CN206189392U - Prefabricated PVC sleeve concrete pile - Google Patents
Prefabricated PVC sleeve concrete pile Download PDFInfo
- Publication number
- CN206189392U CN206189392U CN201621195163.0U CN201621195163U CN206189392U CN 206189392 U CN206189392 U CN 206189392U CN 201621195163 U CN201621195163 U CN 201621195163U CN 206189392 U CN206189392 U CN 206189392U
- Authority
- CN
- China
- Prior art keywords
- pile
- connect
- stake
- steel reinforcement
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a prefabricated PVC sleeve concrete pile, include: the PVC sleeve, connect pile section, steel reinforcement cage, concrete and stake point, connect pile section by the flange, connect the ring sum to connect the cap to constitute, the flange periphery evenly sets up the keyhole, the terminal of steel reinforcement cage bottom is connected with the stake point, the outside is located to the PVC sleeve, and the PVC sleeve is connected through the cementing agent with the stake is sharp bottom, the tip of steel reinforcement cage is equipped with and connects the ring, and the tip welding who connects the ring is on the flange, and adjacent flange is through connecing the cap to connect. The beneficial effects of the utility model are that: 1 ), improved construction speed, become stake quality and bearing capacity, 2 ), the slenderness ratio of pile body has been reduced to arrangement of reinforcement in the pile body has improved pile bearing capacity, both can be used to the embankment stake, can be used to building pile foundation again, has increased its application scope, 3 ), the one -tenth stake quality of pile body easily detects, 4 ), it is applicable in the environment such as ocean, coastal waters and binjiang that the aggressivity is stronger.
Description
Technical field
The utility model is related to a kind of prefabricated pile body, more particularly to a kind of prefabricated plastic casing reinforced concrete stake, is applicable
Among the embankment stake civil engineering such as reinforcement system and building pile foundation.
Background technology
Currently, a kind of plastic casing on-site concrete pile is soft on highway, highway widening, railway, municipal administration, airport etc.
Certain application is obtained in base treatment engineering, Patents have:Plastic sleeve concrete pile (ZL 200920036795.6), list
The construction method (ZL 200610097347.8) of wall screw plastic casing on-site concrete pile, plastic sleeve concrete pile strength core
Hard and soft consubstantiality built pile (ZL 201120340788.2), the construction method for preventing plastic sleeve concrete pile flexural deformation and its
Device (ZL201110004366.2), plastic casing concrete pile driving machine (ZL 200820170698.1), plastic bushing coagulation
The method (ZL 200910024639.2) of native stake and its reinforcing soft soil foundation, for freezing pore-creating cast-in-situ concrete-pile
The construction method (in examination as to substances, application number CN201510190787.7) of immersed tube and frost pore-creating cast-in-situ concrete-pile.The stake
Compared with the cast-in-place pile body of tradition, outside is provided with the plastic bushing of coarse shape to body, enhances the friction of pile body and surrounding soil
Effect, improves the bearing capacity of pile body.But the pile body there is also some shortcomings:1. plastic bushing exists for applying for pile body
Work increased certain difficulty, and speed of application is slow down to a certain extent;2. the pile body is Small Diameter Pile, and conventional is a diameter of
16cm or 20cm, and construction depth is in the range of 10~20m, causes the slenderness ratio of the pile body more than 50, highest can to 125,
There is buckling failure in such high-fineness ratio pile body, cause the bearing capacity of pile body to roll over to a certain extent under vertical load
Subtract;3. the pile body is plain concrete pile, and its bearing capacity is relatively low, therefore is applied in embankment engineering mainly as embankment stake, and
Industrial and civil architecture aspect there is no applies precedent;4. concrete should not fill closely knit in so elongated plastic bushing, and vibrate
Rod cannot be inserted into the bottom of so elongated plastic bushing;5. because the pile body is to set plastic bushing in advance, therefore plastics
The phenomenon that sleeve pipe can be racked under the active force of soil around pile, so as to seriously reduce its pile quality;6. due to the pile body
Slenderness ratio it is excessive, increased the quality testing difficulty of its pile, in engineering commonly use low strain dynamic dynamic monitoring be difficult to obtain
Good POP curve.However, one layer of plastic bushing is set on the outside of pile body has certain advantage, it is prevented from soil around pile pair
The erosion of pile concrete, particularly in the chlorine ion concentrations such as coastal waters, Binjiang environment higher, therefore this kind of road in area
The erosion of consideration pile foundation is needed in the engineerings such as dike, work China Democratic National Construction Association, extends the service life of pile foundation.Therefore, in order to overcome plastic bushing
The defect of concrete-pile and its scope of application of raising, need a kind of new pile mode of searching badly and both preserve plastic sleeve concrete pile
Advantage can expand its application prospect again and seem particularly significant.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, there is provided a kind of prefabricated plastic casing reinforced concrete
Stake.
The purpose of this utility model is achieved through the following technical solutions:This prefabricated plastic casing reinforced concrete
Stake, including:Plastic bushing, pile extension section, steel reinforcement cage, concrete and pile top;The pile extension section is constituted by connecing disk, connecing ring and connecing cap
, connect disk periphery and be uniformly arranged keyhole;The end of the steel reinforcement cage of bottom is connected with pile top;The plastic bushing is located at outermost
Side, bottom plastic bushing is connected with pile top by cementing agent;The end of steel reinforcement cage is provided with and connects ring, and the end for connecing ring is welded on and connects
On disk, the adjacent disk that connects is connected by connecing cap.
As preferred:The plastic bushing is double-walled plastic tubing.
The beneficial effects of the utility model are:
1), the stake of prefabricated plastic casing reinforced concrete substitute cast-in-place plastic sleeve concrete pile improve speed of application,
Pile quality and bearing capacity;
2), prefabricated plastic casing reinforced concrete stake can make Small Diameter Pile (d≤25cm), intermediate diameters stake (25cm<d<
80cm) with large diameter pile (d >=80cm), the slenderness ratio of pile body, and the arrangement of reinforcement in pile body are reduced, improve bearing capacity of pile foundation,
Embankment stake is can be not only used for, building pile foundation is can be used for again, increased its scope of application;
3), the pile quality of pile body is easy to detection;
4), for steel reinforcement cage, then without having to worry about thickness of concrete cover problem, it is applicable to the stronger sea of aggressivity
In the environment such as ocean, coastal waters and Binjiang.
Brief description of the drawings
Fig. 1 is prefabricated plastic casing reinforced concrete pilework schematic diagram;
Fig. 2 is pile extension section schematic diagram;
Fig. 3 is to connect disk, connect ring and connect cap connection floor map;
Fig. 4 is that prefabricated section of pile body two ends vertically pour schematic diagram;
Fig. 5 is that vertically maintenance is molded and sets pile extension section schematic diagram at prefabricated section of pile body two ends;
Fig. 6 is that pile body intermediate prefabricated section laterally pours schematic diagram;
Fig. 7 is that laterally maintenance is molded and sets linkage section schematic diagram pile body intermediate prefabricated section.
Description of reference numerals:Plastic bushing 1, pile extension section 2, steel reinforcement cage 3, concrete 4, pile top 5, disk 6 is connect, ring 7 is connect, is connect cap
8th, keyhole 9, place 10, stake top groove 11, pile top groove 12, vibrating head 13, fixed mount 14, shake table 15, charging aperture 16, gas outlet
17th, blind end 18.
Specific embodiment
The utility model is described further with reference to embodiment.The explanation of following embodiments is only intended to help and manages
Solution the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle
On the premise of, some improvement and modification can also be carried out to the utility model, these are improved and modification also falls into the utility model
In scope of the claims.
Fig. 1 is the structural representation of prefabricated plastic casing reinforced concrete stake, this prefabricated plastic casing reinforced concrete
Stake, including:Plastic bushing 1, pile extension section 2, steel reinforcement cage 3, concrete 4 and pile top 5;The pile extension section 2 is by connecing disk 6, meeting the and of ring 7
The composition of cap 8 is connect, the periphery of disk 6 is connect and is uniformly arranged keyhole 9;The end of the steel reinforcement cage 3 of bottom is connected with pile top 5;The plastics
Sleeve pipe 1 is located at outermost, and bottom plastic bushing 1 is connected with pile top 5 by cementing agent;The end of steel reinforcement cage 3 is provided with and connects ring 7,
The end for connecing ring 7 is welded on and connects on disk 6, and the adjacent disk 6 that connects is connected by connecing cap 8.The plastic bushing 1 is double-walled plastic pipe
Material.
It is 15m, the prefabricated plastic casing reinforced concrete stake of a diameter of 0.5m, its specific implementation to be now intended to make a length
Mode is:Choose three sections of a diameter of 0.5m, wall thickness 9mm, length for 5m pvc pipe as outsourcing plastic bushing 1, using iron plate
Make a pile top for the taper of a diameter of 0.5m 5, from a diameter of 8mm HRB235 reinforcing bars as stirrup, a diameter of 12mm
HRB335 reinforcing bars as cage bar, making length is 5.2m, the steel reinforcement cage 3 of a diameter of 0.44m, meanwhile, make straight using steel plate
Footpath be 0.5m, thickness for 1cm connects disk 6, connect the mode according to Fig. 3 on disk 6, be uniformly arranged keyhole 9 on periphery, in order to connect cap
8 are spliced, and using steel pipe manufacturing length 0.3m, wall thickness 1cm, external diameter 0.45m's connects ring 7.
Successively make three sections of steel reinforcement cages 3, now first paragraph steel reinforcement cage 3 is welded with pile top 5, the other end with connect the phase of ring 7
Even, be then sleeved in first paragraph plastic bushing 1, plastic bushing 1 and pile top 5 use cementing agent are connected, treat it is cementing after the completion of,
To placing concrete 4 in plastic bushing 1, and vibratory compaction, maintenance shaping are carried out to concrete using vibrator;At the same time,
Second segment steel reinforcement cage 3 is enclosed within second segment plastic bushing 1, the two ends of steel reinforcement cage 3 each set and connect ring 7, and placing concrete 4 simultaneously shakes
It is close, the like, steel reinforcement cage 3 and plastic bushing 1 to the 3rd section are assembled, wherein one end of steel reinforcement cage 3 with connect the phase of ring 7
Connect, then placing concrete 4, vibratory compaction, maintenance shaping.
Finally, using will be provided with the end that connects ring 7, all welding connects disk 6 accordingly, as shown in Fig. 2 by connecing cap 8, general
Prefabricated section above-mentioned of three plastic bushing armored concrete are coupled together, and just form plastic bushing reinforced concrete pile.
As shown in figure 4, a number of stake top groove 11 and pile top groove 12 are made in place 10, by the modeling of length 3m or so
Material sleeve pipe 1 is vertically placed in stake top groove 11 and pile top groove 12, respectively as prefabricated section of pile body two ends, then as template
Fixed mount 14 is set around plastic bushing 1, to ensure not bend or mould during the casting concrete 4 in plastic bushing 1
Material sleeve pipe 1 jumps out stake top groove 11 and the outside of pile top groove 12 in pouring for concrete 4 under pressure is acted on;It is inserted into plastic bushing 1
Steel reinforcement cage 3, the overall diameter of steel reinforcement cage 3 is less than plastic bushing interior diameter about 3~6cm or so, then on the top of plastic bushing 1
Casting concrete 4, while vibrating head 13 is inserted into the concrete 4 that continuous vibratory compaction has been poured from the bottom up of plastic bushing 1,
Ensure pile quality;According to shown in Fig. 5, after the concrete 4 in plastic bushing 1 pour it is closely knit after, set at the top of steel reinforcement cage 3
Disk 6 is connect well and ring 7 is connect, the overall diameter for connecing ring 7 is equal with steel reinforcement cage 3, connected by welding procedure, connect the part inlay of ring 7 and exist
In concrete 4, the part exposed is welded with the center aligned of disk 6 is connect, while to connect to have reserved keyhole 9 on the periphery of disk 6;Pile extension
The connection reference picture 3 of section 2.
As shown in fig. 6, setting shake table 15, the length of shake table 15 and the length of plastic bushing 1 in prefabricated place 10
It is consistent, shake table 15 is in flat flute profile, can so wale plastic bushing 1, the position of plastic bushing 1 is kept in vibration
It is constant;Plastic bushing 1 about 3m long as template is vertically placed and secured on shake table 15, while in plastic bushing 1
Two ends set a charging aperture 16 and a gas outlet 17, and charging aperture 16 uses heavy caliber, and gas outlet 17 uses small-bore, with this
Meanwhile, laterally draw in steel reinforcement cage 3 in plastic bushing 1, the length of steel reinforcement cage 3 to exceed the two ends 10 of horizontal plastic bushing 1~
30cm or so;Then blind end 18 is set at the two ends of plastic bushing 1, blind end 18 will pass through the steel reinforcement cage 3 and modeling for exposing
Expect that the two ends of sleeve pipe 1 closely connect, now by charging aperture 16 to casting concrete 4 in horizontal plastic bushing 1, and open simultaneously
Open shake table 15, vibrated when pouring, it is ensured that the density of the inner concrete 4 of plastic bushing 1, to gas outlet 17 at find have coagulation
After soil 4 overflows, then stop pouring, then the two ends of plastic bushing 1 set and connect disk 6 and connect ring 7, according to standard curing 28 days
Afterwards, blind end 18 is removed, pile body intermediate prefabricated section is eventually formed.
Using prefabricated section in the middle of prefabricated section of crane lifting pile body two ends and pile body, then dock each prefabricated section and connect disk
Keyhole 9 on 6, is allowed to insertion, now fills in pile cover 8 in keyhole 9, as shown in Fig. 2 each prefabricated section is connected as a single entity, finally
Form prefabricated plastic casing reinforced concrete stake as shown in Figure 1.
Claims (2)
1. a kind of prefabricated plastic casing reinforced concrete stake, it is characterised in that including:Plastic bushing (1), pile extension section (2), reinforcing bar
Cage (3), concrete (4) and pile top (5);Pile extension section (2) is constituted by connecing disk (6), connecing ring (7) and connecing cap (8), connects disk
(6) periphery is uniformly arranged keyhole (9);The end of the steel reinforcement cage (3) of bottom is connected with pile top (5);The plastic bushing (1) sets
In outermost, bottom plastic bushing (1) is connected with pile top (5) by cementing agent;The end of steel reinforcement cage (3) is provided with and connects ring (7),
The end for connecing ring (7) is welded on and connects on disk (6), and the adjacent disk (6) that connects is connected by connecing cap (8).
2. prefabricated plastic casing reinforced concrete stake according to claim 1, it is characterised in that:The plastic bushing (1)
It is double-walled plastic tubing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621195163.0U CN206189392U (en) | 2016-11-04 | 2016-11-04 | Prefabricated PVC sleeve concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621195163.0U CN206189392U (en) | 2016-11-04 | 2016-11-04 | Prefabricated PVC sleeve concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206189392U true CN206189392U (en) | 2017-05-24 |
Family
ID=58735137
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621195163.0U Expired - Fee Related CN206189392U (en) | 2016-11-04 | 2016-11-04 | Prefabricated PVC sleeve concrete pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206189392U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400781A (en) * | 2016-11-04 | 2017-02-15 | 宁波大学 | Prefabricated reinforced concrete pile provided with plastic bushing and prefabricating method of prefabricated reinforced concrete pile |
CN108411899A (en) * | 2018-05-22 | 2018-08-17 | 高柱福 | A kind of anti-corrosion protection structure of building apertures stake reinforced column |
CN108643176A (en) * | 2018-05-22 | 2018-10-12 | 高柱福 | A kind of antirust arbor of building apertures stake reinforced column |
CN108661047A (en) * | 2018-05-22 | 2018-10-16 | 高柱福 | A kind of stable degree Enhancement Method of building apertures stake reinforced column |
CN110884283A (en) * | 2019-11-27 | 2020-03-17 | 厦门欣陶然景观工程有限公司 | Production process of wood-like pile |
-
2016
- 2016-11-04 CN CN201621195163.0U patent/CN206189392U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400781A (en) * | 2016-11-04 | 2017-02-15 | 宁波大学 | Prefabricated reinforced concrete pile provided with plastic bushing and prefabricating method of prefabricated reinforced concrete pile |
CN108411899A (en) * | 2018-05-22 | 2018-08-17 | 高柱福 | A kind of anti-corrosion protection structure of building apertures stake reinforced column |
CN108643176A (en) * | 2018-05-22 | 2018-10-12 | 高柱福 | A kind of antirust arbor of building apertures stake reinforced column |
CN108661047A (en) * | 2018-05-22 | 2018-10-16 | 高柱福 | A kind of stable degree Enhancement Method of building apertures stake reinforced column |
CN108661047B (en) * | 2018-05-22 | 2019-10-18 | 倡创(上海)咨询管理事务所 | A kind of stable degree Enhancement Method of building apertures stake reinforced column |
CN110884283A (en) * | 2019-11-27 | 2020-03-17 | 厦门欣陶然景观工程有限公司 | Production process of wood-like pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206189392U (en) | Prefabricated PVC sleeve concrete pile | |
CN105386443A (en) | FRP pipe and thick-wall steel pipe compounding hollow recycled concrete pile | |
CN104131556A (en) | Soft-and-hard interlayer alternation foundation drainage prestressed pipe pile and construction method | |
CN103485334B (en) | Bi-layer plastic-bushing inverted-arch cambered hollow special-shaped pile and construction method | |
CN105200983A (en) | PVC pipe and thick wall steel tube composite hollow recycled concrete pile | |
CN103993598A (en) | Crashed stone grouting pile with lead holes implanted in cloth bag and construction method | |
CN106400781B (en) | A kind of method for prefabricating of prefabricated plastic casing reinforced concrete stake | |
CN107816056A (en) | Filled type concrete gravity retaining wall and its construction technology | |
CN104846809A (en) | Prefabricated tubular pile capable of draining water and increasing frictional resistance and construction method thereof | |
CN205999926U (en) | A kind of high-strength composite plastic inspection shaft | |
CN205475206U (en) | Drainage formula cast in situ concrete thin wall tubular pile | |
CN105484279B (en) | A kind of construction method of drainage type cast in place concrete thin tunnel pile | |
CN203594025U (en) | Bi-layer plastic-bushing inverted-arch cambered hollow special-shaped pile | |
CN203498828U (en) | Top reinforced cast-in-place concrete thin-wall pipe pile | |
CN201722684U (en) | Compound pile | |
CN102296593A (en) | Cylindrical compound bored concrete pile of concrete gravels and construction process thereof | |
CN202108039U (en) | Cylindrical compound concrete macadam placepile | |
CN205400050U (en) | Hollow superstructure mandrel of thin wall square chest | |
CN210151705U (en) | Reinforcing pile for soft soil foundation | |
CN115637689A (en) | Immersed tube reinforcement gravel pile construction method for reinforcing soft foundation | |
CN110080314B (en) | Method for reducing side friction resistance of pile foundation | |
CN203782715U (en) | Self-floating type inner mold system for under water pouring of hollow pipe column | |
CN209603127U (en) | Eliminate the bored concrete pile of breathing soil layer frictional force | |
CN203768913U (en) | Cast-in-place foundation pit enclosure structure combined with cemented soil | |
CN208219667U (en) | Foundation pit supporting construction based on campshed and inner support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170524 Termination date: 20191104 |
|
CF01 | Termination of patent right due to non-payment of annual fee |