CN206195245U - A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection - Google Patents

A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection Download PDF

Info

Publication number
CN206195245U
CN206195245U CN201621261635.8U CN201621261635U CN206195245U CN 206195245 U CN206195245 U CN 206195245U CN 201621261635 U CN201621261635 U CN 201621261635U CN 206195245 U CN206195245 U CN 206195245U
Authority
CN
China
Prior art keywords
action bars
phase
electric power
ground wire
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621261635.8U
Other languages
Chinese (zh)
Inventor
王骁
何锋
谷剑峰
张翔鸿
沈亮
刘俊
刘鹏
郑城
沈丽雯
贾钘楠
朱赢健
蒋钟
刘勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Anji Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Anji Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Anji Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201621261635.8U priority Critical patent/CN206195245U/en
Application granted granted Critical
Publication of CN206195245U publication Critical patent/CN206195245U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection, hanging to establish including the earth connection and using lever assembly, lever assembly includes phase 1 enzyme action bars, phase 2 enzyme action bars, third phase action bars, and phase 1 enzyme action bars, phase 2 enzyme action bars, third phase action bars converge with the cable conductor respectively each other, still including being used for the loading the fixed platform of phase 1 enzyme action bars, phase 2 enzyme action bars, third phase action bars, the last lifter that is equipped with of fixed platform, the cable conductor of phase 1 enzyme action bars, phase 2 enzyme action bars, third phase action bars joins into the three -phase unification each other to be held, be equipped with on the lifter and be used for the carry the couple of three -phase unification end. The utility model discloses the advantage lies in reducing the cost of labor of hanging when establishing the earth connection, and the security is good.

