
Further, the upper dimension < lower dimensions of the vertical water-permeable pipe.The vertical water-permeable pipe for so setting has anti- Block and advantage easy to clean.
Further, the metalling includes geotechnical grid and the rubble in geotechnical grid cavity;Geotechnical grid be by A kind of three-dimensional netted cell compartment structure that the HDPE pieces of reinforcing are welded and formed through high-tenacity, is constituted with powerful laterally limiting and big The structure of rigidity, with capable of expansion and contraction, transport can contract it is folded, can the webbed characteristic of tensioning during construction.In order to further be lifted The guide functions of metalling, can be punched on HDPE pieces.The intensity of geotechnical grid is high, and rubble synergy, can be with It is obviously improved the intensity and water transport property of metalling.The HDPE is high density polyethylene (HDPE).
Further, the sand bedding course includes drainpipe and the water storage ball in adjacent drainage channel ligament.Drainpipe can be with By the discharge of relatively large number of precipitation, and water storage ball can not only collect precipitation, and can make the less drop of collection in arid Water evaporates into air again, so that precipitation is recycled, plays a part of regulation temperature, humidifying air.
Further, the draining tube wall is provided with osculum;The drainage channel of the osculum is provided with filtration; First, drainpipe is discharged after the precipitation that osculum oozes by under is collected, and prevents precipitation from gathering inside pavement structure, causes road Face structure is soaked and is damaged for a long time, and secondly, filtration can prevent the solid particle in sand bedding course from blocking osculum, so as to protect The long-term normal table ground work of card drainpipe;Further, the material of the drainpipe is PVC.The PVC is polyvinyl chloride.
Further, the water storage ball is hollow lytag, its particle diameter≤50mm, Los Angeles rate of wear≤60%, Not only intensity is high for water storage ball with above-mentioned parameter, and water storage performance is good;Wherein, Los Angeles rate of wear is a kind of conventional table The parameter of rubble intensity is levied, is with the abrasion index expression broken stone metaling resistance impact of Los Angeles abrasion machine, abrasion and edge scissor The parameter of synergy ability such as cut.
Further, the rubble is graded broken stone, its infiltration coefficient >=150mm/min, with above-mentioned gravelly rubble Layer has precipitation circulation passage concurrently more and the intensity of metalling advantage high, can be obviously improved the intensity and permeability of pavement structure.
Further, the impermeable film is geomembrane;The seam length of adjacent on same layer impermeable film overlap joint is 300-600mm;Length >=the 500mm that staggers of the adjacent seam of levels.The precipitation not being collected so can effectively be prevented from connecing Soil matrix is penetrated at seam.
The laying method of a kind of high intensity, the permeable pavement structure of high osmosis, comprises the following steps:1) laying water proof is thin Film;2) sand bedding course is laid:Laying drainpipe, fills water storage ball in the gap between adjacent row water pipe;3) metalling is laid: The surface laying geotechnical grid of sand bedding course, then fills rubble in the cavity of geotechnical grid;4) surface layer is laid:In metalling Permeable skeleton is laid on surface, and the permeable skeleton includes the horizontal permeability cell being interconnected and is vertically installed in horizontal permeability cell Vertical water-permeable pipe, then toward casting concrete in permeable matrix porosity.
Further, the step 4) in, before casting concrete, first lay crushed stone sealing, institute in permeable skeleton bottom The thickness of crushed stone sealing is stated for 10-20mm, its effect is the delivery port for preventing concrete from blocking vertical water-permeable pipe;The step 4) In, after casting concrete, to be stirred using vibrating spear, the insertion position of vibrating spear is apart from metalling top 30-50mm.In order to carry The structural stability of permeable skeleton when rising concreting, it is ensured that the permeability of the permeable skeleton before and after concreting keeps steady It is fixed, cover plate can be set up on the surface of permeable skeleton, after concrete setting to be poured, cover plate is removed.
Further, the seam length of impermeable film overlap joint adjacent on same layer is 300-600mm;The adjacent seam of levels The length >=500mm that staggers;The upper dimension < lower dimensions of the vertical water-permeable pipe;The draining tube wall is provided with draining Hole;The drainage channel of the osculum is provided with filtration;The water storage ball is hollow lytag, its particle diameter≤ 50mm;The rubble is graded broken stone, its infiltration coefficient >=150mm/min.
A kind of high intensity of the application, the permeable pavement structure of high osmosis, with advantages below:1) intensity is high:By mixing The surface layer and the intensity of the basic unit formed by metalling and sand bedding course that solidifying soil is formed are high, and the cycle of being on active service is long, can be applied to primary and secondary and does Each grade urban road runway face such as line, solves the meeting that traditional porous pavement is only applicable to parking lot, pavement, exhibition The bearing loads such as exhibition section pavement, urban recreative square defect square smaller.2) good penetrability:Vertical water-permeable pipe is difficult to block up Plug, can effectively reduce the pore water pressure caused during Driving Loading, it is ensured that precipitation is imported into basic unit, so as to effectively prevent Precipitation gathers on road surface;Permeability rate >=the 150mm/min of basic unit's medium stone layer, with efficient emptying effectiveness;In sand bedding course Drainpipe effectively can discharge precipitation, and water treatment efficiency is high, can keep the ecological diversity in soil.3) with regulation ring The function of border temperature:Water storage ball in sand bedding course not only can be with water storage, and the water store can be evaporate into air again, from And underground wet land system is formed, play a part of to slow down city tropical island effect.4) purification of air:Horizontal permeability cell can exclude face Air in layer, prevents from being blocked in vertical water-permeable pipe, and can absorb vehicle exhaust, purify air.Above-mentioned permeable road The simple structure in face, its laying method process is simple, can large-scale application.
Brief description of the drawings
Fig. 1 is a kind of high intensity, the structural representation of the permeable pavement structure of high osmosis.
Fig. 2 is the structural representation of geotechnical grid.
Fig. 3 is the structural representation of permeable skeleton.
Specific embodiment
A kind of high intensity, the permeable pavement structure of high osmosis as shown in Figure 1, including it is set in turn in the surface of soil matrix 1 Water proof sealing 2, sand bedding course 3, metalling 4 and surface layer 5.The water proof sealing 2 is made up of upper and lower two-layer geomembrane, same layer The seam length of upper adjacent geomembrane overlap joint is 500mm, and the length that staggers of the adjacent seam of levels is for 600mm.The sand Bed course 3 includes drainpipe 31 and the water storage ball in the gap of adjacent row water pipe 31, and the drainpipe 31 is pvc pipe, on tube wall Osculum is provided with, the drainage channel of osculum is provided with filtration, and the water storage ball is hollow lytag, its particle diameter ≤ 50mm, Los Angeles rate of wear≤60%.As shown in Fig. 2 the metalling 4 includes geotechnical grid 41 and positioned at geotechnical grid 41 Rubble in cavity 410, the rubble is graded broken stone, its infiltration coefficient >=150mm/min.The surface layer 5 includes permeable bone Frame and the concrete between permeable matrix porosity, as shown in figure 3, the permeable skeleton is laterally saturating including what is be interconnected Tracheae 51 and the vertical water-permeable pipe 52 of horizontal permeability cell 51 is vertically installed in, under the upper dimension < of the vertical water-permeable pipe 52 Portion's size.
The precipitation circulation path of the permeable pavement structure is as follows:First, precipitation is entered by the water conservancy diversion of vertical water-permeable pipe 52 Metalling 4;Then, by the water conservancy diversion of vertical water-permeable pipe 52 under precipitation by the flow channel between adjacent rubble in metalling 4 And under ooze to sand bedding course 3;Then, the precipitation part in sand bedding course 3 is entered by the osculum on the surface of drainpipe 31 in sand bedding course 3 Enter drainpipe 31 and be discharged, a part is collected by water storage ball, when arid, air is evaporated into again by the precipitation that water storage ball is collected In;Finally, do not isolated by geomembrane by a small amount of precipitation that sand bedding course 3 is collected and discharged, do not continue to down ooze to soil matrix 1.
The laying method of above-mentioned permeable pavement structure is as follows:1) fertile soil to the surface of soil matrix 1, table soil and turf etc. are carried out Compacting is cleared up and flattened, two-layer geomembrane is then spread;2) sand bedding course 3 is laid:Laying drainpipe 31, adjacent row water pipe 31 it Between gap in fill water storage ball;3) metalling 4 is laid:Geotechnical grid 41 is placed on the surface of sand bedding course 3, by geotechnical grid 41 Certain stress value is pulled open and makes it have, so as to reach the intensity requirement for using, then in the cavity 410 of geotechnical grid 41 Filling rubble is simultaneously compacted;4) surface layer 5 is laid:Permeable skeleton is laid on the surface of metalling 4, the permeable skeleton includes mutually interconnecting Logical horizontal permeability cell 51 and the vertical water-permeable pipe 52 of horizontal permeability cell 51 is vertically installed in, then on the surface of permeable skeleton Capping 53 is set and it is the crushed stone sealing of 15mm in permeable skeleton bottom laying depth, it is last mixed toward pouring in permeable matrix porosity Solidifying soil, after casting concrete, is stirred using vibrating spear, and the insertion position of vibrating spear is apart from the top 40mm of metalling 4, everywhere Continuing stirring until makes the air in concrete all overflow, and treats concrete setting recession except capping 53.

Claims (6)

1. the permeable pavement structure of a kind of high intensity, high osmosis, it is characterised in that:Including be sequentially arranged on soil matrix (1) every Water seal layer (2), basic unit and surface layer (5);
Concrete of the surface layer (5) including permeable skeleton and between permeable matrix porosity;The permeable skeleton includes phase Intercommunicated horizontal permeability cell (51) and it is vertically installed in the vertical water-permeable pipe (52) of horizontal permeability cell (51);
The basic unit includes the metalling (4) on upper strata and the sand bedding course (3) of lower floor;
The water proof sealing (2) is including impermeable film.
2. as claimed in claim 1 a kind of high intensity, the permeable pavement structure of high osmosis, it is characterised in that:It is described vertical The upper dimension < lower dimensions of water-permeable pipe (52).
3. as claimed in claim 1 a kind of high intensity, the permeable pavement structure of high osmosis, it is characterised in that:The rubble Rubble of the layer (4) including geotechnical grid (41) and in geotechnical grid (41) cavity (410);The sand bedding course (3) includes row Water pipe (31) and the water storage ball in adjacent row water pipe (31) gap.
4. as claimed in claim 3 a kind of high intensity, the permeable pavement structure of high osmosis, it is characterised in that:The draining Pipe (31) tube wall is provided with osculum;The drainage channel of the osculum is provided with filtration.
5. as claimed in claim 3 a kind of high intensity, the permeable pavement structure of high osmosis, it is characterised in that:The water storage Ball is hollow lytag, its particle diameter≤50mm, Los Angeles rate of wear≤60%;The rubble is graded broken stone, and it oozes Saturating coefficient >=150mm/min.
6. as claimed in claim 1 a kind of high intensity, the permeable pavement structure of high osmosis, it is characterised in that:The water proof Film is geomembrane;The seam length of impermeable film overlap joint adjacent on same layer is 300-600mm;The adjacent seam of levels The length >=500mm that staggers.
CN201621207541.2U 2016-11-09 2016-11-09 A kind of permeable pavement structure of high intensity, high osmosis Active CN206219935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621207541.2U CN206219935U (en) 2016-11-09 2016-11-09 A kind of permeable pavement structure of high intensity, high osmosis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621207541.2U CN206219935U (en) 2016-11-09 2016-11-09 A kind of permeable pavement structure of high intensity, high osmosis

Publications (1)

Publication Number Publication Date
CN206219935U true CN206219935U (en) 2017-06-06

Family

ID=58793157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621207541.2U Active CN206219935U (en) 2016-11-09 2016-11-09 A kind of permeable pavement structure of high intensity, high osmosis

Country Status (1)

Country Link
CN (1) CN206219935U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351103A (en) * 2016-11-09 2017-01-25 苏谦 Permeable pavement structure with high strength and high permeability and paving method thereof
CN108221544A (en) * 2018-01-04 2018-06-29 温州市九成建设工程有限公司 A kind of water circulation system for ecological sponge urban road
CN109371775A (en) * 2018-11-23 2019-02-22 西南交通大学 Road travel road permeable pavement structure and its laying method
CN110438862A (en) * 2019-08-22 2019-11-12 长安大学 A kind of assembled Plastic Base Asphalt Pavement structure and its construction technology
CN115434206A (en) * 2022-08-31 2022-12-06 中铁十九局集团第三工程有限公司 Pervious concrete pavement structure and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351103A (en) * 2016-11-09 2017-01-25 苏谦 Permeable pavement structure with high strength and high permeability and paving method thereof
CN108221544A (en) * 2018-01-04 2018-06-29 温州市九成建设工程有限公司 A kind of water circulation system for ecological sponge urban road
CN109371775A (en) * 2018-11-23 2019-02-22 西南交通大学 Road travel road permeable pavement structure and its laying method
CN109371775B (en) * 2018-11-23 2023-12-12 西南交通大学 Road traffic lane permeable pavement structure and paving method thereof
CN110438862A (en) * 2019-08-22 2019-11-12 长安大学 A kind of assembled Plastic Base Asphalt Pavement structure and its construction technology
CN110438862B (en) * 2019-08-22 2024-03-15 长安大学 Assembled plastic base asphalt pavement structure and construction process thereof
CN115434206A (en) * 2022-08-31 2022-12-06 中铁十九局集团第三工程有限公司 Pervious concrete pavement structure and construction method thereof
CN115434206B (en) * 2022-08-31 2024-01-19 中铁十九局集团第三工程有限公司 Permeable concrete pavement structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106351103A (en) Permeable pavement structure with high strength and high permeability and paving method thereof
CN206219935U (en) A kind of permeable pavement structure of high intensity, high osmosis
CN202298405U (en) Road pavement dewatering structure system
CN204959952U (en) Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system
CN106638918A (en) Construction method for sponge city rainwater collection system
CN206752614U (en) A kind of sponge-type road sinks formula afforests dividing strip Rainwater collection system
CN208501416U (en) A kind of sponge urban water-through road structure
CN105544342B (en) A kind of urban road delay discharge structure based on porous pavement
CN111042293A (en) Construction process of road central green belt seepage-proofing drainage structure
CN207032427U (en) A kind of Rainwater collection system suitable for old cell
CN109338839B (en) Urban seepage storage system for recycling construction waste
CN106088684B (en) The sunk type square and its construction method that a kind of rainwater-collecting recycles
CN207228292U (en) One kind omits water system in printing slowly after first catchmenting
CN209338948U (en) A kind of water-permeable pavement structure
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN111535098A (en) Rainwater drainage system for green belts and sidewalks of town roads and construction method
CN216786729U (en) Prevent road surface ponding's novel ecology road structure that permeates water
CN105350637B (en) Urban green space subsurface stormwater is regulated and stored device
CN215329163U (en) Structure of combined sponge city system for sidewalk and green belt
CN205529776U (en) Infiltration structure of waterproof road in road surface
CN214116117U (en) Sponge city permeable pavement
CN205276436U (en) A secret device for rainwater regulation
CN213417454U (en) Permeable pavement
CN214301074U (en) Gap type structural water permeable system for regulating and controlling rainwater runoff
CN107558587A (en) One kind omits water system in printing slowly after first catchmenting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant