CN206216902U - Prefabricated bar body reinforcing bar binding tire film - Google Patents
Prefabricated bar body reinforcing bar binding tire film Download PDFInfo
- Publication number
- CN206216902U CN206216902U CN201621209366.0U CN201621209366U CN206216902U CN 206216902 U CN206216902 U CN 206216902U CN 201621209366 U CN201621209366 U CN 201621209366U CN 206216902 U CN206216902 U CN 206216902U
- Authority
- CN
- China
- Prior art keywords
- pedestal
- bar
- support bar
- reinforcing bar
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pallets (AREA)
Abstract
The utility model discloses a kind of Prefabricated bar body reinforcing bar binding tire film, including the rectangle pedestal being adapted with pedestal, the midfeather of pedestal is provided with the location-plate perpendicular with two sides long of the pedestal, location-plate is spaced offers draw-in groove along its length, moving film frame is provided with the outside of the pedestal, moving film frame includes vertical first support bar, the second support bar for being fixedly connected with the top of first support bar and being offset to the pedestal side, many are uniformly fixedly connected with the first support bar and second support bar to be parallel to each other and perpendicular to the locating rod of first support bar, upper end in the second support bar near the side of pedestal is fixedly connected with first angle steel perpendicular with the locating rod, having reached being capable of auxiliary bar colligation, the effect of reinforcing bar colligation spacing and bellows alignment quality is more effectively ensured.
Description
Technical field
The utility model is related to a kind of beam body reinforcing bar colligation servicing unit, more particularly to a kind of Prefabricated bar body reinforcing bar colligation
Fetal membrane.
Background technology
In recent years, as the fast development of modernization construction, transportation business are surging forward, China is vast in territory, its
In it is in the majority with mountain area and hills landforms, be to adapt to mountain area economy and development of the West Regions, greatly developing high-grade highway turns into inevitable.
In Current Highway Bridge Design, Long span is pursued mostly, accomplish that standardization, systematization, convenient construction, cost are low as far as possible, because
This tee girder structure has a larger application prospect, and the design of tee girder can make that highway bridge road-ability is high, pier stabilization high
Property it is good etc..
At present, the technological process of precast beam production prepares for construction is preceding, installs equipment, the processing of reinforcing bar semi-finished product, security protection beam
Bottom cage bar, fixed web model support, colligation precast beam reinforced bar, placement moulding board of precast beam and roof steel bar integral hoisting, wherein
In the construction of colligation beam body reinforcing bar, there is a kind of precast beam of section in inverted trapezoidal, traditional way is usually by manually in length
Assembling reinforcement on square pedestal, due to lacking reliable positioning, framework of steel reinforcement spacing after the completion of colligation and the ripple for wearing
Pipe alignment quality is difficult to control to, and beam body reinforcing bar colligation quality is low to be easy to occur after casting concrete thickness of protection tier not
It is qualified, or even the situation that leakage muscle and bellows position offset occurs, so as to have impact on presentation quality, the durability of precast beam,
So that the bearing capacity of prestressed girder is relatively low, the service life of precast beam is shortened.
Utility model content
The purpose of this utility model be to provide one kind can auxiliary bar colligation, be more effectively ensured reinforcing bar colligation spacing and
The Prefabricated bar body reinforcing bar binding tire film of bellows alignment quality.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of Prefabricated bar body reinforcing bar binding tire film, including the rectangle pedestal being adapted with pedestal, the middle ware of pedestal
Every the location-plate perpendicular with two sides long of the pedestal is provided with, location-plate is spaced offers draw-in groove along its length, described
Moving film frame is provided with the outside of pedestal, moving film frame includes that the top of vertical first support bar and first support bar is fixed
Connection and the second support bar offset to the pedestal side, the first support bar are uniformly fixedly connected with second support bar
There are many to be parallel to each other and in the locating rod of first support bar, the second support bar near the upper end of the side of pedestal
It is fixedly connected with first angle steel perpendicular with the locating rod.
By using above-mentioned technical proposal, when carrying out the colligation of Prefabricated bar body reinforcing bar and wearing hogging moment bellows,
Because distance is more long, reinforcing bar skew is easily lead to during colligation and is shifted with hogging moment bellows, bar spacing occur uneven
The inaccurate situation of even and bellows positioning, can be facilitated using moving film frame and reinforcing bar and bellows are positioned, wherein
The locating rod being parallel to each other can be positioned to the reinforcing bar of level and hogging moment bellows so that horizontal reinforcement and hogging moment
Spacing between bellows is uniform, such to design the alignment quality that improve hogging moment bellows, while can be more effective
Control reinforcing bar colligation spacing, in addition moving film frame can accurately control the length of the blanking of reinforcing bar, to a certain degree
On solve the usage quantity of steel, reduce reinforcing bar colligation cost.
Preferably, the locating rod includes locating sleeve and shank, in shank insertion locating sleeve.
By using above-mentioned technical proposal, locating sleeve interval setting, internal shank can enter in locating sleeve
Row is pulled and pushed, and workman can carry out the colligation of horizontal beam body reinforcing bar according to the spacing of shank.
Preferably, gone up along its length on first angle steel uniformly offering locating slot.
Scheme is put by using above-mentioned technology, vertical locating slot is offered on the first angle steel, tied up vertical reinforcing bar is carried out
During bundle, reinforcing bar is stuck in locating slot, reinforcing bar can be carried out it is vertically oriented, it is such to can be designed so that workman's colligation out
Framework of steel reinforcement spacing is uniform, improves the colligation quality of Prefabricated bar body reinforcing bar.
Preferably, the second support bar includes that the brace being obliquely installed is vertical with what the lower end for being welded on brace was welded
Montant, the height of the bottom higher than the pedestal of the brace.
By using above-mentioned technical proposal, montant is obliquely installed and forms triangular structure with first support bar and positioning pipe,
So that the support of moving film frame is more firm, stable;The section that the brace being obliquely installed is formed with pedestal is in inverted trapezoidal, so to work
People provides reinforcing bar colligation model, and workman's colligation framework of steel reinforcement out fits with the inclined slash in pedestal both sides, such
Design causes colligation framework of steel reinforcement one-step shaping out, and the pouring shaping of inverted trapezoidal precast beam, pours out after being conducive to
Inverted trapezoidal precast beam structure more firmly, stabilization.
Preferably, the first support bar is fixedly connected with horizontal bracing piece with the lower end of the montant.
By using above-mentioned technical proposal, bracing piece is fixedly connected between montant and the lower end of first support bar, it is such
Design causes that moving film frame is more firm, stable, is not in the situation of moving film frame fracture in reinforcing bar process of binding, favorably
Spacing between framework of steel reinforcement is controlled, is more effectively guaranteed the alignment quality of hogging moment bellows.
Preferably, vertical fixing pipe is fixedly connected with the outside of the bottom of the first support bar, the outside of fixing pipe
The fix bar of the level for connecting each first support bar is fixedly connected with, pitman, the first support bar are plugged with fixing pipe
It is fixedly connected in fix bar by pitman.
By using above-mentioned technical proposal, fixing pipe is set using the outside in the bottom of first support bar, fixing pipe
Outside is fixedly connected with horizontal fix bar, can be fixed together multigroup moving film frame by the fix bar of level,
So that more firm, the stabilization of the connection of moving film frame, can be fixed by pitman to moving film frame, such design makes
Obtain moving film frame and stabilization is kept in reinforcing bar colligation, improve the reinforcing bar colligation quality of Prefabricated bar body.
Preferably, the first support bar is provided with universal travel wheel with the bottom of second support bar.
By using above-mentioned technical proposal, when needing to carry out beam body reinforcing bar colligation, workman promotes moving film frame to enter into
The side of pedestal, then moving film frame is arranged on the both sides of pedestal, and such design need not every time carry out film frame assembling, only
Just can be convenient, fast so that the quick admission of film frame carries out reinforcing bar colligation by elapsing moving film frame, save workman's group
Dress, the time of dismounting, labor strength is reduced, improve the operating efficiency of beam body reinforcing bar colligation.
Preferably, the edge of the pedestal is provided with two the second angle steel set along pedestal length direction, the second angle steel
Opened up and positioning round orifice along the second angle steel length direction interval in the one side fitted with the pedestal.
By using above-mentioned technical proposal, the positioning round orifice on the second angle steel is engaged with the locating slot on the first angle steel can
With the reinforcing bar that stable position is vertical so that the spacing between vertical reinforcement is uniform, bar spacing qualification rate is improve, while may be used also
There is the situation of Wrong, missing reinforcing bar to place, improve the efficiency of Prefabricated bar body assembling reinforcement, improve reinforcing bar colligation quality.
Preferably, the moving film frame is two groups and is respectively symmetrically the both sides for being arranged at the pedestal.
By using above-mentioned technical proposal, pedestal both sides, such workman are respectively placed in using two groups of symmetrical moving film framves
The colligation of beam body reinforcing bar can be carried out from pedestal both sides simultaneously, the colligation speed of beam body reinforcing bar is improve, beam body reinforcing bar is improve
The operating efficiency of colligation.
In sum, the utility model has the advantages that:
1st, by using moving film frame, workman can carry out reinforcing bar and tie up according to the positioning distance between tie rods among the film frame for designing
Prick, colligation speed is fast, colligation spacing is easily controlled, and operating efficiency is greatly improved;
2nd, by using the moving film frame with universal wheel, can easily and efficiently carry out passage positioning, workman can be fast
The fixation for carrying out film frame of speed, improves operating efficiency;
3rd, moving film frame is designed near one end of pedestal using brace so that the section formed between moving film frame and pedestal
In inverted trapezoidal, workman directly can go out reinforcing bar film frame of the section in inverted trapezoidal according to film frame colligation.
Brief description of the drawings
Fig. 1 is the overall structure diagram of Prefabricated bar body reinforcing bar binding tire film;
Fig. 2 is the side view of Prefabricated bar body reinforcing bar binding tire film;
Fig. 3 is the top view of Prefabricated bar body reinforcing bar binding tire film.
In figure, 1, pedestal;11st, the second angle steel;111st, positioning round orifice;12nd, location-plate;121st, U-shaped draw-in groove;2nd, moving film
Frame;21st, first support bar;22nd, second support bar;221st, brace;222nd, montant;3rd, locating rod;31st, locating sleeve;32nd, grafting
Bar;4th, the first angle steel;41st, locating slot;5th, bracing piece;6th, fix bar;61st, fixing pipe;62nd, pitman;7th, universal travel wheel;8、
Pedestal.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing
Mark is represented.It should be noted that the word "front", "rear" for being used in description below, "left", "right", "up" and "down" refer to
It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outward " are referred respectively to towards or away from particular elements geometry
The direction at center.
Embodiment:A kind of Prefabricated bar body reinforcing bar binding tire film, with reference to Fig. 1, including rectangular pedestal 1, pedestal 1 includes
Two the second angle steel 11 being arranged on pedestal 8, the second angle steel 11 is equal along angle steel length direction with the one side that the surface of pedestal 8 is affixed
It is even to offer multiple positioning round orifice 111.
Seen with reference to Fig. 2, be located on pedestal 8 between two second angle steel 11 and be placed with location-plate perpendicular to the second angle steel 11
12, location-plate 12 is alongst spaced and offers multiple U-shaped draw-in grooves 121.
With reference to Fig. 1 and Fig. 2, the both sides of pedestal 8 are provided with symmetrical moving film frame 2, and moving film frame 2 includes what is be vertically arranged
First support bar 21 and the second support bar 22 being obliquely installed, second support bar 22 include brace 221 and montant 222, brace 221
The top of top and second support bar 22 weld, brace 221 inclines the angle formed with first support bar 21 to the side of pedestal 8
It is acute angle, montant 222 is vertically arranged and is mutually welded with the end of brace 221, and brace 221 is slightly above with the phase contact of montant 222
The upper surface of pedestal 8, two braces 221 are in inverted trapezoidal with the section that the three of pedestal 8 is formed.
With reference to Fig. 2, brace 221 is triangular in shape with the section of vertical bar, and first support bar 21 is set with the side of brace 221
There is locating rod 3, locating rod 3 includes being parallel to each other and the multiple locating sleeves 31 and shank perpendicular with first support bar 21
32, locating sleeve 31 along first support bar 21 length direction interval setting, in the insertion locating sleeve 31 of shank 32 and can be with
Stretch into and pull-out.
With reference to Fig. 3, brace 221 is welded with the first angle steel 4 perpendicular to locating rod 3 near the upper end of the side of pedestal 8, the
One angle steel 4 is spaced offers multiple locating slots 41 corresponding with positioning round orifice 111 along its length, and vertical reinforcing bar can be with
Positioned by locating slot 41.
Fig. 1 and Fig. 2 is reviewed, first support bar 21 is welded and fixed with the bottom of montant 222 by a bracing piece 5, each
The lower end in the outside of first support bar 21 is welded with a vertical fixing pipe 61, and each fixing pipe 61 is by a fixation for level
Bar 6 is welded, and a pitman 62 is inserted with inside fixing pipe 61, and moving film frame 2 is fixed on the insertion of pitman 62 ground.
First support bar 21 is actively connected a universal travel wheel 7 with the bottom of second support bar 22, by universal row
7 pairs of moving film framves 2 of wheel are walked to move.
Work progress:Second angle steel 11 is installed on pedestal 8 first, placement positioning plate 12, work between the second angle steel 11
People promotes moving film frame 2 to reach the both sides of pedestal 8 so that the montant 222 of the second support bar 22 in moving film frame 2 is close to platform
The side of seat 8.
Workman inserts in fixing pipe 61 pitman 62, taps pitman 62 using hammer so that pitman 62 is inserted in ground
On face so that the both sides installed in pedestal 8 of the stabilization of moving film frame 2, then workman by shank 32, insertion level is determined respectively
In the sleeve pipe 31 of position, the installation of tire film frame is completed.
This specific embodiment is only that, to explanation of the present utility model, it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected by Patent Law in right of the present utility model.
Claims (9)
1. a kind of Prefabricated bar body reinforcing bar binding tire film, it is characterised in that:Including with pedestal(8)The rectangle pedestal being adapted
(1), pedestal(1)Midfeather be provided with and the pedestal(1)The perpendicular location-plate in two sides long(12), location-plate(12)
Interval offers draw-in groove along its length(121), the pedestal(1)Outside be provided with moving film frame(2), moving film frame(2)
Including vertical first support bar(21)With first support bar(21)Top be fixedly connected and to the pedestal(1)One rolls
Oblique second support bar(22), the first support bar(21)On be fixedly connected with many be parallel to each other and perpendicular to first support
Bar(21)Locating rod(3), the second support bar(22)It is upper to be close to pedestal(1)Side upper end be fixedly connected with it is described
Locating rod(3)The first perpendicular angle steel(4).
2. Prefabricated bar body reinforcing bar binding tire film according to claim 1, it is characterised in that:The locating rod(3)Including
Locating sleeve(31)With shank(32), shank(32)Insertion locating sleeve(31)In.
3. Prefabricated bar body reinforcing bar binding tire film according to claim 1, it is characterised in that:First angle steel(4)On
Go up along its length and uniformly offer locating slot(41).
4. Prefabricated bar body reinforcing bar binding tire film according to claim 1, it is characterised in that:The second support bar(22)
Including the brace being obliquely installed(221)Be welded on brace(221)The montant of lower end(222), the brace(221)Bottom it is high
In the pedestal(8)Height.
5. Prefabricated bar body reinforcing bar binding tire film according to claim 4, it is characterised in that:The first support bar(21)
With the montant(222)Lower end be fixedly connected with horizontal bracing piece(5).
6. Prefabricated bar body reinforcing bar binding tire film according to claim 1, it is characterised in that:The first support bar(21)
Bottom on the outside of be fixedly connected with vertical fixing pipe(61), fixing pipe(61)Outside be fixedly connected with connection it is each first
Strut(21)Level fix bar(6), fixing pipe(61)Inside it is plugged with pitman(62), the first support bar(21)Pass through
Pitman(62)It is fixedly connected on fix bar(6)On.
7. Prefabricated bar body reinforcing bar binding tire film according to claim 1, it is characterised in that:The first support bar(21)
With second support bar(22)Bottom be provided with universal travel wheel(7).
8. Prefabricated bar body reinforcing bar binding tire film according to claim 1, it is characterised in that:The pedestal(1)Edge
Two are provided with along pedestal(1)The second angle steel that length direction is set(11), the second angle steel(11)With the pedestal(8)Fit
One side on along the second angle steel(11)Length direction interval opens up and positioning round orifice(111).
9. the Prefabricated bar body reinforcing bar binding tire film according to claim 1 to 8 any one, it is characterised in that:The shifting
Dynamic film frame(2)For two groups and it is respectively symmetrically and is arranged at the pedestal(8)Both sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621209366.0U CN206216902U (en) | 2016-11-09 | 2016-11-09 | Prefabricated bar body reinforcing bar binding tire film |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621209366.0U CN206216902U (en) | 2016-11-09 | 2016-11-09 | Prefabricated bar body reinforcing bar binding tire film |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206216902U true CN206216902U (en) | 2017-06-06 |
Family
ID=58791959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621209366.0U Active CN206216902U (en) | 2016-11-09 | 2016-11-09 | Prefabricated bar body reinforcing bar binding tire film |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206216902U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560428A (en) * | 2018-06-29 | 2018-09-21 | 中交二公局第四工程有限公司 | A kind of assembled steel reinforced binding moulding bed group suitable for different size Precast T-Beams |
CN108638323A (en) * | 2018-06-15 | 2018-10-12 | 交通运输部科学研究院 | A kind of beam prefabricated construction reinforced bar binding rack of T and binding method |
CN109692927A (en) * | 2018-12-27 | 2019-04-30 | 中建四局第六建筑工程有限公司 | A kind of tire film frame assembly and its construction method |
CN110385784A (en) * | 2019-08-22 | 2019-10-29 | 广东省水利水电第三工程局有限公司 | Precast beam positioning device |
-
2016
- 2016-11-09 CN CN201621209366.0U patent/CN206216902U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108638323A (en) * | 2018-06-15 | 2018-10-12 | 交通运输部科学研究院 | A kind of beam prefabricated construction reinforced bar binding rack of T and binding method |
CN108638323B (en) * | 2018-06-15 | 2023-06-20 | 交通运输部科学研究院 | T-beam prefabrication construction steel bar binding rack and binding method |
CN108560428A (en) * | 2018-06-29 | 2018-09-21 | 中交二公局第四工程有限公司 | A kind of assembled steel reinforced binding moulding bed group suitable for different size Precast T-Beams |
CN108560428B (en) * | 2018-06-29 | 2024-03-15 | 中交二公局第四工程有限公司 | Assembled steel bar binding jig frame group suitable for prefabricated T beams of different sizes |
CN109692927A (en) * | 2018-12-27 | 2019-04-30 | 中建四局第六建筑工程有限公司 | A kind of tire film frame assembly and its construction method |
CN110385784A (en) * | 2019-08-22 | 2019-10-29 | 广东省水利水电第三工程局有限公司 | Precast beam positioning device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206216902U (en) | Prefabricated bar body reinforcing bar binding tire film | |
CN104806011B (en) | Raft board post poured band formwork for placing | |
CN103882813B (en) | For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction | |
CN205058277U (en) | Prefabricated T girder iron muscle mould | |
CN106884541B (en) | Positioning assembly, positioning device and positioning method for reserved dowel bars in shear wall | |
CN202954299U (en) | Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge | |
CN103410102A (en) | H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof | |
CN208052253U (en) | A kind of positioning moulding bed prefabricated for T beam web reinforced frames | |
CN102900230B (en) | Liftable reinforced concrete post-casting strip construction method | |
CN202280024U (en) | No.0 block bracket for continuous rigid frame bridge with two-thin-wall piers | |
CN103321155B (en) | Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier | |
CN110792028B (en) | Construction method of cable-stayed bridge without back cables | |
CN108867860A (en) | A kind of precast reinforced concrete beam plate body system and prefabricated rod structure entirety assembling constructing method | |
CN202000265U (en) | Concrete construction formwork for high pier of bridge | |
CN207878262U (en) | A kind of high pier shaft binder concrete construction strutting system | |
CN207714108U (en) | A kind of support system of the more arcading arched aqueducts of large span or bridge | |
CN209584813U (en) | Frame bridge system | |
CN207210963U (en) | Jig structure for T beam steel bar colligations | |
CN116290089A (en) | Concrete pouring template system for underground space and construction method thereof | |
CN207392747U (en) | A kind of prefabricated sizing reinforcing bar card for concrete sealing platform mould | |
CN103306211B (en) | A kind of No. 0 block reinforcing bar binding construction method of growing up based on framework beam | |
CN215052265U (en) | Reinforced concrete thin wall body reinforced structure | |
CN202766974U (en) | Bent cap bearing frame without full framing | |
CN201605528U (en) | Bridge pier column for installing steel-structure bent cap | |
CN211472549U (en) | Group pile embedded bolt positioning and fixing support frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |