CN206187298U - Integrative ship of self -navigation formula subaqueous tunnel immersed tube delivery installation - Google Patents
Integrative ship of self -navigation formula subaqueous tunnel immersed tube delivery installation Download PDFInfo
- Publication number
- CN206187298U CN206187298U CN201621243944.2U CN201621243944U CN206187298U CN 206187298 U CN206187298 U CN 206187298U CN 201621243944 U CN201621243944 U CN 201621243944U CN 206187298 U CN206187298 U CN 206187298U
- Authority
- CN
- China
- Prior art keywords
- hull
- immersed tube
- self
- attachment structure
- ship
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses an integrative ship of self -navigation formula subaqueous tunnel immersed tube delivery installation, first hull and second hull are parallel to each other, be provided with connection structure between first hull and second hull, at first hull, it hangs the equipment of putting to be provided with the tractive on second hull and the connection structure, be carrying space between connection structure first hull in below and second hull, treat that an ampere assembly component setting is connected in carrying space and with the hull, be provided with power plant and positioner on first hull and second hull. The utility model discloses having long distance self -navigation power, can independently not transporting the subaqueous tunnel immersed tube of multiple yardstick with the help of other boats and ships tractions, transit does not need to seal the channel to other boats and ships, and it is current not influence other ships, binary structure ship type has higher stability, unsinkability and antidumping nature, the tractive hang the equipment of putting can be accurate the position of location immersed tube, can realize not having the accurate installation function of immersed tube under the supplementary circumstances of other boats and ships.
Description
Technical field
The utility model is related to cross a river tunnel over strait to build engineering transportation equipment, is applicable cross a river, tunnel immersed tube over strait or class
Like the transport and installation of component to be installed.
Background technology
Immersed tube tunnel is that cross a river, tunnel over strait are passed through frequently with structure type both at home and abroad at present., it is necessary to will be heavy after the completion of prefabricated
Pipe transport is installed to erecting bed.Traditional transportation resources needs first carry out colligation and fix to immersed tube, reserve multiple dragging
Suspension centre, then be equipped with many high-power tugboats and pull immersed tube and transported;Need in transit to carry out navigation channel iceound, forbid other
Ship passes through, and has a strong impact on shipping traffic;Traditional installation method need build Special installation vessel carry out finely positioning installation;Adopt
When being installed with conventional method, the schedule between ship is complicated, and long construction period, operating efficiency is low, and operating expenses is high.
Utility model content
The utility model is for existing cross a river, tunnel immersed tube over strait transport and problem present in installation process, there is provided
One kind has over long distances from boat ability, integrates immersed tube or is similar to the transport of component to be installed and the ship of installation function and sets
It is standby.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:
Integrated ship is installed in a kind of delivery of self-propulsion type submerged tunnel immersed tube, including the first hull, the second hull, attachment structure,
Drawing hangs equipment, power plant and positioner, and the first hull and second ship body are parallel to each other, in the first hull and the
Attachment structure is provided between two hulls, being provided with drawing in the first hull, the second hull and attachment structure hangs equipment,
It is load space between attachment structure the first hull of lower section and the second hull, component to be installed is arranged in load space and and ship
Body phase is connected, and power plant and positioner are provided with the first hull and the second hull.
And, described attachment structure is across the hull surface top of the first hull and the second hull, attachment structure
Quantity is that, more than or equal to 1, when the quantity of attachment structure is more than 1, each attachment structure is symmetrical along the center line of ship length.
And, described drawing hangs equipment for winch and crane, winch and lifting on hull and attachment structure
Machine is and is symmetrical arranged, so that twin hull structure keeps stabilization, the operating radius of multigroup crane are covered in hull and to be installed
Mutually disjointed on component, and between operating radius.
And, described component to be installed is immersed tube.
And, described power plant is respectively arranged at the afterbody of the first hull and the second hull.
And, described positioner is positioning anchor and windlass, and positioning anchor and windlass are respectively arranged at the first hull and the
The head or afterbody of the hull of two hulls.
Compared with prior art, the beneficial effects of the utility model are:
The utility model has over long distances from air power, can not be by other various yardsticks of towage of ship independent transport
Submerged tunnel immersed tube is similar to component to be installed, is not required to close navigation channel to other ships in transit, does not influence other ships to lead to
OK;The couple structure ship type that the utility model is used has stability higher, unsinkability and anti-overturning;It is new by this practicality
Drawing in type hangs equipment and can hang equipment with the use of drawing with precise positioning immersed tube or the position of similar component to be installed
It is capable of achieving without the immersed tube under other ship aided cases or is similar to the accurate installation function of component to be installed.
Brief description of the drawings
Fig. 1 is the utility model overlooking the structure diagram.
Fig. 2 is the utility model side structure schematic view.
Wherein, 1 is the first hull, and 2 is the second hull, and 3 is the first attachment structure, and 4 is winch, and 5 is the second attachment structure,
6 is crane, and 7 is power plant, and 8 is component to be installed, and 9 is positioner.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings:
Embodiment 1:
As shown in drawings, integrated ship, including the first hull 1, second ship are installed in a kind of self-propulsion type submerged tunnel immersed tube delivery
Body 2, the first attachment structure 3, the second attachment structure 5, winch 4, crane 6, power plant 7 and positioner 9, the first ship
Body and second ship body are parallel to each other, and the first attachment structure and the second connection knot are provided between the first hull and the second hull
Structure, sets two and erects heavy-duty machine altogether, and crane is respectively arranged on the midpoint of the first attachment structure and the second attachment structure, and operation
Mutually disjointed between radius, multigroup winch symmetrical be arranged at the first hull, the second hull, the first attachment structure and second are connected
It is load space between the hull of lower section first and the second hull of the first attachment structure and the second attachment structure in structure, treats
Installation component is arranged at this and is fixedly connected with hull by winch and crane, is provided with the first hull and the second hull
Power plant and positioner.Power plant is located at hull afterbody, and positioner is located at hull head.
Embodiment 2:
Integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery, including the first hull 1, the second hull 2, first are connected
Structure 3, the second attachment structure 5, winch 4, crane 6, power plant 7 and positioner 9, the first hull and the second hull
It is parallel to each other, the first attachment structure and the second attachment structure is provided between the first hull and the second hull, four framves is set altogether
Crane, the frame of lifting two is respectively arranged on the midpoint of the first attachment structure and the second attachment structure, two is set up and is placed in the in addition
On the first hull, the second hull between one attachment structure and the second attachment structure, and between the operating radius of each crane mutually
Non-intersect, multigroup winch is symmetrical to be arranged in the first hull, the second hull, the first attachment structure and the second attachment structure,
It is load space between the hull of lower section first and the second hull of the first attachment structure and the second attachment structure, component to be installed sets
It is placed in this and is fixedly connected with hull by winch and crane, thrust power dress is provided with the first hull and the second hull
Put and positioner.Power plant is located at hull afterbody, and positioner is located at hull head.
Integrated ship of the present utility model when in use, using the thrust power equipment on the first hull and the second hull, is adjusted
Whole ship body position is allowed to be placed in member parallel to be installed the top of immersed tube;With the use of the winch above attachment structure and rise
Be drawn to component to be installed in the load space of the lower section of attachment structure by heavy-duty machine, and by the vertical pull-up of immersed tube and fixes, now
Drauht increases, and immersed tube is floated in water;It is that hull and immersed tube are carried using the thrust power equipment of the first hull and the second hull
Arch thrust, hull and immersed tube are transported to position to be installed, and the process does not need other ships auxiliary, by self-propulsion type subaqueous tunnel
Integrated ship complete independently is installed in immersed tube delivery;After reaching appointed place, the first hull and the positioning anchor and anchor of the second hull are used
Machine fixes the horizontal level of ship.Immersed tube is vertically put down with the use of winch and crane, and adjusts horizontal level, until heavy
Pipe reaches precalculated position, completes the installation of immersed tube;After installation terminates, positioning anchor is packed up, clean ship makes a return voyage, into next transport peace
Dress circulation.
The utility model has been described in detail above, but the content is only preferred embodiment of the present utility model,
It is not to be regarded as limiting practical range of the present utility model.All impartial changes made according to present utility model application scope with
Improve etc., all should still belong within patent covering scope of the present utility model.
Claims (10)
1. integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery, it is characterised in that:Including the first hull, the second hull,
Attachment structure, drawing hang equipment, power plant and positioner, and the first hull and second ship body are parallel to each other, the
Attachment structure is provided between one hull and the second hull, drawing is provided with the first hull, the second hull and attachment structure
Equipment is hung, between the first hull and the second hull is load space below attachment structure, component to be installed is arranged on loading
It is connected in space and with hull, power plant and positioner is provided with the first hull and the second hull.
2. integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery according to claim 1, it is characterised in that:It is described
Attachment structure be across the hull surface top of the first hull and the second hull, the quantity of attachment structure is more than or equal to 1.
3. integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery according to claim 2, it is characterised in that:Work as institute
When the quantity of the attachment structure stated is more than 1, each attachment structure is symmetrical along the center line of ship length.
4. integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery according to claims 1 or 2, and its feature exists
In:Described drawing hangs equipment for winch and crane.
5. integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery according to claim 4, it is characterised in that:It is described
Winch and crane be symmetrical arranged to be on hull and attachment structure.
6. integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery according to claim 4, it is characterised in that:It is described
The operating radius of crane be covered on hull and component to be installed, and mutually disjointed between operating radius.
7. integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery according to claims 1 or 2, and its feature exists
In:Described power plant is respectively arranged at the afterbody of the first hull and the second hull.
8. integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery according to claim 4, it is characterised in that:It is described
Power plant be respectively arranged at the afterbody of the first hull and the second hull.
9. integrated ship, its feature are installed according to a kind of described self-propulsion type submerged tunnel immersed tube delivery of one of claims 1 or 2
It is:Described positioner is positioning anchor and windlass.
10. integrated ship is installed in a kind of self-propulsion type submerged tunnel immersed tube delivery according to claim 9, it is characterised in that:It is fixed
Position anchor and windlass are respectively arranged at the head or afterbody of the hull of the first hull and the second hull.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621243944.2U CN206187298U (en) | 2016-11-17 | 2016-11-17 | Integrative ship of self -navigation formula subaqueous tunnel immersed tube delivery installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621243944.2U CN206187298U (en) | 2016-11-17 | 2016-11-17 | Integrative ship of self -navigation formula subaqueous tunnel immersed tube delivery installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206187298U true CN206187298U (en) | 2017-05-24 |
Family
ID=58727059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621243944.2U Withdrawn - After Issue CN206187298U (en) | 2016-11-17 | 2016-11-17 | Integrative ship of self -navigation formula subaqueous tunnel immersed tube delivery installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206187298U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106516021A (en) * | 2016-11-17 | 2017-03-22 | 中交第航务工程局有限公司 | Self-propelled carrying and installing all-in-one ship for underwater tunnel immersed tubes |
CN108419666A (en) * | 2018-02-13 | 2018-08-21 | 大连海洋大学 | Ocean deepwater platform raft fixation is sticked together with cement and launches facility and method |
CN110284504A (en) * | 2019-06-27 | 2019-09-27 | 中国铁建港航局集团有限公司 | A kind of underwater prefabricated components mounting platform and method |
US10836459B2 (en) | 2016-11-17 | 2020-11-17 | Cccc First Harbor Engineering Co., Ltd. | Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process |
-
2016
- 2016-11-17 CN CN201621243944.2U patent/CN206187298U/en not_active Withdrawn - After Issue
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106516021A (en) * | 2016-11-17 | 2017-03-22 | 中交第航务工程局有限公司 | Self-propelled carrying and installing all-in-one ship for underwater tunnel immersed tubes |
WO2018090875A1 (en) * | 2016-11-17 | 2018-05-24 | 中交第一航务工程局有限公司 | Self-sailing integrated vessel for carrying and mounting submerged tubes of underwater tunnel |
US10836459B2 (en) | 2016-11-17 | 2020-11-17 | Cccc First Harbor Engineering Co., Ltd. | Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process |
CN106516021B (en) * | 2016-11-17 | 2021-06-11 | 中交第一航务工程局有限公司 | Self-propelled underwater tunnel immersed tube carrying and mounting integrated ship |
CN108419666A (en) * | 2018-02-13 | 2018-08-21 | 大连海洋大学 | Ocean deepwater platform raft fixation is sticked together with cement and launches facility and method |
CN110284504A (en) * | 2019-06-27 | 2019-09-27 | 中国铁建港航局集团有限公司 | A kind of underwater prefabricated components mounting platform and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106516021A (en) | Self-propelled carrying and installing all-in-one ship for underwater tunnel immersed tubes | |
CN206187298U (en) | Integrative ship of self -navigation formula subaqueous tunnel immersed tube delivery installation | |
CN109056684A (en) | The split type jacket structure of Large marine platform and its installation method of the installation of support method are floated suitable for shallow sea water | |
CN104727336A (en) | Construction method of large single-pipe pile foundation of shallow-sea wind power plant | |
CN101837929B (en) | Operation method for lifting fan for barge in shoal area | |
CN103233452B (en) | The pre-splicing 1/4 cylinder transportation resources of a kind of lattice steel sheet pile large cylinder nominative sheet pile | |
CN103057672A (en) | Platform for transportation and installation of offshore fan unit complete machine | |
CN103661827A (en) | Installation system and construction method of wind turbine assembly in sea intertidal zone | |
CN107571975A (en) | A kind of offshore wind farm mounting platform | |
CN108033283A (en) | A kind of great diameter and long HDPE pipelines it is land go out transportation method | |
CN106522275A (en) | Construction process for shipping large sinking pipes by self-propelled semi-submerged ship | |
CN206634166U (en) | A kind of working ship | |
CN206635654U (en) | A kind of barging device of underwater narrow-bore tunnel super long type prefabricated case beam | |
CN213502818U (en) | Special ship for offshore wind power construction | |
CN104060592B (en) | Method for 1/4 land territory preassembling and overwater dispersion of large cylinder main grids of cellular steel sheet piles | |
CN105064362A (en) | Multifunctional construction auxiliary ship structure for steel pipe piles | |
CN208882038U (en) | Semi-submersible type loads and unloads ship | |
CN207143999U (en) | A kind of underwater immersed tube and the device for setting up underwater immersed tube | |
JP2012112370A (en) | Ship for installing offshore wind turbine and method for installing offshore wind turbine using the same | |
CN211642531U (en) | Semi-submersible type mounting and transporting platform for bridge section | |
CN105129632A (en) | Grid-type steel sheet pile large cylinder main grid installation construction special-purpose crane ship | |
JP5738642B2 (en) | Installation method of offshore wind power generation equipment | |
CN103758096B (en) | A kind of offshore exploration platform and construction method thereof | |
CN210971453U (en) | Large heavy workpiece transporting and lifting ship | |
CN110155263B (en) | Cylindrical semi-submersible drilling platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170524 Effective date of abandoning: 20210611 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20170524 Effective date of abandoning: 20210611 |