Description

It is a kind of for electric power overhaul when hang the auxiliary equipment of ground wire
【Technical field】
The utility model is related to be hung during for electric power overhaul the auxiliary equipment of ground wire, belongs to field of electrical equipment.
【Background technology】
It is that its operating process is to use cable phase by three through commonly used work post during electric power overhaul works that ground wire hangs The out of phase earth operating lever for connecting is hung detected on circuit to be detected respectively, and ground wire is hung under normal landform Difficulty less, but once run into the height for hanging place more than the mutual pool side of cable length when, hang difficult just bright It is aobvious to increase.Difficulty is essentially consisted in:The hanging of ground wire needs the split-phase to carry out, operator when carrying out the first phase ground wire and hanging, separately Outer two-phase is vacantly to place or be placed on ground.So, when ground wire hangs the excessive height in place, operating personnel then need Upper and lower staircase is operated repeatedly to undertake the weight of whole secondary termination.The weight of whole secondary termination is not only grasped including ground wire Make the weight of bar, also the weight including cable, influenceed by hanging the factors such as height, narrow space in addition, librarian use Easily fall in staircase operating process and easily touch wire.
Problem above brings sizable unsafe factor to hanging for ground wire.Therefore, tradition is in such ground wire Hang during generally require other staff's help and grip remaining two action bars so that one hangs the people of need of work two Or three people coordinate can just complete, inefficiency, cost of labor is high.
【Utility model content】
Technical problem to be solved in the utility model is to overcome the deficiencies in the prior art and provide a kind of for electric power The auxiliary equipment of ground wire is hung during maintenance, reduction hangs cost of labor during ground wire.
Above-mentioned technical problem is solved, the utility model is adopted the following technical scheme that:
It is a kind of for electric power overhaul when hang the auxiliary equipment of ground wire, including the operation rod that ground wire hangs, Operation rod includes the first phase action bars, the second phase action bars, third phase action bars, and the first phase action bars, second mutually operate Bar, third phase action bars are mutually converged with cable respectively, also including for loading the first phase action bars, second mutually operating The fixed platform of bar, third phase action bars, the fixed platform is provided with elevating lever, the first phase action bars, the second phase action bars, The cable of third phase action bars mutually merges into three-phase combination one end, and the elevating lever is provided with for three-phase combination one described in carry The hook at end.
The auxiliary equipment for hanging ground wire in the utility model, first this auxiliary are set includes that loading described first mutually grasps Make bar, the second phase action bars, the fixed platform of third phase action bars, operating personnel, can be by first when carrying out hanging work First fixation is put on the stationary platform for phase action bars, the second phase action bars, third phase action bars, does not result in disorder, three operations Mistake will not be changed between bar, is avoided that repetition hangs the problem of same root action bars.
In addition, in the utility model, the fixed platform is provided with elevating lever, the first phase action bars, the second phase action bars, The cable of third phase action bars mutually merges into three-phase combination one end, and the elevating lever is provided with for three-phase combination one described in carry The hook at end, when hanging height and being higher, operating personnel can raise the height of elevating lever, so that three-phase combination one end Height is also corresponding to be raised, such as when operating personnel need to hang the first phase action bars, the height of three-phase combination one end is raised, and is had Help diminution hang a little with three unification the distance between ends, it is ensured that the cable between the first phase action bars and three-phase combination one end Do not stressed in relaxed state, therefore when hanging, operating personnel need not undertake the weight and cable of other two action bars Weight, it is more laborsaving, convenient to operate, and ensure that security, without it is extra increase with personnel side hang personnel grip it is remaining Two action bars, reduce cost of labor.
Preferably, the fixed platform includes base, be fixed with upper mounted plate on base, upper mounted plate be provided with for Insert the jack of the operation rod.
Preferably, fixed plate is fixed on the base by hollow column, position and the sky of the jack The cavity position correspondence of heart column.
Preferably, the jack include for insert the first phase action bars the first jack, insert second and mutually grasp , the 3rd jack for inserting third phase action bars, the hollow column includes being correspondingly arranged at the first jack the second jack for making bar First column of lower section, the second column being correspondingly arranged at below the second jack, the 3rd be correspondingly arranged at below the 3rd jack Column.
Preferably, at least provided with one for fixing the fast of the operation rod temporarily on the wall of fixed plate side Tear mechanism open.
Preferably, the Quick-disassembling mechanism includes two panels elastic clip, two panels elastic clip is formed for fixing action bars The clamping cavity of component, the clamping cavity is provided with opening, and the elastic clip is provided with roller at opening.
Preferably, being provided with bottom plate between fixed plate and base, it also is provided with the bottom plate described Quick-disassembling mechanism.
Preferably, fixed plate and/or bottom plate are arc.
Preferably, the fixed platform lower section is provided with support feet and universal wheel.
Preferably, fixed plate is provided with push rod handrail.
These features of the present utility model and advantage will be detailed in following specific embodiment, accompanying drawing exposure.
【Brief description of the drawings】
The utility model is described further below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of fixed platform in the utility model;
Fig. 2 is the structural representation of fixed platform in the utility model;
Fig. 3 is the structural representation after fixed platform installation operation bar assembly in the utility model;
Fig. 4 is schematic diagram when operating personnel operate in the utility model.
【Specific embodiment】
The technical scheme of the utility model embodiment is explained with reference to the accompanying drawing of the utility model embodiment and Illustrate, but following embodiments are only preferred embodiment of the present utility model, and it is not all.Based on the embodiment in implementation method, Those skilled in the art obtain other embodiment on the premise of creative work is not made, and belong to of the present utility model Protection domain.
Referring to figs. 1 to 4, the present embodiment be it is a kind of for electric power overhaul when hang the auxiliary equipment of ground wire, including ground connection The operation rod that line hangs, operation rod includes the first phase action bars 11, the second phase action bars 12, third phase action bars 13, the first phase action bars 11, the second phase action bars 12, third phase action bars 13 mutually converge to form path with cable respectively, When hanging, the first phase action bars 11, the second phase action bars 12, third phase action bars 13 individually hang circuit to be detected On, when wherein one action bars hangs, two action bars need not hang in addition, when line levels to be detected are not high, in addition Two action bars can be directly placed on the ground, but when circuit to be detected is too high, two action bars then need to be carried in addition To vacant state, born a heavy burden so as to increase operating personnel, nor safety, once hanging cable is touched, easy hair Raw electric shock accidents, thus it is traditional hang work, be required for being equipped with other people helping and grip other action bars.
In the present embodiment, fixed platform, the first phase action bars 11, the second phase action bars 12, third phase behaviour are additionally arranged Making bar 13 can be loaded into fixed platform in advance, and operating personnel, can be by the first phase action bars 11, when carrying out hanging work Two-phase action bars 12, third phase action bars 13 first fixation puts on the stationary platform, do not result in it is in disorder, between three action bars not Mistake can be changed, is avoided that repetition hangs the problem of same root action bars.
The fixed platform is provided with elevating lever 2, the first phase action bars 11, the second phase action bars 12, third phase action bars 13 cable mutually merges into three-phase combination one end 101, and the elevating lever 2 is provided with for three-phase combination one end 101 described in carry Hook 21.Elevating lever 2 in the present embodiment includes outer tube 201 and the inner tube 202 being located in outer tube, on the side wall of outer tube 201 It is provided with the lock-screw 203 for locking inner tube 202.
Hook 21 in the present embodiment is a notched annulus actually, and annulus is fixed on the top of elevating lever 2, specifically For be integrally fixed at the top of inner tube 202, notched this design of annulus is more preferable to the limit effect of cable.
When using, when hanging height and being higher, operating personnel can raise the height of elevating lever 2, so that three-phase The height for unifying end 101 is also accordingly raised, such as when operating personnel need to hang the first phase action bars 11, by three-phase combination one end 101 height is raised, and contributes to diminution to hang a little the distance between with three-phase combination one end 101, it is ensured that the first phase action bars 11 and Cable between three-phase combination one end 101 does not stress in relaxed state, therefore when hanging, operating personnel need not undertake other The weight of two action bars and the weight of cable, it is more laborsaving, convenient to operate, and ensure that security, matches somebody with somebody without extra increasing Personnel side hangs personnel and grips remaining two action bars, reduces cost of labor.
Specific structure:The fixed platform includes base 3, and upper mounted plate 4 is fixed with base 3, and upper mounted plate 4 is arc Shape plate, upper mounted plate 4 is provided with the jack 41 for inserting the operation rod, and the mode for inserting is taken more convenient.Insert Hole 41 specifically includes:For inserting the first jack 411 of the first phase action bars 11, inserting the second of the second phase action bars 12 Jack 412, the 3rd jack 413 for inserting third phase action bars 13.The bar of cylinder, therefore this implementation are due to general operation bar The first jack 411, the second jack 412, the 3rd jack 413 are circular hole in example.
Fixed plate 4 is fixed on the base 3 by hollow column 5, and the position of the jack 41 is vertical with hollow The cavity position correspondence of post 5, specifically, the hollow column 5 includes that being correspondingly arranged at the first of the lower section of the first jack 411 stands Post 51, the second column 52 being correspondingly arranged at below the second jack 412, the 3rd be correspondingly arranged at below the 3rd jack 413 stand Post 53.Hollow column 5 in the present embodiment plays two effects, first, being for being fixed upper mounted plate 4 on the base 3, being risen To an effect being connected, second, structure of the hollow column 5 using its boring so that action bars is inserted from jack 41 After entering, the inside for being contained in hollow column 5 can be stablized, prevent action bars from shaking.Two are completed simultaneously with a hollow column 5 Individual effect, simple structure, small volume, cost is relatively low.
Because the length of action bars is more long, sometimes operating personnel by action bars from hollow column 5 it is whole extract out when compared with For cumbersome, in order to further simplify operation, it is used at least provided with one in the present embodiment, on the side wall of fixed plate 4 interim The Quick-disassembling mechanism of the fixation operation rod, the Quick-disassembling mechanism in the present embodiment has three, is uniformly located at the side of upper mounted plate 4 On wall.
Quick-disassembling mechanism in the present embodiment includes two panels elastic clip 42, and the one end of elastic clip 42 is fixed on upper mounted plate 4 Side wall on, two panels elastic clip 42 forms the clamping cavity 43 for fixing operation rod, and the clamping cavity 43 is provided with out Mouthful, the elastic clip 42 is provided with roller 44 at opening, and during fixed action bars, action bars is snapped in from opening, using roller Rolling effect, action bars can easily snap onto clamping cavity 43 in, certainly, take out when, it is also possible to it is light from opening Take out, it is very convenient, entirely extracted out from hollow column 5 without by action bars.
In order to allow Quick-disassembling mechanism more stably to fix action bars, lower fixation is provided between fixed plate 4 and base 3 Plate 6, also is provided with Quick-disassembling mechanism on the Quick-disassembling mechanism, and bottom plate 6 also relative set three on the bottom plate 6 It is individual.Bottom plate 6 is also arc in the present embodiment, is consistent with the shape of upper mounted plate 4, in appearance more globality.
In the present embodiment, in order to more easily move whole fixed platform, the fixed platform lower section is provided with support feet 71 With universal wheel 72, support feet 71 and universal wheel 72 are located at not homonymy in the present embodiment, and the support effect of support feet 71 is good, is unlikely to At will slide, the removable effect of universal wheel 72 is good, when user needs to move, it is only necessary to which base 3 is inclined into tilting, just can profit Moved with universal wheel 72, and when that need not move, contacted with ground using support feet 71, preferably, the present embodiment In universal wheel 72 using locking effect universal wheel 72, this universal wheel 72 relatively conventional on the market, do not made by structure Illustrate, in addition, moving for convenience, fixed plate 4 is provided with push rod handrail 45, facilitates operating personnel to promote more.
The above, specific embodiment only of the present utility model, but protection domain of the present utility model do not limit to In this, it is familiar with the those skilled in the art and should be understood that the utility model including but not limited to accompanying drawing and above specific embodiment party Content described in formula.Any modification without departing from function and structure principle of the present utility model is intended to be included in claims Scope in.

Claims (10)

1. it is a kind of for electric power overhaul when hang the auxiliary equipment of ground wire, including the operation rod that ground wire hangs, behaviour Making bar assembly includes the first phase action bars, the second phase action bars, third phase action bars, and the first phase action bars, second are mutually grasped Make bar, third phase action bars mutually to be converged with cable respectively, it is characterised in that also including mutually being operated for loading described first Bar, the second phase action bars, the fixed platform of third phase action bars, the fixed platform are provided with elevating lever, the first phase action bars, Second phase action bars, the cable of third phase action bars mutually merge into three-phase combination one end, and the elevating lever is provided with for hanging Carry the hook of described three-phase combination one end.
2. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 1, it is characterised in that the fixation is put down Platform includes base, and upper mounted plate is fixed with base, and upper mounted plate is provided with the jack for inserting the operation rod.
3. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 2, it is characterised in that fixed Plate is fixed on the base by hollow column, and the position of the jack is corresponding with the cavity position of hollow column.
4. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 3, it is characterised in that the jack bag Include for the first jack for inserting the first phase action bars, the second jack for inserting the second phase action bars, insert third phase behaviour Make the 3rd jack of bar, the hollow column includes being correspondingly arranged at the first column below the first jack, is correspondingly arranged at the The second column below two jacks, the 3rd column being correspondingly arranged at below the 3rd jack.
5. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 2, it is characterised in that fixed At least provided with a Quick-disassembling mechanism for being used to fix the operation rod temporarily on the wall of plate side.
6. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 5, it is characterised in that the Quick Release machine Structure includes two panels elastic clip, and two panels elastic clip forms the clamping cavity for fixing operation rod, and the clamping cavity sets There is opening, the elastic clip is provided with roller at opening.
7. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 6, it is characterised in that fixed Bottom plate is provided between plate and base, the Quick-disassembling mechanism also is provided with the bottom plate.
8. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 7, it is characterised in that fixed Plate and/or bottom plate are arc.
9. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as described in one of claim 1 to 8, it is characterised in that institute State fixed platform lower section and be provided with support feet and universal wheel.
10. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as described in one of claim 2 to 8, it is characterised in that institute State upper mounted plate and be provided with push rod handrail.
CN201621261635.8U 2016-11-21 2016-11-21 A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection Active CN206195245U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621261635.8U CN206195245U (en) 2016-11-21 2016-11-21 A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621261635.8U CN206195245U (en) 2016-11-21 2016-11-21 A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection

Publications (1)

Publication Number Publication Date
CN206195245U true CN206195245U (en) 2017-05-24

Family

ID=58724349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621261635.8U Active CN206195245U (en) 2016-11-21 2016-11-21 A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection

Country Status (1)

Country Link
CN (1) CN206195245U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106654991A (en) * 2016-11-21 2017-05-10 国网浙江省电力公司湖州供电公司 Auxiliary equipment for hanging ground wire during power maintenance
CN113964614A (en) * 2021-11-29 2022-01-21 广东电网有限责任公司 Auxiliary mounting tool for grounding wire

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106654991A (en) * 2016-11-21 2017-05-10 国网浙江省电力公司湖州供电公司 Auxiliary equipment for hanging ground wire during power maintenance
CN106654991B (en) * 2016-11-21 2018-11-30 国网浙江省电力公司湖州供电公司 It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul
CN113964614A (en) * 2021-11-29 2022-01-21 广东电网有限责任公司 Auxiliary mounting tool for grounding wire

Similar Documents

Publication Publication Date Title
CN206545475U (en) A kind of Portable multifunctional insulating ladder
CN206195245U (en) A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection
CN106654991B (en) It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul
CN105401873A (en) Insulating elevator
CN204186286U (en) A kind of electric power overhaul ladder
CN210926904U (en) Cable head manufacturing and fixing device
CN107263416A (en) A kind of portable power power tool case with built-in cat ladder
CN206014314U (en) A kind of small-sized lowering or hoisting gear
CN205178281U (en) Box -type substation's wiring stable structure
CN210866964U (en) Transformer overhauls protection frame
CN204528908U (en) Portable conducting wire roller fixed mount
CN211004327U (en) Portable pole wire lifter
CN205977073U (en) Portable telescopic combination power maintenance ladder
CN203833575U (en) Vertical rod hoisting multifunctional tool of substation high-altitude device
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN207700824U (en) A kind of body of rod draws high device
CN205277277U (en) Insulating companion ladder
CN207200318U (en) A kind of Mobile phone charging station
CN218320647U (en) Auxiliary maintenance platform for elevator maintenance
CN205008624U (en) Electric portable drill support
CN210013657U (en) Climbing device for power transmission line construction
CN213622855U (en) Toughened glass processing hanging flower basket
CN214885320U (en) Scaffold for concrete pouring construction of double-first-layer underground bottom plate and wallboard
CN112271644B (en) Laying auxiliary device for low-voltage cable
CN217439936U (en) Engineering ladder for power transformation maintenance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant