一种外墙板安装节点 Download PDFInfo
- Publication number
- CN206189870U CN206189870U CN201620519050.5U CN201620519050U CN206189870U CN 206189870 U CN206189870 U CN 206189870U CN 201620519050 U CN201620519050 U CN 201620519050U CN 206189870 U CN206189870 U CN 206189870U
- Authority
- CN
- China
- Prior art keywords
- side fascia
- lower side
- upper side
- fascia
- installs node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title abstract description 14
- 210000003195 fascia Anatomy 0.000 claims abstract description 139
- 239000002002 slurry Substances 0.000 claims abstract description 30
- 239000011440 grout Substances 0.000 claims abstract description 24
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 10
- 239000010959 steel Substances 0.000 claims abstract description 10
- 210000003205 muscle Anatomy 0.000 claims abstract description 9
- 238000011065 in-situ storage Methods 0.000 claims description 17
- 238000004078 waterproofing Methods 0.000 claims description 10
- 239000004570 mortar (masonry) Substances 0.000 claims description 7
- 239000011381 foam concrete Substances 0.000 claims description 6
- 230000001070 adhesive effect Effects 0.000 claims description 3
- 239000002390 adhesive tape Substances 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 239000000853 adhesive Substances 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 11
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000007789 sealing Methods 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 239000007788 liquid Substances 0.000 abstract 2
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 210000001503 joint Anatomy 0.000 abstract 1
- 238000000034 method Methods 0.000 description 12
- 239000003292 glue Substances 0.000 description 10
- 239000000463 material Substances 0.000 description 8
- 238000009413 insulation Methods 0.000 description 6
- 238000007569 slipcasting Methods 0.000 description 6
- 238000009417 prefabrication Methods 0.000 description 5
- 239000002131 composite material Substances 0.000 description 3
- 150000001875 compounds Chemical class 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 230000002349 favourable effect Effects 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 239000008267 milk Substances 0.000 description 2
- 210000004080 milk Anatomy 0.000 description 2
- 235000013336 milk Nutrition 0.000 description 2
- 238000010792 warming Methods 0.000 description 2
- 238000004026 adhesive bonding Methods 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000035882 stress Effects 0.000 description 1
Landscapes
- Building Environments (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620519050.5U CN206189870U (zh) | 2016-05-31 | 2016-05-31 | 一种外墙板安装节点 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620519050.5U CN206189870U (zh) | 2016-05-31 | 2016-05-31 | 一种外墙板安装节点 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206189870U true CN206189870U (zh) | 2017-05-24 |
Family
ID=58735918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620519050.5U Active CN206189870U (zh) | 2016-05-31 | 2016-05-31 | 一种外墙板安装节点 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206189870U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235668A (zh) * | 2018-09-04 | 2019-01-18 | 于振海 | 住宅楼幕墙与墙体缝隙封堵结构 |
CN110528711A (zh) * | 2019-09-26 | 2019-12-03 | 长沙远大住宅工业集团股份有限公司 | 沉箱的连接节点 |
CN111764520A (zh) * | 2020-06-30 | 2020-10-13 | 北新绿色住宅有限公司 | 一种纤维水泥外墙板搭接密封结构 |
CN112983112A (zh) * | 2021-03-08 | 2021-06-18 | 上海建工二建集团有限公司 | 预制围护外墙底部连接***及其施工方法 |
CN114352019A (zh) * | 2022-01-06 | 2022-04-15 | 苏州良浦住宅工业有限公司 | 一种竖向构件灌浆排气装置 |
-
2016
- 2016-05-31 CN CN201620519050.5U patent/CN206189870U/zh active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235668A (zh) * | 2018-09-04 | 2019-01-18 | 于振海 | 住宅楼幕墙与墙体缝隙封堵结构 |
CN110528711A (zh) * | 2019-09-26 | 2019-12-03 | 长沙远大住宅工业集团股份有限公司 | 沉箱的连接节点 |
CN111764520A (zh) * | 2020-06-30 | 2020-10-13 | 北新绿色住宅有限公司 | 一种纤维水泥外墙板搭接密封结构 |
CN112983112A (zh) * | 2021-03-08 | 2021-06-18 | 上海建工二建集团有限公司 | 预制围护外墙底部连接***及其施工方法 |
CN114352019A (zh) * | 2022-01-06 | 2022-04-15 | 苏州良浦住宅工业有限公司 | 一种竖向构件灌浆排气装置 |
CN114352019B (zh) * | 2022-01-06 | 2024-05-24 | 苏州良浦节能新材料股份有限公司 | 一种竖向构件灌浆排气装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206189870U (zh) | 一种外墙板安装节点 | |
CN206034677U (zh) | 一种外墙板安装节点 | |
CN205976143U (zh) | 一种外墙板安装节点 | |
CN110761322B (zh) | 一种现浇管廊侧墙水平施工缝处加固结构及其施工方法 | |
CN105863103A (zh) | 一种外墙板安装节点 | |
CN206189455U (zh) | 一种管廊 | |
CN208981531U (zh) | 一种预制装配式女儿墙连接结构 | |
CN101818541A (zh) | 开有门窗洞口的预制复合墙板及其制作方法 | |
CN105908878A (zh) | 一种外墙板安装节点 | |
CN110042862A (zh) | 地铁车站预制轨顶风道、与预制中板连接节点及施工方法 | |
CN107806349A (zh) | 一种钢‑frp复合波纹板隧洞二次衬砌结构及其施作方法 | |
CN205894390U (zh) | 复合保温外模板以及带复合保温外模板的墙体 | |
CN206174195U (zh) | 一种装配式混凝土剪力墙拆分、拼装连接结构 | |
CN206279656U (zh) | 预制装配式钢板仓混凝土结构夹心保温复合墙体及连接件 | |
CN205976057U (zh) | 一种外墙板安装节点 | |
CN108240045A (zh) | 一种外墙预制板复合后浇带结构及其施工方法 | |
CN207348239U (zh) | 连接节点防水结构 | |
CN205917937U (zh) | 一种外墙板安装节点 | |
CN105971154A (zh) | 一种外墙板安装节点 | |
CN206189676U (zh) | 一种外墙板安装节点 | |
CN205975951U (zh) | 一种外墙板安装节点 | |
CN206034702U (zh) | 一种外墙板防水节点 | |
CN105863085A (zh) | 一种外墙板防水节点 | |
CN206189695U (zh) | 一种屋面板安装节点 | |
CN205976150U (zh) | 一种外墙板安装节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd. Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD. Contract record no.: 2018430000023 Denomination of utility model: Exterior wallboard mounting joint Granted publication date: 20170524 License type: Common License Record date: 20190102 |
|
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD. Contract record no.: X2019430000004 Denomination of utility model: Exterior wallboard mounting joint Granted publication date: 20170524 License type: Common License Record date: 20191105 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD. Contract record no.: X2020430000002 Denomination of utility model: Exterior wallboard mounting joint Granted publication date: 20170524 License type: Common License Record date: 20200305 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
CP03 | Change of name, title or address |
Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000 Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 3005 Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd. |
|
CP03 | Change of name, title or address | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd Assignor: Zhuyou Zhizao Technology Investment Co., Ltd Contract record no.: X2020980007488 Denomination of utility model: An installation node of exterior wall panel Granted publication date: 20170524 License type: Common License Record date: 20201105 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co., Ltd Contract record no.: X2021980000884 Denomination of utility model: An installation node of exterior wall panel Granted publication date: 20170524 License type: Common License Record date: 20210203 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Hunan Hailong Construction Engineering Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co., Ltd Contract record no.: X2021980001039 Denomination of utility model: An installation node of exterior wall panel Granted publication date: 20170524 License type: Common License Record date: 20210207 |
|
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Henan YingYuan Construction Service Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co., Ltd Contract record no.: X2021980001160 Denomination of utility model: An installation node of exterior wall panel Granted publication date: 20170524 License type: Common License Record date: 20210218 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Henan guochi Construction Service Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co., Ltd Contract record no.: X2021980001282 Denomination of utility model: An installation node of exterior wall panel Granted publication date: 20170524 License type: Common License Record date: 20210225 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Linzhou Hongen Construction Service Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co., Ltd Contract record no.: X2021980001340 Denomination of utility model: A kind of external wall panel installation node Granted publication date: 20170524 License type: Common License Record date: 20210302 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Henan fengque Construction Engineering Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co., Ltd Contract record no.: X2021980010621 Denomination of utility model: An installation node of exterior wall panel Granted publication date: 20170524 License type: Common License Record date: 20211019 |